메뉴 건너뛰기




Volumn 49, Issue 4, 2015, Pages 784-795

A two-phase iterative heuristic approach for the production routing problem

Author keywords

Distribution; Heuristics; Lot sizing; Production; Routing

Indexed keywords

INVENTORY CONTROL; ITERATIVE METHODS; OPTIMIZATION; PRODUCTION; PRODUCTION CONTROL; TRAVELING SALESMAN PROBLEM; VEHICLE ROUTING;

EID: 84946012494     PISSN: 00411655     EISSN: 15265447     Source Type: Journal    
DOI: 10.1287/trsc.2014.0523     Document Type: Article
Times cited : (113)

References (23)
  • 1
    • 84893873667 scopus 로고    scopus 로고
    • Formulations and branchand-cut algorithms for multivehicle production and inventory routing problems
    • Adulyasak Y, Cordeau J-F, Jans R (2014a) Formulations and branchand-cut algorithms for multivehicle production and inventory routing problems. INFORMS J. Comput. 26:103-120.
    • (2014) INFORMS J. Comput. , vol.26 , pp. 103-120
    • Adulyasak, Y.1    Cordeau, J.-F.2    Jans, R.3
  • 2
    • 84894570180 scopus 로고    scopus 로고
    • Optimization-based adaptive large neighborhood search for the production routing problem
    • Adulyasak Y, Cordeau J-F, Jans R (2014b) Optimization-based adaptive large neighborhood search for the production routing problem. Transportation Sci. 48:20-45.
    • (2014) Transportation Sci. , vol.48 , pp. 20-45
    • Adulyasak, Y.1    Cordeau, J.-F.2    Jans, R.3
  • 4
    • 79955067887 scopus 로고    scopus 로고
    • Analysis of the maximum level policy in a production-distribution system
    • Archetti C, Bertazzi L, Paletta G, Speranza MG (2011) Analysis of the maximum level policy in a production-distribution system. Comput. Oper. Res. 38:1731-1746.
    • (2011) Comput. Oper. Res. , vol.38 , pp. 1731-1746
    • Archetti, C.1    Bertazzi, L.2    Paletta, G.3    Speranza, M.G.4
  • 5
    • 0024641438 scopus 로고
    • Computational complexity of uncapacitated multi-echelon production planning problems
    • Arkin E, Joneja D, Roundy R (1989) Computational complexity of uncapacitated multi-echelon production planning problems. Oper. Res. Lett. 8:61-66.
    • (1989) Oper. Res. Lett. , vol.8 , pp. 61-66
    • Arkin, E.1    Joneja, D.2    Roundy, R.3
  • 6
    • 78650513384 scopus 로고    scopus 로고
    • Tabu search with path relinking for an integrated production-distribution system
    • Armentano VA, Shiguemoto AL, Løkketangen A (2011) Tabu search with path relinking for an integrated production-distribution system. Comput. Oper. Res. 38:1199-1209.
    • (2011) Comput. Oper. Res. , vol.38 , pp. 1199-1209
    • Armentano, V.A.1    Shiguemoto, A.L.2    Løkketangen, A.3
  • 7
    • 69849087762 scopus 로고    scopus 로고
    • Heuristics for a multiperiod inventory routing problem with production decision
    • Bard JF, Nananukul N (2009) Heuristics for a multiperiod inventory routing problem with production decision. Comput. Indust. Engrg. 57:713-723.
    • (2009) Comput. Indust. Engrg. , vol.57 , pp. 713-723
    • Bard, J.F.1    Nananukul, N.2
  • 8
    • 67349211770 scopus 로고    scopus 로고
    • The integrated production-inventorydistribution-routing problem
    • Bard JF, Nananukul N (2009) The integrated production-inventorydistribution-routing problem. J. Scheduling 12:257-280.
    • (2009) J. Scheduling , vol.12 , pp. 257-280
    • Bard, J.F.1    Nananukul, N.2
  • 9
    • 77955271201 scopus 로고    scopus 로고
    • A branch-and-price algorithm for an integrated production and inventory routing problem
    • Bard JF, Nananukul N (2010) A branch-and-price algorithm for an integrated production and inventory routing problem. Comput. Oper. Res. 37:2202-2217.
    • (2010) Comput. Oper. Res. , vol.37 , pp. 2202-2217
    • Bard, J.F.1    Nananukul, N.2
  • 10
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran G, Yanasse HH (1982) Computational complexity of the capacitated lot size problem. Management Sci. 28:1174-1186.
    • (1982) Management Sci. , vol.28 , pp. 1174-1186
    • Bitran, G.1    Yanasse, H.H.2
  • 11
    • 34047126268 scopus 로고    scopus 로고
    • A reactive GRASP and path relinking for a combined production distribution problem
    • Boudia M, Louly MAO, Prins C (2007) A reactive GRASP and path relinking for a combined production distribution problem. Comput. Oper. Res. 34:3402-3419.
    • (2007) Comput. Oper. Res. , vol.34 , pp. 3402-3419
    • Boudia, M.1    Louly, M.A.O.2    Prins, C.3
  • 12
    • 56349117292 scopus 로고    scopus 로고
    • A memetic algorithm with dynamic population management for an integrated productiondistribution problem
    • Boudia M, Louly MAO, Prins C (2009) A memetic algorithm with dynamic population management for an integrated productiondistribution problem. Eur. J. Oper. Res. 195:703-715.
    • (2009) Eur. J. Oper. Res. , vol.195 , pp. 703-715
    • Boudia, M.1    Louly, M.A.O.2    Prins, C.3
  • 14
    • 0027625631 scopus 로고
    • A dynamic distribution model with warehouse and customer replenishment requirements
    • Chandra P (1993) A dynamic distribution model with warehouse and customer replenishment requirements. J. Oper. Res. Soc. 44:681-692.
    • (1993) J. Oper. Res. Soc. , vol.44 , pp. 681-692
    • Chandra, P.1
  • 15
    • 0028371172 scopus 로고
    • Coordination of production and distribution planning
    • Chandra P (1994) Coordination of production and distribution planning. Eur. J. Oper. Res. 72:503-517.
    • (1994) Eur. J. Oper. Res. , vol.72 , pp. 503-517
    • Chandra, P.1
  • 16
    • 0028769451 scopus 로고
    • Integration of lotsizing and scheduling decisions in a job-shop
    • Dauzère-Pérès S, Lasserre J-B (1994) Integration of lotsizing and scheduling decisions in a job-shop. Eur. J. Oper. Res. 75:413-426.
    • (1994) Eur. J. Oper. Res. , vol.75 , pp. 413-426
    • Dauzère-Pérès, S.1    Lasserre, J.-B.2
  • 17
    • 0019032810 scopus 로고
    • Deterministic production planning: Algorithms and complexity
    • Florian M, Lenstra JK, Rinnoy Kan AHG (1980) Deterministic production planning: Algorithms and complexity. Management Sci. 26:669-679.
    • (1980) Management Sci. , vol.26 , pp. 669-679
    • Florian, M.1    Lenstra, J.K.2    Rinnoy Kan, A.H.G.3
  • 18
    • 0033339421 scopus 로고    scopus 로고
    • Syncronized development of production, inventory, and distribution schedules
    • Fumero F, Vercellis C (1999) Syncronized development of production, inventory, and distribution schedules. Transportation Sci. 33:330-340.
    • (1999) Transportation Sci. , vol.33 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 19
    • 79955081124 scopus 로고    scopus 로고
    • A library of local search heuristics for the vehicle routing problem
    • Groër C, Golden B, Wasil E (2010) A library of local search heuristics for the vehicle routing problem. Math. Programming Computation 2:79-101.
    • (2010) Math. Programming Computation , vol.2 , pp. 79-101
    • Groër, C.1    Golden, B.2    Wasil, E.3
  • 20
    • 84946034952 scopus 로고    scopus 로고
    • Helsgaun K (2012) LKH. http://www.akira.ruc.dk/~keld/research/LKH/.
    • (2012) LKH
    • Helsgaun, K.1
  • 21
    • 0015604699 scopus 로고
    • An effective heuristic algorithm for the traveling-salesman problem
    • Lin S, Kernighan BW (1973) An effective heuristic algorithm for the traveling-salesman problem. Oper. Res. 21:498-516.
    • (1973) Oper. Res. , vol.21 , pp. 498-516
    • Lin, S.1    Kernighan, B.W.2
  • 22
    • 84893838102 scopus 로고    scopus 로고
    • Efficient formulations and a branch-and-cut algorithm for a production-routing problem
    • G-2010-66, Montreal
    • Ruokokoski M, Solyali O, Cordeau J-F, Jans R, Süral H (2010) Efficient formulations and a branch-and-cut algorithm for a production-routing problem. Les Cahiers du GERAD, G-2010-66, Montreal.
    • (2010) Les Cahiers du GERAD
    • Ruokokoski, M.1    Solyali, O.2    Cordeau, J.-F.3    Jans, R.4    Süral, H.5
  • 23
    • 80051504143 scopus 로고    scopus 로고
    • A relaxation based solution approach for the inventory control and vehicle routing problem in vendor managed systems
    • Neogy SK, Das AK, Bapat RB, eds, World Scientific, London
    • Solyali O, Süral H (2009) A relaxation based solution approach for the inventory control and vehicle routing problem in vendor managed systems. Neogy SK, Das AK, Bapat RB, eds. Modeling, Computation and Optimization (World Scientific, London), 171-189.
    • (2009) Modeling, Computation and Optimization , pp. 171-189
    • Solyali, O.1    Süral, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.