-
1
-
-
84893873667
-
Formulations and branchand-cut algorithms for multivehicle production and inventory routing problems
-
Adulyasak Y, Cordeau J-F, Jans R (2014a) Formulations and branchand-cut algorithms for multivehicle production and inventory routing problems. INFORMS J. Comput. 26:103-120.
-
(2014)
INFORMS J. Comput.
, vol.26
, pp. 103-120
-
-
Adulyasak, Y.1
Cordeau, J.-F.2
Jans, R.3
-
2
-
-
84894570180
-
Optimization-based adaptive large neighborhood search for the production routing problem
-
Adulyasak Y, Cordeau J-F, Jans R (2014b) Optimization-based adaptive large neighborhood search for the production routing problem. Transportation Sci. 48:20-45.
-
(2014)
Transportation Sci.
, vol.48
, pp. 20-45
-
-
Adulyasak, Y.1
Cordeau, J.-F.2
Jans, R.3
-
3
-
-
75749108843
-
Industrial aspects and literature survey: Combined inventory management and routing
-
Andersson H, Hoff A, Christiansen M, Hasle G, Løkketangen A (2010) Industrial aspects and literature survey: Combined inventory management and routing. Comput. Oper. Res. 37:1515-1536.
-
(2010)
Comput. Oper. Res.
, vol.37
, pp. 1515-1536
-
-
Andersson, H.1
Hoff, A.2
Christiansen, M.3
Hasle, G.4
Løkketangen, A.5
-
5
-
-
0024641438
-
Computational complexity of uncapacitated multi-echelon production planning problems
-
Arkin E, Joneja D, Roundy R (1989) Computational complexity of uncapacitated multi-echelon production planning problems. Oper. Res. Lett. 8:61-66.
-
(1989)
Oper. Res. Lett.
, vol.8
, pp. 61-66
-
-
Arkin, E.1
Joneja, D.2
Roundy, R.3
-
6
-
-
78650513384
-
Tabu search with path relinking for an integrated production-distribution system
-
Armentano VA, Shiguemoto AL, Løkketangen A (2011) Tabu search with path relinking for an integrated production-distribution system. Comput. Oper. Res. 38:1199-1209.
-
(2011)
Comput. Oper. Res.
, vol.38
, pp. 1199-1209
-
-
Armentano, V.A.1
Shiguemoto, A.L.2
Løkketangen, A.3
-
7
-
-
69849087762
-
Heuristics for a multiperiod inventory routing problem with production decision
-
Bard JF, Nananukul N (2009) Heuristics for a multiperiod inventory routing problem with production decision. Comput. Indust. Engrg. 57:713-723.
-
(2009)
Comput. Indust. Engrg.
, vol.57
, pp. 713-723
-
-
Bard, J.F.1
Nananukul, N.2
-
8
-
-
67349211770
-
The integrated production-inventorydistribution-routing problem
-
Bard JF, Nananukul N (2009) The integrated production-inventorydistribution-routing problem. J. Scheduling 12:257-280.
-
(2009)
J. Scheduling
, vol.12
, pp. 257-280
-
-
Bard, J.F.1
Nananukul, N.2
-
9
-
-
77955271201
-
A branch-and-price algorithm for an integrated production and inventory routing problem
-
Bard JF, Nananukul N (2010) A branch-and-price algorithm for an integrated production and inventory routing problem. Comput. Oper. Res. 37:2202-2217.
-
(2010)
Comput. Oper. Res.
, vol.37
, pp. 2202-2217
-
-
Bard, J.F.1
Nananukul, N.2
-
10
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran G, Yanasse HH (1982) Computational complexity of the capacitated lot size problem. Management Sci. 28:1174-1186.
-
(1982)
Management Sci.
, vol.28
, pp. 1174-1186
-
-
Bitran, G.1
Yanasse, H.H.2
-
11
-
-
34047126268
-
A reactive GRASP and path relinking for a combined production distribution problem
-
Boudia M, Louly MAO, Prins C (2007) A reactive GRASP and path relinking for a combined production distribution problem. Comput. Oper. Res. 34:3402-3419.
-
(2007)
Comput. Oper. Res.
, vol.34
, pp. 3402-3419
-
-
Boudia, M.1
Louly, M.A.O.2
Prins, C.3
-
12
-
-
56349117292
-
A memetic algorithm with dynamic population management for an integrated productiondistribution problem
-
Boudia M, Louly MAO, Prins C (2009) A memetic algorithm with dynamic population management for an integrated productiondistribution problem. Eur. J. Oper. Res. 195:703-715.
-
(2009)
Eur. J. Oper. Res.
, vol.195
, pp. 703-715
-
-
Boudia, M.1
Louly, M.A.O.2
Prins, C.3
-
13
-
-
40649104331
-
Integrated optimization of production and distribution for several products
-
IEEE, Troyes, France
-
Boudia M, Dauzère-Pérès S, Prins C, Louly MAO (2006) Integrated optimization of production and distribution for several products. 2006 Internat. Conf. Service Systems Service Management (IEEE, Troyes, France), 272-277.
-
(2006)
2006 Internat. Conf. Service Systems Service Management
, pp. 272-277
-
-
Boudia, M.1
Dauzère-Pérès, S.2
Prins, C.3
Louly, M.A.O.4
-
14
-
-
0027625631
-
A dynamic distribution model with warehouse and customer replenishment requirements
-
Chandra P (1993) A dynamic distribution model with warehouse and customer replenishment requirements. J. Oper. Res. Soc. 44:681-692.
-
(1993)
J. Oper. Res. Soc.
, vol.44
, pp. 681-692
-
-
Chandra, P.1
-
15
-
-
0028371172
-
Coordination of production and distribution planning
-
Chandra P (1994) Coordination of production and distribution planning. Eur. J. Oper. Res. 72:503-517.
-
(1994)
Eur. J. Oper. Res.
, vol.72
, pp. 503-517
-
-
Chandra, P.1
-
16
-
-
0028769451
-
Integration of lotsizing and scheduling decisions in a job-shop
-
Dauzère-Pérès S, Lasserre J-B (1994) Integration of lotsizing and scheduling decisions in a job-shop. Eur. J. Oper. Res. 75:413-426.
-
(1994)
Eur. J. Oper. Res.
, vol.75
, pp. 413-426
-
-
Dauzère-Pérès, S.1
Lasserre, J.-B.2
-
17
-
-
0019032810
-
Deterministic production planning: Algorithms and complexity
-
Florian M, Lenstra JK, Rinnoy Kan AHG (1980) Deterministic production planning: Algorithms and complexity. Management Sci. 26:669-679.
-
(1980)
Management Sci.
, vol.26
, pp. 669-679
-
-
Florian, M.1
Lenstra, J.K.2
Rinnoy Kan, A.H.G.3
-
18
-
-
0033339421
-
Syncronized development of production, inventory, and distribution schedules
-
Fumero F, Vercellis C (1999) Syncronized development of production, inventory, and distribution schedules. Transportation Sci. 33:330-340.
-
(1999)
Transportation Sci.
, vol.33
, pp. 330-340
-
-
Fumero, F.1
Vercellis, C.2
-
19
-
-
79955081124
-
A library of local search heuristics for the vehicle routing problem
-
Groër C, Golden B, Wasil E (2010) A library of local search heuristics for the vehicle routing problem. Math. Programming Computation 2:79-101.
-
(2010)
Math. Programming Computation
, vol.2
, pp. 79-101
-
-
Groër, C.1
Golden, B.2
Wasil, E.3
-
20
-
-
84946034952
-
-
Helsgaun K (2012) LKH. http://www.akira.ruc.dk/~keld/research/LKH/.
-
(2012)
LKH
-
-
Helsgaun, K.1
-
21
-
-
0015604699
-
An effective heuristic algorithm for the traveling-salesman problem
-
Lin S, Kernighan BW (1973) An effective heuristic algorithm for the traveling-salesman problem. Oper. Res. 21:498-516.
-
(1973)
Oper. Res.
, vol.21
, pp. 498-516
-
-
Lin, S.1
Kernighan, B.W.2
-
22
-
-
84893838102
-
Efficient formulations and a branch-and-cut algorithm for a production-routing problem
-
G-2010-66, Montreal
-
Ruokokoski M, Solyali O, Cordeau J-F, Jans R, Süral H (2010) Efficient formulations and a branch-and-cut algorithm for a production-routing problem. Les Cahiers du GERAD, G-2010-66, Montreal.
-
(2010)
Les Cahiers du GERAD
-
-
Ruokokoski, M.1
Solyali, O.2
Cordeau, J.-F.3
Jans, R.4
Süral, H.5
-
23
-
-
80051504143
-
A relaxation based solution approach for the inventory control and vehicle routing problem in vendor managed systems
-
Neogy SK, Das AK, Bapat RB, eds, World Scientific, London
-
Solyali O, Süral H (2009) A relaxation based solution approach for the inventory control and vehicle routing problem in vendor managed systems. Neogy SK, Das AK, Bapat RB, eds. Modeling, Computation and Optimization (World Scientific, London), 171-189.
-
(2009)
Modeling, Computation and Optimization
, pp. 171-189
-
-
Solyali, O.1
Süral, H.2
|