A simulation-based optimization framework for product development cycle time reduction
-
Abdelsalam, H.M.E., Bao, H.P., A simulation-based optimization framework for product development cycle time reduction. IEEE Transactions on Engineering Management 53:1 (2006), 69–85.
-
(2006)
IEEE Transactions on Engineering Management
, vol.53
, Issue.1
, pp. 69-85
-
-
Abdelsalam, H.M.E.1
Bao, H.P.2
-
2
-
-
0030416580
-
A genetic algorithm for scheduling and decomposition of multidisciplinary design problems
-
Altus, S.S., Kroo, I.M., Gage, P.J., A genetic algorithm for scheduling and decomposition of multidisciplinary design problems. ASME Journal of Mechanical Design 118:4 (1996), 486–489.
-
(1996)
ASME Journal of Mechanical Design
, vol.118
, Issue.4
, pp. 486-489
-
-
Altus, S.S.1
Kroo, I.M.2
Gage, P.J.3
-
3
-
-
0028467091
-
Improving project management of design
-
Anderson, S.D., Tucker, R.L., Improving project management of design. Journal of Management in Engineering 10:4 (1994), 35–44.
-
(1994)
Journal of Management in Engineering
, vol.10
, Issue.4
, pp. 35-44
-
-
Anderson, S.D.1
Tucker, R.L.2
-
4
-
-
0035252463
-
Balancing and optimizing a portfolio of R&D projects
-
Beaujon, G.J., Marin, S.P., McDonald, G.C., Balancing and optimizing a portfolio of R&D projects. Naval Research Logistics 48:1 (2001), 18–40.
-
(2001)
Naval Research Logistics
, vol.48
, Issue.1
, pp. 18-40
-
-
Beaujon, G.J.1
Marin, S.P.2
McDonald, G.C.3
-
5
-
-
85032069866
-
Design structure matrix extensions and innovations: A survey and new opportunities
-
Browning, T.R., Design structure matrix extensions and innovations: A survey and new opportunities. IEEE Transactions on Engineering Management 63:1 (2016), 27–52.
-
(2016)
IEEE Transactions on Engineering Management
, vol.63
, Issue.1
, pp. 27-52
-
-
Browning, T.R.1
-
6
-
-
0036881796
-
Modeling impacts of process architecture on cost and schedule risk in product development
-
Browning, T.R., Eppinger, S.D., Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transactions on Engineering Management 49:4 (2002), 428–442.
-
(2002)
IEEE Transactions on Engineering Management
, vol.49
, Issue.4
, pp. 428-442
-
-
Browning, T.R.1
Eppinger, S.D.2
-
7
-
-
77952430773
-
A random generator of resource-constrained multi-project network problems
-
Browning, T.R., Yassine, A.A., A random generator of resource-constrained multi-project network problems. Journal of Scheduling 13:2 (2010), 143–161.
-
(2010)
Journal of Scheduling
, vol.13
, Issue.2
, pp. 143-161
-
-
Browning, T.R.1
Yassine, A.A.2
-
8
-
-
77953684240
-
Resource-constrained multi-project scheduling: priority rule performance revisited
-
Browning, T.R., Yassine, A.A., Resource-constrained multi-project scheduling: priority rule performance revisited. International Journal of Production Economics 126:2 (2010), 212–228.
-
(2010)
International Journal of Production Economics
, vol.126
, Issue.2
, pp. 212-228
-
-
Browning, T.R.1
Yassine, A.A.2
-
9
-
-
84941703247
-
Managing a portfolio of product development projects under resource constraints
-
Browning, T., Yassine, A., Managing a portfolio of product development projects under resource constraints. Decision Sciences 47:2 (2016), 333–372.
-
(2016)
Decision Sciences
, vol.47
, Issue.2
, pp. 333-372
-
-
Browning, T.1
Yassine, A.2
-
10
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, methods
-
Brucker, P., Drexl, A., Möhring, R.H., Neumann, K., Pesch, E., Resource-constrained project scheduling: Notation, classification, models, methods. European Journal of Operational Research 112:1 (1999), 3–41.
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.H.3
Neumann, K.4
Pesch, E.5
-
12
-
-
85014829301
-
A branch-and-bound procedure for the resource constrained project scheduling problem
-
Demeulemeester, E., Herroelen, W., A branch-and-bound procedure for the resource constrained project scheduling problem. European Journal of Operational Research 111:1 (1992), 152–174.
-
(1992)
European Journal of Operational Research
, vol.111
, Issue.1
, pp. 152-174
-
-
Demeulemeester, E.1
Herroelen, W.2
-
13
-
-
0030122629
-
An efficient optimal solution procedure for resource constrained project scheduling problem
-
Demeulemeester, E., Herroelen, W., An efficient optimal solution procedure for resource constrained project scheduling problem. European Journal of Operational Research 90:2 (1996), 334–348.
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 334-348
-
-
Demeulemeester, E.1
Herroelen, W.2
-
14
-
-
84946595542
-
An interactive genetic algorithm with the interval arithmetic based on hesitation and its application to achieve customer collaborative product configuration design
-
Dou, R., Zong, C., Li, M., An interactive genetic algorithm with the interval arithmetic based on hesitation and its application to achieve customer collaborative product configuration design. Applied Soft Computing 38 (2016), 384–394.
-
(2016)
Applied Soft Computing
, vol.38
, pp. 384-394
-
-
Dou, R.1
Zong, C.2
Li, M.3
-
15
-
-
85014829217
-
Multi-stage interactive genetic algorithm for collaborative product customization
-
Dou, R., Zong, C., Nan, G., Multi-stage interactive genetic algorithm for collaborative product customization. Knowledge-Based Systems 92 (2016), 43–54.
-
(2016)
Knowledge-Based Systems
, vol.92
, pp. 43-54
-
-
Dou, R.1
Zong, C.2
Nan, G.3
-
16
-
-
0042622452
-
The resource allocation syndrome: The prime challenge of multi-project management?
-
Engwall, M., Jerbrant, A., The resource allocation syndrome: The prime challenge of multi-project management?. International Journal of Project Management 21:6 (2003), 403–409.
-
(2003)
International Journal of Project Management
, vol.21
, Issue.6
, pp. 403-409
-
-
Engwall, M.1
Jerbrant, A.2
-
17
-
-
0035227303
-
Innovation at the speed of information
-
Eppinger, S.D., Innovation at the speed of information. Harvard Business Review 79:1 (2001), 149–158.
-
(2001)
Harvard Business Review
, vol.79
, Issue.1
, pp. 149-158
-
-
Eppinger, S.D.1
-
18
-
-
79958199379
-
-
Springer New York
-
Gendreau, M., Potvin, J.Y., Handbook of metaheuristics, Vol. 2, 2010, Springer, New York.
-
(2010)
Handbook of metaheuristics
, vol.2
-
-
Gendreau, M.1
Potvin, J.Y.2
-
19
-
-
84862737819
-
Structural damage detection using modal parameters and particle swarm optimization
-
Gökdağ, H., Yildiz, A.R., Structural damage detection using modal parameters and particle swarm optimization. Materials Testing 54:6 (2012), 416–420.
-
(2012)
Materials Testing
, vol.54
, Issue.6
, pp. 416-420
-
-
Gökdağ, H.1
Yildiz, A.R.2
-
20
-
-
0003722376
-
Genetic algorithms in search, optimization, and machine learning
-
Addison-Wesley Boston
-
Goldberg, D.E., Genetic algorithms in search, optimization, and machine learning. 1989, Addison-Wesley, Boston.
-
(1989)
-
-
Goldberg, D.E.1
-
21
-
-
13544269251
-
A hybrid genetic algorithm for the job shop scheduling problem
-
Gonçalves, J.F., Mendes, J.D.M., Resende, M.G., A hybrid genetic algorithm for the job shop scheduling problem. European Journal of Operational Research 167:1 (2005), 77–95.
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.1
, pp. 77-95
-
-
Gonçalves, J.F.1
Mendes, J.D.M.2
Resende, M.G.3
-
22
-
-
40849142091
-
A genetic algorithm for the resource constrained multi-project scheduling problem
-
Gonçalves, J.F., Mendes, J.D.M., Resende, M.G., A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research 189:3 (2008), 1171–1190.
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1171-1190
-
-
Gonçalves, J.F.1
Mendes, J.D.M.2
Resende, M.G.3
-
23
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann, S., A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 45:7 (1998), 733–750.
-
(1998)
Naval Research Logistics
, vol.45
, Issue.7
, pp. 733-750
-
-
Hartmann, S.1
-
24
-
-
0036684673
-
A self-adapting genetic algorithm for project scheduling under resource constraints
-
Hartmann, S., A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49:5 (2002), 433–448.
-
(2002)
Naval Research Logistics
, vol.49
, Issue.5
, pp. 433-448
-
-
Hartmann, S.1
-
25
-
-
0034559432
-
Experimental investigation of state-of-the-art heuristics for the resource-constrained scheduling problem
-
Hartmann, S., Kolisch, R., Experimental investigation of state-of-the-art heuristics for the resource-constrained scheduling problem. European Journal of Operational Research 127:2 (2000), 394–407.
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
26
-
-
0031109010
-
Delays in new product introductions and the market value of the firm: The consequences of being late to the market
-
Hendricks, K.B., Singhal, V.R., Delays in new product introductions and the market value of the firm: The consequences of being late to the market. Management Science 43:4 (1997), 422–436.
-
(1997)
Management Science
, vol.43
, Issue.4
, pp. 422-436
-
-
Hendricks, K.B.1
Singhal, V.R.2
-
27
-
-
84871596347
-
When things go wrong, don't rely on committed consumers: Effects of delayed product launches on brand trust
-
Herm, S., When things go wrong, don't rely on committed consumers: Effects of delayed product launches on brand trust. Journal of Product Innovation Management 30:1 (2013), 70–81.
-
(2013)
Journal of Product Innovation Management
, vol.30
, Issue.1
, pp. 70-81
-
-
Herm, S.1
-
28
-
-
33646106557
-
Project scheduling—theory and practice
-
Herroelen, W.S., Project scheduling—theory and practice. Production and Operations Management 14:4 (2005), 413–432.
-
(2005)
Production and Operations Management
, vol.14
, Issue.4
, pp. 413-432
-
-
Herroelen, W.S.1
-
29
-
-
0003463297
-
Adaptation in natural and artificial systems
-
The University of Michigan Press Ann Arbor
-
Holland, J.H., Adaptation in natural and artificial systems. 1975, The University of Michigan Press, Ann Arbor.
-
(1975)
-
-
Holland, J.H.1
-
30
-
-
0030555055
-
Time-based competition: Literature review and implications for modelling
-
Hum, S.H., Sim, H.H., Time-based competition: Literature review and implications for modelling. International Journal of Operations & Production Management 16:1 (1996), 75–90.
-
(1996)
International Journal of Operations & Production Management
, vol.16
, Issue.1
, pp. 75-90
-
-
Hum, S.H.1
Sim, H.H.2
-
31
-
-
0034230027
-
Multi-product planning and scheduling using genetic algorithm approach
-
Ip, W.H., Li, Y., Man, K.F., Tang, K.S., Multi-product planning and scheduling using genetic algorithm approach. Computers & Industrial Engineering 38:2 (2000), 283–296.
-
(2000)
Computers & Industrial Engineering
, vol.38
, Issue.2
, pp. 283-296
-
-
Ip, W.H.1
Li, Y.2
Man, K.F.3
Tang, K.S.4
-
32
-
-
77955199335
-
Evaluation of acceleration effect of dynamic sequencing of design process in a multiproject environment
-
Kang, C., Hong, Y.S., Evaluation of acceleration effect of dynamic sequencing of design process in a multiproject environment. ASME Journal of Mechanical Design, 131(2), 2009, 021008.
-
(2009)
ASME Journal of Mechanical Design
, vol.131
, Issue.2
, pp. 021008
-
-
Kang, C.1
Hong, Y.S.2
-
33
-
-
0003457608
-
Project management: A systems approach to planning, scheduling, and controlling
-
John Wiley & Sons
-
Kerzner, H.R., Project management: A systems approach to planning, scheduling, and controlling. 2013, John Wiley & Sons.
-
(2013)
-
-
Kerzner, H.R.1
-
34
-
-
84930320306
-
A comparative study of non-traditional methods for vehicle crashworthiness and NVH optimization
-
Kiani, M., Yildiz, A.R., A comparative study of non-traditional methods for vehicle crashworthiness and NVH optimization. Archives of Computational Methods in Engineering 23:4 (2016), 723–734.
-
(2016)
Archives of Computational Methods in Engineering
, vol.23
, Issue.4
, pp. 723-734
-
-
Kiani, M.1
Yildiz, A.R.2
-
35
-
-
0003824587
-
Heuristic algorithms for solving the resource constrained project scheduling problem: Classification and computational analysis
-
Handbook on Recent Advances in Project Scheduling Kluwer, Boston
-
Kolisch, R., Hartmann, S., Heuristic algorithms for solving the resource constrained project scheduling problem: Classification and computational analysis. 1998, Handbook on Recent Advances in Project Scheduling, Kluwer, Boston.
-
(1998)
-
-
Kolisch, R.1
Hartmann, S.2
-
36
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch, R., Hartmann, S., Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174:1 (2006), 23–37.
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
37
-
-
0000801563
-
An integrated survey of project deterministic scheduling
-
Kolisch, R., Padman, R., An integrated survey of project deterministic scheduling. OMEGA International Journal of Management Science 29:3 (2001), 249–272.
-
(2001)
OMEGA International Journal of Management Science
, vol.29
, Issue.3
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
38
-
-
0030788844
-
PSPLIB – A project scheduling problem library
-
Kolisch, R., Sprecher, A., PSPLIB – A project scheduling problem library. European Journal of Operational Research 96:1 (1997), 205–216.
-
(1997)
European Journal of Operational Research
, vol.96
, Issue.1
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
39
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch, R., Sprecher, A., Drexl, A., Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41:10 (1995), 1693–1703.
-
(1995)
Management Science
, vol.41
, Issue.10
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
40
-
-
0035719690
-
-
Human-based genetic algorithm. In IEEE transactions on systems, man, and cybernetics, SMC-2001. (pp. 3464–3469).
-
Kosorukoff, A. (2001). Human-based genetic algorithm. In IEEE transactions on systems, man, and cybernetics, SMC-2001. (pp. 3464–3469).
-
(2001)
-
-
Kosorukoff, A.1
-
41
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
Kurtulus, I., Davis, E.W., Multi-project scheduling: Categorization of heuristic rules performance. Management Science 28:2 (1982), 161–172.
-
(1982)
Management Science
, vol.28
, Issue.2
, pp. 161-172
-
-
Kurtulus, I.1
Davis, E.W.2
-
42
-
-
51749101482
-
A fitness differential adaptive parameter controlled evolutionary algorithm with application to the design structure matrix
-
Lancaster, J., Cheng, K., A fitness differential adaptive parameter controlled evolutionary algorithm with application to the design structure matrix. International Journal of Production Research 46:18 (2008), 5043–5057.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.18
, pp. 5043-5057
-
-
Lancaster, J.1
Cheng, K.2
-
43
-
-
33847016105
-
Evolutionary algorithms applied to project scheduling problems—A survey of the state-of-the-art
-
Lancaster, J., Ozbayrak, M., Evolutionary algorithms applied to project scheduling problems—A survey of the state-of-the-art. International Journal of Production Research 45:2 (2007), 425–450.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.2
, pp. 425-450
-
-
Lancaster, J.1
Ozbayrak, M.2
-
44
-
-
0017924416
-
Complexity of scheduling under precedence constraints
-
Lenstra, J.K., Kan, A.H.G.R., Complexity of scheduling under precedence constraints. Operations Research 26:1 (1978), 22–35.
-
(1978)
Operations Research
, vol.26
, Issue.1
, pp. 22-35
-
-
Lenstra, J.K.1
Kan, A.H.G.R.2
-
45
-
-
84891877953
-
Product development drivers in literature and practice
-
Majava, J., Haapasalo, H., Belt, P., Mottonen, M., Product development drivers in literature and practice. International Journal of Product Development 18:6 (2013), 512–530.
-
(2013)
International Journal of Product Development
, vol.18
, Issue.6
, pp. 512-530
-
-
Majava, J.1
Haapasalo, H.2
Belt, P.3
Mottonen, M.4
-
46
-
-
0242443200
-
Project management in practice
-
John Wiley & Sons
-
Mantel, S., Meredith, J., Shafer, S., Sutton, M., Project management in practice. 2007, John Wiley & Sons.
-
(2007)
-
-
Mantel, S.1
Meredith, J.2
Shafer, S.3
Sutton, M.4
-
47
-
-
0030259367
-
A genetic tool for optimal design sequencing in complex engineering systems
-
McCulley, C., Bloebaum, C.L., A genetic tool for optimal design sequencing in complex engineering systems. Structural Optimization 12:2–3 (1996), 186–201.
-
(1996)
Structural Optimization
, vol.12
, Issue.2-3
, pp. 186-201
-
-
McCulley, C.1
Bloebaum, C.L.2
-
48
-
-
34250678915
-
Design process sequencing with competent genetic algorithms
-
Meier, C., Yassine, A.A., Browning, T.R., Design process sequencing with competent genetic algorithms. ASME Journal of Mechanical Design 129:6 (2007), 566–585.
-
(2007)
ASME Journal of Mechanical Design
, vol.129
, Issue.6
, pp. 566-585
-
-
Meier, C.1
Yassine, A.A.2
Browning, T.R.3
-
49
-
-
33745732454
-
Project portfolio management and managing multiple projects: Two sides of the same coin?
-
J.S. Pennypacker L.D. Dye NY, Marcel Dekker New York
-
Pennypacker, J.S., Dye, L.D., Project portfolio management and managing multiple projects: Two sides of the same coin?. Pennypacker, J.S., Dye, L.D., (eds.) Managing multiple projects, 2002, NY, Marcel Dekker, New York, 1–10.
-
(2002)
Managing multiple projects
, pp. 1-10
-
-
Pennypacker, J.S.1
Dye, L.D.2
-
50
-
-
84911482598
-
A guide to the project management body of knowledge: PMBOK guide
-
5th ed. Project Management Institute, Inc.
-
PMI, A guide to the project management body of knowledge: PMBOK guide. 5th ed., 2013, Project Management Institute, Inc.
-
(2013)
-
-
PMI1
-
51
-
-
77951886946
-
Project portfolio management
-
IIL Publishing
-
Rad, P.F., Levin, G., Project portfolio management. 2006, IIL Publishing.
-
(2006)
-
-
Rad, P.F.1
Levin, G.2
-
52
-
-
84944626655
-
-
Springer International Publishing Cham
-
Schwindt, C., Zimmermann, J., Handbook on project management and scheduling, 1 & 2, 2014, Springer International Publishing, Cham.
-
(2014)
Handbook on project management and scheduling
, vol.1-2
-
-
Schwindt, C.1
Zimmermann, J.2
-
53
-
-
0009354591
-
Improving project management skills and techniques
-
Prentice Hall NJ
-
Spinner, M., Improving project management skills and techniques. 1989, Prentice Hall, NJ.
-
(1989)
-
-
Spinner, M.1
-
54
-
-
0038188879
-
Solving the RCPSP efficiently at modest memory requirements
-
Inst. Für Betriebswirtschaftslehre Germany
-
Sprecher, A., Solving the RCPSP efficiently at modest memory requirements. 1996, Inst. Für Betriebswirtschaftslehre, Germany.
-
(1996)
-
-
Sprecher, A.1
-
55
-
-
66349133610
-
Comparing product development processes and managing risk
-
Unger, D.W., Eppinger, S.D., Comparing product development processes and managing risk. International Journal of Product Development 8:4 (2009), 382–402.
-
(2009)
International Journal of Product Development
, vol.8
, Issue.4
, pp. 382-402
-
-
Unger, D.W.1
Eppinger, S.D.2
-
56
-
-
34648837872
-
A hybrid genetic algorithm for the resource-constrained project scheduling problem
-
Valls, V., Ballestin, F., Quintanilla, S., A hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research 185:2 (2008), 495–508.
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 495-508
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, S.3
-
57
-
-
0041877499
-
Efficient process optimization
-
Whitfield, R.I., Duffy, A.H., Coates, G., Hills, W., Efficient process optimization. Concurrent Engineering 11:2 (2003), 83–92.
-
(2003)
Concurrent Engineering
, vol.11
, Issue.2
, pp. 83-92
-
-
Whitfield, R.I.1
Duffy, A.H.2
Coates, G.3
Hills, W.4
-
58
-
-
57049121035
-
An introduction to modeling and analyzing complex product development processes using the Design Structure Matrix (DSM) method
-
Yassine, A., An introduction to modeling and analyzing complex product development processes using the Design Structure Matrix (DSM) method. Quaderni di Management (Italian Management Review)(9), 2004, 72–88.
-
(2004)
Quaderni di Management (Italian Management Review)
, Issue.9
, pp. 72-88
-
-
Yassine, A.1
-
59
-
-
85014827446
-
Analyzing multiple product development projects based on information and resource constraints
-
Yassine & Browning (2002). Analyzing multiple product development projects based on information and resource constraints. Unpublished working paper.
-
(2002)
Unpublished working paper
-
-
-
60
-
-
0242332693
-
Four complex problems in concurrent engineering and the design structure matrix method
-
Yassine, A., Braha, D., Four complex problems in concurrent engineering and the design structure matrix method. Concurrent Engineering: Research and Applications 11:3 (2003), 165–176.
-
(2003)
Concurrent Engineering: Research and Applications
, vol.11
, Issue.3
, pp. 165-176
-
-
Yassine, A.1
Braha, D.2
-
61
-
-
14044256646
-
-
A. Task scheduling of parallel development projects using genetic algorithms. In ASME 2004 international design engineering technical conferences and computers and information in engineering conference
-
Zhuang, M., & Yassine, A. A. (2004). Task scheduling of parallel development projects using genetic algorithms. In ASME 2004 international design engineering technical conferences and computers and information in engineering conference (pp. 215–224).
-
(2004)
, pp. 215-224
-
-
Zhuang, M.1
Yassine, A.2
|