메뉴 건너뛰기




Volumn 45, Issue 2, 2007, Pages 425-450

Evolutionary algorithms applied to project scheduling problems - A survey of the state-of-the-art

Author keywords

Design structure matrix; Evolutionary algorithms; Project scheduling

Indexed keywords

COMBINATORIAL MATHEMATICS; EVOLUTIONARY ALGORITHMS; HEURISTIC METHODS; MATRIX ALGEBRA; PROBLEM SOLVING; TRAVELING SALESMAN PROBLEM;

EID: 33847016105     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600800326     Document Type: Article
Times cited : (34)

References (57)
  • 1
    • 0042287689 scopus 로고    scopus 로고
    • A robust genetic algorithm for resource allocation in project scheduling
    • Alcaraz, J. and Maroto, C., A robust genetic algorithm for resource allocation in project scheduling. Ann. Op. Res., 2001a, 102, 83-109.
    • (2001) Ann. Op. Res , vol.102 , pp. 83-109
    • Alcaraz, J.1    Maroto, C.2
  • 3
    • 84867922216 scopus 로고    scopus 로고
    • Electromagnetism-like mechanism for global optimisation
    • Birbil, S. and Fang, S., Electromagnetism-like mechanism for global optimisation. J. Global Optim., 2003, 25, 263-282.
    • (2003) J. Global Optim , vol.25 , pp. 263-282
    • Birbil, S.1    Fang, S.2
  • 6
    • 12444300607 scopus 로고
    • A comparison of single-project and multi-project approaches in resource-constrained multi-project scheduling problems
    • Chiu, H. and Tsai, D., A comparison of single-project and multi-project approaches in resource-constrained multi-project scheduling problems. J. Chinese Inst. Indust. Eng., 1993, 10, 171-179.
    • (1993) J. Chinese Inst. Indust. Eng , vol.10 , pp. 171-179
    • Chiu, H.1    Tsai, D.2
  • 7
    • 33646075663 scopus 로고    scopus 로고
    • An electromagnetism meta-heuristic for the resource constrained project scheduling problem
    • Universiteit Gent
    • Debels, D. and Vanhoucke, M., An electromagnetism meta-heuristic for the resource constrained project scheduling problem. Working Paper Series, Faculteit Ecomonie and Bedrijfskunde, Universiteit Gent, 2004a.
    • (2004) Working Paper Series. Faculteit Ecomonie and Bedrijfskunde
    • Debels, D.1    Vanhoucke, M.2
  • 9
    • 25444456205 scopus 로고    scopus 로고
    • A scatter-search meta-heuristic for the resource constrained project scheduling problem
    • Debels, D., de Reyck, B., Leus, R. and Vanhoucke, M., A scatter-search meta-heuristic for the resource constrained project scheduling problem. Euro. J. Op. Res., 2006, 169(2), 638-653.
    • (2006) Euro. J. Op. Res , vol.169 , Issue.2 , pp. 638-653
    • Debels, D.1    de Reyck, B.2    Leus, R.3    Vanhoucke, M.4
  • 10
    • 33847020438 scopus 로고    scopus 로고
    • A bi-population based genetic algorithm for the resource-constrained project scheduling problem
    • Universiteit Gent
    • Debels, D. and Vanhoucke, M., A bi-population based genetic algorithm for the resource-constrained project scheduling problem. Working Paper Series, Faculteit Economie en Bedrijfskunde, Universiteit Gent, 2005a.
    • (2005) Working Paper Series. Faculteit Economie en Bedrijfskunde
    • Debels, D.1    Vanhoucke, M.2
  • 11
    • 33847026081 scopus 로고    scopus 로고
    • A decomposition-based heuristic for the resource constrained project scheduling problem
    • Universiteit Gent
    • Debels, D. and Vvanhoucke, M., A decomposition-based heuristic for the resource constrained project scheduling problem. Working Paper Series, Faculteit Economie en Bedrijfskunde, Universiteit Gent, 2005b.
    • (2005) Working Paper Series. Faculteit Economie en Bedrijfskunde
    • Debels, D.1    Vvanhoucke, M.2
  • 12
    • 0033084695 scopus 로고    scopus 로고
    • Ant algorithms for discrete optimisation
    • Dorigo, M., di Caro, G. and Gambardella, L, Ant algorithms for discrete optimisation. Artif. Life, 1999, 5, 137-172.
    • (1999) Artif. Life , vol.5 , pp. 137-172
    • Dorigo, M.1    di Caro, G.2    Gambardella, L.3
  • 14
    • 33847082135 scopus 로고    scopus 로고
    • Eshelman, L.J. and Schaffer, D.J. Real-coded genetic algorithms and interval schema, 1992 (Foundations of Genetic Algorithms 2: Whitely, San Mateo, CA).
    • Eshelman, L.J. and Schaffer, D.J. Real-coded genetic algorithms and interval schema, 1992 (Foundations of Genetic Algorithms 2: Whitely, San Mateo, CA).
  • 15
    • 0000049494 scopus 로고
    • Greedy randomised adaptive search procedure
    • Feo, T. and Resende, M., Greedy randomised adaptive search procedure. J. Global Optim., 1995, 6, 109-133.
    • (1995) J. Global Optim , vol.6 , pp. 109-133
    • Feo, T.1    Resende, M.2
  • 17
    • 0001257619 scopus 로고
    • Genetic algorithms and scatter search. Unsuspected potentials
    • Glover, F., Genetic algorithms and scatter search. Unsuspected potentials. Statist. Comp., 1994, 4, 131-140.
    • (1994) Statist. Comp , vol.4 , pp. 131-140
    • Glover, F.1
  • 19
    • 33847052477 scopus 로고    scopus 로고
    • A genetic algorithm for the resource constrained multi-project scheduling problem. AT&T Labs Technical Report TD-668LM4
    • Gonçalves, J., Mendes, J. and Resende, M., A genetic algorithm for the resource constrained multi-project scheduling problem. AT&T Labs Technical Report TD-668LM4, 2004.
    • (2004)
    • Gonçalves, J.1    Mendes, J.2    Resende, M.3
  • 20
    • 74849101820 scopus 로고
    • Optimisation and approximation in deterministic sequencing and scheduling theory: A survey
    • Graham, R., Lawler, E., Lenstra, J. and Rinnooy Kan, A., Optimisation and approximation in deterministic sequencing and scheduling theory: a survey. Annals of Discrete Mathematics, 1979, 5, 287-326.
    • (1979) Annals of Discrete Mathematics , vol.5 , pp. 287-326
    • Graham, R.1    Lawler, E.2    Lenstra, J.3    Rinnooy Kan, A.4
  • 21
    • 11644286761 scopus 로고    scopus 로고
    • Scheduling medical research experiments - An application of project scheduling methods
    • University of Kiel, Germany
    • Hartmann, S., Scheduling medical research experiments - An application of project scheduling methods. Manuskripte aus den Instituten fur Betriebswirtschaftslehre, No. 452, University of Kiel, Germany, 1997.
    • (1997) Manuskripte aus den Instituten fur Betriebswirtschaftslehre , Issue.452
    • Hartmann, S.1
  • 22
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource constrained project scheduling
    • Hartmann, S., A competitive genetic algorithm for resource constrained project scheduling. Naval Res. Logist., 1998, 45, 733-750.
    • (1998) Naval Res. Logist , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 23
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • Hartmann, S., Project scheduling with multiple modes: a genetic algorithm. Ann. Op. Res., 2001, 102, 111-136.
    • (2001) Ann. Op. Res , vol.102 , pp. 111-136
    • Hartmann, S.1
  • 24
    • 0036684673 scopus 로고    scopus 로고
    • A self adapting genetic algorithm for project scheduling under resource constraints
    • Hartmann, S., A self adapting genetic algorithm for project scheduling under resource constraints. Naval Res. Logist., 2002, 49, 433-448.
    • (2002) Naval Res. Logist , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 25
    • 33847012991 scopus 로고    scopus 로고
    • Herbots, J., Herroelen, W. and Leus, R., Experimental investigation of the applicability of ant colony optimisation algorithms for project scheduling. Department of Applied Economics, K. U. Leuvn, 2004.
    • Herbots, J., Herroelen, W. and Leus, R., Experimental investigation of the applicability of ant colony optimisation algorithms for project scheduling. Department of Applied Economics, K. U. Leuvn, 2004.
  • 26
    • 0032042933 scopus 로고    scopus 로고
    • Resource contrained project scheduling: A survey of recent developments
    • Herroelen, W., de Reyck, B. and Demeulemeester, E., Resource contrained project scheduling: a survey of recent developments. Comput. Oper. Res., 1998, 25, 279-302.
    • (1998) Comput. Oper. Res , vol.25 , pp. 279-302
    • Herroelen, W.1    de Reyck, B.2    Demeulemeester, E.3
  • 27
    • 0035254136 scopus 로고    scopus 로고
    • Herroelen, W., Demeulemeester, E. and de Reyck, B., A note on the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al. Euro. J. Op. Res., 2001, 128, 679-688.
    • Herroelen, W., Demeulemeester, E. and de Reyck, B., A note on the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al. Euro. J. Op. Res., 2001, 128, 679-688.
  • 28
    • 0036807111 scopus 로고    scopus 로고
    • An evolutionary algorithm for resource constrained project scheduling
    • Hindi, K., Yang, H. and Flezar, K., An evolutionary algorithm for resource constrained project scheduling. IEEE Trans. Evol. Comp., 2002, 6, 512-518.
    • (2002) IEEE Trans. Evol. Comp , vol.6 , pp. 512-518
    • Hindi, K.1    Yang, H.2    Flezar, K.3
  • 31
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource constrained project scheduling: An update
    • Kolisch, R. and Hartmann, S., Experimental investigation of heuristics for resource constrained project scheduling: an update. Euro. J. Oper. Res., 2006, 174(1), 23-37.
    • (2006) Euro. J. Oper. Res , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 32
    • 33847033350 scopus 로고    scopus 로고
    • Kolisch, R. and Sprecher, A., PSPLIB: A project scheduling problem library, Christian Albrechts Universitat zu Kiel, Germany, 1996. Available online at: http://129.187.106.231/psplib/ (accessed November 2004).
    • Kolisch, R. and Sprecher, A., PSPLIB: A project scheduling problem library, Christian Albrechts Universitat zu Kiel, Germany, 1996. Available online at: http://129.187.106.231/psplib/ (accessed November 2004).
  • 34
    • 0033312040 scopus 로고    scopus 로고
    • A GA-based multicriteria optimal model for construction scheduling
    • Leu, S. and Yang, C., A GA-based multicriteria optimal model for construction scheduling. J. Construct. Eng. Manage., 1999, 125, 420-427.
    • (1999) J. Construct. Eng. Manage , vol.125 , pp. 420-427
    • Leu, S.1    Yang, C.2
  • 36
    • 33847061670 scopus 로고    scopus 로고
    • Mendes, J., Goncalves, J. and Resende, M., A random key based genetic algorithm for the resource constrained project scheduling problem. AT&T Labs Research Technical Report TD-6DUK2C, 2005.
    • Mendes, J., Goncalves, J. and Resende, M., A random key based genetic algorithm for the resource constrained project scheduling problem. AT&T Labs Research Technical Report TD-6DUK2C, 2005.
  • 37
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimisation for resource-constrained project scheduling
    • Merkle, D., Middendorf, M. and Schmeck, H., Ant colony optimisation for resource-constrained project scheduling. IEEE Trans. Evol. Comp., 2000, 6, 333-346.
    • (2000) IEEE Trans. Evol. Comp , vol.6 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 38
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multi-mode resource constrained project scheduling problem
    • Mori, M. and Tseng, C., A genetic algorithm for multi-mode resource constrained project scheduling problem. Euro. J. Op. Res., 1996, 100(1), 134-141.
    • (1996) Euro. J. Op. Res , vol.100 , Issue.1 , pp. 134-141
    • Mori, M.1    Tseng, C.2
  • 40
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J.H., A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Manage. Sci., 1984, 30, 584.
    • (1984) Manage. Sci , vol.30 , pp. 584
    • Patterson, J.H.1
  • 43
    • 33847043950 scopus 로고    scopus 로고
    • Parameterised heuristics for project scheduling - biased random sampling methods
    • Germany
    • Schrimer, A. and Riesenberg, S., Parameterised heuristics for project scheduling - biased random sampling methods. Christian-Albrechts Universitat, Keil, Germany, 1997.
    • (1997) Christian-Albrechts Universitat, Keil
    • Schrimer, A.1    Riesenberg, S.2
  • 47
    • 0019597497 scopus 로고
    • The design structure system: A method for managing the design of complex systems
    • Stewart, D., The design structure system: a method for managing the design of complex systems. IEEE Trans. Eng. Manage., 1981, 28, 71-74.
    • (1981) IEEE Trans. Eng. Manage , vol.28 , pp. 71-74
    • Stewart, D.1
  • 49
    • 0031124354 scopus 로고    scopus 로고
    • A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
    • Ulusoy, G., Sivrikaya-Şerifoǧlu, F. and Bilge, U., A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Comp. Op. Res., 1997, 24, 335-351.
    • (1997) Comp. Op. Res , vol.24 , pp. 335-351
    • Ulusoy, G.1    Sivrikaya-Şerifoǧlu, F.2    Bilge, U.3
  • 50
    • 0042788727 scopus 로고    scopus 로고
    • Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
    • Ulusoy, G., Sivrikaya-Şerifoǧlu, F. and Şahin, Ş., Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows. Ann. Op. Res., 2001, 102, 237-261.
    • (2001) Ann. Op. Res , vol.102 , pp. 237-261
    • Ulusoy, G.1    Sivrikaya-Şerifoǧlu, F.2    Şahin, S.3
  • 51
    • 0007831119 scopus 로고
    • Evolutionary divide and conquer: A novel genetic algorithm approach to the TSP
    • Valenzuela, C. and Jones, A., Evolutionary divide and conquer: a novel genetic algorithm approach to the TSP. Evol. Comp., 1993, 1, 313-333.
    • (1993) Evol. Comp , vol.1 , pp. 313-333
    • Valenzuela, C.1    Jones, A.2
  • 52
    • 84892530231 scopus 로고    scopus 로고
    • An evolutionary approach to the resource constrained project scheduling problem
    • Porto, Portugal, 16-20 July
    • Valls, V., Quintanilla, S. and Ballestin, F., An evolutionary approach to the resource constrained project scheduling problem, in 4th Metaheuristics International Conference, Porto, Portugal, 16-20 July 2001.
    • (2001) 4th Metaheuristics International Conference
    • Valls, V.1    Quintanilla, S.2    Ballestin, F.3
  • 53


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.