-
1
-
-
0042287689
-
A robust genetic algorithm for resource allocation in project scheduling
-
Alcaraz, J. and Maroto, C., A robust genetic algorithm for resource allocation in project scheduling. Ann. Op. Res., 2001a, 102, 83-109.
-
(2001)
Ann. Op. Res
, vol.102
, pp. 83-109
-
-
Alcaraz, J.1
Maroto, C.2
-
3
-
-
84867922216
-
Electromagnetism-like mechanism for global optimisation
-
Birbil, S. and Fang, S., Electromagnetism-like mechanism for global optimisation. J. Global Optim., 2003, 25, 263-282.
-
(2003)
J. Global Optim
, vol.25
, pp. 263-282
-
-
Birbil, S.1
Fang, S.2
-
5
-
-
33847068738
-
Resource-constrained project scheduling: An update
-
Brucker, P., Drexl, A., Mohring, R.H., Neumann, K. and Pesch, E., Resource-constrained project scheduling: an update. Euro. J. Oper. Res., 1999, 174(1), 23-37.
-
(1999)
Euro. J. Oper. Res
, vol.174
, Issue.1
, pp. 23-37
-
-
Brucker, P.1
Drexl, A.2
Mohring, R.H.3
Neumann, K.4
Pesch, E.5
-
6
-
-
12444300607
-
A comparison of single-project and multi-project approaches in resource-constrained multi-project scheduling problems
-
Chiu, H. and Tsai, D., A comparison of single-project and multi-project approaches in resource-constrained multi-project scheduling problems. J. Chinese Inst. Indust. Eng., 1993, 10, 171-179.
-
(1993)
J. Chinese Inst. Indust. Eng
, vol.10
, pp. 171-179
-
-
Chiu, H.1
Tsai, D.2
-
7
-
-
33646075663
-
An electromagnetism meta-heuristic for the resource constrained project scheduling problem
-
Universiteit Gent
-
Debels, D. and Vanhoucke, M., An electromagnetism meta-heuristic for the resource constrained project scheduling problem. Working Paper Series, Faculteit Ecomonie and Bedrijfskunde, Universiteit Gent, 2004a.
-
(2004)
Working Paper Series. Faculteit Ecomonie and Bedrijfskunde
-
-
Debels, D.1
Vanhoucke, M.2
-
8
-
-
33847010216
-
A hybrid scatter search/electromegnetism meta-heuristic for project scheduling
-
Universiteit Gent
-
Debels, D., de Reyck, B., Leus, R. and Vanhoucke, M., A hybrid scatter search/electromegnetism meta-heuristic for project scheduling. Working Paper Series, Faculteit Ecomonie and Bedrijfskunde, Universiteit Gent, 2004b.
-
(2004)
Working Paper Series. Faculteit Ecomonie and Bedrijfskunde
-
-
Debels, D.1
de Reyck, B.2
Leus, R.3
Vanhoucke, M.4
-
9
-
-
25444456205
-
A scatter-search meta-heuristic for the resource constrained project scheduling problem
-
Debels, D., de Reyck, B., Leus, R. and Vanhoucke, M., A scatter-search meta-heuristic for the resource constrained project scheduling problem. Euro. J. Op. Res., 2006, 169(2), 638-653.
-
(2006)
Euro. J. Op. Res
, vol.169
, Issue.2
, pp. 638-653
-
-
Debels, D.1
de Reyck, B.2
Leus, R.3
Vanhoucke, M.4
-
10
-
-
33847020438
-
A bi-population based genetic algorithm for the resource-constrained project scheduling problem
-
Universiteit Gent
-
Debels, D. and Vanhoucke, M., A bi-population based genetic algorithm for the resource-constrained project scheduling problem. Working Paper Series, Faculteit Economie en Bedrijfskunde, Universiteit Gent, 2005a.
-
(2005)
Working Paper Series. Faculteit Economie en Bedrijfskunde
-
-
Debels, D.1
Vanhoucke, M.2
-
11
-
-
33847026081
-
A decomposition-based heuristic for the resource constrained project scheduling problem
-
Universiteit Gent
-
Debels, D. and Vvanhoucke, M., A decomposition-based heuristic for the resource constrained project scheduling problem. Working Paper Series, Faculteit Economie en Bedrijfskunde, Universiteit Gent, 2005b.
-
(2005)
Working Paper Series. Faculteit Economie en Bedrijfskunde
-
-
Debels, D.1
Vvanhoucke, M.2
-
12
-
-
0033084695
-
Ant algorithms for discrete optimisation
-
Dorigo, M., di Caro, G. and Gambardella, L, Ant algorithms for discrete optimisation. Artif. Life, 1999, 5, 137-172.
-
(1999)
Artif. Life
, vol.5
, pp. 137-172
-
-
Dorigo, M.1
di Caro, G.2
Gambardella, L.3
-
13
-
-
0032626111
-
Parameter control in evolutionary algorithms
-
Eiben, A., Hinterding, R. and Michalewicz, Z., Parameter control in evolutionary algorithms. IEEE Trans. Evol. Compu., 1999, 3(2), 124-141.
-
(1999)
IEEE Trans. Evol. Compu
, vol.3
, Issue.2
, pp. 124-141
-
-
Eiben, A.1
Hinterding, R.2
Michalewicz, Z.3
-
14
-
-
33847082135
-
-
Eshelman, L.J. and Schaffer, D.J. Real-coded genetic algorithms and interval schema, 1992 (Foundations of Genetic Algorithms 2: Whitely, San Mateo, CA).
-
Eshelman, L.J. and Schaffer, D.J. Real-coded genetic algorithms and interval schema, 1992 (Foundations of Genetic Algorithms 2: Whitely, San Mateo, CA).
-
-
-
-
15
-
-
0000049494
-
Greedy randomised adaptive search procedure
-
Feo, T. and Resende, M., Greedy randomised adaptive search procedure. J. Global Optim., 1995, 6, 109-133.
-
(1995)
J. Global Optim
, vol.6
, pp. 109-133
-
-
Feo, T.1
Resende, M.2
-
17
-
-
0001257619
-
Genetic algorithms and scatter search. Unsuspected potentials
-
Glover, F., Genetic algorithms and scatter search. Unsuspected potentials. Statist. Comp., 1994, 4, 131-140.
-
(1994)
Statist. Comp
, vol.4
, pp. 131-140
-
-
Glover, F.1
-
19
-
-
33847052477
-
-
A genetic algorithm for the resource constrained multi-project scheduling problem. AT&T Labs Technical Report TD-668LM4
-
Gonçalves, J., Mendes, J. and Resende, M., A genetic algorithm for the resource constrained multi-project scheduling problem. AT&T Labs Technical Report TD-668LM4, 2004.
-
(2004)
-
-
Gonçalves, J.1
Mendes, J.2
Resende, M.3
-
20
-
-
74849101820
-
Optimisation and approximation in deterministic sequencing and scheduling theory: A survey
-
Graham, R., Lawler, E., Lenstra, J. and Rinnooy Kan, A., Optimisation and approximation in deterministic sequencing and scheduling theory: a survey. Annals of Discrete Mathematics, 1979, 5, 287-326.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, R.1
Lawler, E.2
Lenstra, J.3
Rinnooy Kan, A.4
-
21
-
-
11644286761
-
Scheduling medical research experiments - An application of project scheduling methods
-
University of Kiel, Germany
-
Hartmann, S., Scheduling medical research experiments - An application of project scheduling methods. Manuskripte aus den Instituten fur Betriebswirtschaftslehre, No. 452, University of Kiel, Germany, 1997.
-
(1997)
Manuskripte aus den Instituten fur Betriebswirtschaftslehre
, Issue.452
-
-
Hartmann, S.1
-
22
-
-
0032188522
-
A competitive genetic algorithm for resource constrained project scheduling
-
Hartmann, S., A competitive genetic algorithm for resource constrained project scheduling. Naval Res. Logist., 1998, 45, 733-750.
-
(1998)
Naval Res. Logist
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
23
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
Hartmann, S., Project scheduling with multiple modes: a genetic algorithm. Ann. Op. Res., 2001, 102, 111-136.
-
(2001)
Ann. Op. Res
, vol.102
, pp. 111-136
-
-
Hartmann, S.1
-
24
-
-
0036684673
-
A self adapting genetic algorithm for project scheduling under resource constraints
-
Hartmann, S., A self adapting genetic algorithm for project scheduling under resource constraints. Naval Res. Logist., 2002, 49, 433-448.
-
(2002)
Naval Res. Logist
, vol.49
, pp. 433-448
-
-
Hartmann, S.1
-
25
-
-
33847012991
-
-
Herbots, J., Herroelen, W. and Leus, R., Experimental investigation of the applicability of ant colony optimisation algorithms for project scheduling. Department of Applied Economics, K. U. Leuvn, 2004.
-
Herbots, J., Herroelen, W. and Leus, R., Experimental investigation of the applicability of ant colony optimisation algorithms for project scheduling. Department of Applied Economics, K. U. Leuvn, 2004.
-
-
-
-
26
-
-
0032042933
-
Resource contrained project scheduling: A survey of recent developments
-
Herroelen, W., de Reyck, B. and Demeulemeester, E., Resource contrained project scheduling: a survey of recent developments. Comput. Oper. Res., 1998, 25, 279-302.
-
(1998)
Comput. Oper. Res
, vol.25
, pp. 279-302
-
-
Herroelen, W.1
de Reyck, B.2
Demeulemeester, E.3
-
27
-
-
0035254136
-
-
Herroelen, W., Demeulemeester, E. and de Reyck, B., A note on the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al. Euro. J. Op. Res., 2001, 128, 679-688.
-
Herroelen, W., Demeulemeester, E. and de Reyck, B., A note on the paper 'Resource-constrained project scheduling: notation, classification, models and methods' by Brucker et al. Euro. J. Op. Res., 2001, 128, 679-688.
-
-
-
-
28
-
-
0036807111
-
An evolutionary algorithm for resource constrained project scheduling
-
Hindi, K., Yang, H. and Flezar, K., An evolutionary algorithm for resource constrained project scheduling. IEEE Trans. Evol. Comp., 2002, 6, 512-518.
-
(2002)
IEEE Trans. Evol. Comp
, vol.6
, pp. 512-518
-
-
Hindi, K.1
Yang, H.2
Flezar, K.3
-
31
-
-
33845270624
-
Experimental investigation of heuristics for resource constrained project scheduling: An update
-
Kolisch, R. and Hartmann, S., Experimental investigation of heuristics for resource constrained project scheduling: an update. Euro. J. Oper. Res., 2006, 174(1), 23-37.
-
(2006)
Euro. J. Oper. Res
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
32
-
-
33847033350
-
-
Kolisch, R. and Sprecher, A., PSPLIB: A project scheduling problem library, Christian Albrechts Universitat zu Kiel, Germany, 1996. Available online at: http://129.187.106.231/psplib/ (accessed November 2004).
-
Kolisch, R. and Sprecher, A., PSPLIB: A project scheduling problem library, Christian Albrechts Universitat zu Kiel, Germany, 1996. Available online at: http://129.187.106.231/psplib/ (accessed November 2004).
-
-
-
-
33
-
-
0009318561
-
-
Institut fur Betriebswirtschaftslehre, Universitat du Kiel
-
Kolisch, R., Sprecher, A. and Drexl, A., Characterisation and generation of a general class of Resource-Constrained project scheduling problems, 1992, Institut fur Betriebswirtschaftslehre, Universitat du Kiel.
-
(1992)
Characterisation and generation of a general class of Resource-Constrained project scheduling problems
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
34
-
-
0033312040
-
A GA-based multicriteria optimal model for construction scheduling
-
Leu, S. and Yang, C., A GA-based multicriteria optimal model for construction scheduling. J. Construct. Eng. Manage., 1999, 125, 420-427.
-
(1999)
J. Construct. Eng. Manage
, vol.125
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
35
-
-
84886880619
-
-
Department of Industrial Engineering and Management, Yuan-Ze University, Taiwan
-
Liang, Y., Chen, A., Kao, W. and Chyu, C., An ant colony approach to resource constrained project scheduling problems. Department of Industrial Engineering and Management, Yuan-Ze University, Taiwan, 2004.
-
(2004)
An ant colony approach to resource constrained project scheduling problems
-
-
Liang, Y.1
Chen, A.2
Kao, W.3
Chyu, C.4
-
36
-
-
33847061670
-
-
Mendes, J., Goncalves, J. and Resende, M., A random key based genetic algorithm for the resource constrained project scheduling problem. AT&T Labs Research Technical Report TD-6DUK2C, 2005.
-
Mendes, J., Goncalves, J. and Resende, M., A random key based genetic algorithm for the resource constrained project scheduling problem. AT&T Labs Research Technical Report TD-6DUK2C, 2005.
-
-
-
-
37
-
-
0036672003
-
Ant colony optimisation for resource-constrained project scheduling
-
Merkle, D., Middendorf, M. and Schmeck, H., Ant colony optimisation for resource-constrained project scheduling. IEEE Trans. Evol. Comp., 2000, 6, 333-346.
-
(2000)
IEEE Trans. Evol. Comp
, vol.6
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
38
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
Mori, M. and Tseng, C., A genetic algorithm for multi-mode resource constrained project scheduling problem. Euro. J. Op. Res., 1996, 100(1), 134-141.
-
(1996)
Euro. J. Op. Res
, vol.100
, Issue.1
, pp. 134-141
-
-
Mori, M.1
Tseng, C.2
-
39
-
-
0028565588
-
Performance evaluation of genetic algorithms for flowshop scheduling problems
-
Murata, T. and Ishibuchi, H., Performance evaluation of genetic algorithms for flowshop scheduling problems, in Proceedings of the First IEEE Conference on Evolutionary Computation, 2, pp. 812-817.
-
Proceedings of the First IEEE Conference on Evolutionary Computation
, vol.2
, pp. 812-817
-
-
Murata, T.1
Ishibuchi, H.2
-
40
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
-
Patterson, J.H., A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Manage. Sci., 1984, 30, 584.
-
(1984)
Manage. Sci
, vol.30
, pp. 584
-
-
Patterson, J.H.1
-
43
-
-
33847043950
-
Parameterised heuristics for project scheduling - biased random sampling methods
-
Germany
-
Schrimer, A. and Riesenberg, S., Parameterised heuristics for project scheduling - biased random sampling methods. Christian-Albrechts Universitat, Keil, Germany, 1997.
-
(1997)
Christian-Albrechts Universitat, Keil
-
-
Schrimer, A.1
Riesenberg, S.2
-
44
-
-
4243916314
-
-
Working Paper, Abaut Izzet Baysal University, Bolu, Turkey
-
Sivrikaya-Şerifoǧlu, F., 1998, A new uniform order-based crossover for concurrent consideration of sequencing and selection problems. Working Paper, Abaut Izzet Baysal University, Bolu, Turkey.
-
(1998)
A new uniform order-based crossover for concurrent consideration of sequencing and selection problems
-
-
Sivrikaya-Şerifoǧlu, F.1
-
46
-
-
0001900725
-
A comparison of genetic sequencing operators
-
Morgan Kaufmann: San Mateo, CA
-
Starkweather, T., McDaniels, S., Mathias, K. and Whitely, C., A comparison of genetic sequencing operators, in Proceedings of the 4th International Conference on Genetic Algorithms (Morgan Kaufmann: San Mateo, CA) 1991.
-
(1991)
Proceedings of the 4th International Conference on Genetic Algorithms
-
-
Starkweather, T.1
McDaniels, S.2
Mathias, K.3
Whitely, C.4
-
47
-
-
0019597497
-
The design structure system: A method for managing the design of complex systems
-
Stewart, D., The design structure system: a method for managing the design of complex systems. IEEE Trans. Eng. Manage., 1981, 28, 71-74.
-
(1981)
IEEE Trans. Eng. Manage
, vol.28
, pp. 71-74
-
-
Stewart, D.1
-
49
-
-
0031124354
-
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
-
Ulusoy, G., Sivrikaya-Şerifoǧlu, F. and Bilge, U., A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Comp. Op. Res., 1997, 24, 335-351.
-
(1997)
Comp. Op. Res
, vol.24
, pp. 335-351
-
-
Ulusoy, G.1
Sivrikaya-Şerifoǧlu, F.2
Bilge, U.3
-
50
-
-
0042788727
-
Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
-
Ulusoy, G., Sivrikaya-Şerifoǧlu, F. and Şahin, Ş., Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows. Ann. Op. Res., 2001, 102, 237-261.
-
(2001)
Ann. Op. Res
, vol.102
, pp. 237-261
-
-
Ulusoy, G.1
Sivrikaya-Şerifoǧlu, F.2
Şahin, S.3
-
51
-
-
0007831119
-
Evolutionary divide and conquer: A novel genetic algorithm approach to the TSP
-
Valenzuela, C. and Jones, A., Evolutionary divide and conquer: a novel genetic algorithm approach to the TSP. Evol. Comp., 1993, 1, 313-333.
-
(1993)
Evol. Comp
, vol.1
, pp. 313-333
-
-
Valenzuela, C.1
Jones, A.2
-
52
-
-
84892530231
-
An evolutionary approach to the resource constrained project scheduling problem
-
Porto, Portugal, 16-20 July
-
Valls, V., Quintanilla, S. and Ballestin, F., An evolutionary approach to the resource constrained project scheduling problem, in 4th Metaheuristics International Conference, Porto, Portugal, 16-20 July 2001.
-
(2001)
4th Metaheuristics International Conference
-
-
Valls, V.1
Quintanilla, S.2
Ballestin, F.3
-
53
-
-
24944581032
-
A hybrid genetic algorithm for the resource constrained project scheduling problem with the peak crossover operator
-
Valls, V., Quintanilla, S. and Ballestin, F., A hybrid genetic algorithm for the resource constrained project scheduling problem with the peak crossover operator, in 8th International Workshop on Project Management and Scheduling, 2002, pp. 368-371.
-
(2002)
8th International Workshop on Project Management and Scheduling
, pp. 368-371
-
-
Valls, V.1
Quintanilla, S.2
Ballestin, F.3
-
56
-
-
0041877499
-
Efficient process optimisation
-
Whitfield, R., Duffy, A., Coates, G. and Hills, W., Efficient process optimisation. Concur. Engi., 2003, 11, 83-92.
-
(2003)
Concur. Engi
, vol.11
, pp. 83-92
-
-
Whitfield, R.1
Duffy, A.2
Coates, G.3
Hills, W.4
-
57
-
-
14044256646
-
Task scheduling of parallel development projects using genetic algorithms
-
Salt Lake City, Utah, USA
-
Zhuang, M. and Yassine, A., Task scheduling of parallel development projects using genetic algorithms, in DETC ASME 2004 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, Salt Lake City, Utah, USA, 2004.
-
(2004)
DETC ASME 2004 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference
-
-
Zhuang, M.1
Yassine, A.2
|