-
1
-
-
0031199079
-
A predictive model of sequential iteration in engineering design
-
Smith, R. P., and Eppinger, S. D., 1997, "A Predictive Model of Sequential Iteration in Engineering Design," Manage. Sci., 43(8), pp. 1104-1120.
-
(1997)
Manage. Sci.
, vol.43
, Issue.8
, pp. 1104-1120
-
-
Smith, R.P.1
Eppinger, S.D.2
-
2
-
-
0003579807
-
-
McGraw-Hill, New York, NY
-
Ulrich, K. T., and Eppinger, S. D., 2003, Product Design and Development, McGraw-Hill, New York, NY.
-
(2003)
Product Design and Development
-
-
Ulrich, K.T.1
Eppinger, S.D.2
-
3
-
-
33646716176
-
Characteristics and models of iteration in engineering design
-
The Hague, Netherlands
-
Smith, R. P., and Eppinger, S. D., 1993, "Characteristics and Models of Iteration in Engineering Design," Proceedings of International Conference on Engineering Design, The Hague, Netherlands, pp. 564-571.
-
(1993)
Proceedings of International Conference on Engineering Design
, pp. 564-571
-
-
Smith, R.P.1
Eppinger, S.D.2
-
4
-
-
0034823525
-
Structuring product development processes
-
Ahmadi, R., Roemer, T. A., and Wang, R. H., 2001, "Structuring Product Development Processes," Eur. J. Oper. Res., 130(3), pp. 539-558.
-
(2001)
Eur. J. Oper. Res.
, vol.130
, Issue.3
, pp. 539-558
-
-
Ahmadi, R.1
Roemer, T.A.2
Wang, R.H.3
-
5
-
-
11144299339
-
A model-based method for organizing tasks in product development
-
Eppinger, S. D., Whitney, D. E., Smith, R. P., and Gebala, D. A., 1994, "A Model-Based Method for Organizing Tasks in Product Development," Res. Eng. Des., 6(1), pp. 1-13.
-
(1994)
Res. Eng. Des.
, vol.6
, Issue.1
, pp. 1-13
-
-
Eppinger, S.D.1
Whitney, D.E.2
Smith, R.P.3
Gebala, D.A.4
-
6
-
-
0026825151
-
Creating project plans to focus product development
-
Wheelwright, S. C., and Clark, K. B., 1992, "Creating Project Plans to Focus Product Development," Harvard Bus. Rev., 70(2), pp. 70-82.
-
(1992)
Harvard Bus. Rev.
, vol.70
, Issue.2
, pp. 70-82
-
-
Wheelwright, S.C.1
Clark, K.B.2
-
7
-
-
0031108561
-
A model-based framework to overlap product development activities
-
Krishnan, V., Eppinger, S. D., and Whitney, D. E., 1997, "A Model-Based Framework to Overlap Product Development Activities," Manage. Sci., 43(4), pp. 437-451.
-
(1997)
Manage. Sci.
, vol.43
, Issue.4
, pp. 437-451
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
8
-
-
4544267535
-
Concurrent crashing and overlapping in product development
-
Roemer, T. A., and Reza, A., 2004, "Concurrent Crashing and Overlapping in Product Development," Oper. Res., 52(4), pp. 606-622.
-
(2004)
Oper. Res.
, vol.52
, Issue.4
, pp. 606-622
-
-
Roemer, T.A.1
Reza, A.2
-
9
-
-
0034313848
-
Time-cost trade-offs in overlapped product development
-
Roemer, T. A., Reza, A., and Wang, R. H., 2000, "Time-Cost Trade-Offs in Overlapped Product Development," Oper. Res., 48(6), pp. 858-865.
-
(2000)
Oper. Res.
, vol.48
, Issue.6
, pp. 858-865
-
-
Roemer, T.A.1
Reza, A.2
Wang, R.H.3
-
10
-
-
0031084622
-
Identifying controlling features of engineering design iteration
-
Smith, R. P., and Eppinger, S. D., 1997, "Identifying Controlling Features of Engineering Design Iteration," Manage. Sci., 43(3), pp. 276-293.
-
(1997)
Manage. Sci.
, vol.43
, Issue.3
, pp. 276-293
-
-
Smith, R.P.1
Eppinger, S.D.2
-
11
-
-
0032648503
-
Managing development risk in product design processes
-
Ahmadi, R., and Wang, R. H., 1999, "Managing Development Risk in Product Design Processes," Oper. Res., 47(2), pp. 235-246.
-
(1999)
Oper. Res.
, vol.47
, Issue.2
, pp. 235-246
-
-
Ahmadi, R.1
Wang, R.H.2
-
12
-
-
85030631225
-
A design process modeling approach incorporating nonlinear elements
-
Atlanta, GA, Paper No. DETC98-5663
-
Andersson, J., Phol, J., and Eppinger, S. D., 1998, "A Design Process Modeling Approach Incorporating Nonlinear Elements," Proceedings of ASME International Design Engineering and Technical Conferences, Atlanta, GA, Paper No. DETC98-5663.
-
(1998)
Proceedings of ASME International Design Engineering and Technical Conferences
-
-
Andersson, J.1
Phol, J.2
Eppinger, S.D.3
-
13
-
-
0036881796
-
Modeling impacts of process architecture on cost and schedule risk in product development
-
Browning, T. R., and Eppinger, S. D., 2002, "Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development," IEEE Trans. Eng. Manage., 49(4), pp. 428-442.
-
(2002)
IEEE Trans. Eng. Manage.
, vol.49
, Issue.4
, pp. 428-442
-
-
Browning, T.R.1
Eppinger, S.D.2
-
14
-
-
23344432043
-
A simulation-based process model for managing complex design projects
-
Cho, S.-H., and Eppinger, S. D., 2005, "A Simulation-Based Process Model for Managing Complex Design Projects," IEEE Trans. Eng. Manage., 52(3), pp. 316-328.
-
(2005)
IEEE Trans. Eng. Manage.
, vol.52
, Issue.3
, pp. 316-328
-
-
Cho, S.-H.1
Eppinger, S.D.2
-
15
-
-
0042622463
-
Problems in managing internal development projects in multi-project environments
-
Elonen, S., and Artto, K. A., 2003, "Problems in Managing Internal Development Projects in Multi-Project Environments," Int. J. Proj. Manage., 21(6), pp. 395-402.
-
(2003)
Int. J. Proj. Manage.
, vol.21
, Issue.6
, pp. 395-402
-
-
Elonen, S.1
Artto, K.A.2
-
16
-
-
0000858254
-
From project to process management: An empirically-based framework for analyzing product development time
-
Adler, P. S., Mandelbaum, A., Nguyen, V., and Schwerer, E., 1995, "From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time," Manage. Sci., 41(3), pp. 458-484.
-
(1995)
Manage. Sci.
, vol.41
, Issue.3
, pp. 458-484
-
-
Adler, P.S.1
Mandelbaum, A.2
Nguyen, V.3
Schwerer, E.4
-
17
-
-
32644440855
-
Multi-project scheduling and control: A process-based comparative study of critical chain methodology and some alternatives
-
Cohen, I., Mandelbaum, A., and Shtub, A., 2004, "Multi-Project Scheduling and Control: A Process-Based Comparative Study of Critical Chain Methodology and Some Alternatives," Proj. Manage. J., 35(2), pp. 39-50.
-
(2004)
Proj. Manage. J.
, vol.35
, Issue.2
, pp. 39-50
-
-
Cohen, I.1
Mandelbaum, A.2
Shtub, A.3
-
18
-
-
0037211465
-
Managing multi-project environments through constant work-in-process
-
Anavi-Isakow, S., and Golany, B., 2003, "Managing Multi-Project Environments Through Constant Work-In-Process," Int. J. Proj. Manage., 21(1), pp. 9-18.
-
(2003)
Int. J. Proj. Manage.
, vol.21
, Issue.1
, pp. 9-18
-
-
Anavi-Isakow, S.1
Golany, B.2
-
19
-
-
17444420771
-
Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
-
Cohen, I., Golany, B., and Shtub, A., 2005, "Managing Stochastic, Finite Capacity, Multi-Project Systems Through the Cross-Entropy Methodology," Ann. Operat. Res., 134(1), pp. 183-199.
-
(2005)
Ann. Operat. Res.
, vol.134
, Issue.1
, pp. 183-199
-
-
Cohen, I.1
Golany, B.2
Shtub, A.3
-
20
-
-
0033353544
-
Lead time modeling and acceleration of product design and development
-
Narahari, Y., Viswanadham, N., and Kumar, V. K., 1999, "Lead Time Modeling and Acceleration of Product Design and Development," IEEE Trans. Rob. Autom., 15(5), pp. 882-896.
-
(1999)
IEEE Trans. Rob. Autom.
, vol.15
, Issue.5
, pp. 882-896
-
-
Narahari, Y.1
Viswanadham, N.2
Kumar, V.K.3
-
21
-
-
15844378008
-
-
Working paper, MIT, Cambridge, MA
-
Yassine, A., and Browning, T. R., 2001, "Analyzing Multiple Product Development Projects Based on Information and Resource Constraints," Working paper, MIT, Cambridge, MA.
-
(2001)
Analyzing Multiple Product Development Projects Based on Information and Resource Constraints
-
-
Yassine, A.1
Browning, T.R.2
-
22
-
-
0019597497
-
The design structure system: A method for managing design of complex systems
-
Steward, D. V., 1981, "The Design Structure System: A Method for Managing Design of Complex Systems," IEEE Trans. Eng. Manage., 28(3), pp. 71-74.
-
(1981)
IEEE Trans. Eng. Manage.
, vol.28
, Issue.3
, pp. 71-74
-
-
Steward, D.V.1
-
23
-
-
34248386115
-
Re-sequencing of design processes with activity stochastic time and cost: An optimization-simulation approach
-
Abdelsalam, H. M. E., and Bao, H. P., 2007, "Re-Sequencing of Design Processes With Activity Stochastic Time and Cost: An Optimization-Simulation Approach," ASME J. Mech. Des., 129(2), pp. 150-157.
-
(2007)
ASME J. Mech. Des.
, vol.129
, Issue.2
, pp. 150-157
-
-
Abdelsalam, H.M.E.1
Bao, H.P.2
-
24
-
-
34250678915
-
Design process sequencing with competent genetic algorithms
-
Meier, C., Yassine, A., and Browning, T. R., 2007, "Design Process Sequencing With Competent Genetic Algorithms," ASME J. Mech. Des., 129(6), pp. 566-585.
-
(2007)
ASME J. Mech. Des.
, vol.129
, Issue.6
, pp. 566-585
-
-
Meier, C.1
Yassine, A.2
Browning, T.R.3
-
25
-
-
0003403633
-
Integrating a genetic algorithm into a knowledge-based system for ordering complex design processes
-
Rogers, J. L., McCully, C. M., and Bloebaum, C. L., 1996, "Integrating a Genetic Algorithm Into a Knowledge-Based System for Ordering Complex Design Processes," NASA, Technical Memorandum 110247.
-
(1996)
NASA, Technical Memorandum 110247
-
-
Rogers, J.L.1
McCully, C.M.2
Bloebaum, C.L.3
-
26
-
-
0030416580
-
A genetic algorithm for scheduling and decomposition of multidisciplinary design problems
-
Altus, S. S., Kroo, I. M., and Gage, P. J., 1996, "A Genetic Algorithm for Scheduling and Decomposition of Multidisciplinary Design Problems," ASME J. Mech. Des., 118(4), pp. 486-489.
-
(1996)
ASME J. Mech. Des.
, vol.118
, Issue.4
, pp. 486-489
-
-
Altus, S.S.1
Kroo, I.M.2
Gage, P.J.3
-
28
-
-
34250631367
-
Degree of modularity in engineering systems and products with technical and business constraints
-
Hölttä-Otto, K., and de Weck, O., 2007, "Degree of Modularity in Engineering Systems and Products With Technical and Business Constraints," Concurr. Eng. Res. Appl., 15(2), pp. 113-124.
-
(2007)
Concurr. Eng. Res. Appl.
, vol.15
, Issue.2
, pp. 113-124
-
-
Hölttä-Otto, K.1
De Weck, O.2
|