메뉴 건너뛰기




Volumn 131, Issue 2, 2009, Pages 0210081-02100811

Evaluation of acceleration effect of dynamic sequencing of design process in a multiproject environment

Author keywords

Design process; DSM; Dynamic sequencing; Multiproject environment; Stochastic processing network

Indexed keywords

ITERATIVE METHODS; STOCHASTIC SYSTEMS; STRUCTURAL OPTIMIZATION;

EID: 77955199335     PISSN: 10500472     EISSN: None     Source Type: Journal    
DOI: 10.1115/1.3066599     Document Type: Article
Times cited : (17)

References (28)
  • 1
    • 0031199079 scopus 로고    scopus 로고
    • A predictive model of sequential iteration in engineering design
    • Smith, R. P., and Eppinger, S. D., 1997, "A Predictive Model of Sequential Iteration in Engineering Design," Manage. Sci., 43(8), pp. 1104-1120.
    • (1997) Manage. Sci. , vol.43 , Issue.8 , pp. 1104-1120
    • Smith, R.P.1    Eppinger, S.D.2
  • 4
    • 0034823525 scopus 로고    scopus 로고
    • Structuring product development processes
    • Ahmadi, R., Roemer, T. A., and Wang, R. H., 2001, "Structuring Product Development Processes," Eur. J. Oper. Res., 130(3), pp. 539-558.
    • (2001) Eur. J. Oper. Res. , vol.130 , Issue.3 , pp. 539-558
    • Ahmadi, R.1    Roemer, T.A.2    Wang, R.H.3
  • 5
    • 11144299339 scopus 로고
    • A model-based method for organizing tasks in product development
    • Eppinger, S. D., Whitney, D. E., Smith, R. P., and Gebala, D. A., 1994, "A Model-Based Method for Organizing Tasks in Product Development," Res. Eng. Des., 6(1), pp. 1-13.
    • (1994) Res. Eng. Des. , vol.6 , Issue.1 , pp. 1-13
    • Eppinger, S.D.1    Whitney, D.E.2    Smith, R.P.3    Gebala, D.A.4
  • 6
    • 0026825151 scopus 로고
    • Creating project plans to focus product development
    • Wheelwright, S. C., and Clark, K. B., 1992, "Creating Project Plans to Focus Product Development," Harvard Bus. Rev., 70(2), pp. 70-82.
    • (1992) Harvard Bus. Rev. , vol.70 , Issue.2 , pp. 70-82
    • Wheelwright, S.C.1    Clark, K.B.2
  • 7
    • 0031108561 scopus 로고    scopus 로고
    • A model-based framework to overlap product development activities
    • Krishnan, V., Eppinger, S. D., and Whitney, D. E., 1997, "A Model-Based Framework to Overlap Product Development Activities," Manage. Sci., 43(4), pp. 437-451.
    • (1997) Manage. Sci. , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 8
    • 4544267535 scopus 로고    scopus 로고
    • Concurrent crashing and overlapping in product development
    • Roemer, T. A., and Reza, A., 2004, "Concurrent Crashing and Overlapping in Product Development," Oper. Res., 52(4), pp. 606-622.
    • (2004) Oper. Res. , vol.52 , Issue.4 , pp. 606-622
    • Roemer, T.A.1    Reza, A.2
  • 9
    • 0034313848 scopus 로고    scopus 로고
    • Time-cost trade-offs in overlapped product development
    • Roemer, T. A., Reza, A., and Wang, R. H., 2000, "Time-Cost Trade-Offs in Overlapped Product Development," Oper. Res., 48(6), pp. 858-865.
    • (2000) Oper. Res. , vol.48 , Issue.6 , pp. 858-865
    • Roemer, T.A.1    Reza, A.2    Wang, R.H.3
  • 10
    • 0031084622 scopus 로고    scopus 로고
    • Identifying controlling features of engineering design iteration
    • Smith, R. P., and Eppinger, S. D., 1997, "Identifying Controlling Features of Engineering Design Iteration," Manage. Sci., 43(3), pp. 276-293.
    • (1997) Manage. Sci. , vol.43 , Issue.3 , pp. 276-293
    • Smith, R.P.1    Eppinger, S.D.2
  • 11
    • 0032648503 scopus 로고    scopus 로고
    • Managing development risk in product design processes
    • Ahmadi, R., and Wang, R. H., 1999, "Managing Development Risk in Product Design Processes," Oper. Res., 47(2), pp. 235-246.
    • (1999) Oper. Res. , vol.47 , Issue.2 , pp. 235-246
    • Ahmadi, R.1    Wang, R.H.2
  • 13
    • 0036881796 scopus 로고    scopus 로고
    • Modeling impacts of process architecture on cost and schedule risk in product development
    • Browning, T. R., and Eppinger, S. D., 2002, "Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development," IEEE Trans. Eng. Manage., 49(4), pp. 428-442.
    • (2002) IEEE Trans. Eng. Manage. , vol.49 , Issue.4 , pp. 428-442
    • Browning, T.R.1    Eppinger, S.D.2
  • 14
    • 23344432043 scopus 로고    scopus 로고
    • A simulation-based process model for managing complex design projects
    • Cho, S.-H., and Eppinger, S. D., 2005, "A Simulation-Based Process Model for Managing Complex Design Projects," IEEE Trans. Eng. Manage., 52(3), pp. 316-328.
    • (2005) IEEE Trans. Eng. Manage. , vol.52 , Issue.3 , pp. 316-328
    • Cho, S.-H.1    Eppinger, S.D.2
  • 15
    • 0042622463 scopus 로고    scopus 로고
    • Problems in managing internal development projects in multi-project environments
    • Elonen, S., and Artto, K. A., 2003, "Problems in Managing Internal Development Projects in Multi-Project Environments," Int. J. Proj. Manage., 21(6), pp. 395-402.
    • (2003) Int. J. Proj. Manage. , vol.21 , Issue.6 , pp. 395-402
    • Elonen, S.1    Artto, K.A.2
  • 16
    • 0000858254 scopus 로고
    • From project to process management: An empirically-based framework for analyzing product development time
    • Adler, P. S., Mandelbaum, A., Nguyen, V., and Schwerer, E., 1995, "From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time," Manage. Sci., 41(3), pp. 458-484.
    • (1995) Manage. Sci. , vol.41 , Issue.3 , pp. 458-484
    • Adler, P.S.1    Mandelbaum, A.2    Nguyen, V.3    Schwerer, E.4
  • 17
    • 32644440855 scopus 로고    scopus 로고
    • Multi-project scheduling and control: A process-based comparative study of critical chain methodology and some alternatives
    • Cohen, I., Mandelbaum, A., and Shtub, A., 2004, "Multi-Project Scheduling and Control: A Process-Based Comparative Study of Critical Chain Methodology and Some Alternatives," Proj. Manage. J., 35(2), pp. 39-50.
    • (2004) Proj. Manage. J. , vol.35 , Issue.2 , pp. 39-50
    • Cohen, I.1    Mandelbaum, A.2    Shtub, A.3
  • 18
    • 0037211465 scopus 로고    scopus 로고
    • Managing multi-project environments through constant work-in-process
    • Anavi-Isakow, S., and Golany, B., 2003, "Managing Multi-Project Environments Through Constant Work-In-Process," Int. J. Proj. Manage., 21(1), pp. 9-18.
    • (2003) Int. J. Proj. Manage. , vol.21 , Issue.1 , pp. 9-18
    • Anavi-Isakow, S.1    Golany, B.2
  • 19
    • 17444420771 scopus 로고    scopus 로고
    • Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
    • Cohen, I., Golany, B., and Shtub, A., 2005, "Managing Stochastic, Finite Capacity, Multi-Project Systems Through the Cross-Entropy Methodology," Ann. Operat. Res., 134(1), pp. 183-199.
    • (2005) Ann. Operat. Res. , vol.134 , Issue.1 , pp. 183-199
    • Cohen, I.1    Golany, B.2    Shtub, A.3
  • 20
    • 0033353544 scopus 로고    scopus 로고
    • Lead time modeling and acceleration of product design and development
    • Narahari, Y., Viswanadham, N., and Kumar, V. K., 1999, "Lead Time Modeling and Acceleration of Product Design and Development," IEEE Trans. Rob. Autom., 15(5), pp. 882-896.
    • (1999) IEEE Trans. Rob. Autom. , vol.15 , Issue.5 , pp. 882-896
    • Narahari, Y.1    Viswanadham, N.2    Kumar, V.K.3
  • 22
    • 0019597497 scopus 로고
    • The design structure system: A method for managing design of complex systems
    • Steward, D. V., 1981, "The Design Structure System: A Method for Managing Design of Complex Systems," IEEE Trans. Eng. Manage., 28(3), pp. 71-74.
    • (1981) IEEE Trans. Eng. Manage. , vol.28 , Issue.3 , pp. 71-74
    • Steward, D.V.1
  • 23
    • 34248386115 scopus 로고    scopus 로고
    • Re-sequencing of design processes with activity stochastic time and cost: An optimization-simulation approach
    • Abdelsalam, H. M. E., and Bao, H. P., 2007, "Re-Sequencing of Design Processes With Activity Stochastic Time and Cost: An Optimization-Simulation Approach," ASME J. Mech. Des., 129(2), pp. 150-157.
    • (2007) ASME J. Mech. Des. , vol.129 , Issue.2 , pp. 150-157
    • Abdelsalam, H.M.E.1    Bao, H.P.2
  • 24
    • 34250678915 scopus 로고    scopus 로고
    • Design process sequencing with competent genetic algorithms
    • Meier, C., Yassine, A., and Browning, T. R., 2007, "Design Process Sequencing With Competent Genetic Algorithms," ASME J. Mech. Des., 129(6), pp. 566-585.
    • (2007) ASME J. Mech. Des. , vol.129 , Issue.6 , pp. 566-585
    • Meier, C.1    Yassine, A.2    Browning, T.R.3
  • 25
    • 0003403633 scopus 로고    scopus 로고
    • Integrating a genetic algorithm into a knowledge-based system for ordering complex design processes
    • Rogers, J. L., McCully, C. M., and Bloebaum, C. L., 1996, "Integrating a Genetic Algorithm Into a Knowledge-Based System for Ordering Complex Design Processes," NASA, Technical Memorandum 110247.
    • (1996) NASA, Technical Memorandum 110247
    • Rogers, J.L.1    McCully, C.M.2    Bloebaum, C.L.3
  • 26
    • 0030416580 scopus 로고    scopus 로고
    • A genetic algorithm for scheduling and decomposition of multidisciplinary design problems
    • Altus, S. S., Kroo, I. M., and Gage, P. J., 1996, "A Genetic Algorithm for Scheduling and Decomposition of Multidisciplinary Design Problems," ASME J. Mech. Des., 118(4), pp. 486-489.
    • (1996) ASME J. Mech. Des. , vol.118 , Issue.4 , pp. 486-489
    • Altus, S.S.1    Kroo, I.M.2    Gage, P.J.3
  • 28
    • 34250631367 scopus 로고    scopus 로고
    • Degree of modularity in engineering systems and products with technical and business constraints
    • Hölttä-Otto, K., and de Weck, O., 2007, "Degree of Modularity in Engineering Systems and Products With Technical and Business Constraints," Concurr. Eng. Res. Appl., 15(2), pp. 113-124.
    • (2007) Concurr. Eng. Res. Appl. , vol.15 , Issue.2 , pp. 113-124
    • Hölttä-Otto, K.1    De Weck, O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.