Volumn 47, Issue 2, 2016, Pages 333-372

Managing a Portfolio of Product Development Projects under Resource Constraints

Author keywords

Multiproject scheduling; Portfolio management; Priority rules; Product development; Project management; Resource constraints

Indexed keywords


EID: 84941703247     PISSN: 00117315     EISSN: 15405915     Source Type: Journal    
DOI: 10.1111/deci.12172     Document Type: Article
Times cited : (37)

References (81)
  • 1
    • 0345356702 scopus 로고
    • Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems
    • Allam, S. I. G. (1988). Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6, 93-115.
    • (1988) Construction Management and Economics , vol.6 , pp. 93-115
    • Allam, S.I.G.1
  • 2
  • 3
    • 33847741707 scopus 로고    scopus 로고
    • Projects with sequential iteration: Models and complexity
    • Banerjee, A., Carrillo, J. E., & Paul, A. (2007). Projects with sequential iteration: Models and complexity. IIE Transactions, 39(5), 453-463.
    • (2007) IIE Transactions , vol.39 , Issue.5 , pp. 453-463
    • Banerjee, A.1    Carrillo, J.E.2    Paul, A.3
  • 4
    • 0035252463 scopus 로고    scopus 로고
    • Balancing and optimizing a portfolio of R&D projects
    • Beaujon, G. J., Marin, S. P., & McDonald, G. C. (2001). Balancing and optimizing a portfolio of R&D projects. Naval Research Logistics, 48(1), 18-40.
    • (2001) Naval Research Logistics , vol.48 , Issue.1 , pp. 18-40
    • Beaujon, G.J.1    Marin, S.P.2    McDonald, G.C.3
  • 5
    • 56249148604 scopus 로고    scopus 로고
    • Project management practice, generic or contextual: A reality check
    • Besner, C., & Hobbs, B. (2008). Project management practice, generic or contextual: A reality check. Project Management Journal, 39(1), 16-33.
    • (2008) Project Management Journal , vol.39 , Issue.1 , pp. 16-33
    • Besner, C.1    Hobbs, B.2
  • 6
    • 43849098421 scopus 로고    scopus 로고
    • Project portfolio management - there's more to it than what management enacts
    • Blichfeldt, B. S., & Eskerod, P. (2008). Project portfolio management - there's more to it than what management enacts. International Journal of Project Management, 26(4), 357-365.
    • (2008) International Journal of Project Management , vol.26 , Issue.4 , pp. 357-365
    • Blichfeldt, B.S.1    Eskerod, P.2
  • 7
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor, F. F. (1990). Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research, 49(1), 3-13.
    • (1990) European Journal of Operational Research , vol.49 , Issue.1 , pp. 3-13
    • Boctor, F.F.1
  • 8
    • 77953687537 scopus 로고    scopus 로고
    • Multi-objective simulated annealing for the resource-constrained multi-project scheduling problem
    • Osnabrück, Germany, April 17-19.
    • Bouleimen, K., & Lecocq, H. (2000). Multi-objective simulated annealing for the resource-constrained multi-project scheduling problem. 7th International Workshop on Project Management and Scheduling (PMS 2000), Osnabrück, Germany, April 17-19.
    • (2000) 7th International Workshop on Project Management and Scheduling (PMS 2000)
    • Bouleimen, K.1    Lecocq, H.2
  • 9
    • 36849083967 scopus 로고    scopus 로고
    • The statistical mechanics of complex product development: Empirical and analytical results
    • Braha, D., & Bar-Yam, Y. (2007). The statistical mechanics of complex product development: Empirical and analytical results. Management Science, 53(7), 1127-1145.
    • (2007) Management Science , vol.53 , Issue.7 , pp. 1127-1145
    • Braha, D.1    Bar-Yam, Y.2
  • 10
    • 0036881796 scopus 로고    scopus 로고
    • Modeling impacts of process architecture on cost and schedule risk in product development
    • Browning, T. R., & Eppinger, S. D. (2002). Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transactions on Engineering Management, 49(4), 428-442.
    • (2002) IEEE Transactions on Engineering Management , vol.49 , Issue.4 , pp. 428-442
    • Browning, T.R.1    Eppinger, S.D.2
  • 11
    • 34547279437 scopus 로고    scopus 로고
    • A survey of activity network-based process models for managing product development projects
    • Browning, T. R., & Ramasesh, R. V. (2007). A survey of activity network-based process models for managing product development projects. Production & Operations Management, 16(2), 217-240.
    • (2007) Production & Operations Management , vol.16 , Issue.2 , pp. 217-240
    • Browning, T.R.1    Ramasesh, R.V.2
  • 12
    • 77952430773 scopus 로고    scopus 로고
    • A random generator of resource-constrained multi-project network problems
    • Browning, T. R., & Yassine, A. A. (2010a). A random generator of resource-constrained multi-project network problems. Journal of Scheduling, 13(2), 143-161.
    • (2010) Journal of Scheduling , vol.13 , Issue.2 , pp. 143-161
    • Browning, T.R.1    Yassine, A.A.2
  • 13
    • 77953684240 scopus 로고    scopus 로고
    • Resource-constrained multi-project scheduling: Priority rule performance revisited
    • Browning, T. R., & Yassine, A. A. (2010b). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126(2), 212-228.
    • (2010) International Journal of Production Economics , vol.126 , Issue.2 , pp. 212-228
    • Browning, T.R.1    Yassine, A.A.2
  • 14
    • 84861525916 scopus 로고    scopus 로고
    • Analysing the relationship between design process composition and robustness to task delays
    • Dubrovnik, Croatia, May 19-22.
    • Chalupnik, M. J., Wynn, D. C., Eckert, C. M., & Clarkson, P. J. (2008). Analysing the relationship between design process composition and robustness to task delays. International Design Conference, Dubrovnik, Croatia, May 19-22.
    • (2008) International Design Conference
    • Chalupnik, M.J.1    Wynn, D.C.2    Eckert, C.M.3    Clarkson, P.J.4
  • 15
    • 23344432043 scopus 로고    scopus 로고
    • A simulation-based process model for managing complex design projects
    • Cho, S.-H., & Eppinger, S. D. (2005). A simulation-based process model for managing complex design projects. IEEE Transactions on Engineering Management, 52(3), 316-328.
    • (2005) IEEE Transactions on Engineering Management , vol.52 , Issue.3 , pp. 316-328
    • Cho, S.-H.1    Eppinger, S.D.2
  • 16
    • 32644440855 scopus 로고    scopus 로고
    • Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives
    • Cohen, I., Mandelbaum, A., & Shtub, A. (2004). Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives. Project Management Journal, 35(2), 39-50.
    • (2004) Project Management Journal , vol.35 , Issue.2 , pp. 39-50
    • Cohen, I.1    Mandelbaum, A.2    Shtub, A.3
  • 17
    • 33846864716 scopus 로고    scopus 로고
    • A market-based multi-agent system model for decentralized multi-project scheduling
    • Confessore, G., Giordani, S., & Rismondo, S. (2007). A market-based multi-agent system model for decentralized multi-project scheduling. Annals of Operations Research, 150(1), 115-135.
    • (2007) Annals of Operations Research , vol.150 , Issue.1 , pp. 115-135
    • Confessore, G.1    Giordani, S.2    Rismondo, S.3
  • 18
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource-constrained projects: An experimental investigation
    • Cooper, D. F. (1976). Heuristics for scheduling resource-constrained projects: An experimental investigation. Management Science, 22(11), 1186-1194.
    • (1976) Management Science , vol.22 , Issue.11 , pp. 1186-1194
    • Cooper, D.F.1
  • 19
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarks for the project manager
    • Cooper, K. G. (1993a). The rework cycle: Benchmarks for the project manager. Project Management Journal, 24(1), 17-21.
    • (1993) Project Management Journal , vol.24 , Issue.1 , pp. 17-21
    • Cooper, K.G.1
  • 20
    • 0003285499 scopus 로고
    • The rework cycle: Why projects are mismanaged
    • February).
    • Cooper, K. G. (1993b). The rework cycle: Why projects are mismanaged. PMNETwork (February).
    • (1993) PMNETwork
    • Cooper, K.G.1
  • 22
    • 0016520377 scopus 로고
    • Project network summary measures and constrained resource scheduling
    • Davis, E. W. (1975). Project network summary measures and constrained resource scheduling. IIE Transactions, 7(2), 132-142.
    • (1975) IIE Transactions , vol.7 , Issue.2 , pp. 132-142
    • Davis, E.W.1
  • 23
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis, E. W., & Patterson, J. H. (1975). A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Science, 21(8), 944-955.
    • (1975) Management Science , vol.21 , Issue.8 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 24
    • 0035517620 scopus 로고    scopus 로고
    • Technology portfolio management: Optimizing interdependent projects over multiple time periods
    • Dickinson, M. W., Thornton, A. C., & Graves, S. (2001). Technology portfolio management: Optimizing interdependent projects over multiple time periods. IEEE Transactions on Engineering Management, 48(4), 518-527.
    • (2001) IEEE Transactions on Engineering Management , vol.48 , Issue.4 , pp. 518-527
    • Dickinson, M.W.1    Thornton, A.C.2    Graves, S.3
  • 25
    • 33646418970 scopus 로고    scopus 로고
    • Impact of role in the decision to fail: An exploratory study of terminated projects
    • Dilts, D. M., & Pence, K. R. (2006). Impact of role in the decision to fail: An exploratory study of terminated projects. Journal of Operations Management, 24(4), 378-396.
    • (2006) Journal of Operations Management , vol.24 , Issue.4 , pp. 378-396
    • Dilts, D.M.1    Pence, K.R.2
  • 26
    • 0042622452 scopus 로고    scopus 로고
    • The resource allocation syndrome: The prime challenge of multi-project management?
    • Engwall, M., & Jerbrant, A. (2003). The resource allocation syndrome: The prime challenge of multi-project management?. International Journal of Project Management, 21(6), 403-409.
    • (2003) International Journal of Project Management , vol.21 , Issue.6 , pp. 403-409
    • Engwall, M.1    Jerbrant, A.2
  • 28
    • 0011717163 scopus 로고
    • Towards the development of a complete multiproject scheduling system
    • Fendley, L. G. (1968). Towards the development of a complete multiproject scheduling system. Journal of Industrial Engineering, 19(10), 505-515.
    • (1968) Journal of Industrial Engineering , vol.19 , Issue.10 , pp. 505-515
    • Fendley, L.G.1
  • 29
    • 34547345802 scopus 로고    scopus 로고
    • A resource-process framework of new service development
    • Froehle, C. M., & Roth, A. V. (2007). A resource-process framework of new service development. Production & Operations Management, 16(2), 169-188.
    • (2007) Production & Operations Management , vol.16 , Issue.2 , pp. 169-188
    • Froehle, C.M.1    Roth, A.V.2
  • 30
    • 40849142091 scopus 로고    scopus 로고
    • A genetic algorithm for the resource constrained multi-project scheduling problem
    • Gonçalves, J. F., Mendes, J. J. d. M., & Resende, M. G. C. (2008). A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research, 189(3), 1171-1190.
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 1171-1190
    • Gonçalves, J.F.1    Mendes, J.J.d.M.2    Resende, M.G.C.3
  • 32
    • 33751531856 scopus 로고    scopus 로고
    • A hierarchical approach to multi-project planning under uncertainty
    • Hans, E. W., Herroelen, W., Leus, R., & Wullink, G. (2007). A hierarchical approach to multi-project planning under uncertainty. Omega, 35(5), 563-577.
    • (2007) Omega , vol.35 , Issue.5 , pp. 563-577
    • Hans, E.W.1    Herroelen, W.2    Leus, R.3    Wullink, G.4
  • 33
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • Hartmann, S., & Briskorn, D. (2009). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1-14.
    • (2009) European Journal of Operational Research , vol.207 , Issue.1 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 34
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann, S., & Kolisch, R. (2000). Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research, 127(2), 394-407.
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 36
    • 33646106557 scopus 로고    scopus 로고
    • Project scheduling-theory and practice
    • Herroelen, W. S. (2005). Project scheduling-theory and practice. Production and Operations Management, 14(4), 413-432.
    • (2005) Production and Operations Management , vol.14 , Issue.4 , pp. 413-432
    • Herroelen, W.S.1
  • 37
    • 77953872113 scopus 로고    scopus 로고
    • A multi-agent system for the decentralized resource-constrained multi-project scheduling problem
    • Homberger, J. (2007). A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. International Transactions in Operational Research, 14(6), 565-589.
    • (2007) International Transactions in Operational Research , vol.14 , Issue.6 , pp. 565-589
    • Homberger, J.1
  • 38
    • 33749680762 scopus 로고    scopus 로고
    • A heuristic genetic algorithm for product portfolio planning
    • Jiao, J. R., Zhang, Y., & Wang, Y. (2007). A heuristic genetic algorithm for product portfolio planning. Computers & Operations Research, 34(6), 1777-1799.
    • (2007) Computers & Operations Research , vol.34 , Issue.6 , pp. 1777-1799
    • Jiao, J.R.1    Zhang, Y.2    Wang, Y.3
  • 39
  • 40
    • 5644271863 scopus 로고    scopus 로고
    • Optimal project sequencing with recourse at a scarce resource
    • Kavadias, S. K., & Loch, C. H. (2003). Optimal project sequencing with recourse at a scarce resource. Production and Operations Management, 12(4), 433-444.
    • (2003) Production and Operations Management , vol.12 , Issue.4 , pp. 433-444
    • Kavadias, S.K.1    Loch, C.H.2
  • 41
    • 0022101234 scopus 로고
    • Innovation is not a linear process
    • Kline, S. J. (1985). Innovation is not a linear process. Research Management, 28(2), 36-45.
    • (1985) Research Management , vol.28 , Issue.2 , pp. 36-45
    • Kline, S.J.1
  • 42
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch, R. (1996a). Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14(3), 179-192.
    • (1996) Journal of Operations Management , vol.14 , Issue.3 , pp. 179-192
    • Kolisch, R.1
  • 43
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch, R. (1996b). Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research, 90(2), 320-333.
    • (1996) European Journal of Operational Research , vol.90 , Issue.2 , pp. 320-333
    • Kolisch, R.1
  • 44
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • In J. Weglarz (Ed.), Boston: Kluwer Academic Publishers
    • Kolisch, R., & Hartmann, S. (1999). Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In J. Weglarz (Ed.), Project scheduling. Boston: Kluwer Academic Publishers, 147-178.
    • (1999) Project scheduling , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 45
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch, R., & Hartmann, S. (2005). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174(1), 23-37.
    • (2005) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 46
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus, I., & Davis, E. W. (1982). Multi-project scheduling: Categorization of heuristic rules performance. Management Science, 28(2), 161-172.
    • (1982) Management Science , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 47
    • 39349103031 scopus 로고    scopus 로고
    • Effects of resource allocation policies for reducing project durations: A systems modelling approach
    • Lee, Z. W., Ford, D. N., & Joglekar, N. (2008). Effects of resource allocation policies for reducing project durations: A systems modelling approach. Systems Research and Behavioral Science, 24(6), 551-566.
    • (2008) Systems Research and Behavioral Science , vol.24 , Issue.6 , pp. 551-566
    • Lee, Z.W.1    Ford, D.N.2    Joglekar, N.3
  • 48
    • 0017924416 scopus 로고
    • Complexity of scheduling under precedence constraints
    • Lenstra, J. K., & Kan, A. H. G. R. (1978). Complexity of scheduling under precedence constraints. Operations Research, 26(1), 22-35.
    • (1978) Operations Research , vol.26 , Issue.1 , pp. 22-35
    • Lenstra, J.K.1    Kan, A.H.G.R.2
  • 49
    • 70449434719 scopus 로고    scopus 로고
    • An adaptive process model to support product development project management
    • Lévárdy, V., & Browning, T. R. (2009). An adaptive process model to support product development project management. IEEE Transactions on Engineering Management, 56(4), 600-620.
    • (2009) IEEE Transactions on Engineering Management , vol.56 , Issue.4 , pp. 600-620
    • Lévárdy, V.1    Browning, T.R.2
  • 50
    • 0020797755 scopus 로고
    • The practice of management science in R&D project management
    • Liberatore, M. J., & Titus, G. J. (1983). The practice of management science in R&D project management. Management Science, 29(8), 962-974.
    • (1983) Management Science , vol.29 , Issue.8 , pp. 962-974
    • Liberatore, M.J.1    Titus, G.J.2
  • 51
    • 48349129173 scopus 로고    scopus 로고
    • A particle swarm optimization for resource-constrained multi-project scheduling problem
    • Harbin, China, Dec 15-19.
    • Linyi, D., & Yan, L. (2007). A particle swarm optimization for resource-constrained multi-project scheduling problem. International Conference on Computational Intelligence and Security, Harbin, China, Dec 15-19.
    • (2007) International Conference on Computational Intelligence and Security
    • Linyi, D.1    Yan, L.2
  • 52
    • 0036814697 scopus 로고    scopus 로고
    • Dynamic portfolio selection of NPD programs using marginal returns
    • Loch, C. H., & Kavadias, S. (2002). Dynamic portfolio selection of NPD programs using marginal returns. Management Science, 48(10), 1227-1241.
    • (2002) Management Science , vol.48 , Issue.10 , pp. 1227-1241
    • Loch, C.H.1    Kavadias, S.2
  • 53
    • 29144485769 scopus 로고    scopus 로고
    • Rush and be wrong or wait and be late? A model of information in collaborative processes
    • Loch, C. H., & Terwiesch, C. (2005). Rush and be wrong or wait and be late? A model of information in collaborative processes. Production and Operations Management, 14(3), 331-343.
    • (2005) Production and Operations Management , vol.14 , Issue.3 , pp. 331-343
    • Loch, C.H.1    Terwiesch, C.2
  • 54
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling
    • Lova, A., & Tormos, P. (2001). Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling. Annals of Operations Research, 102(1-4), 263-286.
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 56
    • 0033102403 scopus 로고    scopus 로고
    • Scheduling of design projects with uncertain number of iterations
    • Luh, P. B., Liu, F., & Moser, B. (1999). Scheduling of design projects with uncertain number of iterations. European Journal of Operational Research, 113(3), 575-592.
    • (1999) European Journal of Operational Research , vol.113 , Issue.3 , pp. 575-592
    • Luh, P.B.1    Liu, F.2    Moser, B.3
  • 59
    • 68849107317 scopus 로고    scopus 로고
    • Solving resource constrained multiple project scheduling problems by random key-based genetic algorithm
    • Okada, I., Lin, L., & Gen, M. (2009). Solving resource constrained multiple project scheduling problems by random key-based genetic algorithm. Electronics and Communications in Japan, 92(8), 25-35.
    • (2009) Electronics and Communications in Japan , vol.92 , Issue.8 , pp. 25-35
    • Okada, I.1    Lin, L.2    Gen, M.3
  • 62
    • 33745732454 scopus 로고    scopus 로고
    • Project portfolio management and managing multiple projects: Two sides of the same coin?
    • In J. S. Pennypacker, & L. D. Dye (Eds.), New York, NY: Marcel Dekker
    • Pennypacker, J. S., & Dye, L. D. (2002). Project portfolio management and managing multiple projects: Two sides of the same coin?. In J. S. Pennypacker, & L. D. Dye (Eds.), Managing multiple projects. New York, NY: Marcel Dekker, 1-10.
    • (2002) Managing multiple projects , pp. 1-10
    • Pennypacker, J.S.1    Dye, L.D.2
  • 63
    • 0036697280 scopus 로고    scopus 로고
    • On uncertainty, ambiguity and complexity in project management
    • Pich, M. T., Loch, C. H., & Meyer, A. D. (2002). On uncertainty, ambiguity and complexity in project management. Management Science, 48(8), 1008-1023.
    • (2002) Management Science , vol.48 , Issue.8 , pp. 1008-1023
    • Pich, M.T.1    Loch, C.H.2    Meyer, A.D.3
  • 64
  • 65
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A. A. B., Watters, L. J., & Wolfe, P. M. (1969). Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 16(1), 93-108.
    • (1969) Management Science , vol.16 , Issue.1 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 67
    • 1642332320 scopus 로고    scopus 로고
    • Technological innovation, product development, and entrepreneurship in Management Science
    • Shane, S. A., & Ulrich, K. T. (2004). Technological innovation, product development, and entrepreneurship in Management Science. Management Science, 50(2), 133-144.
    • (2004) Management Science , vol.50 , Issue.2 , pp. 133-144
    • Shane, S.A.1    Ulrich, K.T.2
  • 69
    • 0031084622 scopus 로고    scopus 로고
    • Identifying controlling features of engineering design iteration
    • Smith, R. P., & Eppinger, S. D. (1997a). Identifying controlling features of engineering design iteration. Management Science, 43(3), 276-293.
    • (1997) Management Science , vol.43 , Issue.3 , pp. 276-293
    • Smith, R.P.1    Eppinger, S.D.2
  • 70
    • 0031199079 scopus 로고    scopus 로고
    • A predictive model of sequential iteration in engineering design
    • Smith, R. P., & Eppinger, S. D. (1997b). A predictive model of sequential iteration in engineering design. Management Science, 43(8), 1104-1120.
    • (1997) Management Science , vol.43 , Issue.8 , pp. 1104-1120
    • Smith, R.P.1    Eppinger, S.D.2
  • 74
    • 0033891822 scopus 로고    scopus 로고
    • The effect of 'front-loading' problem-solving on product development performance
    • Thomke, S., & Fujimoto, T. (2000). The effect of 'front-loading' problem-solving on product development performance. Journal of Product Innovation Management, 17(2), 128-142.
    • (2000) Journal of Product Innovation Management , vol.17 , Issue.2 , pp. 128-142
    • Thomke, S.1    Fujimoto, T.2
  • 75
    • 0032093607 scopus 로고    scopus 로고
    • Managing experimentation in the design of new products
    • Thomke, S. H. (1998). Managing experimentation in the design of new products. Management Science, 44(6), 743-762.
    • (1998) Management Science , vol.44 , Issue.6 , pp. 743-762
    • Thomke, S.H.1
  • 76
    • 84962116874 scopus 로고    scopus 로고
    • Scheduling resource-constrained projects when non-conformaties exist
    • Tukel, O. I. (1996). Scheduling resource-constrained projects when non-conformaties exist. Project Management Journal, 27, 47-55.
    • (1996) Project Management Journal , vol.27 , pp. 47-55
    • Tukel, O.I.1
  • 77
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy, G., & Özdamar, L. (1989). Heuristic performance and network/resource characteristics in resource-constrained project scheduling. Journal of the Operational Research Society, 40(12), 1145-1152.
    • (1989) Journal of the Operational Research Society , vol.40 , Issue.12 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2
  • 80
    • 0036614607 scopus 로고    scopus 로고
    • A quantitative approach to the process modeling and planning in concurrent engineering
    • Yan, H.-S., Wang, Z., & Jiang, M. (2002). A quantitative approach to the process modeling and planning in concurrent engineering. Concurrent Engineering: Research and Applications, 10(2), 97-111.
    • (2002) Concurrent Engineering: Research and Applications , vol.10 , Issue.2 , pp. 97-111
    • Yan, H.-S.1    Wang, Z.2    Jiang, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.