메뉴 건너뛰기




Volumn 28, Issue 3, 2017, Pages 244-255

On the meaning of ‘Waste’: review and definition

Author keywords

buffer; lean; systematic literature review; Waste

Indexed keywords

COMPUTER APPLICATIONS; INDUSTRIAL ENGINEERING; MANAGEMENT SCIENCE; WASTES;

EID: 84997684072     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537287.2016.1264640     Document Type: Review
Times cited : (52)

References (67)
  • 1
    • 0027615253 scopus 로고
    • Selecting a Set of Vendors in a Manufacturing Environment
    • Akinc, U., 1993. “Selecting a Set of Vendors in a Manufacturing Environment.” Journal of Operations Management 11 (2):107–122.10.1016/0272-6963(93)90018-K
    • (1993) Journal of Operations Management , vol.11 , Issue.2 , pp. 107-122
    • Akinc, U.1
  • 2
    • 0037153021 scopus 로고    scopus 로고
    • Design of a Rapid Response and High Efficiency Service by Lean Production Principles: Methodology and Evaluation of Variability of Performance
    • Arbos, L. C., 2002. “Design of a Rapid Response and High Efficiency Service by Lean Production Principles:Methodology and Evaluation of Variability of Performance.” International Journal of Production Economics 80 (2):169–183.10.1016/S0925-5273(02)00316-X
    • (2002) International Journal of Production Economics , vol.80 , Issue.2 , pp. 169-183
    • Arbos, L.C.1
  • 3
    • 80053198873 scopus 로고    scopus 로고
    • The Operations-Time Chart: A Graphical Tool to Evaluate the Performance of Production Systems–From Batch-and-Queue to Lean Manufacturing
    • Arbos, L. C., J. F., Santos, and C. V., Sanchez. 2011. “The Operations-Time Chart:A Graphical Tool to Evaluate the Performance of Production Systems–From Batch-and-Queue to Lean Manufacturing.” Computers & Industrial Engineering 61 (3):663–675.
    • (2011) Computers & Industrial Engineering , vol.61 , Issue.3 , pp. 663-675
    • Arbos, L.C.1    Santos, J.F.2    Sanchez, C.V.3
  • 4
    • 0037366641 scopus 로고    scopus 로고
    • Value Stream Analysis of a Re-engineered Construction Supply Chain
    • Arbulu, R., I., Tommelein, K., Walsh, and J., Hershauer. 2003. “Value Stream Analysis of a Re-engineered Construction Supply Chain.” Building Research & Information 31 (2):161–171.10.1080/09613210301993
    • (2003) Building Research & Information , vol.31 , Issue.2 , pp. 161-171
    • Arbulu, R.1    Tommelein, I.2    Walsh, K.3    Hershauer, J.4
  • 5
    • 84860136611 scopus 로고    scopus 로고
    • Observation: A Lean Tool for Improving the Effectiveness of Lean Six Sigma
    • Arumugam, V., J., Antony, and A., Douglas. 2012. “Observation:A Lean Tool for Improving the Effectiveness of Lean Six Sigma.” The TQM Journal 24 (3):275–287.10.1108/17542731211226781
    • (2012) The TQM Journal , vol.24 , Issue.3 , pp. 275-287
    • Arumugam, V.1    Antony, J.2    Douglas, A.3
  • 8
    • 84861356327 scopus 로고    scopus 로고
    • ‘Lean First, Then Automate’: A Framework for Process Improvement in Pure Service Companies. A Case Study
    • Bortolotti, T., and P., Romano. 2012. “‘Lean First, Then Automate’:A Framework for Process Improvement in Pure Service Companies. A Case Study.” Production Planning & Control 23 (7):513–522.10.1080/09537287.2011.640040
    • (2012) Production Planning & Control , vol.23 , Issue.7 , pp. 513-522
    • Bortolotti, T.1    Romano, P.2
  • 9
    • 0003346045 scopus 로고    scopus 로고
    • On Customer Value and Improvement in Product Development Processes
    • Browning, T. R., 2003. “On Customer Value and Improvement in Product Development Processes.” Systems Engineering 6 (1):49–61.10.1002/(ISSN)1520-6858
    • (2003) Systems Engineering , vol.6 , Issue.1 , pp. 49-61
    • Browning, T.R.1
  • 10
    • 0033717981 scopus 로고    scopus 로고
    • Just-in-Time is Not Just for Manufacturing: A Service Perspective
    • Canel, C., D., Rosen, and E. A., Anderson. 2000. “Just-in-Time is Not Just for Manufacturing:A Service Perspective.” Industrial Management & Data Systems 100 (2):51–60.10.1108/02635570010286104
    • (2000) Industrial Management & Data Systems , vol.100 , Issue.2 , pp. 51-60
    • Canel, C.1    Rosen, D.2    Anderson, E.A.3
  • 11
    • 84876332401 scopus 로고    scopus 로고
    • Achieving Lean Objectives through RFID: A Simulation-Based Assessment
    • Chongwatpol, J., and R., Sharda. 2013. “Achieving Lean Objectives through RFID:A Simulation-Based Assessment.” Decision Sciences 44 (2):239–266.10.1111/deci.2013.44.issue-2
    • (2013) Decision Sciences , vol.44 , Issue.2 , pp. 239-266
    • Chongwatpol, J.1    Sharda, R.2
  • 12
    • 0036905807 scopus 로고    scopus 로고
    • From Defect Reduction to Reduction of Waste and Customer/Stakeholder Satisfaction (Understanding the New TQM Metrology)
    • Dahlgaard, J. J., and S. M. P., Dahlgaard. 2002. “From Defect Reduction to Reduction of Waste and Customer/Stakeholder Satisfaction (Understanding the New TQM Metrology).” Total Quality Management 13 (8):1069–1086.10.1080/09544120200000003
    • (2002) Total Quality Management , vol.13 , Issue.8 , pp. 1069-1086
    • Dahlgaard, J.J.1    Dahlgaard, S.M.P.2
  • 13
    • 79952040948 scopus 로고    scopus 로고
    • Can Lean Thinking Transform American Health Care?
    • Dart, R. C., 2011. “Can Lean Thinking Transform American Health Care?” Annals of Emergency Medicine 57 (3):279–281.10.1016/j.annemergmed.2010.11.027
    • (2011) Annals of Emergency Medicine , vol.57 , Issue.3 , pp. 279-281
    • Dart, R.C.1
  • 14
    • 0003964033 scopus 로고
    • 2nd ed, Cambridge: Massachusetts Institute of Technology
    • Deming, E. W., 1986. Out of the Crisis. 2nd ed. Cambridge:Massachusetts Institute of Technology.
    • (1986) Out of the Crisis
    • Deming, E.W.1
  • 18
    • 73849102551 scopus 로고    scopus 로고
    • ASP, the Art and Science of Practice: Tales from the Front: Case Studies Indicate the Potential Pitfalls of Misapplication of Lean Improvement Programs
    • Gorman, M. F., J., Hoff, and R., Kinion. 2009. “ASP, the Art and Science of Practice:Tales from the Front:Case Studies Indicate the Potential Pitfalls of Misapplication of Lean Improvement Programs.” Interfaces 39 (6):540–548.10.1287/inte.1090.0464
    • (2009) Interfaces , vol.39 , Issue.6 , pp. 540-548
    • Gorman, M.F.1    Hoff, J.2    Kinion, R.3
  • 19
    • 84875012391 scopus 로고    scopus 로고
    • Redefining Customer Value in Lean Product Development Design Projects
    • Gudem, M., M., Steinert, T., Welo, and L., Leifer. 2013. “Redefining Customer Value in Lean Product Development Design Projects.” Journal of Engineering, Design and Technology 11 (1):71–89.10.1108/17260531311309143
    • (2013) Journal of Engineering, Design and Technology , vol.11 , Issue.1 , pp. 71-89
    • Gudem, M.1    Steinert, M.2    Welo, T.3    Leifer, L.4
  • 21
    • 0003845126 scopus 로고
    • Basingstoke: Macmillan
    • Hill, T., 1993. Manufacturing Strategy. Basingstoke:Macmillan.10.1007/978-1-349-22664-1
    • (1993) Manufacturing Strategy
    • Hill, T.1
  • 24
    • 33847417402 scopus 로고    scopus 로고
    • The Genealogy of Lean Production
    • Holweg, M., 2007. “The Genealogy of Lean Production.” Journal of Operations Management 25 (2):420–437.10.1016/j.jom.2006.04.001
    • (2007) Journal of Operations Management , vol.25 , Issue.2 , pp. 420-437
    • Holweg, M.1
  • 27
    • 84912523953 scopus 로고    scopus 로고
    • Lean Production: Literature Review and Trends
    • Jasti, N. V. K., and R., Kodali. 2015. “Lean Production:Literature Review and Trends.” International Journal of Production Research 53 (3):867–885.10.1080/00207543.2014.937508
    • (2015) International Journal of Production Research , vol.53 , Issue.3 , pp. 867-885
    • Jasti, N.V.K.1    Kodali, R.2
  • 28
    • 84873422488 scopus 로고    scopus 로고
    • A Methodology for Effective Implementation of Lean Strategies and Its Performance Evaluation in Manufacturing Organizations
    • Karim, A., and K., Arif-Uz-Zaman. 2013. “A Methodology for Effective Implementation of Lean Strategies and Its Performance Evaluation in Manufacturing Organizations.” Business Process Management Journal 19 (1):169–196.10.1108/14637151311294912
    • (2013) Business Process Management Journal , vol.19 , Issue.1 , pp. 169-196
    • Karim, A.1    Arif-Uz-Zaman, K.2
  • 30
    • 0033716420 scopus 로고    scopus 로고
    • Behind the Learning Curve: Linking Learning Activities to Waste Reduction
    • Lapré, M. A., A. S., Mukherjee, and L. N., Van Wassenhove. 2000. “Behind the Learning Curve:Linking Learning Activities to Waste Reduction.” Management Science 46 (5):597–611.10.1287/mnsc.46.5.597.12049
    • (2000) Management Science , vol.46 , Issue.5 , pp. 597-611
    • Lapré, M.A.1    Mukherjee, A.S.2    Van Wassenhove, L.N.3
  • 31
    • 0032665432 scopus 로고    scopus 로고
    • Integrated Decision Modelling of Supply Chain Efficiency
    • Li, D., and C., O’Brien. 1999. “Integrated Decision Modelling of Supply Chain Efficiency.” International Journal of Production Economics 59 (1):147–157.10.1016/S0925-5273(98)00097-8
    • (1999) International Journal of Production Economics , vol.59 , Issue.1 , pp. 147-157
    • Li, D.1    O’Brien, C.2
  • 32
    • 4644333148 scopus 로고    scopus 로고
    • New York, NY: McGraw-Hill
    • Liker, J. K., 2003. The Toyota Way. New York, NY:McGraw-Hill.
    • (2003) The Toyota Way
    • Liker, J.K.1
  • 34
    • 0033354364 scopus 로고    scopus 로고
    • Managing Waste and Looking beyond: The IMI Approach
    • Lim, K., P. K., Ahmed, and M., Zairi. 1999. “Managing Waste and Looking beyond:The IMI Approach.” The TQM Magazine 11 (5):304–310.
    • (1999) The TQM Magazine , vol.11 , Issue.5 , pp. 304-310
    • Lim, K.1    Ahmed, P.K.2    Zairi, M.3
  • 35
    • 84873456162 scopus 로고    scopus 로고
    • A Decision-focused Knowledge Management Framework to Support Collaborative Decision Making for Lean Supply Chain Management
    • Liu, S., M., Leat, J., Moizer, P., Megicks, and D., Kasturiratne. 2013. “A Decision-focused Knowledge Management Framework to Support Collaborative Decision Making for Lean Supply Chain Management.” International Journal of Production Research 51 (7):2123–2137.10.1080/00207543.2012.709646
    • (2013) International Journal of Production Research , vol.51 , Issue.7 , pp. 2123-2137
    • Liu, S.1    Leat, M.2    Moizer, J.3    Megicks, P.4    Kasturiratne, D.5
  • 39
    • 33747886515 scopus 로고    scopus 로고
    • Disentangling Leanness and Agility: An Empirical Investigation
    • Narasimhan, R., M., Swink, and S. W., Kim. 2006. “Disentangling Leanness and Agility:An Empirical Investigation.” Journal of Operations Management 24 (5):440–457.10.1016/j.jom.2005.11.011
    • (2006) Journal of Operations Management , vol.24 , Issue.5 , pp. 440-457
    • Narasimhan, R.1    Swink, M.2    Kim, S.W.3
  • 41
    • 34547309667 scopus 로고    scopus 로고
    • Lean Principles and Premium Brands: Conflict or Complement?
    • Oliver, N., L., Schab, and M., Holweg. 2007. “Lean Principles and Premium Brands:Conflict or Complement?” International Journal of Production Research 45 (16):3723–3739.10.1080/00207540701223600
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3723-3739
    • Oliver, N.1    Schab, L.2    Holweg, M.3
  • 43
    • 77953325355 scopus 로고    scopus 로고
    • Software Process Improvement through the Lean Measurement (SPI-LEAM) Method
    • Petersen, K., and C., Wohlin. 2010. “Software Process Improvement through the Lean Measurement (SPI-LEAM) Method.” Journal of Systems and Software 83 (7):1275–1287.10.1016/j.jss.2010.02.005
    • (2010) Journal of Systems and Software , vol.83 , Issue.7 , pp. 1275-1287
    • Petersen, K.1    Wohlin, C.2
  • 44
    • 0000118103 scopus 로고    scopus 로고
    • The Application of JIT Philosophy to Construction: A Case Study in Site Layout
    • Pheng, L. S., and M. S., Hui. 1999. “The Application of JIT Philosophy to Construction:A Case Study in Site Layout.” Construction Management & Economics 17 (5):657–668.10.1080/014461999371268
    • (1999) Construction Management & Economics , vol.17 , Issue.5 , pp. 657-668
    • Pheng, L.S.1    Hui, M.S.2
  • 45
    • 84865501220 scopus 로고    scopus 로고
    • Lean Software Development: A Tutorial
    • Poppendieck, M., and M. A., Cusumano. 2012. “Lean Software Development:A Tutorial.” IEEE Software 29 (5):26–32.10.1109/MS.2012.107
    • (2012) IEEE Software , vol.29 , Issue.5 , pp. 26-32
    • Poppendieck, M.1    Cusumano, M.A.2
  • 47
    • 77649134932 scopus 로고    scopus 로고
    • Transferring Lean into Government
    • Radnor, Z., 2010. “Transferring Lean into Government.” Journal of Manufacturing Technology Management 21 (3):411–428.10.1108/17410381011024368
    • (2010) Journal of Manufacturing Technology Management , vol.21 , Issue.3 , pp. 411-428
    • Radnor, Z.1
  • 48
    • 84861414395 scopus 로고    scopus 로고
    • A Decision Framework for Maximising Lean Manufacturing Performance
    • Ramesh, V., and R., Kodali. 2012. “A Decision Framework for Maximising Lean Manufacturing Performance.” International Journal of Production Research 50 (8):2234–2251.10.1080/00207543.2011.564665
    • (2012) International Journal of Production Research , vol.50 , Issue.8 , pp. 2234-2251
    • Ramesh, V.1    Kodali, R.2
  • 49
    • 23844468379 scopus 로고    scopus 로고
    • A Model for the Assessment of Waste in Job Shop Environments
    • Rawabdeh, I. A., 2005. “A Model for the Assessment of Waste in Job Shop Environments.” International Journal of Operations & Production Management 25 (8):800–822.10.1108/01443570510608619
    • (2005) International Journal of Operations & Production Management , vol.25 , Issue.8 , pp. 800-822
    • Rawabdeh, I.A.1
  • 51
    • 0032298250 scopus 로고    scopus 로고
    • On Theory in Operations Management
    • Schmenner, R. W., and M. L., Swink. 1998. “On Theory in Operations Management.” Journal of Operations Management 17 (1):97–113.10.1016/S0272-6963(98)00028-X
    • (1998) Journal of Operations Management , vol.17 , Issue.1 , pp. 97-113
    • Schmenner, R.W.1    Swink, M.L.2
  • 53
    • 0037357671 scopus 로고    scopus 로고
    • Lean Manufacturing: Context, Practice Bundles, and Performance
    • Shah, R., and P. T., Ward. 2003. “Lean Manufacturing:Context, Practice Bundles, and Performance.” Journal of Operations Management 21 (2):129–149.10.1016/S0272-6963(02)00108-0
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 54
    • 34248550363 scopus 로고    scopus 로고
    • Defining and Developing Measures of Lean Production
    • Shah, R., and P. T., Ward. 2007. “Defining and Developing Measures of Lean Production.” Journal of Operations Management 25 (4):785–805.10.1016/j.jom.2007.01.019
    • (2007) Journal of Operations Management , vol.25 , Issue.4 , pp. 785-805
    • Shah, R.1    Ward, P.T.2
  • 58
    • 84892378497 scopus 로고    scopus 로고
    • Facilitating Wasteful Activities Discovery in Pure Service Environment through Usage of Process Mining
    • Tomašević, I., and D., Slović. 2013. “Facilitating Wasteful Activities Discovery in Pure Service Environment through Usage of Process Mining.” International Journal of Industrial Engineering and Management 4 (4):199–206.
    • (2013) International Journal of Industrial Engineering and Management , vol.4 , Issue.4 , pp. 199-206
    • Tomašević, I.1    Slović, D.2
  • 59
    • 0141888108 scopus 로고    scopus 로고
    • Towards a Methodology for Developing Evidence-informed Management Knowledge by Means of Systematic Review
    • Tranfield, D., D., Denyer, and P., Smart. 2003. “Towards a Methodology for Developing Evidence-informed Management Knowledge by Means of Systematic Review.” British Journal of Management 14 (3):207–222.10.1111/bjom.2003.14.issue-3
    • (2003) British Journal of Management , vol.14 , Issue.3 , pp. 207-222
    • Tranfield, D.1    Denyer, D.2    Smart, P.3
  • 60
    • 29144481648 scopus 로고    scopus 로고
    • Could Lean Production Job Design Be Intrinsically Motivating? Contextual, Configurational, and Levels-of-Analysis Issues
    • de Treville, S., and J., Antonakis. 2006. “Could Lean Production Job Design Be Intrinsically Motivating? Contextual, Configurational, and Levels-of-Analysis Issues.” Journal of Operations Management 24 (2):99–123.
    • (2006) Journal of Operations Management , vol.24 , Issue.2 , pp. 99-123
    • de Treville, S.1    Antonakis, J.2
  • 61
    • 84886462618 scopus 로고    scopus 로고
    • A Lean Prebid Planning Model for Construction Contractors: A Case Study in Vietnam
    • Tserng, H. P., S. Y. L., Yin, and T. L., Ngo. 2013. “A Lean Prebid Planning Model for Construction Contractors:A Case Study in Vietnam.” Journal of Marine Science and Technology 21 (4):430–441.
    • (2013) Journal of Marine Science and Technology , vol.21 , Issue.4 , pp. 430-441
    • Tserng, H.P.1    Yin, S.Y.L.2    Ngo, T.L.3
  • 64
    • 70349620176 scopus 로고    scopus 로고
    • Lean Supply Chain and Its Effect on Product Cost and Quality: A Case Study on Ford Motor Company
    • Wee, H. M., and S., Wu. 2009. “Lean Supply Chain and Its Effect on Product Cost and Quality:A Case Study on Ford Motor Company.” Supply Chain Management:An International Journal 14 (5):335–341.10.1108/13598540910980242
    • (2009) Supply Chain Management: An International Journal , vol.14 , Issue.5 , pp. 335-341
    • Wee, H.M.1    Wu, S.2
  • 67
    • 84863317713 scopus 로고    scopus 로고
    • Lean Principles, Practices, and Impacts: A Study on Small and Medium-sized Enterprises (SMEs)
    • Zhou, B., 2012. “Lean Principles, Practices, and Impacts:A Study on Small and Medium-sized Enterprises (SMEs).” Annals of Operations Research 241 (1):457–474.
    • (2012) Annals of Operations Research , vol.241 , Issue.1 , pp. 457-474
    • Zhou, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.