-
3
-
-
34047256125
-
Design methods in the aerospace industry: looking for evidence of set-based practices
-
Technology and Policy Program, Massachusetts Institute of Technology, Cambridge, MA
-
Bernstein, J. (1998), “Design methods in the aerospace industry: looking for evidence of set-based practices”, Master's thesis, Technology and Policy Program, Massachusetts Institute of Technology, Cambridge, MA.
-
(1998)
Master's thesis
-
-
Bernstein, J.1
-
4
-
-
34247175699
-
-
The Lean Aerospace Initiative, Massachusetts Institute of Technology, Cambridge, MA
-
Chase, J. (2000), Measuring Value in Product Development, The Lean Aerospace Initiative, Massachusetts Institute of Technology, Cambridge, MA.
-
(2000)
Measuring Value in Product Development
-
-
Chase, J.1
-
5
-
-
84929068042
-
Reducing the time to market: the case of the world auto industry
-
Clark, K.B. and Fujimoto, T. (1989), “Reducing the time to market: the case of the world auto industry”, Design Management Journal, Vol. 1, pp. 49-57.
-
(1989)
Design Management Journal
, vol.1
, pp. 49-57
-
-
Clark, K.B.1
Fujimoto, T.2
-
8
-
-
84993064820
-
-
3rd ed., Perseus Books Group, Cambridge, MA
-
Cooper, R.G. (2001), Winning at New Products: Accelerating the Process from Idea to Launch, 3rd ed., Perseus Books Group, Cambridge, MA.
-
(2001)
Winning at New Products: Accelerating the Process from Idea to Launch
-
-
Cooper, R.G.1
-
9
-
-
0003556621
-
-
The Free Press, New York, NY
-
Cusamano, M.A. and Nobeoka, K. (1998), Thinking Beyond Lean: How Multi Project Management is Transforming Product Development at Toyota and Other Companies, The Free Press, New York, NY.
-
(1998)
Thinking Beyond Lean: How Multi Project Management is Transforming Product Development at Toyota and Other Companies
-
-
Cusamano, M.A.1
Nobeoka, K.2
-
10
-
-
1642446965
-
Applying lean thinking to new product introduction
-
Haque, B. and James-Moore, M. (2004), “Applying lean thinking to new product introduction”, Journal of Engineering Design, Vol. 15 No. 1, pp. 1-31.
-
(2004)
Journal of Engineering Design
, vol.15
, Issue.1
, pp. 1-31
-
-
Haque, B.1
James-Moore, M.2
-
11
-
-
0030192615
-
The difficult path to lean product development
-
Karlsson, C. and Ahlstrom, P. (1996), “The difficult path to lean product development”, Journal of Product Innovation Management, Vol. 13 No. 4, pp. 283-95.
-
(1996)
Journal of Product Innovation Management
, vol.13
, Issue.4
, pp. 283-295
-
-
Karlsson, C.1
Ahlstrom, P.2
-
13
-
-
3843087369
-
Customer focused lean production development
-
Kosonen, K. and Buhanist, P. (1995), “Customer focused lean production development”, International Journal of Production Economics, Vol. 41, pp. 211-16.
-
(1995)
International Journal of Production Economics
, vol.41
, pp. 211-216
-
-
Kosonen, K.1
Buhanist, P.2
-
14
-
-
0035786328
-
Strategies to improve confidence in immunity testing under CISPR24
-
Lachance, J., Lawrence, R. and Stegner, S. (2001), “Strategies to improve confidence in immunity testing under CISPR24”, IEEE International Symposium on Electromagnetic Compatibility, Vol. 1, pp. 84-8.
-
(2001)
IEEE International Symposium on Electromagnetic Compatibility
, vol.1
, pp. 84-88
-
-
Lachance, J.1
Lawrence, R.2
Stegner, S.3
-
15
-
-
6144225184
-
Design for dimensional control
-
in Huang, G.Q. (Ed.) Chapman & Hall, London
-
Leaney, P.G. (1996), “Design for dimensional control”, in Huang, G.Q. (Ed.), Design for X - Concurrent Engineering Imperatives, Chapman & Hall, London, pp. 173-95.
-
(1996)
Design for X - Concurrent Engineering Imperatives
, pp. 173-195
-
-
Leaney, P.G.1
-
16
-
-
84857326570
-
Lean engineering: doing the right thing right
-
McManus, H. (2005), “Lean engineering: doing the right thing right”, Proceedings of International Conference on Innovation and Integration in Aerospace Sciences, Belfast, UK, pp. 4-5.
-
(2005)
Proceedings of International Conference on Innovation and Integration in Aerospace Sciences, Belfast, UK
, pp. 4-5
-
-
McManus, H.1
-
17
-
-
33644690184
-
Optimal temporal product introduction strategies under valuation changes and learning
-
Mallik, S. and Chhajed, D. (2006), “Optimal temporal product introduction strategies under valuation changes and learning”, European Journal of Operational Research, Vol. 172, pp. 430-52.
-
(2006)
European Journal of Operational Research
, vol.172
, pp. 430-452
-
-
Mallik, S.1
Chhajed, D.2
-
18
-
-
82955230684
-
Weaving the waste net: a model to the product development system low performance drivers and its causes
-
White Paper - LAI 08-01, Cambridge, MA
-
Marcus, V. and Pereira, P. (2008), “Weaving the waste net: a model to the product development system low performance drivers and its causes”, White Paper - LAI 08-01, Cambridge, MA.
-
(2008)
-
-
Marcus, V.1
Pereira, P.2
-
19
-
-
84875621773
-
The design structure matrix (DSM)
-
MIT and UIUC (2003), “The design structure matrix (DSM)”, available at: www.dsmweb.org.
-
(2003)
-
-
-
20
-
-
33745656162
-
-
Productivity Press, New York, NY
-
Morgan, J.M. and Liker, J.K. (2006), The Toyota Product Development System - Integrating People, Process, and Technology, Productivity Press, New York, NY.
-
(2006)
The Toyota Product Development System - Integrating People, Process, and Technology
-
-
Morgan, J.M.1
Liker, J.K.2
-
21
-
-
45449117655
-
Lean product development: maximizing the customer perceived value through design change (redesign)
-
Naveen, G. and Singh, N. (2008), “Lean product development: maximizing the customer perceived value through design change (redesign)”, International Journal of Production Economics, Vol. 114, pp. 313-32.
-
(2008)
International Journal of Production Economics
, vol.114
, pp. 313-332
-
-
Naveen, G.1
Singh, N.2
-
22
-
-
85171643511
-
Modeling of integrated product development processes
-
Brighton, UK
-
Negele, H., Fricke, E., Schrepfer, L. and Hortlein, N. (1999), “Modeling of integrated product development processes”, Proceedings of the 9th Annual Symposium of INCOSE, Brighton, UK.
-
(1999)
Proceedings of the 9th Annual Symposium of INCOSE
-
-
Negele, H.1
Fricke, E.2
Schrepfer, L.3
Hortlein, N.4
-
23
-
-
84892276196
-
-
2nd ed., Springer, London
-
Pahl, G. and Beitz, W. (1996), Engineering Design: A Systematic Approach, 2nd ed., Springer, London.
-
(1996)
Engineering Design: A Systematic Approach
-
-
Pahl, G.1
Beitz, W.2
-
24
-
-
85107977335
-
Software tools for new product development
-
Rangaswamy, A. and Lilien, G.L. (1997), “Software tools for new product development”, Journal of Marketing Research, Special Issue on Innovation and New Products, Vol. 34 No. 1, pp. 177-84.
-
(1997)
Journal of Marketing Research, Special Issue on Innovation and New Products
, vol.34
, Issue.1
, pp. 177-184
-
-
Rangaswamy, A.1
Lilien, G.L.2
-
25
-
-
20444504756
-
Let it flow
-
ABI/INFORM Global
-
Reinertsen, D. (2005), “Let it flow”, Industrial Engineer, Vol. 37, ABI/INFORM Global.
-
(2005)
Industrial Engineer
, vol.37
-
-
Reinertsen, D.1
-
27
-
-
0003931681
-
-
Lean Enterprise Institute, Cambridge, MA
-
Rother, M. and Shook, J. (1999), Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA, Lean Enterprise Institute, Cambridge, MA.
-
(1999)
Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA
-
-
Rother, M.1
Shook, J.2
-
28
-
-
35548995274
-
-
Editora Saraiva, São Paulo
-
Rozenfeld, H., Forcellini, F.A., Amaral, D.C., Toledo, J.C. and Silva, S.L. (2006), Gestão de Desenvolvimento de Produtos, Editora Saraiva, São Paulo.
-
(2006)
Gestão de Desenvolvimento de Produtos
-
-
Rozenfeld, H.1
Forcellini, F.A.2
Amaral, D.C.3
Toledo, J.C.4
Silva, S.L.5
-
30
-
-
0003627290
-
-
Von Nostrand Reinhold, New York, NY
-
Smith, P.G. and Reinertsen, D.G. (1991), Developing Products in Half the Time, Von Nostrand Reinhold, New York, NY.
-
(1991)
Developing Products in Half the Time
-
-
Smith, P.G.1
Reinertsen, D.G.2
-
31
-
-
0001817489
-
Toyota's principles of set-based concurrent engineering
-
Sobek, D., Ward, A. and Liker, J. (1999), “Toyota's principles of set-based concurrent engineering”, Sloan Management Review, Winter, pp. 67-83.
-
(1999)
Sloan Management Review
, pp. 67-83
-
-
Sobek, D.1
Ward, A.2
Liker, J.3
-
32
-
-
84993037006
-
-
3rd ed., McGraw-Hill, New York, NY
-
Ulrich, K. and Eppinger, S. (2004), Product Design and Development, 3rd ed., McGraw-Hill, New York, NY.
-
(2004)
Product Design and Development
-
-
Ulrich, K.1
Eppinger, S.2
-
33
-
-
67649430396
-
-
The Lean Enterprise Institute, Cambridge, MA
-
Ward, A.C., Shook, J. and Sobek, D. (2007), Lean Product and Process Development, The Lean Enterprise Institute, Cambridge, MA.
-
(2007)
Lean Product and Process Development
-
-
Ward, A.C.1
Shook, J.2
Sobek, D.3
-
35
-
-
84993100407
-
-
Rawson Associates, New York, NY
-
Womack, J.P., Jones, D.T. and Roos, D. (1990), The Machine that Changed the World, Rawson Associates, New York, NY.
-
(1990)
The Machine that Changed the World
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
-
36
-
-
56349147000
-
Development of a conceptual framework for lean new product development process
-
Anand, G. and Kodali, R. (2008), “Development of a conceptual framework for lean new product development process”, International Journal of Product Development, Vol. 6 No. 2.
-
(2008)
International Journal of Product Development
, vol.6
, Issue.2
-
-
Anand, G.1
Kodali, R.2
-
37
-
-
33748283214
-
-
Butterworth Heinemann, London
-
Barclay, I., Dann, Z. and Holroyd, P. (1992), New Product Development, Butterworth Heinemann, London.
-
(1992)
New Product Development
-
-
Barclay, I.1
Dann, Z.2
Holroyd, P.3
-
38
-
-
0001247310
-
Product development in the world auto industry
-
Clark, K.B., Chew, W.B., Fujimoto, T., Meyer, J. and Scherer, F.M. (1987), “Product development in the world auto industry”, Brookings Papers on Economic Activity, Vol. 3, pp. 729-81.
-
(1987)
Brookings Papers on Economic Activity
, vol.3
, pp. 729-781
-
-
Clark, K.B.1
Chew, W.B.2
Fujimoto, T.3
Meyer, J.4
Scherer, F.M.5
-
40
-
-
0031271567
-
PDMA research on new product development practices: updating trends and benchmarking best practices
-
Griffin, A. (1997), “PDMA research on new product development practices: updating trends and benchmarking best practices”, Journal of Product Innovation Management, Vol. 14, pp. 429-58.
-
(1997)
Journal of Product Innovation Management
, vol.14
, pp. 429-458
-
-
Griffin, A.1
-
41
-
-
3543108498
-
The seven value stream mapping tools
-
Hines, P. and Rich, N. (1997), “The seven value stream mapping tools”, International Journal of Operations & Production Management, Vol. 17 No. 1, pp. 46-64.
-
(1997)
International Journal of Operations & Production Management
, vol.17
, Issue.1
, pp. 46-64
-
-
Hines, P.1
Rich, N.2
-
42
-
-
33748275265
-
Towards lean product lifecycle management: a framework for new product development
-
Hines, P., Francis, M. and Found, P. (2005), “Towards lean product lifecycle management: a framework for new product development”, Journal of Manufacturing Technology Management, Vol. 17 No. 7.
-
(2005)
Journal of Manufacturing Technology Management
, vol.17
, Issue.7
-
-
Hines, P.1
Francis, M.2
Found, P.3
-
43
-
-
3543058709
-
Concurrent new product development: an empirical assessment
-
Maylor, H. (1997), “Concurrent new product development: an empirical assessment”, International Journal of Operation and Production Management, Vol. 17 No. 2, pp. 1196-214.
-
(1997)
International Journal of Operation and Production Management
, vol.17
, Issue.2
, pp. 1196-1214
-
-
Maylor, H.1
-
44
-
-
84978516794
-
-
2nd ed., Wiley, New York, NY
-
Smith, P. and Reinertsen, D. (1998), Developing Products in Half the Time, 2nd ed., Wiley, New York, NY.
-
(1998)
Developing Products in Half the Time
-
-
Smith, P.1
Reinertsen, D.2
-
45
-
-
0004043602
-
The role of concurrent engineering in weapons systems acquisition
-
Institute of Defence Analysis, Alexandria, VA
-
Winner, R., Pennell, J., Bertrand, H. and Slusarezuk, M. (1988), “The role of concurrent engineering in weapons systems acquisition”, IDA Report R-338, Institute of Defence Analysis, Alexandria, VA.
-
(1988)
IDA Report R-338
-
-
Winner, R.1
Pennell, J.2
Bertrand, H.3
Slusarezuk, M.4
|