메뉴 건너뛰기




Volumn 4, Issue 4, 2013, Pages 229-236

Assessing the trade-off between lean and resilience through supply chain risk management

Author keywords

Lean; Resilience; Supply chain risk management; Trade off

Indexed keywords


EID: 84892379331     PISSN: 22172661     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (31)

References (26)
  • 2
    • 9344220146 scopus 로고    scopus 로고
    • Ericsson's Proactive Supply Chain Risk Management Approach After a Serious Sub-supplier Accident
    • Norrman, A., Jansson, U. (2004), "Ericsson's Proactive Supply Chain Risk Management Approach After a Serious Sub-supplier Accident", International Journal of Physical Distribution and Logistics Management, Vol. 34, No. 5, pp. 434-456.
    • (2004) International Journal of Physical Distribution and Logistics Management , vol.34 , Issue.5 , pp. 434-456
    • Norrman, A.1    Jansson, U.2
  • 4
    • 35348838950 scopus 로고    scopus 로고
    • An emergent framework for supply chain risk management and performance measurement
    • Ritchie, B., Brindley, C. (2007), "An emergent framework for supply chain risk management and performance measurement", Journal of the Operational Research Society, Vol. 58, pp. 1398-1411.
    • (2007) Journal of the Operational Research Society , vol.58 , pp. 1398-1411
    • Ritchie, B.1    Brindley, C.2
  • 9
    • 0030836978 scopus 로고    scopus 로고
    • The seamless supply chain-the predator's strategic advantage
    • Towill, D.R. (1997), "The seamless supply chain-the predator's strategic advantage", International Journal of Technology Management, Vol. 13, No. 1, pp. 37-56.
    • (1997) International Journal of Technology Management , vol.13 , Issue.1 , pp. 37-56
    • Towill, D.R.1
  • 10
    • 85151532938 scopus 로고    scopus 로고
    • Beyond Partnerships: The Power of Lean Supply Chains
    • in Book: Trends in Supply Chain Design and Management (Jung, H., Jeong, B., Chen F.F) Springer Series in Advance Manufacturing, Springer-Verlag, London, Eds.
    • Rivera, L., Wan, H., Chen, F.F., Lee, W.M. (2007), "Beyond Partnerships: The Power of Lean Supply Chains", in Book: Trends in Supply Chain Design and Management (Eds. Jung, H., Jeong, B., Chen F.F), Springer Series in Advance Manufacturing, Springer-Verlag, London, pp. 241-268.
    • (2007) , pp. 241-268
    • Rivera, L.1    Wan, H.2    Chen, F.F.3    Lee, W.M.4
  • 11
    • 84892410501 scopus 로고    scopus 로고
    • Proceedings of the International Conference on Industrial Engineering and Operations Management, Dhaka, Bangladesh
    • Machado, V.C., Duarte, S. (2010), "Trade-offs among Paradigms in Supply Chain Management", Proceedings of the International Conference on Industrial Engineering and Operations Management, Dhaka, Bangladesh.
    • (2010) Trade-offs among Paradigms in Supply Chain Management
    • Machado, V.C.1    Duarte, S.2
  • 12
    • 0002303124 scopus 로고
    • Triumph of the Lean Production System
    • Krafcik, J.F. (1988), "Triumph of the Lean Production System", Sloan Management Review, Vol. 30, No. 1, pp. 41-52.
    • (1988) Sloan Management Review , vol.30 , Issue.1 , pp. 41-52
    • Krafcik, J.F.1
  • 17
    • 80053314623 scopus 로고    scopus 로고
    • Assessing and managing risks using the supply chain risk management process (SCRMP)
    • Tummala, R., Schoenherr, T. (2011), "Assessing and managing risks using the supply chain risk management process (SCRMP)", Supply Chain Management: An International Journal, Vol. 16, No. 6, pp. 474-483.
    • (2011) Supply Chain Management: An International Journal , vol.16 , Issue.6 , pp. 474-483
    • Tummala, R.1    Schoenherr, T.2
  • 18
    • 84875533951 scopus 로고    scopus 로고
    • Navigation conditions and the risk management in inland waterway transport on the middle Danube
    • Backalic, T., Maslaric, M. (2012), "Navigation conditions and the risk management in inland waterway transport on the middle Danube", Transport Problems, Vol. 7, No. 4, pp. 13-24.
    • (2012) Transport Problems , vol.7 , Issue.4 , pp. 13-24
    • Backalic, T.1    Maslaric, M.2
  • 19
    • 51149123444 scopus 로고    scopus 로고
    • An empirical examination of supply chain performance along several dimensions of risk
    • Wagner, S., Bode, M. (2008). "An empirical examination of supply chain performance along several dimensions of risk", Journal of Business Logistics, Vol. 29, No. 1, pp. 307-325.
    • (2008) Journal of Business Logistics , vol.29 , Issue.1 , pp. 307-325
    • Wagner, S.1    Bode, M.2
  • 20
    • 84927920243 scopus 로고    scopus 로고
    • Supply chain risk management: literature review with risk categorization and papers classification
    • In Book: Managing the Future Supply Chain: Current Concepts and Solutions for Reliability and Robustness (Kersten, W., Blecker, T., Ringle, C.M.) Eul Verlag, Koln, Eds.
    • Maslaric, M., Huiskonen, J., Groznik, A., Backalic, T. (2012), "Supply chain risk management: literature review with risk categorization and papers classification", In Book: Managing the Future Supply Chain: Current Concepts and Solutions for Reliability and Robustness (Eds. Kersten, W., Blecker, T., Ringle, C.M.), Eul Verlag, Koln, pp. 101-116.
    • (2012) , pp. 101-116
    • Maslaric, M.1    Huiskonen, J.2    Groznik, A.3    Backalic, T.4
  • 21
    • 84892418688 scopus 로고    scopus 로고
    • The drivers of supply chain vulnerability: an integrated framework
    • Peck, H. (2005), "The drivers of supply chain vulnerability: an integrated framework", International Journal of Logistics Management, Vol. 17, No. 2, pp. 277-287.
    • (2005) International Journal of Logistics Management , vol.17 , Issue.2 , pp. 277-287
    • Peck, H.1
  • 23
    • 84892412414 scopus 로고    scopus 로고
    • accessed 10 August 2012
    • http://husdal.com, accessed 10 August 2012.
  • 24
    • 53549088957 scopus 로고    scopus 로고
    • Building a Resilience Supply Chain
    • Sheffi, Y. (2005), "Building a Resilience Supply Chain", Harvard Business School Publishing, Vol. 1, pp. 1-8.
    • (2005) Harvard Business School Publishing , vol.1 , pp. 1-8
    • Sheffi, Y.1
  • 25
    • 71949097577 scopus 로고    scopus 로고
    • House of risk: a model for proactive supply chain risk management
    • Pujawan, I.N., Geraldin, H.L. (2009), "House of risk: a model for proactive supply chain risk management", Business Process Management Journal, Vol. 15, No. 6, pp. 953-967.
    • (2009) Business Process Management Journal , vol.15 , Issue.6 , pp. 953-967
    • Pujawan, I.N.1    Geraldin, H.L.2
  • 26
    • 69849108628 scopus 로고    scopus 로고
    • Supply chain risk management (SCRM): a case study on the automotive and electronic industries in Brazil
    • Blos, F.M., Wee, H.M., Quaddus, M., Watanabe, K. (2009), "Supply chain risk management (SCRM): a case study on the automotive and electronic industries in Brazil", Supply Chain Management: An International Journal, Vol.14, No. 4, pp. 247-252.
    • (2009) Supply Chain Management: An International Journal , vol.14 , Issue.4 , pp. 247-252
    • Blos, F.M.1    Wee, H.M.2    Quaddus, M.3    Watanabe, K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.