메뉴 건너뛰기




Volumn , Issue , 2016, Pages 966-974

Integrating crane information models in BIM for checking the compliance of lifting plan requirements

Author keywords

Construction Requirements; Crane Information Model; Crane Lifting Plans; Regulatory Compliance

Indexed keywords

ARCHITECTURAL DESIGN; CONSTRUCTION EQUIPMENT; CRANES; INFORMATION THEORY; REGULATORY COMPLIANCE; ROBOTICS;

EID: 84994257517     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.22260/isarc2016/0116     Document Type: Conference Paper
Times cited : (11)

References (25)
  • 1
    • 33746350454 scopus 로고    scopus 로고
    • Integrating 3D visualization and simulation for tower crane operations on construction sites
    • M. Al-Hussein, M. Athar Niaz, H. Yu, H. Kim, Integrating 3D visualization and simulation for tower crane operations on construction sites, Autom. Constr. 15 (2006) 554-562. doi:10.1016/j.autcon.2005.07.007.
    • (2006) Autom. Constr , vol.15 , pp. 554-562
    • Al-Hussein, M.1    Athar Niaz, M.2    Yu, H.3    Kim, H.4
  • 2
    • 58149216115 scopus 로고    scopus 로고
    • Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes
    • A. Shapira, M. Simcha, Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes, J. Constr. Eng. Manag. 135 (2009) 307-318. doi:10.1061/(ASCE)0733-9364(2009)135:4(307).
    • (2009) J. Constr. Eng. Manag , vol.135 , pp. 307-318
    • Shapira, A.1    Simcha, M.2
  • 4
    • 84869460618 scopus 로고    scopus 로고
    • Integrative model for quantitative evaluation of safety on construction sites with tower cranes
    • A. Shapira, M. Simcha, M. Goldenberg, Integrative model for quantitative evaluation of safety on construction sites with tower cranes, J. Constr. Eng. Manag. 138 (2012) 1281-1293. doi:10.1061/(ASCE)CO.1943-7862.0000537.
    • (2012) J. Constr. Eng. Manag , vol.138 , pp. 1281-1293
    • Shapira, A.1    Simcha, M.2    Goldenberg, M.3
  • 6
    • 57249090593 scopus 로고    scopus 로고
    • DCRANE: A database system for utilization of cranes
    • M. Al-Hussein, S. Alkass, O. Moselhi, DCRANE: a database system for utilization of cranes, Can. J. Civ. Eng. 27 (2000) 1130-1138. doi:10.1139/l00-039.
    • (2000) Can. J. Civ. Eng , vol.27 , pp. 1130-1138
    • Al-Hussein, M.1    Alkass, S.2    Moselhi, O.3
  • 7
    • 0029470095 scopus 로고
    • Patterns of Construction-Space Use in Multistory Buildings
    • D.R. Riley, V.E. Sanvido, Patterns of Construction-Space Use in Multistory Buildings, J. Constr. Eng. Manag. 121 (1995) 464-473.
    • (1995) J. Constr. Eng. Manag , vol.121 , pp. 464-473
    • Riley, D.R.1    Sanvido, V.E.2
  • 8
    • 3142750829 scopus 로고    scopus 로고
    • Representing Work Spaces Generically in Construction Method Models
    • B. Akinci, M. Fischer, J. Kunz, R. Levitt, Representing Work Spaces Generically in Construction Method Models, J. Constr. Eng. Manag. 128 (2002) 296-305. doi:10.1061/(ASCE)0733-9364(2002)128:4(296).
    • (2002) J. Constr. Eng. Manag , vol.128 , pp. 296-305
    • Akinci, B.1    Fischer, M.2    Kunz, J.3    Levitt, R.4
  • 9
    • 0043253368 scopus 로고    scopus 로고
    • Formalization and Automation of Time-Space Conflict Analysis
    • B. Akinci, M. Fischer, R. Levitt, R. Carlson, Formalization and Automation of Time-Space Conflict Analysis, J. Comput. Civ. Eng. 16 (2002) 124-134. doi:10.1061/(ASCE)0887-3801(2002)16:2(124).
    • (2002) J. Comput. Civ. Eng , vol.16 , pp. 124-134
    • Akinci, B.1    Fischer, M.2    Levitt, R.3    Carlson, R.4
  • 10
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • S.J. Guo, Identification and resolution of work space conflicts in building construction, J. Constr. Eng. Manag. 128 (2002) 287-295. doi:10.1061/(ASCE)0733-9364(2002)128:4(287).
    • (2002) J. Constr. Eng. Manag , vol.128 , pp. 287-295
    • Guo, S.J.1
  • 11
    • 77952911062 scopus 로고    scopus 로고
    • Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design
    • D.K.H. Chua, K.W. Yeoh, Y. Song, Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design., J. Constr. Eng. Manag. 136 (2010) 641-649. doi:10.1061/(ASCE)CO.1943-7862.0000166.
    • (2010) J. Constr. Eng. Manag , vol.136 , pp. 641-649
    • Chua, D.K.H.1    Yeoh, K.W.2    Song, Y.3
  • 12
    • 84952361602 scopus 로고    scopus 로고
    • Enabling Construction 4D Topological Analysis for Effective Construction Planning
    • X. Su, H. Cai, Enabling Construction 4D Topological Analysis for Effective Construction Planning, J. Comput. Civ. Eng. (2014) 1-10. doi:10.1061/(ASCE)CP.1943-5487.0000463.
    • (2014) J. Comput. Civ. Eng , pp. 1-10
    • Su, X.1    Cai, H.2
  • 13
    • 77149152512 scopus 로고    scopus 로고
    • Automated Code Compliance Checking for Building Envelope Design
    • X. Tan, A. Hammad, P. Fazio, Automated Code Compliance Checking for Building Envelope Design, J. Comput. Civ. Eng. 24 (2010) 203-211. doi:10.1061/(ASCE)0887-3801(2010)24:2(203).
    • (2010) J. Comput. Civ. Eng , vol.24 , pp. 203-211
    • Tan, X.1    Hammad, A.2    Fazio, P.3
  • 14
    • 84922569995 scopus 로고    scopus 로고
    • Development of an object model for automated compliance checking
    • S. Malsane, J. Matthews, S. Lockley, P.E.D. Love, D. Greenwood, Development of an object model for automated compliance checking, Autom. Constr. 49 (2015) 51-58. doi:10.1016/j.autcon.2014.10.004.
    • (2015) Autom. Constr , vol.49 , pp. 51-58
    • Malsane, S.1    Matthews, J.2    Lockley, S.3    Love, P.E.D.4    Greenwood, D.5
  • 15
    • 84865344904 scopus 로고    scopus 로고
    • Ontology-based semantic modeling of regulation constraint for automated construction quality compliance checking
    • B.T. Zhong, L.Y. Ding, H.B. Luo, Y. Zhou, Y.Z. Hu, H.M. Hu, Ontology-based semantic modeling of regulation constraint for automated construction quality compliance checking, Autom. Constr. 28 (2012) 58-70. doi:10.1016/j.autcon.2012.06.006.
    • (2012) Autom. Constr , vol.28 , pp. 58-70
    • Zhong, B.T.1    Ding, L.Y.2    Luo, H.B.3    Zhou, Y.4    Hu, Y.Z.5    Hu, H.M.6
  • 16
    • 79957509563 scopus 로고    scopus 로고
    • Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
    • C. Huang, C.K. Wong, C.M. Tam, Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming, Autom. Constr. 20 (2011) 571-580. doi:10.1016/j.autcon.2010.11.023.
    • (2011) Autom. Constr , vol.20 , pp. 571-580
    • Huang, C.1    Wong, C.K.2    Tam, C.M.3
  • 17
    • 0037647504 scopus 로고    scopus 로고
    • GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
    • C.M. Tam, T.K.L. Tong, GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction, Constr. Manag. Econ. 21 (2003) 257-266. doi:10.1080/0144619032000049665.
    • (2003) Constr. Manag. Econ , vol.21 , pp. 257-266
    • Tam, C.M.1    Tong, T.K.L.2
  • 19
    • 63649124542 scopus 로고    scopus 로고
    • Transformation of a 4D product and process model to generate motion of mobile cranes
    • K. Tantisevi, B. Akinci, Transformation of a 4D product and process model to generate motion of mobile cranes, Autom. Constr. 18 (2009) 458-468. doi:10.1016/j.autcon.2008.10.008.
    • (2009) Autom. Constr , vol.18 , pp. 458-468
    • Tantisevi, K.1    Akinci, B.2
  • 20
    • 84867859668 scopus 로고    scopus 로고
    • Optimizing location of tower cranes on construction sites through GIS and BIM integration
    • J. Irizarry, E.P. Karan, Optimizing location of tower cranes on construction sites through GIS and BIM integration, Electron. J. Inf. Technol. Constr. 17 (2012) 361-366.
    • (2012) Electron. J. Inf. Technol. Constr , vol.17 , pp. 361-366
    • Irizarry, J.1    Karan, E.P.2
  • 21
    • 84897390065 scopus 로고    scopus 로고
    • Evolution of the crane selection and on-site utilization process for modular construction multilifts
    • J. Olearczyk, M. Al-Hussein, A. Bouferguène, Evolution of the crane selection and on-site utilization process for modular construction multilifts, Autom. Constr. 43 (2014) 59-72. doi:10.1016/j.autcon.2014.03.015.
    • (2014) Autom. Constr , vol.43 , pp. 59-72
    • Olearczyk, J.1    Al-Hussein, M.2    Bouferguène, A.3
  • 22
    • 84949544141 scopus 로고    scopus 로고
    • Decision support for tower crane selection with building information models and genetic algorithms
    • M. Marzouk, A. Abubakr, Decision support for tower crane selection with building information models and genetic algorithms, Autom. Constr. 61 (2015) 1-15. doi:10.1016/j.autcon.2015.09.008.
    • (2015) Autom. Constr , vol.61 , pp. 1-15
    • Marzouk, M.1    Abubakr, A.2
  • 23
    • 84944442108 scopus 로고    scopus 로고
    • A BIM-based approach for automated tower crane layout planning
    • J. Wang, X. Zhang, W. Shou, X. Wang, B. Xu, M.J. Kim, et al., A BIM-based approach for automated tower crane layout planning, Autom. Constr. 59 (2015) 168-178. doi:10.1016/j.autcon.2015.05.006.
    • (2015) Autom. Constr , vol.59 , pp. 168-178
    • Wang, J.1    Zhang, X.2    Shou, W.3    Wang, X.4    Xu, B.5    Kim, M.J.6
  • 24
    • 33751284023 scopus 로고    scopus 로고
    • Modeling of Functional Construction Requirements for Constructability Analysis
    • Y. Song, D.K.H. Chua, Modeling of Functional Construction Requirements for Constructability Analysis, J. Constr. Eng. Manag. 132 (2006) 1314-1326. doi:10.1061/(ASCE)0733-9364(2006)132:12(1314).
    • (2006) J. Constr. Eng. Manag , vol.132 , pp. 1314-1326
    • Song, Y.1    Chua, D.K.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.