-
1
-
-
0043253368
-
Formalization and automation of time-space conflict analysis
-
DOI 10.1061/(ASCE)0887-3801(2002)16:2(124)
-
Akinci, B., Fischen, M., Levitt, R., and Carlson, R. (2002a). " Formalization and automation of time-space conflict analysis.." J. Comput. Civ. Eng. 0887-3801, 16 (2), 124-134. 10.1061/(ASCE)0887-3801(2002)16:2(124) (Pubitemid 40475287)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 124-134
-
-
Akinci, B.1
Fischen, M.2
Levitt, R.3
Carlson, R.4
-
2
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
-
Akinci, B., Fischer, M., and Kunz, J. (2002b). " Automated generation of work spaces required by construction activities.." J. Constr. Eng. Manage. 0733-9364, 128 (4), 306-315. 10.1061/(ASCE)0733-9364(2002)128: 4(306) (Pubitemid 40265535)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
3
-
-
3142750829
-
Representing work spaces generically in construction method models
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(296)
-
Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2002c). " Representing work spaces generically in construction method models.." J. Constr. Eng. Manage. 0733-9364, 128 (4), 296-305. 10.1061/(ASCE)0733-9364(2002) 128:4(296) (Pubitemid 40265534)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 296-305
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
Levitt, R.4
-
4
-
-
33746778753
-
Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies
-
DOI 10.1111/j.1467-8667.2006.00454.x
-
Dawood, N., and Mallasi, Z. (2006). " Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 21 (7), 498-513. 10.1111/j.1467-8667.2006.00454.x (Pubitemid 44165263)
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.7
, pp. 498-513
-
-
Dawood, N.1
Mallasi, Z.2
-
5
-
-
2342430993
-
Identification and resolution of work space conflicts in building construction
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(287)
-
Guo, S. -J. (2002). " Identification and resolution of work space conflicts in building construction.." J. Constr. Eng. Manage. 0733-9364, 128 (4), 287-295. 10.1061/(ASCE)0733-9364(2002)128:4(287) (Pubitemid 40265533)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 287-295
-
-
Guo, S.-J.1
-
6
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
0733-9364. 10.1061/(ASCE)0733-9364(2000)126:4(251)
-
Koo, B., and Fischer, M. (2000). " Feasibility study of 4D CAD in commercial construction.." J. Constr. Eng. Manage. 0733-9364, 126 (4), 251-260. 10.1061/(ASCE)0733-9364(2000)126:4(251)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
7
-
-
33746364173
-
Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation
-
DOI 10.1016/j.autcon.2005.08.005, PII S092658050500124X
-
Mallasi, Z. (2006). " Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation.." Autom. Constr. 0926-5805, 15 (5), 640-655. 10.1016/j.autcon.2005.08.005 (Pubitemid 44118734)
-
(2006)
Automation in Construction
, vol.15
, Issue.5
, pp. 640-655
-
-
Mallasi, Z.1
-
8
-
-
0032165225
-
Generating, evaluating and visualizing construction schedules with CAD tools
-
0926-5805. 10.1016/S0926-5805(98)00053-3
-
McKinney, K., and Fischer, M. (1998). " Generating, evaluating and visualizing construction schedules with CAD tools.." Autom. Constr. 0926-5805, 7 (6), 433-447. 10.1016/S0926-5805(98)00053-3
-
(1998)
Autom. Constr.
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
9
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
0733-9364. 10.1061/(ASCE)0733-9364(1995)121:4(464)
-
Riley, D. R., and Sanvido, V. E. (1995). " Patterns of construction-space use in multistory buildings.." J. Constr. Eng. Manage. 0733-9364, 121 (4), 464-473. 10.1061/(ASCE)0733-9364(1995)121:4(464)
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
10
-
-
0002299336
-
Space planning method for multistory building construction
-
0733-9364. 10.1061/(ASCE)0733-9364(1997)123:2(171)
-
Riley, D. R., and Sanvido, V. E. (1997). " Space planning method for multistory building construction.." J. Constr. Eng. Manage. 0733-9364, 123 (2), 171-180. 10.1061/(ASCE)0733-9364(1997)123:2(171)
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 171-180
-
-
Riley, D.R.1
Sanvido, V.E.2
-
11
-
-
27444447204
-
Detection of spatio-temporal conflicts on a temporal 3D space system
-
DOI 10.1016/j.advengsoft.2005.03.025, PII S0965997805001304, Selected Papers from Civil-Comp 2003 and AICivil-Comp 2003
-
Song, Y., and Chua, D. K. H. (2005). " Detection of spatio-temporal conflicts on a temporal 3D space system.." Adv. Eng. Software 0965-9978, 36 (11-12), 814-826. 10.1016/j.advengsoft.2005.03.025 (Pubitemid 41531143)
-
(2005)
Advances in Engineering Software
, vol.36
, Issue.11-12
, pp. 814-826
-
-
Song, Y.1
Chua, D.K.H.2
-
12
-
-
0028750185
-
HVLS: Horizontal and vertical logic scheduling for multistory projects
-
0733-9364. 10.1061/(ASCE)0733-9364(1994)120:4(875)
-
Thabet, W. Y., and Beliveau, Y. J. (1994a). " HVLS: Horizontal and vertical logic scheduling for multistory projects.." J. Constr. Eng. Manage. 0733-9364, 120 (4), 875-892. 10.1061/(ASCE)0733-9364(1994)120:4(875)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 875-892
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
13
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
0733-9364. 10.1061/(ASCE)0733-9364(1994)120:1(96)
-
Thabet, W. Y., and Beliveau, Y. J. (1994b). " Modeling work space to schedule repetitive floors in multistory buildings.." J. Constr. Eng. Manage. 0733-9364, 120 (1), 96-116. 10.1061/(ASCE)0733-9364(1994)120:1(96)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
14
-
-
33646196837
-
Critical space analysis
-
0733-9364. 10.1061/(ASCE)0733-9364(2006)132:5(473)
-
Winch, G. M., and North, S. (2006). " Critical space analysis.." J. Constr. Eng. Manage. 0733-9364, 132 (5), 473-481. 10.1061/(ASCE)0733-9364(2006)132:5(473)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.5
, pp. 473-481
-
-
Winch, G.M.1
North, S.2
-
15
-
-
0035278754
-
Improvement algorithm for limited space scheduling
-
DOI 10.1061/(ASCE)0733-9364(2001)127:2(116)
-
Zouein, P. P., and Tommelein, I. D. (2001). " Improvement algorithm for limited space scheduling.." J. Constr. Eng. Manage. 0733-9364, 127 (2), 116-124. 10.1061/(ASCE)0733-9364(2001)127:2(116) (Pubitemid 32297259)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.2
, pp. 116-124
-
-
Zouein, P.P.1
Tommelein, I.D.2
|