메뉴 건너뛰기




Volumn 132, Issue 12, 2006, Pages 1314-1326

Modeling of functional construction requirements for constructability analysis

Author keywords

Constructability; Construction management; Evaluation; Models

Indexed keywords

BALANCED CANTILEVER APPROACH; CONSTRUCTABILITY ANALYSIS; FUNCTIONAL CONSTRUCTION REQUIREMENTS; INTERMEDIATE FUNCTION;

EID: 33751284023     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:12(1314)     Document Type: Article
Times cited : (40)

References (29)
  • 1
    • 48549110047 scopus 로고
    • Qualitative reasoning about physical systems: An introduction
    • Bobrow, D. G. (1984). " Qualitative reasoning about physical systems: An introduction.. " Artif. Intell., 24 (1-3), 1-5.
    • (1984) Artif. Intell. , vol.24 , Issue.1-3 , pp. 1-5
    • Bobrow, D.G.1
  • 2
    • 0035501811 scopus 로고    scopus 로고
    • A scheme for functional reasoning in conceptual design
    • Chakrabarti, A., and Bligh, T. P. (2001). " A scheme for functional reasoning in conceptual design.. " Des. Stud., 22, 493-517.
    • (2001) Des. Stud. , vol.22 , pp. 493-517
    • Chakrabarti, A.1    Bligh, T.P.2
  • 3
    • 0035791391 scopus 로고    scopus 로고
    • Component state model and its application in constructability analysis of construction schedule
    • Eisenstadt, Austria.
    • Chua, D. K. H., and Song, Y. (2001). " Component state model and its application in constructability analysis of construction schedule.. " Proc., 8th Int. Conf. on Civil Structural Engineering Computing, Eisenstadt, Austria,.
    • (2001) Proc., 8th Int. Conf. on Civil Structural Engineering Computing
    • Chua, D.K.H.1    Song, Y.2
  • 4
    • 0141961732 scopus 로고    scopus 로고
    • Component state model and its application in constructability analysis of construction schedule
    • Chua, D. K. H., and Song, Y. (2003a). " Component state model and its application in constructability analysis of construction schedule.. " Adv. Eng. Software, 34 (11-12), 671-681.
    • (2003) Adv. Eng. Software , vol.34 , Issue.11-12 , pp. 671-681
    • Chua, D.K.H.1    Song, Y.2
  • 5
    • 2342436657 scopus 로고    scopus 로고
    • Component state criteria representation to incorporate construction program knowledge for constructability analysis
    • ASCE, Reston, Va.
    • Chua, D. K. H., and Song, Y. (2003b). " Component state criteria representation to incorporate construction program knowledge for constructability analysis.. " Proc., Construction Research Congress (CD-ROM), ASCE, Reston, Va,.
    • (2003) Proc., Construction Research Congress
    • Chua, D.K.H.1    Song, Y.2
  • 6
    • 33751262043 scopus 로고
    • Constructability: A primer
    • Construction Industry Institute (CII). (University of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1986). " Constructability: A primer.. " Publication 3-1, University of Texas at Austin, Austin, Tex.
    • (1986) Publication 3-1
  • 7
    • 33751265036 scopus 로고    scopus 로고
    • Non-functional requirements elicitation
    • J. C.Sampaio do prado Leite, and J. H.Doorn, eds., Kluwer, Boston;
    • Cysneiros, L. M., and Yu, E. (2004). " Non-functional requirements elicitation.. " Perspective in software requirements, J. C. Sampaio do prado Leite, and, J. H. Doorn, eds., Kluwer, Boston; 115-138.
    • (2004) Perspective in Software Requirements , pp. 115-138
    • Cysneiros, L.M.1    Yu, E.2
  • 8
    • 0037983850 scopus 로고    scopus 로고
    • Function and representation in conceptual design
    • Deng, Y. M. (2002). " Function and representation in conceptual design.. " Artif. Intell. Eng. Des. Anal. Manuf., 16, 343-362.
    • (2002) Artif. Intell. Eng. Des. Anal. Manuf. , vol.16 , pp. 343-362
    • Deng, Y.M.1
  • 9
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with computer-interpretable construction method models
    • Fischer, M., and Aalami, F. (1996). " Scheduling with computer-interpretable construction method models.. " J. Constr. Eng. Manage., 122 (4), 337-347.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 337-347
    • Fischer, M.1    Aalami, F.2
  • 10
    • 0030196033 scopus 로고    scopus 로고
    • Examples and characteristics of shared project models
    • Fischer, M., and Froese, T. (1996). " Examples and characteristics of shared project models.. " J. Comput. Civ. Eng., 10 (3), 174-182.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.3 , pp. 174-182
    • Fischer, M.1    Froese, T.2
  • 11
    • 0028517808 scopus 로고
    • MDA Planner: Interactive planning tool using product models and construction methods
    • Jägbeck, A. (1994). " MDA Planner: Interactive planning tool using product models and construction methods.. " J. Comput. Civ. Eng., 8 (4), 536-554.
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.4 , pp. 536-554
    • Jägbeck, A.1
  • 12
    • 0026142701 scopus 로고
    • Device representation, the significance of functional knowledge
    • Keuneke, A. M. (1991). " Device representation, the significance of functional knowledge.. " IEEE Expert, 6 (2), 22-25.
    • (1991) IEEE Expert , vol.6 , Issue.2 , pp. 22-25
    • Keuneke, A.M.1
  • 14
    • 0031139959 scopus 로고    scopus 로고
    • Design rationale system: Understanding the issues
    • Lee, J. (1997). " Design rationale system: Understanding the issues.. " IEEE Expert, 12 (3), 78-85.
    • (1997) IEEE Expert , vol.12 , Issue.3 , pp. 78-85
    • Lee, J.1
  • 15
    • 0000363297 scopus 로고    scopus 로고
    • Automating communication in civil engineering
    • Luiten, G. L., and Tolman, F. P. (1997). " Automating communication in civil engineering.. " J. Constr. Eng. Manage., 123 (2), 113-120.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 113-120
    • Luiten, G.L.1    Tolman, F.P.2
  • 16
    • 0024139998 scopus 로고    scopus 로고
    • Constructability improvement during field operations
    • O'Connor, J. T., and Davis, V. S. (1998). " Constructability improvement during field operations.. " J. Constr. Eng. Manage., 114 (4), 548-564.
    • (1998) J. Constr. Eng. Manage. , vol.114 , Issue.4 , pp. 548-564
    • O'Connor, J.T.1    Davis, V.S.2
  • 17
    • 0023363645 scopus 로고
    • Constructability concepts for engineering and procurement
    • O'Connor, J. T., Rusch, S. E., and Schulz, M. J. (1987). " Constructability concepts for engineering and procurement.. " J. Constr. Eng. Manage., 113 (2), 235-248.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.2 , pp. 235-248
    • O'Connor, J.T.1    Rusch, S.E.2    Schulz, M.J.3
  • 18
    • 0030247855 scopus 로고    scopus 로고
    • Function-behavior-structure paths and their roles in analogy-based design
    • Qian, L., and Gero, J. S. (1996). " Function-behavior-structure paths and their roles in analogy-based design.. " Artif. Intell. Eng. Des. Anal. Manuf., 10 (5), 289-312.
    • (1996) Artif. Intell. Eng. Des. Anal. Manuf. , vol.10 , Issue.5 , pp. 289-312
    • Qian, L.1    Gero, J.S.2
  • 20
    • 33751283428 scopus 로고    scopus 로고
    • COSEE: Component state network centric model for verifying temporal and spatial consistence in project schedules
    • Song, Y. B., and Chua, D. K. H. (2003). " COSEE: Component state network centric model for verifying temporal and spatial consistence in project schedules.. " Proc., CIS W78's 20th Int. Conf. On Information Technology for Construction, Waiheke Island, New Zeland, 325-332.
    • (2003) Proc., CIS W78's 20th Int. Conf. on Information Technology for Construction , pp. 325-332
    • Song, Y.B.1    Chua, D.K.H.2
  • 21
    • 27444447204 scopus 로고    scopus 로고
    • Detection of spatio-temporal conflicts on a temporal 3D space system
    • Song, Y. B., and Chua, D. K. H. (2005). " Detection of spatio-temporal conflicts on a temporal 3D space system.. " Adv. Eng. Software, 36, 814-826.
    • (2005) Adv. Eng. Software , vol.36 , pp. 814-826
    • Song, Y.B.1    Chua, D.K.H.2
  • 23
    • 0030195306 scopus 로고    scopus 로고
    • Object-oriented model for integrating construction product and process information
    • Stumpf, A. L., Ganeshan, R., Chin, S., and Liu, L. Y. (1996). " Object-oriented model for integrating construction product and process information.. " J. Comput. Civ. Eng., 10 (3), 204-212.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.3 , pp. 204-212
    • Stumpf, A.L.1    Ganeshan, R.2    Chin, S.3    Liu, L.Y.4
  • 24
    • 0023363812 scopus 로고
    • Improving constructability during conceptual planning
    • Tatum, C. B. (1989). " Improving constructability during conceptual planning.. " J. Constr. Eng. Manage., 113 (2), 191-207.
    • (1989) J. Constr. Eng. Manage. , vol.113 , Issue.2 , pp. 191-207
    • Tatum, C.B.1
  • 27
    • 5244321999 scopus 로고
    • 32, Center for Integrated Facility Engineering, Stanford University, Stanford, Calif.
    • Waugh, L. M. (1990). " A construction planner.. " Technical Rep. 32, Center for Integrated Facility Engineering, Stanford University, Stanford, Calif.
    • (1990) A Construction Planner
    • Waugh, L.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.