메뉴 건너뛰기




Volumn 55, Issue 9, 2017, Pages 2522-2539

Evaluating strategic remanufacturing supply chain decisions

Author keywords

green manufacturing; Monte Carlo method; remanufacturing; simulation; strategy; supply chain design; sustainable manufacturing

Indexed keywords

DECISION MAKING; ECONOMICS; MANUFACTURE; STOCHASTIC MODELS; STOCHASTIC SYSTEMS; SUPPLY CHAINS;

EID: 84991497566     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2016.1239848     Document Type: Article
Times cited : (37)

References (111)
  • 1
    • 20344396908 scopus 로고    scopus 로고
    • An Analysis of the Multi-product Newsboy Problem with a Budget Constraint
    • Abdel-Malek, L. L., and R., Montanari. 2005. “An Analysis of the Multi-product Newsboy Problem with a Budget Constraint.” International Journal of Production Economics 97 (3):296–307.10.1016/j.ijpe.2004.08.008
    • (2005) International Journal of Production Economics , vol.97 , Issue.3 , pp. 296-307
    • Abdel-Malek, L.L.1    Montanari, R.2
  • 2
    • 84938055622 scopus 로고    scopus 로고
    • Viability of Remanufacturing Practice: A Strategic Decision Making Framework for Chinese Auto-parts Companies
    • Abdulrahman, M. D.-A., N., Subramanian, C., Liu, and C., Shu. 2015. “Viability of Remanufacturing Practice:A Strategic Decision Making Framework for Chinese Auto-parts Companies.” Journal of Cleaner Production 105:311–323.10.1016/j.jclepro.2014.02.065
    • (2015) Journal of Cleaner Production , vol.105 , pp. 311-323
    • Abdulrahman, M.D.A.1    Subramanian, N.2    Liu, C.3    Shu, C.4
  • 3
    • 74449092167 scopus 로고    scopus 로고
    • Inventory Optimization in a One Product Recoverable Manufacturing System
    • Ahiska, S. S., and R. E., King. 2010. “Inventory Optimization in a One Product Recoverable Manufacturing System.” International Journal of Production Economics 124 (1):11–19.10.1016/j.ijpe.2009.09.002
    • (2010) International Journal of Production Economics , vol.124 , Issue.1 , pp. 11-19
    • Ahiska, S.S.1    King, R.E.2
  • 4
    • 84897083363 scopus 로고    scopus 로고
    • Modeling and Analysis of a Product Substitution Strategy for a Stochastic Manufacturing/Remanufacturing System
    • Ahiska, S. S., and E., Kurtul. 2014. “Modeling and Analysis of a Product Substitution Strategy for a Stochastic Manufacturing/Remanufacturing System.” Computers & Industrial Engineering 72:1–11.10.1016/j.cie.2014.02.015
    • (2014) Computers & Industrial Engineering , vol.72 , pp. 1-11
    • Ahiska, S.S.1    Kurtul, E.2
  • 5
    • 54349099641 scopus 로고    scopus 로고
    • Remanufacturing as a Marketing Strategy
    • Atasu, A., M., Sarvary, and L. N., Van Wassenhove. 2008. “Remanufacturing as a Marketing Strategy.” Management Science 54 (10):1731–1746.10.1287/mnsc.1080.0893
    • (2008) Management Science , vol.54 , Issue.10 , pp. 1731-1746
    • Atasu, A.1    Sarvary, M.2    Van Wassenhove, L.N.3
  • 6
    • 77950309286 scopus 로고    scopus 로고
    • So What If Remanufacturing Cannibalizes My New Product Sales?
    • Atasu, A., V. D. R., Guide Jr., and L. N., Van Wassenhove. 2010. “So What If Remanufacturing Cannibalizes My New Product Sales?.” California Management Review 52 (2):56–76.10.1525/cmr.2010.52.2.56
    • (2010) California Management Review , vol.52 , Issue.2 , pp. 56-76
    • Atasu, A.1    Guide, V.D.R.2    Van Wassenhove, L.N.3
  • 7
    • 33846211233 scopus 로고    scopus 로고
    • Effects of Random Yield in Remanufacturing with Price-sensitive Supply and Demand
    • Bakal, I. S., and E., Akcali. 2006. “Effects of Random Yield in Remanufacturing with Price-sensitive Supply and Demand.” Production and Operations Management 15 (3):407–420.
    • (2006) Production and Operations Management , vol.15 , Issue.3 , pp. 407-420
    • Bakal, I.S.1    Akcali, E.2
  • 8
    • 84908242243 scopus 로고    scopus 로고
    • Optimal Core Acquisition and Pricing Strategies for Hybrid Manufacturing and Remanufacturing Systems
    • Bulmuş, S. C., S. X., Zhu, and R. H., Teunter. 2014. “Optimal Core Acquisition and Pricing Strategies for Hybrid Manufacturing and Remanufacturing Systems.” International Journal of Production Research 52 (22):6627–6641.10.1080/00207543.2014.906073
    • (2014) International Journal of Production Research , vol.52 , Issue.22 , pp. 6627-6641
    • Bulmuş, S.C.1    Zhu, S.X.2    Teunter, R.H.3
  • 9
    • 84893657109 scopus 로고    scopus 로고
    • Optimal Acquisition and Production Policy in a Hybrid Manufacturing/Remanufacturing System with Core Acquisition at Different Quality Levels
    • Cai, X., M., Lai, X., Li, Y., Li, and X., Wu. 2014. “Optimal Acquisition and Production Policy in a Hybrid Manufacturing/Remanufacturing System with Core Acquisition at Different Quality Levels.” European Journal of Operational Research 233 (2):374–382.10.1016/j.ejor.2013.07.017
    • (2014) European Journal of Operational Research , vol.233 , Issue.2 , pp. 374-382
    • Cai, X.1    Lai, M.2    Li, X.3    Li, Y.4    Wu, X.5
  • 10
    • 80755143170 scopus 로고    scopus 로고
    • The Co-opetitive Strategy of a Closed-loop Supply Chain with Remanufacturing
    • Chen, J. M., and C. I., Chang. 2012. “The Co-opetitive Strategy of a Closed-loop Supply Chain with Remanufacturing.” Transportation Research Part E-Logistics and Transportation Review 48 (2):387–400.10.1016/j.tre.2011.10.001
    • (2012) Transportation Research Part E-Logistics and Transportation Review , vol.48 , Issue.2 , pp. 387-400
    • Chen, J.M.1    Chang, C.I.2
  • 11
    • 84881287206 scopus 로고    scopus 로고
    • Advance Selling in a Supply Chain under Uncertain Supply and Demand
    • Cho, S.-H., and C. S., Tang. 2013. “Advance Selling in a Supply Chain under Uncertain Supply and Demand.” Manufacturing & Service Operations Management 15 (2):305–319.10.1287/msom.1120.0423
    • (2013) Manufacturing & Service Operations Management , vol.15 , Issue.2 , pp. 305-319
    • Cho, S.-H.1    Tang, C.S.2
  • 13
    • 84863553389 scopus 로고    scopus 로고
    • Forecasting Product Returns for Remanufacturing Operations
    • Clottey, T., W. C., Benton, and R., Srivastava. 2012. “Forecasting Product Returns for Remanufacturing Operations.” Decision Sciences 43 (4):589–614.10.1111/deci.2012.43.issue-4
    • (2012) Decision Sciences , vol.43 , Issue.4 , pp. 589-614
    • Clottey, T.1    Benton, W.C.2    Srivastava, R.3
  • 14
    • 84856547923 scopus 로고    scopus 로고
    • A Manufacturing and Remanufacturing Aggregate Planning Model Considering a Non-linear Supply Function of Recovered Products
    • Corominas, A., A., Lusa, and J., Olivella. 2012. “A Manufacturing and Remanufacturing Aggregate Planning Model Considering a Non-linear Supply Function of Recovered Products.” Production Planning & Control 23 (2–3):194–204.10.1080/09537287.2011.591651
    • (2012) Production Planning & Control , vol.23 , Issue.2-3 , pp. 194-204
    • Corominas, A.1    Lusa, A.2    Olivella, J.3
  • 15
    • 80052445264 scopus 로고    scopus 로고
    • Impact of Strategic Decision Making for Outsourcing on Managing Manufacturing
    • Dekkers, R., 2011. “Impact of Strategic Decision Making for Outsourcing on Managing Manufacturing.” International Journal of Operations & Production Management 31 (9):935–965.10.1108/01443571111165839
    • (2011) International Journal of Operations & Production Management , vol.31 , Issue.9 , pp. 935-965
    • Dekkers, R.1
  • 16
    • 77954861017 scopus 로고    scopus 로고
    • Multiperiod Remanufacturing Planning with Uncertain Quality of Inputs
    • Denizel, M., M., Ferguson, and G., Souza. 2010. “Multiperiod Remanufacturing Planning with Uncertain Quality of Inputs.” IEEE Transactions on Engineering Management 57 (3):394–404.10.1109/TEM.2009.2024506
    • (2010) IEEE Transactions on Engineering Management , vol.57 , Issue.3 , pp. 394-404
    • Denizel, M.1    Ferguson, M.2    Souza, G.3
  • 17
    • 84899016240 scopus 로고    scopus 로고
    • Monte Carlo Simulation: Remanufacturing or Not–A Newsvendor Perspective
    • Fes, Morroco, International Mediterranean and Latin American Modeling Multiconference, I3M 2010
    • Diaz, R., M., Tulpule, F., Longo, and A., Cimino. 2010. “Monte Carlo Simulation:Remanufacturing or Not–A Newsvendor Perspective.” 9th International Conference on Modeling and Applied Simulation (MAS). Fes, Morroco, International Mediterranean and Latin American Modeling Multiconference, I3M 2010.
    • (2010) 9th International Conference on Modeling and Applied Simulation (MAS)
    • Diaz, R.1    Tulpule, M.2    Longo, F.3    Cimino, A.4
  • 18
    • 84955093882 scopus 로고    scopus 로고
    • The Remanufacturing Newsvendor Problem
    • New York: Springer
    • Drake, M. J., D. W., Pentico, and R. P., Sroufe. 2012. “The Remanufacturing Newsvendor Problem.” In Handbook of Newsvendor Problems, 249–262. New York:Springer.10.1007/978-1-4614-3600-3
    • (2012) Handbook of Newsvendor Problems , pp. 249-262
    • Drake, M.J.1    Pentico, D.W.2    Sroufe, R.P.3
  • 19
    • 0037063284 scopus 로고    scopus 로고
    • Inventory Models with Random Yield in a Random Environment
    • Erdem, A. S., and S., Özekici. 2002. “Inventory Models with Random Yield in a Random Environment.” International Journal of Production Economics 78:239–253.10.1016/S0925-5273(01)00165-7
    • (2002) International Journal of Production Economics , vol.78 , pp. 239-253
    • Erdem, A.S.1    Özekici, S.2
  • 22
    • 70350741231 scopus 로고    scopus 로고
    • Managing New and Differentiated Remanufactured Products
    • Ferrer, G., and J. M., Swaminathan. 2010. “Managing New and Differentiated Remanufactured Products.” European Journal of Operational Research 203 (2):370–379.10.1016/j.ejor.2009.08.007
    • (2010) European Journal of Operational Research , vol.203 , Issue.2 , pp. 370-379
    • Ferrer, G.1    Swaminathan, J.M.2
  • 23
    • 0040150529 scopus 로고    scopus 로고
    • Material Planning for a Remanufacturing Facility
    • Ferrer, G., and D. C., Whybark. 2001. “Material Planning for a Remanufacturing Facility.” Production and Operations Management 10 (2):112–124.
    • (2001) Production and Operations Management , vol.10 , Issue.2 , pp. 112-124
    • Ferrer, G.1    Whybark, D.C.2
  • 24
    • 12244298221 scopus 로고    scopus 로고
    • Inventory Inaccuracy and Supply Chain Performance: A Simulation Study of a Retail Supply Chain
    • Fleisch, E., and C., Tellkamp. 2005. “Inventory Inaccuracy and Supply Chain Performance:A Simulation Study of a Retail Supply Chain.” International Journal of Production Economics 95 (3):373–385.10.1016/j.ijpe.2004.02.003
    • (2005) International Journal of Production Economics , vol.95 , Issue.3 , pp. 373-385
    • Fleisch, E.1    Tellkamp, C.2
  • 25
    • 84949782680 scopus 로고    scopus 로고
    • Coordinating a Three-layer Supply Chain with Uncertain Demand and Random Yield
    • Giri, B. C., S., Bardhan, and T., Maiti. 2016. “Coordinating a Three-layer Supply Chain with Uncertain Demand and Random Yield.” International Journal of Production Research 54 (8):2499–2518.10.1080/00207543.2015.1119324
    • (2016) International Journal of Production Research , vol.54 , Issue.8 , pp. 2499-2518
    • Giri, B.C.1    Bardhan, S.2    Maiti, T.3
  • 26
    • 84945232561 scopus 로고    scopus 로고
    • Product Recovery Optimization in Closed-loop Supply Chain to Improve Sustainability in Manufacturing
    • Govindan, K., P. C., Jha, and K., Garg. 2016. “Product Recovery Optimization in Closed-loop Supply Chain to Improve Sustainability in Manufacturing.” International Journal of Production Research 54 (5):1463–1486.10.1080/00207543.2015.1083625
    • (2016) International Journal of Production Research , vol.54 , Issue.5 , pp. 1463-1486
    • Govindan, K.1    Jha, P.C.2    Garg, K.3
  • 27
    • 70350782348 scopus 로고    scopus 로고
    • The Newsboy Problem When Customer Demand is a Compound Renewal Process
    • Grubbström, R. W., 2010. “The Newsboy Problem When Customer Demand is a Compound Renewal Process.” European Journal of Operational Research 203 (1):134–142.10.1016/j.ejor.2009.06.032
    • (2010) European Journal of Operational Research , vol.203 , Issue.1 , pp. 134-142
    • Grubbström, R.W.1
  • 28
    • 84905818726 scopus 로고    scopus 로고
    • Optimal Collection and Remanufacturing Decisions in Reverse Supply Chains with Collector’s Imperfect Sorting
    • Gu, Q., and G., Tagaras. 2014. “Optimal Collection and Remanufacturing Decisions in Reverse Supply Chains with Collector’s Imperfect Sorting.” International Journal of Production Research 52 (17):5155–5170.10.1080/00207543.2014.899720
    • (2014) International Journal of Production Research , vol.52 , Issue.17 , pp. 5155-5170
    • Gu, Q.1    Tagaras, G.2
  • 29
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling Using Drum-buffer-rope in a Remanufacturing Environment
    • Guide Jr., V., 1996. “Scheduling Using Drum-buffer-rope in a Remanufacturing Environment.” International Journal of Production Research 34 (4):1081–1091.10.1080/00207549608904951
    • (1996) International Journal of Production Research , vol.34 , Issue.4 , pp. 1081-1091
    • Guide, V.1
  • 30
    • 0033738099 scopus 로고    scopus 로고
    • Production Planning and Control for Remanufacturing: Industry Practice and Research Needs
    • Guide Jr., V. D. R., 2000. “Production Planning and Control for Remanufacturing:Industry Practice and Research Needs.” Journal of Operations Management 18 (4):467–483.10.1016/S0272-6963(00)00034-6
    • (2000) Journal of Operations Management , vol.18 , Issue.4 , pp. 467-483
    • Guide, V.D.R.1
  • 33
    • 0031272625 scopus 로고    scopus 로고
    • Product Structure Complexity and Scheduling of Operations in Recoverable Manufacturing
    • Guide Jr., V. D. R., R., Srivastava, and M. E., Kraus. 1997. “Product Structure Complexity and Scheduling of Operations in Recoverable Manufacturing.” International Journal of Production Research 35 (11):3179–3200.10.1080/002075497194345
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3179-3200
    • Guide, V.D.R.1    Srivastava, R.2    Kraus, M.E.3
  • 34
    • 0032642459 scopus 로고    scopus 로고
    • Production Planning and Control for Remanufacturing: A State-of-the-Art Survey
    • Guide Jr., V. D. R., V., Jayaraman, and R., Srivastava. 1999. “Production Planning and Control for Remanufacturing:A State-of-the-Art Survey.” Robotics and Computer-Integrated Manufacturing 15 (3):221–230.10.1016/S0736-5845(99)00020-4
    • (1999) Robotics and Computer-Integrated Manufacturing , vol.15 , Issue.3 , pp. 221-230
    • Guide, V.D.R.1    Jayaraman, V.2    Srivastava, R.3
  • 35
    • 84912529363 scopus 로고    scopus 로고
    • Coordinating Decentralised Assembly Systems with Random Yield and Random Demand
    • Güler, M. G., 2015. “Coordinating Decentralised Assembly Systems with Random Yield and Random Demand.” International Journal of Production Research 53 (3):886–896.10.1080/00207543.2014.939240
    • (2015) International Journal of Production Research , vol.53 , Issue.3 , pp. 886-896
    • Güler, M.G.1
  • 36
    • 3042545957 scopus 로고    scopus 로고
    • Supply Management in Assembly Systems with Random Yield and Random Demand
    • Gurnani, H., R., Akella, and J., Lehoczky. 2000. “Supply Management in Assembly Systems with Random Yield and Random Demand.” IIE Transactions 32 (8):701–714.
    • (2000) IIE Transactions , vol.32 , Issue.8 , pp. 701-714
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 37
    • 84958523796 scopus 로고    scopus 로고
    • A Robust Optimisation Model for Hybrid Remanufacturing and Manufacturing Systems under Uncertain Return Quality and Market Demand
    • Han, S., W., Ma, L., Zhao, X., Zhang, M. K., Lim, S., Yang, and S., Leung. 2016. “A Robust Optimisation Model for Hybrid Remanufacturing and Manufacturing Systems under Uncertain Return Quality and Market Demand.” International Journal of Production Research 54 (17):5056–5072.10.1080/00207543.2016.1145815
    • (2016) International Journal of Production Research , vol.54 , Issue.17 , pp. 5056-5072
    • Han, S.1    Ma, W.2    Zhao, L.3    Zhang, X.4    Lim, M.K.5    Yang, S.6    Leung, S.7
  • 38
    • 0033524320 scopus 로고    scopus 로고
    • An EOQ Lot Sizing Model with Random Supplier Capacity
    • Hariga, M., and M., Haouari. 1999. “An EOQ Lot Sizing Model with Random Supplier Capacity.” International Journal of Production Economics 58:39–47.10.1016/S0925-5273(98)00086-3
    • (1999) International Journal of Production Economics , vol.58 , pp. 39-47
    • Hariga, M.1    Haouari, M.2
  • 39
    • 84863204458 scopus 로고    scopus 로고
    • Coordination in Multi-echelon Supply Chain under Supply and Demand Uncertainty
    • He, Y., and X., Zhao. 2012. “Coordination in Multi-echelon Supply Chain under Supply and Demand Uncertainty.” International Journal of Production Economics 139 (1):106–115.10.1016/j.ijpe.2011.04.021
    • (2012) International Journal of Production Economics , vol.139 , Issue.1 , pp. 106-115
    • He, Y.1    Zhao, X.2
  • 40
    • 33846301849 scopus 로고    scopus 로고
    • Inventory Record Inaccuracy, Double Marginalization, and RFID Adoption
    • Hesse, H. S., 2007. “Inventory Record Inaccuracy, Double Marginalization, and RFID Adoption.” Production and Operations Management 16 (5):542–553.
    • (2007) Production and Operations Management , vol.16 , Issue.5 , pp. 542-553
    • Hesse, H.S.1
  • 41
    • 84932195712 scopus 로고    scopus 로고
    • The Impact of Information Sharing, Random Yield, Correlation, and Lead times in Closed Loop Supply Chains
    • Hosoda, T., S. M., Disney, and N., Gavirneni. 2015. “The Impact of Information Sharing, Random Yield, Correlation, and Lead times in Closed Loop Supply Chains.” European Journal of Operational Research 246 (3):827–836.
    • (2015) European Journal of Operational Research , vol.246 , Issue.3 , pp. 827-836
    • Hosoda, T.1    Disney, S.M.2    Gavirneni, N.3
  • 42
    • 33846877094 scopus 로고    scopus 로고
    • Analytical Solution for a Single-period Production Inventory Problem with Uniformity Distributed Yield and Demand
    • Inderfurth, K., 2004. “Analytical Solution for a Single-period Production Inventory Problem with Uniformity Distributed Yield and Demand.” Central European Journal of Operations Research 12 (2):117–127.
    • (2004) Central European Journal of Operations Research , vol.12 , Issue.2 , pp. 117-127
    • Inderfurth, K.1
  • 44
    • 84994501789 scopus 로고    scopus 로고
    • Addressing Supply-demand Imbalance: Designing Efficient Remanufacturing Strategies
    • Jia, J., S. H., Xu, and V. D. R., Guide. 2016. “Addressing Supply-demand Imbalance:Designing Efficient Remanufacturing Strategies.” Production and Operations Management. doi:10.1111/poms.12598.
    • (2016) Production and Operations Management
    • Jia, J.1    Xu, S.H.2    Guide, V.D.R.3
  • 45
    • 79957631311 scopus 로고    scopus 로고
    • Optimal Control of Reassembly with Variable Quality Returns in a Product Remanufacturing System
    • Jin, X., J., Ni, and Y., Koren. 2011. “Optimal Control of Reassembly with Variable Quality Returns in a Product Remanufacturing System.” CIRP Annals-Manufacturing Technology 60 (1):25–28.10.1016/j.cirp.2011.03.133
    • (2011) CIRP Annals-Manufacturing Technology , vol.60 , Issue.1 , pp. 25-28
    • Jin, X.1    Ni, J.2    Koren, Y.3
  • 46
    • 84867065803 scopus 로고    scopus 로고
    • Heuristic Algorithms for Minimising Total Recovery Cost of End-of-life Products under Quality Constraints
    • Jun, H.-B., D.-H., Lee, J.-G., Kim, and D., Kiritsis. 2012. “Heuristic Algorithms for Minimising Total Recovery Cost of End-of-life Products under Quality Constraints.” International Journal of Production Research 50 (19):5330–5347.10.1080/00207543.2011.624562
    • (2012) International Journal of Production Research , vol.50 , Issue.19 , pp. 5330-5347
    • Jun, H.-B.1    Lee, D.-H.2    Kim, J.-G.3    Kiritsis, D.4
  • 47
    • 80055031645 scopus 로고    scopus 로고
    • Production Planning of a Hybrid Manufacturing–Remanufacturing System under Uncertainty within a Closed-loop Supply Chain
    • Kenné, J.-P., P., Dejax, and A., Gharbi. 2012. “Production Planning of a Hybrid Manufacturing–Remanufacturing System under Uncertainty within a Closed-loop Supply Chain.” International Journal of Production Economics 135 (1):81–93.10.1016/j.ijpe.2010.10.026
    • (2012) International Journal of Production Economics , vol.135 , Issue.1 , pp. 81-93
    • Kenné, J.-P.1    Dejax, P.2    Gharbi, A.3
  • 48
    • 56549083654 scopus 로고    scopus 로고
    • The Single-period Inventory Problem: Extension to Random Yield from the Perspective of the Supply Chain
    • Keren, B., 2009. “The Single-period Inventory Problem:Extension to Random Yield from the Perspective of the Supply Chain.” Omega 37:801–810.10.1016/j.omega.2008.07.006
    • (2009) Omega , vol.37 , pp. 801-810
    • Keren, B.1
  • 49
    • 0035201653 scopus 로고    scopus 로고
    • Eco-efficiency Gains from Remanufacturing: A Case Study of Photocopier Remanufacturing at Fuji Xerox Australia
    • Kerr, W., and C., Ryan. 2001. “Eco-efficiency Gains from Remanufacturing:A Case Study of Photocopier Remanufacturing at Fuji Xerox Australia.” Journal of Cleaner Production 9 (1):75–81.10.1016/S0959-6526(00)00032-9
    • (2001) Journal of Cleaner Production , vol.9 , Issue.1 , pp. 75-81
    • Kerr, W.1    Ryan, C.2
  • 51
    • 84875434810 scopus 로고    scopus 로고
    • Optimal Control of an Inventory-production System with State-dependent Random Yield
    • Kutzner, S. C., and G. P., Kiesmüller. 2013. “Optimal Control of an Inventory-production System with State-dependent Random Yield.” European Journal of Operational Research 227 (3):444–452.10.1016/j.ejor.2013.01.006
    • (2013) European Journal of Operational Research , vol.227 , Issue.3 , pp. 444-452
    • Kutzner, S.C.1    Kiesmüller, G.P.2
  • 52
    • 84880513522 scopus 로고    scopus 로고
    • From Waste to Value–A System Dynamics Model for Strategic Decision-making in Closed-loop Supply Chains
    • Lehr, C. B., J.-H., Thun, and P. M., Milling. 2013. “From Waste to Value–A System Dynamics Model for Strategic Decision-making in Closed-loop Supply Chains.” International Journal of Production Research 51 (13):4105–4116.10.1080/00207543.2013.774488
    • (2013) International Journal of Production Research , vol.51 , Issue.13 , pp. 4105-4116
    • Lehr, C.B.1    Thun, J.-H.2    Milling, P.M.3
  • 53
    • 84861399588 scopus 로고    scopus 로고
    • Quantity Decisions in a Supply Chain with Early Returns Remanufacturing
    • Li, X., Y., Li, and X., Cai. 2012. “Quantity Decisions in a Supply Chain with Early Returns Remanufacturing.” International Journal of Production Research 50 (8):2161–2173.10.1080/00207543.2011.565085
    • (2012) International Journal of Production Research , vol.50 , Issue.8 , pp. 2161-2173
    • Li, X.1    Li, Y.2    Cai, X.3
  • 54
    • 84872117565 scopus 로고    scopus 로고
    • Double Marginalization and Coordination in the Supply Chain with Uncertain Supply
    • Li, X., Y., Li, and X., Cai. 2013. “Double Marginalization and Coordination in the Supply Chain with Uncertain Supply.” European Journal of Operational Research 226 (2):228–236.10.1016/j.ejor.2012.10.047
    • (2013) European Journal of Operational Research , vol.226 , Issue.2 , pp. 228-236
    • Li, X.1    Li, Y.2    Cai, X.3
  • 55
    • 84912080742 scopus 로고    scopus 로고
    • Remanufacturing and Pricing Decisions with Random Yield and Random Demand
    • Li, X., Y., Li, and X., Cai. 2015. “Remanufacturing and Pricing Decisions with Random Yield and Random Demand.” Computers & Operations Research 54:195–203.10.1016/j.cor.2014.01.005
    • (2015) Computers & Operations Research , vol.54 , pp. 195-203
    • Li, X.1    Li, Y.2    Cai, X.3
  • 56
    • 79957517299 scopus 로고    scopus 로고
    • The Supplier–Buyer Integrated Production-inventory Model with Random Yield
    • Liu, X., and S., Çetinkaya. 2011. “The Supplier–Buyer Integrated Production-inventory Model with Random Yield.” International Journal of Production Research 49:4043–4061.10.1080/00207543.2010.485588
    • (2011) International Journal of Production Research , vol.49 , pp. 4043-4061
    • Liu, X.1    Çetinkaya, S.2
  • 57
    • 84951279453 scopus 로고    scopus 로고
    • Strategies for Evaluating Performance of Flexibility in Product Recovery System
    • Madaan, J., F. T. S., Chan, and B., Niu. 2016. “Strategies for Evaluating Performance of Flexibility in Product Recovery System.” International Journal of Production Research 54 (10):2895–2906.10.1080/00207543.2015.1120899
    • (2016) International Journal of Production Research , vol.54 , Issue.10 , pp. 2895-2906
    • Madaan, J.1    Chan, F.T.S.2    Niu, B.3
  • 58
    • 39649124927 scopus 로고    scopus 로고
    • Economic Order Quantity for Items with Imperfect Quality: Revisited
    • Maddah, B., and M. Y., Jaber. 2008. “Economic Order Quantity for Items with Imperfect Quality:Revisited.” International Journal of Production Economics 112:808–815.10.1016/j.ijpe.2007.07.003
    • (2008) International Journal of Production Economics , vol.112 , pp. 808-815
    • Maddah, B.1    Jaber, M.Y.2
  • 59
    • 57649095497 scopus 로고    scopus 로고
    • Lot Sizing with Random Yield and Different Qualities
    • Maddah, B., M. K., Salameh, and G. M., Karame. 2009. “Lot Sizing with Random Yield and Different Qualities.” Applied Mathematical Modelling 33:1997–2009.10.1016/j.apm.2008.05.009
    • (2009) Applied Mathematical Modelling , vol.33 , pp. 1997-2009
    • Maddah, B.1    Salameh, M.K.2    Karame, G.M.3
  • 60
    • 84879690922 scopus 로고    scopus 로고
    • Analysis of Flexible Decision Strategies for Sustainability-focused Green Product Recovery System
    • Mangla, S., J., Madaan, and F. T. S., Chan. 2013. “Analysis of Flexible Decision Strategies for Sustainability-focused Green Product Recovery System.” International Journal of Production Research 51 (11):3428–3442.10.1080/00207543.2013.774493
    • (2013) International Journal of Production Research , vol.51 , Issue.11 , pp. 3428-3442
    • Mangla, S.1    Madaan, J.2    Chan, F.T.S.3
  • 61
    • 84905001211 scopus 로고    scopus 로고
    • Using Systems Dynamics to Evaluate the Tradeoff among Supply Chain Aggregate Production Planning Policies
    • Mendoza, J. D., J., Mula, and F., Campuzano-Bolarin. 2014. “Using Systems Dynamics to Evaluate the Tradeoff among Supply Chain Aggregate Production Planning Policies.” International Journal of Operations & Production Management 34 (8):1055–1079.10.1108/IJOPM-06-2012-0238
    • (2014) International Journal of Operations & Production Management , vol.34 , Issue.8 , pp. 1055-1079
    • Mendoza, J.D.1    Mula, J.2    Campuzano-Bolarin, F.3
  • 63
    • 84861406033 scopus 로고    scopus 로고
    • Dynamic Product Acquisition in Closed Loop Supply Chains
    • Minner, S., and G. P., Kiesmüller. 2012. “Dynamic Product Acquisition in Closed Loop Supply Chains.” International Journal of Production Research 50 (11):2836–2851.10.1080/00207543.2010.539280
    • (2012) International Journal of Production Research , vol.50 , Issue.11 , pp. 2836-2851
    • Minner, S.1    Kiesmüller, G.P.2
  • 64
    • 84938631972 scopus 로고    scopus 로고
    • Optimal Pricing and Core Acquisition Strategy for a Hybrid Manufacturing/Remanufacturing System
    • Mitra, S., 2016. “Optimal Pricing and Core Acquisition Strategy for a Hybrid Manufacturing/Remanufacturing System.” International Journal of Production Research 54 (5):1285–1302.10.1080/00207543.2015.1067376
    • (2016) International Journal of Production Research , vol.54 , Issue.5 , pp. 1285-1302
    • Mitra, S.1
  • 65
    • 77950627714 scopus 로고    scopus 로고
    • A Modelling Framework for the Acquisition and Remanufacturing of Used Products
    • Nikolaidis, Y., 2009. “A Modelling Framework for the Acquisition and Remanufacturing of Used Products.” International Journal of Sustainable Engineering 2 (3):154–170.10.1080/19397030902738952
    • (2009) International Journal of Sustainable Engineering , vol.2 , Issue.3 , pp. 154-170
    • Nikolaidis, Y.1
  • 66
    • 85053016836 scopus 로고    scopus 로고
    • Reverse Logistics Decision Making for Modular Products: The Impact of Supply Chain Strategies
    • Nowak, T., F., Toyasaki, T., Wakolbinger, and D., Ng. 2014. “Reverse Logistics Decision Making for Modular Products:The Impact of Supply Chain Strategies.” Lecture Notes in Management Science 6:65–73.
    • (2014) Lecture Notes in Management Science , vol.6 , pp. 65-73
    • Nowak, T.1    Toyasaki, F.2    Wakolbinger, T.3    Ng, D.4
  • 67
    • 70349655405 scopus 로고    scopus 로고
    • Outsourcing Reverse Logistics and Remanufacturing Functions: A Conceptual Strategic Model
    • Ordoobadi, S. M., 2009. “Outsourcing Reverse Logistics and Remanufacturing Functions:A Conceptual Strategic Model.” Management Research News 32 (9):831–845.10.1108/01409170910980344
    • (2009) Management Research News , vol.32 , Issue.9 , pp. 831-845
    • Ordoobadi, S.M.1
  • 68
    • 0042639298 scopus 로고    scopus 로고
    • Inventory Models with Unreliable Suppliers in a Random Environment
    • Ozekici, S., and M., Parlar. 1999. “Inventory Models with Unreliable Suppliers in a Random Environment.” Annals of Operations Research 91:126–136.
    • (1999) Annals of Operations Research , vol.91 , pp. 126-136
    • Ozekici, S.1    Parlar, M.2
  • 70
    • 84874155085 scopus 로고    scopus 로고
    • Quantity Discount Supply Chain Models with Fashion Products and Uncertain Yields
    • Peng, H., and M., Zhou. 2013. “Quantity Discount Supply Chain Models with Fashion Products and Uncertain Yields.” Mathematical Problems in Engineering 2013:11.
    • (2013) Mathematical Problems in Engineering , vol.2013 , pp. 11
    • Peng, H.1    Zhou, M.2
  • 71
    • 84859912000 scopus 로고    scopus 로고
    • A Model to Evaluate Acquisition Price and Quantity of Used Products for Remanufacturing
    • Pokharel, S., and Y., Liang. 2012. “A Model to Evaluate Acquisition Price and Quantity of Used Products for Remanufacturing.” International Journal of Production Economics 138 (1):170–176.10.1016/j.ijpe.2012.03.019
    • (2012) International Journal of Production Economics , vol.138 , Issue.1 , pp. 170-176
    • Pokharel, S.1    Liang, Y.2
  • 72
    • 84941788368 scopus 로고    scopus 로고
    • Optimal Configuration of Remanufacturing Supply Network with Return Quality Decision
    • Radhi, M., and G., Zhang. 2016. “Optimal Configuration of Remanufacturing Supply Network with Return Quality Decision.” International Journal of Production Research 54 (5):1487–1502.10.1080/00207543.2015.1086034
    • (2016) International Journal of Production Research , vol.54 , Issue.5 , pp. 1487-1502
    • Radhi, M.1    Zhang, G.2
  • 73
    • 33846876939 scopus 로고    scopus 로고
    • A Comprehensive Analysis of the Newsvendor Model with Unreliable Supply
    • Rekik, Y., E., Sahin, and Y., Dallery. 2007. “A Comprehensive Analysis of the Newsvendor Model with Unreliable Supply.” OR Spectrum 29:207–233.10.1007/s00291-005-0025-0
    • (2007) OR Spectrum , vol.29 , pp. 207-233
    • Rekik, Y.1    Sahin, E.2    Dallery, Y.3
  • 74
    • 84859098537 scopus 로고    scopus 로고
    • Lifecycle Pricing for Installed Base Management with Constrained Capacity and Remanufacturing
    • Robotis, A., S., Bhattacharya, and L. N., Van Wassenhove. 2012. “Lifecycle Pricing for Installed Base Management with Constrained Capacity and Remanufacturing.” Production and Operations Management 21 (2):236–252.10.1111/poms.2012.21.issue-2
    • (2012) Production and Operations Management , vol.21 , Issue.2 , pp. 236-252
    • Robotis, A.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 75
  • 76
    • 84945242230 scopus 로고    scopus 로고
    • Dual Channel Closed-loop Supply Chain Coordination with a Reward-driven Remanufacturing Policy
    • Saha, S., S. P., Sarmah, and I., Moon. 2016. “Dual Channel Closed-loop Supply Chain Coordination with a Reward-driven Remanufacturing Policy.” International Journal of Production Research 54 (5):1503–1517.10.1080/00207543.2015.1090031
    • (2016) International Journal of Production Research , vol.54 , Issue.5 , pp. 1503-1517
    • Saha, S.1    Sarmah, S.P.2    Moon, I.3
  • 77
    • 38149040239 scopus 로고    scopus 로고
    • Analysis of a Newsvendor Which Has Errors in Inventory Data Records
    • Sahin, E., J., Buzacott, and Y., Dallery. 2008. “Analysis of a Newsvendor Which Has Errors in Inventory Data Records.” European Journal of Operational Research 188:370–389.10.1016/j.ejor.2007.04.021
    • (2008) European Journal of Operational Research , vol.188 , pp. 370-389
    • Sahin, E.1    Buzacott, J.2    Dallery, Y.3
  • 78
    • 0037409304 scopus 로고    scopus 로고
    • A Strategic Decision Framework for Green Supply Chain Management
    • Sarkis, J., 2003. “A Strategic Decision Framework for Green Supply Chain Management.” Journal of Cleaner Production 11 (4):397–409.10.1016/S0959-6526(02)00062-8
    • (2003) Journal of Cleaner Production , vol.11 , Issue.4 , pp. 397-409
    • Sarkis, J.1
  • 79
    • 1642269093 scopus 로고    scopus 로고
    • Closed-loop Supply Chain Models with Product Remanufacturing
    • Savaskan, R. C., S., Bhattacharya, and L. N., Van Wassenhove. 2004. “Closed-loop Supply Chain Models with Product Remanufacturing.” Management Science 50 (2):239–252.10.1287/mnsc.1030.0186
    • (2004) Management Science , vol.50 , Issue.2 , pp. 239-252
    • Savaskan, R.C.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 80
    • 84941941083 scopus 로고    scopus 로고
    • Remanufacturing Decisions and Implications under Material Cost Uncertainty
    • Shi, W., and K. J., Min. 2015. “Remanufacturing Decisions and Implications under Material Cost Uncertainty.” International Journal of Production Research 53 (21):6421–6435.10.1080/00207543.2014.932933
    • (2015) International Journal of Production Research , vol.53 , Issue.21 , pp. 6421-6435
    • Shi, W.1    Min, K.J.2
  • 81
    • 0019083768 scopus 로고
    • Optimal Inventory Policies When Stockouts Result from Defective Products
    • Shih, W., 1980. “Optimal Inventory Policies When Stockouts Result from Defective Products.” International Journal of Production Research 18 (6):677–686.10.1080/00207548008919699
    • (1980) International Journal of Production Research , vol.18 , Issue.6 , pp. 677-686
    • Shih, W.1
  • 82
    • 0016924731 scopus 로고
    • Establishing the Order Quantity When the Amount Received is Uncertain
    • Silver, E. A., 1976. “Establishing the Order Quantity When the Amount Received is Uncertain.” INFOR 14 (1):32–39.
    • (1976) INFOR , vol.14 , Issue.1 , pp. 32-39
    • Silver, E.A.1
  • 84
    • 84893938793 scopus 로고    scopus 로고
    • Buffer Allocation for Hybrid Manufacturing/Remanufacturing System Considering Quality Grading
    • Su, C., and A., Xu. 2014. “Buffer Allocation for Hybrid Manufacturing/Remanufacturing System Considering Quality Grading.” International Journal of Production Research 52 (5):1269–1284.10.1080/00207543.2013.828165
    • (2014) International Journal of Production Research , vol.52 , Issue.5 , pp. 1269-1284
    • Su, C.1    Xu, A.2
  • 85
  • 86
    • 77956484123 scopus 로고    scopus 로고
    • Aftermarket Remanufacturing Strategic Planning Decision-making Framework: Theory & Practice
    • Subramoniam, R., D., Huisingh, and R. B., Chinnam. 2010. “Aftermarket Remanufacturing Strategic Planning Decision-making Framework:Theory & Practice.” Journal of Cleaner Production 18 (16–17):1575–1586.10.1016/j.jclepro.2010.07.022
    • (2010) Journal of Cleaner Production , vol.18 , Issue.16-17 , pp. 1575-1586
    • Subramoniam, R.1    Huisingh, D.2    Chinnam, R.B.3
  • 87
    • 84869090438 scopus 로고    scopus 로고
    • Remanufacturing Decision-making Framework (RDMF): Research Validation Using the Analytical Hierarchical Process
    • Subramoniam, R., D., Huisingh, R. B., Chinnam, and S., Subramoniam. 2013. “Remanufacturing Decision-making Framework (RDMF):Research Validation Using the Analytical Hierarchical Process.” Journal of Cleaner Production 40:212–220.10.1016/j.jclepro.2011.09.004
    • (2013) Journal of Cleaner Production , vol.40 , pp. 212-220
    • Subramoniam, R.1    Huisingh, D.2    Chinnam, R.B.3    Subramoniam, S.4
  • 88
    • 55349132005 scopus 로고    scopus 로고
    • Optimal Location and Value of Timely Sorting of Used Items in a Remanufacturing Supply Chain with Multiple Collection Sites
    • Tagaras, G., and C., Zikopoulos. 2008. “Optimal Location and Value of Timely Sorting of Used Items in a Remanufacturing Supply Chain with Multiple Collection Sites.” International Journal of Production Economics 115 (2):424–432.10.1016/j.ijpe.2007.10.026
    • (2008) International Journal of Production Economics , vol.115 , Issue.2 , pp. 424-432
    • Tagaras, G.1    Zikopoulos, C.2
  • 89
    • 84863224138 scopus 로고    scopus 로고
    • Dynamic Pricing in the Newsvendor Problem with Yield Risks
    • Tang, O., S., Nurmaya Musa, and J., Li. 2012. “Dynamic Pricing in the Newsvendor Problem with Yield Risks.” International Journal of Production Economics 139 (1):127–134.10.1016/j.ijpe.2011.01.018
    • (2012) International Journal of Production Economics , vol.139 , Issue.1 , pp. 127-134
    • Tang, O.1    Nurmaya Musa, S.2    Li, J.3
  • 90
    • 84866431775 scopus 로고    scopus 로고
    • Managing a Remanufacturing System with Random Yield: Properties, Observations, and Heuristics
    • Tao, Z., S. X., Zhou, and C. S., Tang. 2012. “Managing a Remanufacturing System with Random Yield:Properties, Observations, and Heuristics.” Production and Operations Management 21 (5):797–813.10.1111/poms.2012.21.issue-5
    • (2012) Production and Operations Management , vol.21 , Issue.5 , pp. 797-813
    • Tao, Z.1    Zhou, S.X.2    Tang, C.S.3
  • 91
    • 78650414341 scopus 로고    scopus 로고
    • Optimal Core Acquisition and Remanufacturing Policies under Uncertain Core Quality Fractions
    • Teunter, R. H., and S. D. P., Flapper. 2011. “Optimal Core Acquisition and Remanufacturing Policies under Uncertain Core Quality Fractions.” European Journal of Operational Research 210 (2):241–248.10.1016/j.ejor.2010.06.015
    • (2011) European Journal of Operational Research , vol.210 , Issue.2 , pp. 241-248
    • Teunter, R.H.1    Flapper, S.D.P.2
  • 93
    • 81355154406 scopus 로고    scopus 로고
    • Cost Allocation in Manufacturing–Remanufacturing Operations
    • Toktay, L. B., and D., Wei. 2011. “Cost Allocation in Manufacturing–Remanufacturing Operations.” Production and Operations Management 20 (6):841–847.10.1111/poms.2011.20.issue-6
    • (2011) Production and Operations Management , vol.20 , Issue.6 , pp. 841-847
    • Toktay, L.B.1    Wei, D.2
  • 94
    • 84890816601 scopus 로고    scopus 로고
    • Coordination of Manufacturing, Remanufacturing and Returns Acceptance in Hybrid Manufacturing/Remanufacturing Systems
    • Vercraene, S., J.-P., Gayon, and S. D., Flapper. 2014. “Coordination of Manufacturing, Remanufacturing and Returns Acceptance in Hybrid Manufacturing/Remanufacturing Systems.” International Journal of Production Economics 148:62–70.10.1016/j.ijpe.2013.11.001
    • (2014) International Journal of Production Economics , vol.148 , pp. 62-70
    • Vercraene, S.1    Gayon, J.-P.2    Flapper, S.D.3
  • 95
    • 33746964923 scopus 로고    scopus 로고
    • A System Dynamics Model for Dynamic Capacity Planning of Remanufacturing in Closed-loop Supply Chains
    • Vlachos, D., P., Georgiadis, and E., Iakovou. 2007. “A System Dynamics Model for Dynamic Capacity Planning of Remanufacturing in Closed-loop Supply Chains.” Computers & Operations Research 34 (2):367–394.10.1016/j.cor.2005.03.005
    • (2007) Computers & Operations Research , vol.34 , Issue.2 , pp. 367-394
    • Vlachos, D.1    Georgiadis, P.2    Iakovou, E.3
  • 96
    • 79751526499 scopus 로고    scopus 로고
    • Optimum Policy in Hybrid Manufacturing/Remanufacturing System
    • Wang, J., J., Zhao, and X., Wang. 2011. “Optimum Policy in Hybrid Manufacturing/Remanufacturing System.” Computers & Industrial Engineering 60 (3):411–419.10.1016/j.cie.2010.05.002
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.3 , pp. 411-419
    • Wang, J.1    Zhao, J.2    Wang, X.3
  • 97
    • 85027940764 scopus 로고    scopus 로고
    • Pricing and Remanufacturing Decisions in Two Competing Supply Chains
    • Wei, J., and J., Zhao. 2015. “Pricing and Remanufacturing Decisions in Two Competing Supply Chains.” International Journal of Production Research 53 (1):258–278.10.1080/00207543.2014.951088
    • (2015) International Journal of Production Research , vol.53 , Issue.1 , pp. 258-278
    • Wei, J.1    Zhao, J.2
  • 98
    • 84959243752 scopus 로고    scopus 로고
    • Refund Policies for Cores with Quality Variation in OEM Remanufacturing
    • Wei, S., O., Tang, and W., Liu. 2015. “Refund Policies for Cores with Quality Variation in OEM Remanufacturing.” International Journal of Production Economics 170:629–640.10.1016/j.ijpe.2014.12.006
    • (2015) International Journal of Production Economics , vol.170 , pp. 629-640
    • Wei, S.1    Tang, O.2    Liu, W.3
  • 100
    • 84867023879 scopus 로고    scopus 로고
    • OEM Product Design in a Price Competition with Remanufactured Product
    • Wu, C. H., 2013. “OEM Product Design in a Price Competition with Remanufactured Product.” Omega-International Journal of Management Science 41 (2):287–298.10.1016/j.omega.2012.04.004
    • (2013) Omega-International Journal of Management Science , vol.41 , Issue.2 , pp. 287-298
    • Wu, C.H.1
  • 101
    • 84889882869 scopus 로고    scopus 로고
    • Dynamic Pricing Models for Used Products in Remanufacturing with Lost-Sales and Uncertain Quality
    • Xiong, Y., G., Li, Y., Zhou, K., Fernandes, R., Harrison, and Z., Xiong. 2014. “Dynamic Pricing Models for Used Products in Remanufacturing with Lost-Sales and Uncertain Quality.” International Journal of Production Economics 147 Part C:678–688.10.1016/j.ijpe.2013.04.025
    • (2014) International Journal of Production Economics , vol.147 , pp. 678-688
    • Xiong, Y.1    Li, G.2    Zhou, Y.3    Fernandes, K.4    Harrison, R.5    Xiong, Z.6
  • 102
    • 34247525012 scopus 로고    scopus 로고
    • Sourcing with Random Yields and Stochastic Demand: A Newsvendor Approach
    • Yang, S., J., Yang, and L., Abdel-Malek. 2007. “Sourcing with Random Yields and Stochastic Demand:A Newsvendor Approach.” Computers & Operations Research 34:3682–3690.10.1016/j.cor.2006.01.015
    • (2007) Computers & Operations Research , vol.34 , pp. 3682-3690
    • Yang, S.1    Yang, J.2    Abdel-Malek, L.3
  • 103
    • 84961386925 scopus 로고    scopus 로고
    • Optimal Acquisition Policy in Remanufacturing under General Core Quality Distributions
    • Yang, C.-H., J., Wang, and P., Ji. 2015. “Optimal Acquisition Policy in Remanufacturing under General Core Quality Distributions.” International Journal of Production Research 53 (5):1425–1438.10.1080/00207543.2014.944283
    • (2015) International Journal of Production Research , vol.53 , Issue.5 , pp. 1425-1438
    • Yang, C.-H.1    Wang, J.2    Ji, P.3
  • 104
    • 0001198301 scopus 로고
    • Lot Sizing with Random Yields: A Review
    • Yano, C. A., and H. L., Lee. 1995. “Lot Sizing with Random Yields:A Review.” Operations Research 43 (2):311–334.10.1287/opre.43.2.311
    • (1995) Operations Research , vol.43 , Issue.2 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 105
    • 84961879684 scopus 로고    scopus 로고
    • A Quantitative Evaluation Model to Measure the Disassembly Difficulty; Application of the Semi-destructive Methods in Aviation End-of-life
    • Zahedi, H., C., Mascle, and P., Baptiste. 2016. “A Quantitative Evaluation Model to Measure the Disassembly Difficulty; Application of the Semi-destructive Methods in Aviation End-of-life.” International Journal of Production Research 54 (12):3736–3748.10.1080/00207543.2016.1165877
    • (2016) International Journal of Production Research , vol.54 , Issue.12 , pp. 3736-3748
    • Zahedi, H.1    Mascle, C.2    Baptiste, P.3
  • 106
    • 79955643668 scopus 로고    scopus 로고
    • A Capacitated Production Planning Problem for Closed-loop Supply Chain with Remanufacturing
    • Zhang, J., X., Liu, and Y., Tu. 2011. “A Capacitated Production Planning Problem for Closed-loop Supply Chain with Remanufacturing.” The International Journal of Advanced Manufacturing Technology 54 (5–8):757–766.10.1007/s00170-010-2948-0
    • (2011) The International Journal of Advanced Manufacturing Technology , vol.54 , Issue.5-8 , pp. 757-766
    • Zhang, J.1    Liu, X.2    Tu, Y.3
  • 107
    • 84875415660 scopus 로고    scopus 로고
    • Pricing and Remanufacturing Decisions of a Decentralized Fuzzy Supply Chain
    • Zhao, J., W. Y., Liu, and J., Wei. 2013. “Pricing and Remanufacturing Decisions of a Decentralized Fuzzy Supply Chain.” Discrete Dynamics in Nature and Society 2013:1–10.
    • (2013) Discrete Dynamics in Nature and Society , vol.2013 , pp. 1-10
    • Zhao, J.1    Liu, W.Y.2    Wei, J.3
  • 108
    • 79957476590 scopus 로고    scopus 로고
    • Optimal Product Acquisition, Pricing, and Inventory Management for Systems with Remanufacturing
    • Zhou, S. X., and Y., Yu. 2011. “Optimal Product Acquisition, Pricing, and Inventory Management for Systems with Remanufacturing.” Operations Research 59 (2):514–521.10.1287/opre.1100.0898
    • (2011) Operations Research , vol.59 , Issue.2 , pp. 514-521
    • Zhou, S.X.1    Yu, Y.2
  • 109
    • 79951911651 scopus 로고    scopus 로고
    • Optimal Control of Inventory Systems with Multiple Types of Remanufacturable Products
    • Zhou, S. X., Z., Tao, and X., Chao. 2011. “Optimal Control of Inventory Systems with Multiple Types of Remanufacturable Products.” Manufacturing & Service Operations Management 13 (1):20–34.10.1287/msom.1100.0298
    • (2011) Manufacturing & Service Operations Management , vol.13 , Issue.1 , pp. 20-34
    • Zhou, S.X.1    Tao, Z.2    Chao, X.3
  • 110
    • 84876121636 scopus 로고    scopus 로고
    • The Bright Side of Manufacturing–Remanufacturing Conflict in a Decentralised Closed-Loop Supply Chain
    • Zhou, Y., Y., Xiong, G., Li, Z., Xiong, and M., Beck. 2013. “The Bright Side of Manufacturing–Remanufacturing Conflict in a Decentralised Closed-Loop Supply Chain.” International Journal of Production Research 51 (9):2639–2651.10.1080/00207543.2012.737956
    • (2013) International Journal of Production Research , vol.51 , Issue.9 , pp. 2639-2651
    • Zhou, Y.1    Xiong, Y.2    Li, G.3    Xiong, Z.4    Beck, M.5
  • 111
    • 38049093864 scopus 로고    scopus 로고
    • On the Attractiveness of Sorting before Disassembly in Remanufacturing
    • Zikopoulos, C., and G., Tagaras. 2008. “On the Attractiveness of Sorting before Disassembly in Remanufacturing.” IIE Transactions 40 (3):313–323.10.1080/07408170701488078
    • (2008) IIE Transactions , vol.40 , Issue.3 , pp. 313-323
    • Zikopoulos, C.1    Tagaras, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.