메뉴 건너뛰기




Volumn 34, Issue 4, 1996, Pages 1081-1091

Scheduling using drum-buffer-rope in a remanufacturing environment

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; CONTROL SYSTEMS; MANUFACTURE; MATHEMATICAL MODELS; OPERATIONS RESEARCH; REPAIR; SCHEDULING;

EID: 0030129785     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608904951     Document Type: Article
Times cited : (97)

References (10)
  • 1
    • 0028403388 scopus 로고
    • A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks
    • Cook, D.P., 1994, A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks. Production and Inventory Management, 35(1), 73-78.
    • (1994) Production and Inventory Management , vol.35 , Issue.1 , pp. 73-78
    • Cook, D.P.1
  • 5
    • 0026205378 scopus 로고
    • Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques
    • Lockamy, A. and Cox, J., 1994, Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques. International Journal of Production Research, 29, 1661-1672.
    • (1994) International Journal of Production Research , vol.29 , pp. 1661-1672
    • Lockamy, A.1    Cox, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.