메뉴 건너뛰기




Volumn 2, Issue 3, 2009, Pages 154-170

A modelling framework for the acquisition and remanufacturing of used products

Author keywords

Cell phones mobile phones; Mixed integer programming; Product acquisition; Remanufacturing; Reverse logistics

Indexed keywords

ACQUISITION SYSTEMS; CELL PHONE; ECONOMIC BENEFITS; MATHEMATICAL PROGRAMMING MODELS; MIXED INTEGER PROGRAMMING; MODELLING FRAMEWORK; OPTIMAL DECISIONS; OPTIMISATIONS; PRODUCT ACQUISITION; PROFIT-POTENTIAL; REVERSE LOGISTICS; STOCHASTIC PARAMETERS; USED PRODUCT; USEFUL LIFE;

EID: 77950627714     PISSN: 19397038     EISSN: 19397046     Source Type: Journal    
DOI: 10.1080/19397030902738952     Document Type: Article
Times cited : (35)

References (29)
  • 2
    • 77957736649 scopus 로고    scopus 로고
    • Directive 2002/95/EC of the European Parliament and of the Council of 27 January 2003 on the restriction of the use of certain hazardous substances in electrical and electronic equipment (RoHS)
    • Directive 2002/95/EC of the European Parliament and of the Council of 27 January 2003 on the restriction of the use of certain hazardous substances in electrical and electronic equipment (RoHS).
  • 3
    • 77957745354 scopus 로고    scopus 로고
    • Directive 2002/96/EC of the European Parliament and of the Council of 27 January 2003 on waste electrical and electronic equipment (WEEE)
    • Directive 2002/96/EC of the European Parliament and of the Council of 27 January 2003 on waste electrical and electronic equipment (WEEE).
  • 4
    • 0040150529 scopus 로고    scopus 로고
    • Material planning for a remanufacturing facility
    • Ferrer, G. and Whybark, C., 2001. Material planning for a remanufacturing facility. Production and Operations Management, 10 (2), 112-124.
    • (2001) Production and Operations Management , vol.10 , Issue.2 , pp. 112-124
    • Ferrer, G.1    Whybark, C.2
  • 5
    • 84892291864 scopus 로고    scopus 로고
    • Flapper, S.D.P., van Nunen, J.A.E.E., and van Wassenhove, L.N., ed., Berlin: Springer-Verlag
    • Flapper, S.D.P., van Nunen, J.A.E.E., and van Wassenhove, L.N., ed., 2005. Managing closed-loop supply chains. Berlin: Springer-Verlag.
    • (2005) Managing Closed-loop Supply Chains
  • 7
    • 31044456836 scopus 로고    scopus 로고
    • Remanufacturing of mobile phones - capacity, program and facility adaptation planning
    • Franke, C., et al., 2006. Remanufacturing of mobile phones - capacity, program and facility adaptation planning. Omega, 34 (6), 562-570.
    • (2006) Omega , vol.34 , Issue.6 , pp. 562-570
    • Franke, C.1
  • 8
    • 33644882467 scopus 로고    scopus 로고
    • Closed-loop supply chains in process industries: An empirical study of producer re-use issues
    • French, M.L. and LaForge, R.L., 2006. Closed-loop supply chains in process industries: an empirical study of producer re-use issues. Journal of Operations Management, 24 (3), 271-286.
    • (2006) Journal of Operations Management , vol.24 , Issue.3 , pp. 271-286
    • French, M.L.1    Laforge, R.L.2
  • 9
    • 33846325135 scopus 로고    scopus 로고
    • Optimal acquisition and sorting policies for remanufacturing
    • Galbreth, M.R. and Blackburn, J.D., 2006. Optimal acquisition and sorting policies for remanufacturing. Production and Operations Management, 15 (3), 384-392.
    • (2006) Production and Operations Management , vol.15 , Issue.3 , pp. 384-392
    • Galbreth, M.R.1    Blackburn, J.D.2
  • 10
    • 0033738099 scopus 로고    scopus 로고
    • Production planning and control for remanufacturing
    • Guide Jr, V.D.R., 2000. Production planning and control for remanufacturing. Journal of Operations Management, 18 (4),467-483.
    • (2000) Journal of Operations Management , vol.18 , Issue.4 , pp. 467-483
    • Guide, V.D.R.1
  • 11
    • 0032181029 scopus 로고    scopus 로고
    • Inventory buffers in recoverable manufacturing
    • Guide Jr, V.D.R. and Srivastava, R., 1998. Inventory buffers in recoverable manufacturing. Journal of Operations Management, 16 (5), 551-568.
    • (1998) Journal of Operations Management , vol.16 , Issue.5 , pp. 551-568
    • Guide, V.D.R.1    Srivastava, R.2
  • 14
    • 0347460516 scopus 로고    scopus 로고
    • Guide, Jr, V.D.R. and van Wassenhove, L.N., ed., Pittsburg, PA: Carnegie Mellon University Press
    • Guide, Jr, V.D.R. and van Wassenhove, L.N., ed., 2003. Business aspects of closed-loop supply chains. Pittsburg, PA: Carnegie Mellon University Press.
    • (2003) Business Aspects of Closed-loop Supply Chains
  • 15
    • 0000683467 scopus 로고    scopus 로고
    • Simple optimal replenishment and disposal policies for a product recovery system with leadtimes
    • Inderfurth, K., 1997. Simple optimal replenishment and disposal policies for a product recovery system with leadtimes. OR Spektrum, 19 (2), 111-122.
    • (1997) OR Spektrum , vol.19 , Issue.2 , pp. 111-122
    • Inderfurth, K.1
  • 16
    • 0009311625 scopus 로고    scopus 로고
    • Analysis of MRP policies with recovery options
    • In: U. Leopold- Wildburger, et al., eds., Heidelberg: Physica
    • Inderfurth, K. and Jensen, T., 1999. Analysis of MRP policies with recovery options. In: U. Leopold- Wildburger, et al., eds. Modeling and decisions in economics, Heidelberg: Physica, 189-228.
    • (1999) Modeling and Decisions In Economics , pp. 189-228
    • Inderfurth, K.1    Jensen, T.2
  • 17
    • 33748905322 scopus 로고    scopus 로고
    • A quantitative approach to assessing the profitability of car and truck tire remanufacturing
    • Lebreton, B. and Tuma, A., 2006. A quantitative approach to assessing the profitability of car and truck tire remanufacturing. International Journal of Production Economics, 104 (2), 639-652.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 639-652
    • Lebreton, B.1    Tuma, A.2
  • 19
    • 10444276610 scopus 로고    scopus 로고
    • The effect of remanufacturing on procurement decisions for resellers in secondary markets
    • Robotis, A., Bhattacharya, S. and van Wassenhove, L.N., 2005. The effect of remanufacturing on procurement decisions for resellers in secondary markets. European Journal of Operational Research, 163 (3), 688-705.
    • (2005) European Journal of Operational Research , vol.163 , Issue.3 , pp. 688-705
    • Robotis, A.1    Bhattacharya, S.2    van Wassenhove, L.N.3
  • 20
    • 3142675796 scopus 로고    scopus 로고
    • Process and facility planning for mobile phone remanufacturing
    • Seliger, G., et al., 2004. Process and facility planning for mobile phone remanufacturing. CIRP Annals -Manufacturing Technology, 53 (1), 9-12.
    • (2004) Cirp Annals -manufacturing Technology , vol.53 , Issue.1 , pp. 9-12
    • Seliger, G.1
  • 22
    • 33847365367 scopus 로고    scopus 로고
    • Green supply-chain management: A state-of-the-art literature review
    • Srivastava, S.K., 2007. Green supply-chain management: a state-of-the-art literature review. International Journal of Management Reviews, 9 (1), 53-80.
    • (2007) International Journal of Management Reviews , vol.9 , Issue.1 , pp. 53-80
    • Srivastava, S.K.1
  • 23
    • 0001228726 scopus 로고    scopus 로고
    • Inventory management of remanufacturable products
    • Toktay, B., Wein, L. and Stefanos, Z., 2000. Inventory management of remanufacturable products. Management Science, 46 (11), 1412-1426.
    • (2000) Management Science , vol.46 , Issue.11 , pp. 1412-1426
    • Toktay, B.1    Wein, L.2    Stefanos, Z.3
  • 24
    • 0003962386 scopus 로고    scopus 로고
    • PhD Series in General Management 28, Rotterdam School of Management, Erasmus University Rotterdam
    • van der Laan, E., 1997. The effects of remanufacturing on inventory control. PhD Series in General Management 28, Rotterdam School of Management, Erasmus University Rotterdam.
    • (1997) The Effects of Remanufacturing On Inventory Control
    • van der Laan, E.1
  • 25
    • 0032690281 scopus 로고    scopus 로고
    • Inventory control in hybrid systems with remanufacturing
    • van der Laan, E., et al., 1999. Inventory control in hybrid systems with remanufacturing. Management Science, 45 (5),733-747.
    • (1999) Management Science , vol.45 , Issue.5 , pp. 733-747
    • van der Laan, E.1
  • 26
    • 0348090493 scopus 로고    scopus 로고
    • Closed- loop supply chains
    • In: R. Ayres and L. Ayres, eds., Northampton, MA: Edward Elgar
    • van Wassenhove, L.N. and Guide Jr, V.D.R., 2002. Closed- loop supply chains. In: R. Ayres and L. Ayres, eds. A handbook of industrial ecology, Northampton, MA: Edward Elgar, 497-509.
    • (2002) A Handbook of Industrial Ecology , pp. 497-509
    • van Wassenhove, L.N.1    Guide, V.D.R.2
  • 27
    • 0000909011 scopus 로고
    • Global sensitivity analysis
    • Wagner, H.M., 1995. Global sensitivity analysis. Operations Research, 43 (6), 948-969.
    • (1995) Operations Research , vol.43 , Issue.6 , pp. 948-969
    • Wagner, H.M.1
  • 28
    • 32644471561 scopus 로고    scopus 로고
    • Can large- scale disassembly be profitable? A linear programming approach to quantifying the turning point to make disassembly economically viable
    • Willems, B., Dewulf, W. and Duflou, J.R., 2006. Can large- scale disassembly be profitable? A linear programming approach to quantifying the turning point to make disassembly economically viable. International Journal of Production Research, 44 (6), 1125-1146.
    • (2006) International Journal of Production Research , vol.44 , Issue.6 , pp. 1125-1146
    • Willems, B.1    Dewulf, W.2    Duflou, J.R.3
  • 29
    • 34147190047 scopus 로고    scopus 로고
    • Impact of uncertainty in the quality of returns on the profitability of a single-period refurbishing operation
    • Zikopoulos, C. and Tagaras, G., 2007. Impact of uncertainty in the quality of returns on the profitability of a single-period refurbishing operation. European Journal of Operational Research, 182 (1), 205-225.
    • (2007) European Journal of Operational Research , vol.182 , Issue.1 , pp. 205-225
    • Zikopoulos, C.1    Tagaras, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.