메뉴 건너뛰기




Volumn 48, Issue 2, 1997, Pages 187-204

Scheduling policies for remanufacturing

Author keywords

Disassembly scheduling; Priority despatching; Recoverable manufacturing

Indexed keywords

COMPUTER SIMULATION; INDUSTRIAL WASTES; MANUFACTURE; MATHEMATICAL MODELS; PERFORMANCE; PRODUCTION CONTROL; PRODUCTION ENGINEERING; RECYCLING; REPAIR; STRATEGIC PLANNING;

EID: 0030823588     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(96)00091-6     Document Type: Article
Times cited : (138)

References (43)
  • 1
    • 0001928677 scopus 로고
    • The utilization-focused service economy: Resource efficiency and product life extension
    • B. Allenby and D. Richards (Eds.). National Academy Press, Washington, DC
    • Stahel, W., 1994. The utilization-focused service economy: Resource efficiency and product life extension, in: B. Allenby and D. Richards (Eds.). The Greening of Industrial Ecosystems. National Academy Press, Washington, DC, pp. 178-190.
    • (1994) The Greening of Industrial Ecosystems , pp. 178-190
    • Stahel, W.1
  • 3
    • 0037819554 scopus 로고
    • Corporate challenge for an age of recomsumption
    • Vandermerwe, S. and Oliff, M., 1991. Corporate challenge for an age of recomsumption. The Columbia J World Bus., 27(3): 7-25.
    • (1991) The Columbia J World Bus. , vol.27 , Issue.3 , pp. 7-25
    • Vandermerwe, S.1    Oliff, M.2
  • 5
    • 0001590781 scopus 로고
    • Packaging taxes and recycling incentives: The German green dot program
    • Rousso, A. and Shah, S., 1994. Packaging taxes and recycling incentives: the German green dot program. National Tax J. XLVIII: 689-701.
    • (1994) National Tax J. , vol.48 , pp. 689-701
    • Rousso, A.1    Shah, S.2
  • 6
    • 0040236998 scopus 로고
    • Designed for disassembly
    • Inoue, H., 1994. Designed for disassembly. Look Japan, 40: 24-25.
    • (1994) Look Japan , vol.40 , pp. 24-25
    • Inoue, H.1
  • 8
    • 0011778547 scopus 로고
    • On the operational logistic aspects of reuse
    • Nottingham, UK
    • Flapper, S.D.P., 1995. On the operational logistic aspects of reuse. Proc. 2nd Internat. Symp. on Logistics. Nottingham, UK, pp. 343-348.
    • (1995) Proc. 2nd Internat. Symp. on Logistics , pp. 343-348
    • Flapper, S.D.P.1
  • 10
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling using drum-bufferrope in a remanufacturing environment
    • Guide, Jr. V.D.R., 1996. Scheduling using drum-bufferrope in a remanufacturing environment. Int. J. Prod. Res., 34: 1081-1091.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 1081-1091
    • Guide V.D.R., Jr.1
  • 11
    • 0028330626 scopus 로고
    • A simulation study of unit exchange spares management of diesel locomotives in the Indian railways
    • Kumar, N., Vrat P. and Sushil, 1994. A simulation study of unit exchange spares management of diesel locomotives in the Indian railways. Int. J. Prod. Econom., 33: 225-236.
    • (1994) Int. J. Prod. Econom. , vol.33 , pp. 225-236
    • Kumar, N.1    Vrat, P.2    Sushil3
  • 12
    • 0024142713 scopus 로고
    • MRPII for repair/refurbish industries
    • Panisset, B., 1988. MRPII for repair/refurbish industries. Prod. Inv. Mgmt. J., 29: 12-15.
    • (1988) Prod. Inv. Mgmt. J. , vol.29 , pp. 12-15
    • Panisset, B.1
  • 13
    • 0011725222 scopus 로고
    • Core obsolescence forecasting in remanufacturing
    • Krupp, J., 1992. Core obsolescence forecasting in remanufacturing. Prod. Inv. Mgmt. J., 33: 12-17.
    • (1992) Prod. Inv. Mgmt. J. , vol.33 , pp. 12-17
    • Krupp, J.1
  • 14
    • 0027908820 scopus 로고
    • Structuring bills of material for automotive remanufacturing
    • Krupp, J. 1993. Structuring bills of material for automotive remanufacturing. Prod. Inv. Mgmt. J., 34: 46-52.
    • (1993) Prod. Inv. Mgmt. J. , vol.34 , pp. 46-52
    • Krupp, J.1
  • 15
    • 0039052992 scopus 로고
    • The impact of lot size and production scheduling on inventory investment in a remanufacturing environment
    • Perry, J., 1991. The impact of lot size and production scheduling on inventory investment in a remanufacturing environment. Prod. Inv. Mgmt. J., 32: 41-45.
    • (1991) Prod. Inv. Mgmt. J. , vol.32 , pp. 41-45
    • Perry, J.1
  • 16
    • 0039645194 scopus 로고
    • On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies
    • Aachen, Germany
    • Flapper, S.D.P., 1994. On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies. Internat. Dedicated Conf. on Lean/Agile Manufacturing in the Automotive Industries, Aachen, Germany, pp. 749-756.
    • (1994) Internat. Dedicated Conf. on Lean/Agile Manufacturing in the Automotive Industries , pp. 749-756
    • Flapper, S.D.P.1
  • 17
    • 0001353411 scopus 로고
    • Scheduling disassembly
    • Gupta, S. and Taleb, K., 1994, Scheduling disassembly. Int. J. Prod. Res., 32: 1857-1868.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 1857-1868
    • Gupta, S.1    Taleb, K.2
  • 18
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson, M.R. and Wang, M.H., 1995. Planning product disassembly for material recovery opportunities. Int. J. Prod. Res., 33: 3119-3142.
    • (1995) Int. J. Prod. Res. , vol.33 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 19
    • 0040968005 scopus 로고    scopus 로고
    • Rough cut capacity planning for remanufacturing firms
    • in press
    • Guide Jr., V.D.R. and Spencer, M.S., 1996, Rough cut capacity planning for remanufacturing firms. Prod. Planning Control, in press.
    • (1996) Prod. Planning Control
    • Guide V.D.R., Jr.1    Spencer, M.S.2
  • 21
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W.L. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Res. Logist. Quart., 15: 241-254.
    • (1968) Naval Res. Logist. Quart. , vol.15 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 23
    • 0011727186 scopus 로고
    • Priority dispatching rules in job shops with assembly operations and random delays
    • Sculli, D., 1980. Priority dispatching rules in job shops with assembly operations and random delays. Omega, 8: 227-234.
    • (1980) Omega , vol.8 , pp. 227-234
    • Sculli, D.1
  • 24
    • 0025235188 scopus 로고
    • Priority dispatching rules in a fabrication/assembly shop
    • Sculli, D. and Tsang, K., 1990. Priority dispatching rules in a fabrication/assembly shop. Math. Comput. Modelling, 13: 73-79.
    • (1990) Math. Comput. Modelling , vol.13 , pp. 73-79
    • Sculli, D.1    Tsang, K.2
  • 25
    • 0024641735 scopus 로고
    • The effects of product structure and sequencing rules on assembly shop performance
    • Fry, T., Oliff, M., Minor, E. and Leong, K., 1989. The effects of product structure and sequencing rules on assembly shop performance. Int. J. Prod. Res., 27: 671-686.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 671-686
    • Fry, T.1    Oliff, M.2    Minor, E.3    Leong, K.4
  • 26
    • 0022681216 scopus 로고
    • Evaluating scheduling policies in a multilevel assembly system
    • Goodwin, J.S. and Weeks, J.K., 1986. Evaluating scheduling policies in a multilevel assembly system. Int. J. Prod. Res., 24: 247-257.
    • (1986) Int. J. Prod. Res. , vol.24 , pp. 247-257
    • Goodwin, J.S.1    Weeks, J.K.2
  • 27
    • 84989446840 scopus 로고
    • Operating policies for scheduling assembled products
    • Goodwin, J.S. and Goodwin Jr., J., 1982. Operating policies for scheduling assembled products. Dec. Sci., 13: 585-603.
    • (1982) Dec. Sci. , vol.13 , pp. 585-603
    • Goodwin, J.S.1    Goodwin J., Jr.2
  • 28
    • 38249004133 scopus 로고
    • Sequencing rules, progress milestones and product structure in a multi-stage job shop
    • Philipoom, P., Markland, R. and Fry, T., 1989. Sequencing rules, progress milestones and product structure in a multi-stage job shop. J. Oper. Mgmt., 8: 209-229.
    • (1989) J. Oper. Mgmt. , vol.8 , pp. 209-229
    • Philipoom, P.1    Markland, R.2    Fry, T.3
  • 29
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for an assembly shop
    • Russell, R.S. and Taylor, III. B., 1985. An evaluation of sequencing rules for an assembly shop. Dec. Sci., 16: 196-212.
    • (1985) Dec. Sci. , vol.16 , pp. 196-212
    • Russell, R.S.1    Taylor B. III2
  • 30
    • 0022130137 scopus 로고
    • An evaluation of scheduling policies in a dual constrained assembly shop
    • Russell, R.S. and Taylor, III, B., 1985. An evaluation of scheduling policies in a dual constrained assembly shop. IIE Trans., 17: 219-232.
    • (1985) IIE Trans. , vol.17 , pp. 219-232
    • Russell, R.S.1    Taylor B. III2
  • 31
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi-level assembly job shops
    • Adam, N.R., Bertrand, J. and Surkis, J., 1987. Priority assignment procedures in multi-level assembly job shops. IIE Trans., 19: 317-328.
    • (1987) IIE Trans. , vol.19 , pp. 317-328
    • Adam, N.R.1    Bertrand, J.2    Surkis, J.3
  • 32
    • 85041970291 scopus 로고
    • An experimental investigation of priority dispatching in aircraft maintenance using a simplified model
    • The RAND Corporation, USA
    • Miller, L.W., Ginsberg, A.S. and Maxwell, W., 1974. An experimental investigation of priority dispatching in aircraft maintenance using a simplified model. Report R-1385-PR, The RAND Corporation, USA.
    • (1974) Report R-1385-PR
    • Miller, L.W.1    Ginsberg, A.S.2    Maxwell, W.3
  • 33
    • 0021424669 scopus 로고
    • A comparative study of priority dispatching rules in a hybrid assembly/job shop
    • Huang, P.Y., 1984. A comparative study of priority dispatching rules in a hybrid assembly/job shop. Int. J. Prod. Res., 22: 375-387.
    • (1984) Int. J. Prod. Res. , vol.22 , pp. 375-387
    • Huang, P.Y.1
  • 34
    • 0021899335 scopus 로고
    • Priority rules for shop floor control in a material requirements planning system under various levels of capacity
    • Biggs, J.R., 1985. Priority rules for shop floor control in a material requirements planning system under various levels of capacity. Int. J. Prod. Res., 23: 33-46.
    • (1985) Int. J. Prod. Res. , vol.23 , pp. 33-46
    • Biggs, J.R.1
  • 36
    • 0020393745 scopus 로고
    • Job shop scheduling - A systematic approach
    • Dar-El, E.M. and Wysk, R.A., 1982. Job shop scheduling - A systematic approach. J. Manuf. Systems, 1: 77-88.
    • (1982) J. Manuf. Systems , vol.1 , pp. 77-88
    • Dar-El, E.M.1    Wysk, R.A.2
  • 37
    • 84889510446 scopus 로고    scopus 로고
    • Green Products by Design. 1992. U.S. Congress, Office of Technology Assessment, U.S. Government Printing Office, Washington, DC
    • Green Products by Design. 1992. U.S. Congress, Office of Technology Assessment, U.S. Government Printing Office, Washington, DC.
  • 38
    • 38149145323 scopus 로고
    • Priority dispatching rules in an assembly shop
    • Sculli, D., 1987. Priority dispatching rules in an assembly shop. Omega, 15: 49-57.
    • (1987) Omega , vol.15 , pp. 49-57
    • Sculli, D.1
  • 42
    • 0014520366 scopus 로고
    • A simulation study of expediting in a job shop
    • Hottenstein, M., 1969. A simulation study of expediting in a job shop. Prod. Inv. Mgmt., 9: 1-11.
    • (1969) Prod. Inv. Mgmt. , vol.9 , pp. 1-11
    • Hottenstein, M.1
  • 43
    • 0014749165 scopus 로고
    • Expediting in job-order-control systems: A simulation study
    • Hottenstein, M., 1970. Expediting in job-order-control systems: A simulation study. AIIE Trans., 2: 46-54.
    • (1970) AIIE Trans. , vol.2 , pp. 46-54
    • Hottenstein, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.