메뉴 건너뛰기




Volumn 35, Issue 11, 1997, Pages 3179-3200

Product structure complexity and scheduling of operations in recoverable manufacturing

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; DECISION MAKING; PRODUCT DESIGN; PRODUCTION ENGINEERING; RESOURCE ALLOCATION; SCHEDULING;

EID: 0031272625     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497194345     Document Type: Article
Times cited : (100)

References (44)
  • 1
    • 84985756865 scopus 로고
    • Product structure complexity and multi-level lot sizing using alternative costing policies
    • Benton, W. C., and Srivastava, R., 1985, Product structure complexity and multi-level lot sizing using alternative costing policies. Decision Sciences, 16, 357-369.
    • (1985) Decision Sciences , vol.16 , pp. 357-369
    • Benton, W.C.1    Srivastava, R.2
  • 2
    • 0027694374 scopus 로고
    • Product structure complexity and inventory storage capacity on the performance of a multi-level manufacturing system
    • Benton, W. C., and Srivastava, R., 1993, Product structure complexity and inventory storage capacity on the performance of a multi-level manufacturing system. International Journal of Production Research, 31, 2531-2545.
    • (1993) International Journal of Production Research , vol.31 , pp. 2531-2545
    • Benton, W.C.1    Srivastava, R.2
  • 3
    • 0021899335 scopus 로고
    • Priority rules for shop floor control in a material requirements planning system under various levels of capacity
    • Biggs, J. R., 1985, Priority rules for shop floor control in a material requirements planning system under various levels of capacity. International Journal of Production Research, 23, 33-46.
    • (1985) International Journal of Production Research , vol.23 , pp. 33-46
    • Biggs, J.R.1
  • 4
    • 0040553743 scopus 로고
    • The impact of a rolling schedule in a multi-level MRP system
    • Blackburn, J., and Millen, R., 1982, The impact of a rolling schedule in a multi-level MRP system. Journal of Operations Management, 2, 125-135.
    • (1982) Journal of Operations Management , vol.2 , pp. 125-135
    • Blackburn, J.1    Millen, R.2
  • 6
    • 84989454182 scopus 로고
    • The measurement and operating benefits of component part commonality
    • Collier, D. A., 1981, The measurement and operating benefits of component part commonality. Decision Sciences, 12, 85-96.
    • (1981) Decision Sciences , vol.12 , pp. 85-96
    • Collier, D.A.1
  • 7
    • 0020207726 scopus 로고
    • Aggregate safety stock levels and component part commonality
    • Collier, D. A., 1981, Aggregate safety stock levels and component part commonality. Management Science, 28, 1296-1303.
    • (1981) Management Science , vol.28 , pp. 1296-1303
    • Collier, D.A.1
  • 10
    • 0039645194 scopus 로고
    • On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies
    • Aachen, Germany
    • Flapper, S. D. P., 1994, On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies. International Dedicated Conference on L ean/Agile Manufacturing in the Automotive Industries, Aachen, Germany, pp. 749-756.
    • (1994) International Dedicated Conference on L Ean/Agile Manufacturing in the Automotive Industries , pp. 749-756
    • Flapper, S.D.P.1
  • 11
  • 13
    • 84989446840 scopus 로고
    • Operating policies for scheduling assembled products
    • Goodwin, J. S., and Goodwin, Jr, J. C., 1982, Operating policies for scheduling assembled products. Decision Sciences, 13, 585-603.
    • (1982) Decision Sciences , vol.13 , pp. 585-603
    • Goodwin, J.S.1    Goodwin, J.C.2
  • 15
    • 0001526386 scopus 로고
    • The effects of various production strategies on product structures with commonality
    • Guerrero, H., 1985, The effects of various production strategies on product structures with commonality. Journal of Operations Management, 5, 395-410.
    • (1985) Journal of Operations Management , vol.5 , pp. 395-410
    • Guerrero, H.1
  • 16
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling using drum-buffer-rope in a remanufacturing environment
    • Guide, Jr., V. D. R., 1996, Scheduling using drum-buffer-rope in a remanufacturing environment. International Journal of Production Research, 34, 1081-1091.
    • (1996) International Journal of Production Research , vol.34 , pp. 1081-1091
    • Guide, V.D.R.1
  • 17
    • 0031118844 scopus 로고    scopus 로고
    • Rough cut capacity planning for remanufacturing firms
    • Guide, Jr., V. D. R., and Spencer, M. S., 1997, Rough cut capacity planning for remanufacturing firms. Production Planning and Control 8, 237-244.
    • (1997) Production Planning and Control , vol.8 , pp. 237-244
    • Guide, V.D.R.1    Spencer, M.S.2
  • 21
    • 0021424669 scopus 로고
    • A comparative study of priority dispatching rules in a hybrid assembly/ job shop
    • Huang, P. Y., 1984, A comparative study of priority dispatching rules in a hybrid assembly/ job shop. International Journal of Production Research, 22, 375-387.
    • (1984) International Journal of Production Research , vol.22 , pp. 375-387
    • Huang, P.Y.1
  • 22
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson, M. R., and Wang, M. H., 1995, Planning product disassembly for material recovery opportunities. International Journal of Production Research, 33, 3119-3142.
    • (1995) International Journal of Production Research , vol.33 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 24
    • 0011725222 scopus 로고
    • Core obsolescence forecasting in remanufacturing
    • Krupp, j., 1992, Core obsolescence forecasting in remanufacturing. Production and Inventory Management Journal, 33 (2), 225-236.
    • (1992) Production and Inventory Management Journal , vol.33 , Issue.2 , pp. 225-236
    • Krupp, J.1
  • 25
    • 0027908820 scopus 로고
    • Structuring bills of material for automotive remanufacturing
    • Krupp, J., 1993, Structuring bills of material for automotive remanufacturing. Production and Inventory Management Journal, 34 (4), 46-52.
    • (1993) Production and Inventory Management Journal , vol.34 , Issue.4 , pp. 46-52
    • Krupp, J.1
  • 26
    • 0028330626 scopus 로고
    • A simulation study of unit exchange spares management of diesel locomotives in the Indian railways
    • Kumar, N., Vrat, P., and Sushil, S 1994, A simulation study of unit exchange spares management of diesel locomotives in the Indian railways. International Journal of Production Economics, 33, 225-236.
    • (1994) International Journal of Production Economics , vol.33 , pp. 225-236
    • Kumar, N.1    Vrat, P.2    Sushil, S.3
  • 29
    • 0028401193 scopus 로고
    • The effects of environmental factors on the design of master production scheduling systems
    • Lin, N., Krajewski, L., Leong, G. K., and Benton, W. C., 1994, The effects of environmental factors on the design of master production scheduling systems. Journal of Operations Management, 11, 367-384.
    • (1994) Journal of Operations Management , vol.11 , pp. 367-384
    • Lin, N.1    Krajewski, L.2    Leong, G.K.3    Benton, W.C.4
  • 30
    • 0021370421 scopus 로고
    • Remanufacturing
    • Lund, R., 1984, Remanufacturing. Technology Review, 87 (2), 18-23.
    • (1984) Technology Review , vol.87 , Issue.2 , pp. 18-23
    • Lund, R.1
  • 32
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W. L., and Mehra, M., 1968, Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 34
    • 0039052992 scopus 로고
    • The impact of lot size and production scheduling on inventory investment in a remanufacturing environment
    • Perry, J., 1991, The impact of lot size and production scheduling on inventory investment in a remanufacturing environment. Production and Inventory Management Journal, 32 (3), 41-45.
    • (1991) Production and Inventory Management Journal , vol.32 , Issue.3 , pp. 41-45
    • Perry, J.1
  • 35
    • 38249004133 scopus 로고
    • Sequencing rules, progress milestones and product structure in a multistage job shop
    • Philipoom, P. R., Markland, R. E., and Fry, T. D., 1989, Sequencing rules, progress milestones and product structure in a multistage job shop. Journal of Operations Management, 8, 209-229.
    • (1989) Journal of Operations Management , vol.8 , pp. 209-229
    • Philipoom, P.R.1    Markland, R.E.2    Fry, T.D.3
  • 36
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for an assembly shop
    • Russell, R. S., and Taylor, B. W., 1985a, An evaluation of sequencing rules for an assembly shop. Decision Sciences, 16, 196-212.
    • (1985) Decision Sciences , vol.16 , pp. 196-212
    • Russell, R.S.1    Taylor, B.W.2
  • 37
    • 0022130137 scopus 로고
    • An evaluation of scheduling policies in a dual constrained assembly shop
    • Russell, R. S., and Taylor, B. W., 1985b, An evaluation of scheduling policies in a dual constrained assembly shop. IIE Transactions, 17, 219-232.
    • (1985) IIE Transactions , vol.17 , pp. 219-232
    • Russell, R.S.1    Taylor, B.W.2
  • 38
    • 84987044773 scopus 로고
    • Planning and scheduling the repair shops of the Deutsche Luftansa AG: A hierarchical approach
    • Schneeweiss, C., and Schroder, H., 1991, Planning and scheduling the repair shops of the Deutsche Luftansa AG: A hierarchical approach. Production and Operations Management, 1, 22- 33.
    • (1991) Production and Operations Management , vol.1
    • Schneeweiss, C.1    Schroder, H.2
  • 39
    • 0025235188 scopus 로고
    • Priority dispatching rules in a fabrication/assembly shop
    • Sculli, D., and Tsang, K., 1990, Priority dispatching rules in a fabrication/assembly shop. Mathematical Computing and Modeling, 13, 73-79.
    • (1990) Mathematical Computing and Modeling , vol.13 , pp. 73-79
    • Sculli, D.1    Tsang, K.2
  • 40
    • 0042498352 scopus 로고
    • Performance analysis and capacity planning of a landing gear shop
    • Srikar, B., and Vinod, B., 1989, Performance analysis and capacity planning of a landing gear shop. Interfaces, 19, 52- 60.
    • (1989) Interfaces , vol.19
    • Srikar, B.1    Vinod, B.2
  • 41
    • 84990610701 scopus 로고
    • Effects of product structure complexity on multi-level lot sizing
    • Sum, C., Png, D., and Yang, K., 1993, Effects of product structure complexity on multi-level lot sizing. Decision Sciences, 24, 1135-1155.
    • (1993) Decision Sciences , vol.24 , pp. 1135-1155
    • Sum, C.1    Png, D.2    Yang, K.3
  • 43
    • 0003709943 scopus 로고
    • US Government Printing Office
    • US Congress, Office of Technology Assessment, 1992, Green Products by Design, US Government Printing Office.
    • (1992) Green Products by Design
  • 44
    • 38249043908 scopus 로고
    • Component part standardization: An analysis of commonality sources and indices
    • Wacker, J. G., and Treleven, M., 1986, Component part standardization: an analysis of commonality sources and indices. Journal of Operations Management, 6, 219-244.
    • (1986) Journal of Operations Management , vol.6 , pp. 219-244
    • Wacker, J.G.1    Treleven, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.