-
3
-
-
84901600302
-
Constructing a baseline input-output model with environmental accounts
-
Choi, T., R. Jackson, and N. Leigh. 2009. "Constructing a Baseline Input-Output Model with Environmental Accounts. " The 48th Western Regional Science Annual Meeting, Napa, CA.
-
(2009)
The 48th Western Regional Science Annual Meeting, Napa, CA
-
-
Choi, T.1
Jackson, R.2
Leigh, N.3
-
4
-
-
78649323401
-
Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system
-
Chung, C., and H. Wee. 2011. "Short Life-cycle Deteriorating Product Remanufacturing in a Green Supply Chain Inventory Control System. " International Journal of Production Economics 129: 195-203.
-
(2011)
International Journal of Production Economics
, vol.129
, pp. 195-203
-
-
Chung, C.1
Wee, H.2
-
5
-
-
21244458433
-
Slow consumption: Reflections on product life spans and the throwaway society
-
Cooper, T. 2005. "Slow Consumption: Reflections on Product Life Spans and the Throwaway Society. " Journal of Industrial Ecology 9: 51-67.
-
(2005)
Journal of Industrial Ecology
, vol.9
, pp. 51-67
-
-
Cooper, T.1
-
6
-
-
33750081068
-
Estimating the volatility of mining projects considering price and operating cost uncertainties
-
Costa Lima, G. A., and S. B. Suslick. 2006. "Estimating the Volatility of Mining Projects Considering Price and Operating Cost Uncertainties. " Resources Policy 31: 86-94.
-
(2006)
Resources Policy
, vol.31
, pp. 86-94
-
-
Costa Lima, G.A.1
Suslick, S.B.2
-
8
-
-
84941939136
-
-
Accessed August 26, 2013
-
Fuji Xerox. 2002. Environmental Report 2012. Accessed August 26, 2013. http://www. fujixerox. com/eng/company/ecology/ report2002/2002e. pdf
-
(2002)
Environmental Report 2012
-
-
Xerox, F.1
-
10
-
-
33847036372
-
The economics of remanufacturing under limited component durability and finite product life cycles
-
Geyer, R., L. N. Van Wassenhove, and A. Atasu. 2007. "The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles. " Management Science 53: 88-100.
-
(2007)
Management Science
, vol.53
, pp. 88-100
-
-
Geyer, R.1
Van Wassenhove, L.N.2
Atasu, A.3
-
12
-
-
0035201653
-
Eco-efficiency gains from remanufacturing
-
Kerr, W., and C. Ryan. 2001. "Eco-efficiency Gains from Remanufacturing. " Journal of Cleaner Production 9: 75-81.
-
(2001)
Journal of Cleaner Production
, vol.9
, pp. 75-81
-
-
Kerr, W.1
Ryan, C.2
-
13
-
-
29444436355
-
How to analyze the investment-uncertainty relationship in real option models?
-
Lund, D. 2005. "How to Analyze the Investment-Uncertainty Relationship in Real Option Models" Review of Financial Economics 14 (3-4): 311-322.
-
(2005)
Review of Financial Economics
, vol.14
, Issue.3-4
, pp. 311-322
-
-
Lund, D.1
-
14
-
-
38249037059
-
Time to build, option value, and investment decisions
-
Majd, S., and R. S. Pindyck. 1987. "Time to Build, Option Value, and Investment Decisions. " Journal of Financial Economics 18 (1): 7-27.
-
(1987)
Journal of Financial Economics
, vol.18
, Issue.1
, pp. 7-27
-
-
Majd, S.1
Pindyck, R.S.2
-
16
-
-
84941941117
-
-
Accessed August 26
-
Materials Risk. 2013. Where Next for Copper Prices? Accessed August 26. http://materials-risk. com/copper-prices/
-
(2013)
Where Next for Copper Prices
-
-
-
17
-
-
84863243906
-
An exit and entry study of renewable power producers: A real options approach
-
Min, K. Jo, C. Lou, and C. Wang. 2012. "An Exit and Entry Study of Renewable Power Producers: A Real Options Approach. " The Engineering Economist 57: 55-75.
-
(2012)
The Engineering Economist
, vol.57
, pp. 55-75
-
-
Min, K.J.1
Lou, C.2
Wang, C.3
-
18
-
-
4344668159
-
Optimal control of a remanufacturing system
-
Nakashima, K., H. Arimitsu, T. Nose, and S. Kuriyama. 2004. "Optimal Control of a Remanufacturing System. " International Journal of Production Research 42 (17): 3619-3625.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.17
, pp. 3619-3625
-
-
Nakashima, K.1
Arimitsu, H.2
Nose, T.3
Kuriyama, S.4
-
19
-
-
84865683306
-
Investing in reusability of products of uncertain remanufacturing cost: The role of inspection capabilities
-
Robotis, A., T. Boyaci, and V. Verter. 2012. "Investing in Reusability of Products of Uncertain Remanufacturing Cost: The Role of Inspection Capabilities. " International Journal of Production Economics 140: 385-395.
-
(2012)
International Journal of Production Economics
, vol.140
, pp. 385-395
-
-
Robotis, A.1
Boyaci, T.2
Verter, V.3
-
20
-
-
1642269093
-
Closed-loop supply chain models with product remanufacturing
-
Savaskan, R. Canan, S. Bhattacharya, and L. N. Van Wassenhove. 2004. "Closed-loop Supply Chain Models with Product Remanufacturing. " Management Science 50 (2): 239-252.
-
(2004)
Management Science
, vol.50
, Issue.2
, pp. 239-252
-
-
Savaskan, R.C.1
Bhattacharya, S.2
Van Wassenhove, L.N.3
-
21
-
-
84876756342
-
A study of product weight and collection rate in closed-loop supply chains with recycling
-
Shi, W., and Kyung Jo Min. 2013. "A Study of Product Weight and Collection Rate in Closed-loop Supply Chains with Recycling. " IEEE Transactions on Engineering Management 60: 409-423.
-
(2013)
IEEE Transactions on Engineering Management
, vol.60
, pp. 409-423
-
-
Shi, W.1
Jo Min, K.2
-
22
-
-
84941936181
-
-
US EPA. Accessed August 26
-
US EPA. 2013. Accessed August 26. http://www. epa. gov/wastes/conserve/tools/rmd/bizasst/rec-tax. htm
-
(2013)
-
-
-
24
-
-
34248997594
-
Optimal technology choice and investment timing: A stochastic model of industrial cogeneration vs heat-only production
-
Wickart, M., and R. Madlener. 2007. "Optimal Technology Choice and Investment Timing: A Stochastic Model of Industrial Cogeneration vs. Heat-only Production. " Energy Economics 29: 934-952.
-
(2007)
Energy Economics
, vol.29
, pp. 934-952
-
-
Wickart, M.1
Madlener, R.2
-
25
-
-
84941935580
-
-
Accessed August 26, 2013
-
Xerox. 2005. Accessed August 26, 2013. www. xerox. com/corporate-citizenship-2005/Environment-Health-Safety-Report-2005. pdf
-
(2005)
-
-
-
26
-
-
76249117372
-
Outsourcing timing, contract selection, and negotiation
-
Yao, T., B. Jiang, S. T. Young, and S. Talluri. 2010. "Outsourcing Timing, Contract Selection, and Negotiation. " International Journal of Production Research 48 (2): 305-326.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.2
, pp. 305-326
-
-
Yao, T.1
Jiang, B.2
Young, S.T.3
Talluri, S.4
-
27
-
-
77955705634
-
Inventory decision-making models for a closed-loop supply chain system
-
Yuan, K. F., and Y. Gao. 2010. "Inventory Decision-making Models for a Closed-loop Supply Chain System. " International Journal of Production Research 48 (20): 6155-6187.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.20
, pp. 6155-6187
-
-
Yuan, K.F.1
Gao, Y.2
-
29
-
-
84876121636
-
The bright side of manufacturing-remanufacturing conflict in a decentralised closed-loop supply chain
-
Zhou, Y., Y. Xiong, G. Li, Z. Xiong, and M. Beck. 2013. "The Bright Side of Manufacturing-Remanufacturing Conflict in a Decentralised Closed-loop Supply Chain. " International Journal of Production Research 51 (9): 2639-2651.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.9
, pp. 2639-2651
-
-
Zhou, Y.1
Xiong, Y.2
Li, G.3
Xiong, Z.4
Beck, M.5
-
30
-
-
84866333024
-
A simulation based real options approach for the investment evaluation of nuclear power
-
Zhu, L. 2012. "A Simulation Based Real Options Approach for the Investment Evaluation of Nuclear Power. " Computer & Industrial Engineering 63: 585-593.
-
(2012)
Computer & Industrial Engineering
, vol.63
, pp. 585-593
-
-
Zhu, L.1
|