-
4
-
-
0001928677
-
The utilization-focused service economy: Resource efficiency and product-life extension
-
Allenby B, Richards D, editors. Washington DC: National Academy Press
-
Stahel W. The utilization-focused service economy: Resource efficiency and product-life extension. In: Allenby B, Richards D, editors. The Greening of Industrial Ecosystems. Washington DC: National Academy Press, 1994.
-
(1994)
The Greening of Industrial Ecosystems
-
-
Stahel, W.1
-
7
-
-
0031256632
-
Eco-efficiency, asset recovery and remanufacturing
-
Ayres R, Ferrer G, Van Leynseele T. Eco-efficiency, asset recovery and remanufacturing. Eur Mgmt J 1997;15:557-74.
-
(1997)
Eur Mgmt J
, vol.15
, pp. 557-574
-
-
Ayres, R.1
Ferrer, G.2
Van Leynseele, T.3
-
8
-
-
0031259984
-
The economics of personal computer remanufacturing
-
Ferrer G. The economics of personal computer remanufacturing. Res Conservation Recycling 1997;21:79-108.
-
(1997)
Res Conservation Recycling
, vol.21
, pp. 79-108
-
-
Ferrer, G.1
-
11
-
-
0030129785
-
Scheduling using drum-buffer-rope in a remanufacturing environment
-
Guide Jr VDR. Scheduling using drum-buffer-rope in a remanufacturing environment. Int J Prod Res 1996;34:1081-91.
-
(1996)
Int J Prod Res
, vol.34
, pp. 1081-1091
-
-
Guide Jr., V.D.R.1
-
12
-
-
0021370421
-
Remanufacturing
-
Lund R. Remanufacturing. Technol Rev 1984;87:18-23.
-
(1984)
Technol Rev
, vol.87
, pp. 18-23
-
-
Lund, R.1
-
13
-
-
0000192839
-
An analysis of single-item inventory systems with returns
-
Muckstadt J, Isaac M. An analysis of single-item inventory systems with returns. Naval Res Logis Quarterly 1981;28:237-54.
-
(1981)
Naval Res Logis Quarterly
, vol.28
, pp. 237-254
-
-
Muckstadt, J.1
Isaac, M.2
-
14
-
-
0003915990
-
-
EPA530-N-002, Washington DC: US Government Printing Office
-
United States Environmental Protection Agency. Remanufactured products: as good as new. EPA530-N-002, Washington DC: US Government Printing Office, 1997.
-
(1997)
Remanufactured Products: As Good as New
-
-
-
17
-
-
0030871134
-
An evaluation of capacity planning techniques in a remanufacturing environment
-
Guide Jr VDR, Srivastava R, Spencer M. An evaluation of capacity planning techniques in a remanufacturing environment. Int J Prod Res 1997;35:67-82.
-
(1997)
Int J Prod Res
, vol.35
, pp. 67-82
-
-
Guide Jr., V.D.R.1
Srivastava, R.2
Spencer, M.3
-
19
-
-
0031277045
-
Quantitative models for reverse logistics
-
Fleischmann M, Bloemhof-Ruwaard J, Dekker R, van der Laan E, Nunen van J, Van Wassenhove L. Quantitative models for reverse logistics. Eur J Oper Res 1997;103:1-17.
-
(1997)
Eur J Oper Res
, vol.103
, pp. 1-17
-
-
Fleischmann, M.1
Bloemhof-Ruwaard, J.2
Dekker, R.3
Van Der Laan, E.4
Van Nunen, J.5
Van Wassenhove, L.6
-
21
-
-
7044252312
-
Environmental concerns and recycling/disassembly efforts in the electronics industry
-
Moyer LK, Gupta SM. Environmental concerns and recycling/disassembly efforts in the electronics industry. J Electron Manuf 1997;7:1-22.
-
(1997)
J Electron Manuf
, vol.7
, pp. 1-22
-
-
Moyer, L.K.1
Gupta, S.M.2
-
22
-
-
0028261976
-
The strategic and competitive implications of recycling and design for disassembly in the electronics industry
-
San Francisco, CA: IEEE
-
Clegg A, Williams W. The strategic and competitive implications of recycling and design for disassembly in the electronics industry. In: Proc 1994 IEEE Int Symp on Electronics and the Environment. San Francisco, CA: IEEE, 1994; 6-12.
-
(1994)
Proc 1994 IEEE Int Symp on Electronics and the Environment
, pp. 6-12
-
-
Clegg, A.1
Williams, W.2
-
23
-
-
21344494294
-
The recovery problem in product design
-
Navin-Chandra D. The recovery problem in product design. J Eng Des 1994;5:65-86.
-
(1994)
J Eng des
, vol.5
, pp. 65-86
-
-
Navin-Chandra, D.1
-
24
-
-
0030262196
-
A methodology to evaluate ease of disassembly for product recycling
-
Kroll E, Beardsley B, Parulian A. A methodology to evaluate ease of disassembly for product recycling. IIE Trans 1996;28:837-45.
-
(1996)
IIE Trans
, vol.28
, pp. 837-845
-
-
Kroll, E.1
Beardsley, B.2
Parulian, A.3
-
25
-
-
33645809000
-
Green Products by Design: Choices for a Cleaner Environment
-
Office of Technology Assessment
-
Green Products by Design: Choices for a Cleaner Environment. Congress of the United States, Office of Technology Assessment, 1992.
-
(1992)
Congress of the United States
-
-
-
28
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
Brennan L, Gupta SM, Taleb KN. Operations planning issues in an assembly/disassembly environment. Int J Oper Prod Mgmt 1994;14:57-67.
-
(1994)
Int J Oper Prod Mgmt
, vol.14
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
30
-
-
0032181029
-
Inventory buffers in recoverable manufacturing
-
Guide Jr VDR, Srivastava R. Inventory buffers in recoverable manufacturing. J Oper Management, 1998;16:551-68.
-
(1998)
J Oper Management
, vol.16
, pp. 551-568
-
-
Guide Jr., V.D.R.1
Srivastava, R.2
-
31
-
-
0031272625
-
Product structure complexity and scheduling of operations in recoverable manufacturing
-
Guide Jr VDR, Srivastava R, Kraus M. Product structure complexity and scheduling of operations in recoverable manufacturing. Int J Prod Res 1997;35:3179-99.
-
(1997)
Int J Prod Res
, vol.35
, pp. 3179-3199
-
-
Guide Jr., V.D.R.1
Srivastava, R.2
Kraus, M.3
-
32
-
-
0031556588
-
Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system
-
Guide Jr VDR. Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. Int J Prod Econom 1997;53:101-16.
-
(1997)
Int J Prod Econom
, vol.53
, pp. 101-116
-
-
Guide Jr., V.D.R.1
-
33
-
-
0031118844
-
Rough-cut capacity planning for remanufacturing firms
-
Guide Jr VDR, Spencer MS. Rough-cut capacity planning for remanufacturing firms. Prod Plan Control 1997;8:237-44.
-
(1997)
Prod Plan Control
, vol.8
, pp. 237-244
-
-
Guide Jr., V.D.R.1
Spencer, M.S.2
-
34
-
-
0030736226
-
An evaluation of order release strategies in a remanufacturing environment
-
Guide Jr VDR, Srivastava R. An evaluation of order release strategies in a remanufacturing environment. Compu Oper Res 1997;24:37-47.
-
(1997)
Compu Oper Res
, vol.24
, pp. 37-47
-
-
Guide Jr., V.D.R.1
Srivastava, R.2
-
35
-
-
0003962386
-
-
Ph.D. Series in General Management 28, Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands
-
van der Laan E. The effects of remanufacturing on inventory control. Ph.D. Series in General Management 28, Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands:, 1997.
-
(1997)
The Effects of Remanufacturing on Inventory Control
-
-
Van Der Laan, E.1
-
36
-
-
0031249294
-
Repairable inventory theory: Models and applications
-
Guide Jr VDR, Srivastava R. Repairable inventory theory: models and applications. Eur J Oper Res 1997;102:1-20.
-
(1997)
Eur J Oper Res
, vol.102
, pp. 1-20
-
-
Guide Jr., V.D.R.1
Srivastava, R.2
-
37
-
-
0024944968
-
Purchasing policies for new containers considering the random returns of previously issued containers
-
Kelle P, Silver EA. Purchasing policies for new containers considering the random returns of previously issued containers. IIE Trans 1989;21:349-54.
-
(1989)
IIE Trans
, vol.21
, pp. 349-354
-
-
Kelle, P.1
Silver, E.A.2
-
38
-
-
0000683467
-
Simple optimal replenishment and disposal policies for product recovery systems with leadtimes
-
Inderfurth K. Simple optimal replenishment and disposal policies for product recovery systems with leadtimes. OR Spektrum 1997;19:111-22.
-
(1997)
OR Spektrum
, vol.19
, pp. 111-122
-
-
Inderfurth, K.1
-
40
-
-
0030205950
-
Product remanufacturing and disposal: A numerical comparison of alternative control strategies
-
van der Laan E, Salomon M, Dekker R. Product remanufacturing and disposal: A numerical comparison of alternative control strategies. Int J Prod Econom 1996;45:489-98.
-
(1996)
Int J Prod Econom
, vol.45
, pp. 489-498
-
-
Van Der Laan, E.1
Salomon, M.2
Dekker, R.3
-
41
-
-
0030393112
-
An (s,Q) inventory model with remanufacturing and disposal
-
van der Laan E, Dekker R, Salomon M, Ridder A. An (s,Q) inventory model with remanufacturing and disposal. Int J Prod Econom 1996;146-47:339-50.
-
(1996)
Int J Prod Econom
, vol.146
, Issue.47
, pp. 339-350
-
-
Van Der Laan, E.1
Dekker, R.2
Salomon, M.3
Ridder, A.4
-
42
-
-
0011755822
-
Pure and mixed strategies for the EOQ repair and waste disposal problem
-
Richter K. Pure and mixed strategies for the EOQ repair and waste disposal problem. OR Spektrum 1997;19:123-9.
-
(1997)
OR Spektrum
, vol.19
, pp. 123-129
-
-
Richter, K.1
-
43
-
-
0030572943
-
The EOQ repair and waste disposal model with variable setup numbers
-
Richter K. The EOQ repair and waste disposal model with variable setup numbers. European J Oper Res 1996;95: 313-24.
-
(1996)
European J Oper Res
, vol.95
, pp. 313-324
-
-
Richter, K.1
-
44
-
-
0030206702
-
The extended EOQ repair and waste disposal model
-
Richter K. The extended EOQ repair and waste disposal model. Int J Produ Econom 1996;45:443-7.
-
(1996)
Int J Produ Econom
, vol.45
, pp. 443-447
-
-
Richter, K.1
-
45
-
-
0003367947
-
Product remanufacturing and its effects on production and inventory control
-
Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands
-
Salomon M, van der Laan E, Dekker R, Thierry M, Ridder A. Product remanufacturing and its effects on production and inventory control. Management Report Series No. 172, Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands:, 1994.
-
(1994)
Management Report Series No. 172
, vol.172
-
-
Salomon, M.1
Van Der Laan, E.2
Dekker, R.3
Thierry, M.4
Ridder, A.5
-
46
-
-
0031251420
-
Production planning and inventory control with remanufacturing and disposal
-
van der Laan E, Salomon M. Production planning and inventory control with remanufacturing and disposal. Eur J Oper Res 1997;102:264-78.
-
(1997)
Eur J Oper Res
, vol.102
, pp. 264-278
-
-
Van Der Laan, E.1
Salomon, M.2
-
47
-
-
0039645194
-
On the logistics aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies
-
Aachen, Germany
-
Flapper SDP. On the logistics aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies. In: Int Dedication Conf on Lean/Agile Manufacturing in the Automotive Industry, Aachen, Germany, 1994; 749-756.
-
(1994)
Int Dedication Conf on Lean/Agile Manufacturing in the Automotive Industry
, pp. 749-756
-
-
Flapper, S.D.P.1
-
48
-
-
0024142713
-
MRPII for repair/refurbish industries
-
Panisset B. MRPII for repair/refurbish industries. Prod Inv Mgmt J 1988;29:12-5.
-
(1988)
Prod Inv Mgmt J
, vol.29
, pp. 12-15
-
-
Panisset, B.1
-
50
-
-
0027908820
-
Structuring bills of material for automotive remanufacturing
-
Krupp J. Structuring bills of material for automotive remanufacturing. Prod Inv Mgmt J 1993;34:46-52.
-
(1993)
Prod Inv Mgmt J
, vol.34
, pp. 46-52
-
-
Krupp, J.1
-
51
-
-
0031119840
-
Disassembly of complex product structures with parts and materials commonality
-
Taleb KN, Gupta SM, Brennan L. Disassembly of complex product structures with parts and materials commonality. Prod Plann Control 1997;8:255-69.
-
(1997)
Prod Plann Control
, vol.8
, pp. 255-269
-
-
Taleb, K.N.1
Gupta, S.M.2
Brennan, L.3
-
52
-
-
0031143697
-
Buffering from material recovery uncertainty in a recoverable manufacturing environment
-
Guide Jr VDR, Srivastava R. Buffering from material recovery uncertainty in a recoverable manufacturing environment. J Oper Res Soc 1997;48:519-29.
-
(1997)
J Oper Res Soc
, vol.48
, pp. 519-529
-
-
Guide Jr., V.D.R.1
Srivastava, R.2
-
53
-
-
84952519001
-
Planning product disassembly for material recovery opportunities
-
Johnson MR, Wang MH. Planning product disassembly for material recovery opportunities. Int J Prod Res 1995;33:3119-42.
-
(1995)
Int J Prod Res
, vol.33
, pp. 3119-3142
-
-
Johnson, M.R.1
Wang, M.H.2
-
54
-
-
0029356018
-
Disassembly and recycling of electronic consumer products: An overview
-
de Ron A, Penev K. Disassembly and recycling of electronic consumer products: an overview. Technovation 1995;15:363-74.
-
(1995)
Technovation
, vol.15
, pp. 363-374
-
-
De Ron, A.1
Penev, K.2
-
55
-
-
0030085256
-
Determination of a disassembly strategy
-
Penev K, Ron de A. Determination of a disassembly strategy. Int J Production Res 1996;34:495-506.
-
(1996)
Int J Production Res
, vol.34
, pp. 495-506
-
-
Penev, K.1
De Ron, A.2
-
56
-
-
0029719665
-
Comparing different disassembly strategies
-
Dallas, TX: IEEE
-
Lou S, Leu J, Jorjani S. Comparing different disassembly strategies. In: Proceedings of the 1996 IEEE Int Symp on Electronics and the Environment. Dallas, TX: IEEE, 1996, 73-77.
-
(1996)
Proceedings of the 1996 IEEE Int Symp on Electronics and the Environment
, pp. 73-77
-
-
Lou, S.1
Leu, J.2
Jorjani, S.3
-
57
-
-
0029405384
-
Simulation, animation, and analysis of design disassembly for maintainability analysis
-
Vujosevic R, Raskar R, Yetukuri NV, Jothishankar, Juang SH. Simulation, animation, and analysis of design disassembly for maintainability analysis. Int J Prod Res 1995;33:2999-3022.
-
(1995)
Int J Prod Res
, vol.33
, pp. 2999-3022
-
-
Vujosevic, R.1
Raskar, R.2
Yetukuri, N.V.3
Jothishankar4
Juang, S.H.5
-
59
-
-
85024533129
-
Algorithm for multiple disassembly and parallel assemblies
-
Dutta D, Woo TC, Algorithm for multiple disassembly and parallel assemblies. Trans ASME 117:102-109.
-
Trans ASME
, vol.117
, pp. 102-109
-
-
Dutta, D.1
Woo, T.C.2
-
60
-
-
84947652551
-
Assembly/disassembly sequence planning
-
Yokota K, Brough DR. Assembly/disassembly sequence planning. Assembly Autom 1992;12:31-8.
-
(1992)
Assembly Autom
, vol.12
, pp. 31-38
-
-
Yokota, K.1
Brough, D.R.2
-
61
-
-
0028058444
-
Disassembly-oriented assessment methodology to support design for recycling
-
Zussman E, Kriwet A, Seliger G. Disassembly-oriented assessment methodology to support design for recycling. Ann CIRP 43:9-14.
-
Ann CIRP
, vol.43
, pp. 9-14
-
-
Zussman, E.1
Kriwet, A.2
Seliger, G.3
-
62
-
-
0029708793
-
Probabilistic reactive disassembly planning
-
Geiger D, Zussman E. Probabilistic reactive disassembly planning. Ann CIRP 1996;45:49-52.
-
(1996)
Ann CIRP
, vol.45
, pp. 49-52
-
-
Geiger, D.1
Zussman, E.2
-
64
-
-
0027306693
-
CAD system with product assembly/disassembly planning function
-
Arai E, Iwata K. CAD system with product assembly/disassembly planning function. Robotics and Comput Integrated Manuf 1993;10:41-8.
-
(1993)
Robotics and Comput Integrated Manuf
, vol.10
, pp. 41-48
-
-
Arai, E.1
Iwata, K.2
|