메뉴 건너뛰기




Volumn 15, Issue 3, 1999, Pages 221-230

Production planning and control for remanufacturing: A state-of-the-art survey

Author keywords

Ecom; Production planning and control; Remanufacturing

Indexed keywords

DECISION MAKING; DECISION SUPPORT SYSTEMS; DECISION THEORY; ENVIRONMENTAL PROTECTION; MATHEMATICAL MODELS; OPTIMIZATION; PROBLEM SOLVING; PROCESS ENGINEERING; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 0032642459     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0736-5845(99)00020-4     Document Type: Article
Times cited : (171)

References (64)
  • 4
    • 0001928677 scopus 로고
    • The utilization-focused service economy: Resource efficiency and product-life extension
    • Allenby B, Richards D, editors. Washington DC: National Academy Press
    • Stahel W. The utilization-focused service economy: Resource efficiency and product-life extension. In: Allenby B, Richards D, editors. The Greening of Industrial Ecosystems. Washington DC: National Academy Press, 1994.
    • (1994) The Greening of Industrial Ecosystems
    • Stahel, W.1
  • 6
  • 7
    • 0031256632 scopus 로고    scopus 로고
    • Eco-efficiency, asset recovery and remanufacturing
    • Ayres R, Ferrer G, Van Leynseele T. Eco-efficiency, asset recovery and remanufacturing. Eur Mgmt J 1997;15:557-74.
    • (1997) Eur Mgmt J , vol.15 , pp. 557-574
    • Ayres, R.1    Ferrer, G.2    Van Leynseele, T.3
  • 8
    • 0031259984 scopus 로고    scopus 로고
    • The economics of personal computer remanufacturing
    • Ferrer G. The economics of personal computer remanufacturing. Res Conservation Recycling 1997;21:79-108.
    • (1997) Res Conservation Recycling , vol.21 , pp. 79-108
    • Ferrer, G.1
  • 11
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling using drum-buffer-rope in a remanufacturing environment
    • Guide Jr VDR. Scheduling using drum-buffer-rope in a remanufacturing environment. Int J Prod Res 1996;34:1081-91.
    • (1996) Int J Prod Res , vol.34 , pp. 1081-1091
    • Guide Jr., V.D.R.1
  • 12
    • 0021370421 scopus 로고
    • Remanufacturing
    • Lund R. Remanufacturing. Technol Rev 1984;87:18-23.
    • (1984) Technol Rev , vol.87 , pp. 18-23
    • Lund, R.1
  • 13
    • 0000192839 scopus 로고
    • An analysis of single-item inventory systems with returns
    • Muckstadt J, Isaac M. An analysis of single-item inventory systems with returns. Naval Res Logis Quarterly 1981;28:237-54.
    • (1981) Naval Res Logis Quarterly , vol.28 , pp. 237-254
    • Muckstadt, J.1    Isaac, M.2
  • 14
    • 0003915990 scopus 로고    scopus 로고
    • EPA530-N-002, Washington DC: US Government Printing Office
    • United States Environmental Protection Agency. Remanufactured products: as good as new. EPA530-N-002, Washington DC: US Government Printing Office, 1997.
    • (1997) Remanufactured Products: As Good as New
  • 17
    • 0030871134 scopus 로고    scopus 로고
    • An evaluation of capacity planning techniques in a remanufacturing environment
    • Guide Jr VDR, Srivastava R, Spencer M. An evaluation of capacity planning techniques in a remanufacturing environment. Int J Prod Res 1997;35:67-82.
    • (1997) Int J Prod Res , vol.35 , pp. 67-82
    • Guide Jr., V.D.R.1    Srivastava, R.2    Spencer, M.3
  • 21
    • 7044252312 scopus 로고    scopus 로고
    • Environmental concerns and recycling/disassembly efforts in the electronics industry
    • Moyer LK, Gupta SM. Environmental concerns and recycling/disassembly efforts in the electronics industry. J Electron Manuf 1997;7:1-22.
    • (1997) J Electron Manuf , vol.7 , pp. 1-22
    • Moyer, L.K.1    Gupta, S.M.2
  • 22
    • 0028261976 scopus 로고
    • The strategic and competitive implications of recycling and design for disassembly in the electronics industry
    • San Francisco, CA: IEEE
    • Clegg A, Williams W. The strategic and competitive implications of recycling and design for disassembly in the electronics industry. In: Proc 1994 IEEE Int Symp on Electronics and the Environment. San Francisco, CA: IEEE, 1994; 6-12.
    • (1994) Proc 1994 IEEE Int Symp on Electronics and the Environment , pp. 6-12
    • Clegg, A.1    Williams, W.2
  • 23
    • 21344494294 scopus 로고
    • The recovery problem in product design
    • Navin-Chandra D. The recovery problem in product design. J Eng Des 1994;5:65-86.
    • (1994) J Eng des , vol.5 , pp. 65-86
    • Navin-Chandra, D.1
  • 24
    • 0030262196 scopus 로고    scopus 로고
    • A methodology to evaluate ease of disassembly for product recycling
    • Kroll E, Beardsley B, Parulian A. A methodology to evaluate ease of disassembly for product recycling. IIE Trans 1996;28:837-45.
    • (1996) IIE Trans , vol.28 , pp. 837-845
    • Kroll, E.1    Beardsley, B.2    Parulian, A.3
  • 25
    • 33645809000 scopus 로고
    • Green Products by Design: Choices for a Cleaner Environment
    • Office of Technology Assessment
    • Green Products by Design: Choices for a Cleaner Environment. Congress of the United States, Office of Technology Assessment, 1992.
    • (1992) Congress of the United States
  • 28
    • 21844513640 scopus 로고
    • Operations planning issues in an assembly/disassembly environment
    • Brennan L, Gupta SM, Taleb KN. Operations planning issues in an assembly/disassembly environment. Int J Oper Prod Mgmt 1994;14:57-67.
    • (1994) Int J Oper Prod Mgmt , vol.14 , pp. 57-67
    • Brennan, L.1    Gupta, S.M.2    Taleb, K.N.3
  • 30
    • 0032181029 scopus 로고    scopus 로고
    • Inventory buffers in recoverable manufacturing
    • Guide Jr VDR, Srivastava R. Inventory buffers in recoverable manufacturing. J Oper Management, 1998;16:551-68.
    • (1998) J Oper Management , vol.16 , pp. 551-568
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 31
    • 0031272625 scopus 로고    scopus 로고
    • Product structure complexity and scheduling of operations in recoverable manufacturing
    • Guide Jr VDR, Srivastava R, Kraus M. Product structure complexity and scheduling of operations in recoverable manufacturing. Int J Prod Res 1997;35:3179-99.
    • (1997) Int J Prod Res , vol.35 , pp. 3179-3199
    • Guide Jr., V.D.R.1    Srivastava, R.2    Kraus, M.3
  • 32
    • 0031556588 scopus 로고    scopus 로고
    • Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system
    • Guide Jr VDR. Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. Int J Prod Econom 1997;53:101-16.
    • (1997) Int J Prod Econom , vol.53 , pp. 101-116
    • Guide Jr., V.D.R.1
  • 33
    • 0031118844 scopus 로고    scopus 로고
    • Rough-cut capacity planning for remanufacturing firms
    • Guide Jr VDR, Spencer MS. Rough-cut capacity planning for remanufacturing firms. Prod Plan Control 1997;8:237-44.
    • (1997) Prod Plan Control , vol.8 , pp. 237-244
    • Guide Jr., V.D.R.1    Spencer, M.S.2
  • 34
    • 0030736226 scopus 로고    scopus 로고
    • An evaluation of order release strategies in a remanufacturing environment
    • Guide Jr VDR, Srivastava R. An evaluation of order release strategies in a remanufacturing environment. Compu Oper Res 1997;24:37-47.
    • (1997) Compu Oper Res , vol.24 , pp. 37-47
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 35
    • 0003962386 scopus 로고    scopus 로고
    • Ph.D. Series in General Management 28, Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands
    • van der Laan E. The effects of remanufacturing on inventory control. Ph.D. Series in General Management 28, Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands:, 1997.
    • (1997) The Effects of Remanufacturing on Inventory Control
    • Van Der Laan, E.1
  • 36
    • 0031249294 scopus 로고    scopus 로고
    • Repairable inventory theory: Models and applications
    • Guide Jr VDR, Srivastava R. Repairable inventory theory: models and applications. Eur J Oper Res 1997;102:1-20.
    • (1997) Eur J Oper Res , vol.102 , pp. 1-20
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 37
    • 0024944968 scopus 로고
    • Purchasing policies for new containers considering the random returns of previously issued containers
    • Kelle P, Silver EA. Purchasing policies for new containers considering the random returns of previously issued containers. IIE Trans 1989;21:349-54.
    • (1989) IIE Trans , vol.21 , pp. 349-354
    • Kelle, P.1    Silver, E.A.2
  • 38
    • 0000683467 scopus 로고    scopus 로고
    • Simple optimal replenishment and disposal policies for product recovery systems with leadtimes
    • Inderfurth K. Simple optimal replenishment and disposal policies for product recovery systems with leadtimes. OR Spektrum 1997;19:111-22.
    • (1997) OR Spektrum , vol.19 , pp. 111-122
    • Inderfurth, K.1
  • 40
    • 0030205950 scopus 로고    scopus 로고
    • Product remanufacturing and disposal: A numerical comparison of alternative control strategies
    • van der Laan E, Salomon M, Dekker R. Product remanufacturing and disposal: A numerical comparison of alternative control strategies. Int J Prod Econom 1996;45:489-98.
    • (1996) Int J Prod Econom , vol.45 , pp. 489-498
    • Van Der Laan, E.1    Salomon, M.2    Dekker, R.3
  • 41
    • 0030393112 scopus 로고    scopus 로고
    • An (s,Q) inventory model with remanufacturing and disposal
    • van der Laan E, Dekker R, Salomon M, Ridder A. An (s,Q) inventory model with remanufacturing and disposal. Int J Prod Econom 1996;146-47:339-50.
    • (1996) Int J Prod Econom , vol.146 , Issue.47 , pp. 339-350
    • Van Der Laan, E.1    Dekker, R.2    Salomon, M.3    Ridder, A.4
  • 42
    • 0011755822 scopus 로고    scopus 로고
    • Pure and mixed strategies for the EOQ repair and waste disposal problem
    • Richter K. Pure and mixed strategies for the EOQ repair and waste disposal problem. OR Spektrum 1997;19:123-9.
    • (1997) OR Spektrum , vol.19 , pp. 123-129
    • Richter, K.1
  • 43
    • 0030572943 scopus 로고    scopus 로고
    • The EOQ repair and waste disposal model with variable setup numbers
    • Richter K. The EOQ repair and waste disposal model with variable setup numbers. European J Oper Res 1996;95: 313-24.
    • (1996) European J Oper Res , vol.95 , pp. 313-324
    • Richter, K.1
  • 44
    • 0030206702 scopus 로고    scopus 로고
    • The extended EOQ repair and waste disposal model
    • Richter K. The extended EOQ repair and waste disposal model. Int J Produ Econom 1996;45:443-7.
    • (1996) Int J Produ Econom , vol.45 , pp. 443-447
    • Richter, K.1
  • 45
    • 0003367947 scopus 로고
    • Product remanufacturing and its effects on production and inventory control
    • Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands
    • Salomon M, van der Laan E, Dekker R, Thierry M, Ridder A. Product remanufacturing and its effects on production and inventory control. Management Report Series No. 172, Rotterdam School of Management. Erasmus University Rotterdam: The Netherlands:, 1994.
    • (1994) Management Report Series No. 172 , vol.172
    • Salomon, M.1    Van Der Laan, E.2    Dekker, R.3    Thierry, M.4    Ridder, A.5
  • 46
    • 0031251420 scopus 로고    scopus 로고
    • Production planning and inventory control with remanufacturing and disposal
    • van der Laan E, Salomon M. Production planning and inventory control with remanufacturing and disposal. Eur J Oper Res 1997;102:264-78.
    • (1997) Eur J Oper Res , vol.102 , pp. 264-278
    • Van Der Laan, E.1    Salomon, M.2
  • 47
    • 0039645194 scopus 로고
    • On the logistics aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies
    • Aachen, Germany
    • Flapper SDP. On the logistics aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies. In: Int Dedication Conf on Lean/Agile Manufacturing in the Automotive Industry, Aachen, Germany, 1994; 749-756.
    • (1994) Int Dedication Conf on Lean/Agile Manufacturing in the Automotive Industry , pp. 749-756
    • Flapper, S.D.P.1
  • 48
    • 0024142713 scopus 로고
    • MRPII for repair/refurbish industries
    • Panisset B. MRPII for repair/refurbish industries. Prod Inv Mgmt J 1988;29:12-5.
    • (1988) Prod Inv Mgmt J , vol.29 , pp. 12-15
    • Panisset, B.1
  • 50
    • 0027908820 scopus 로고
    • Structuring bills of material for automotive remanufacturing
    • Krupp J. Structuring bills of material for automotive remanufacturing. Prod Inv Mgmt J 1993;34:46-52.
    • (1993) Prod Inv Mgmt J , vol.34 , pp. 46-52
    • Krupp, J.1
  • 51
    • 0031119840 scopus 로고    scopus 로고
    • Disassembly of complex product structures with parts and materials commonality
    • Taleb KN, Gupta SM, Brennan L. Disassembly of complex product structures with parts and materials commonality. Prod Plann Control 1997;8:255-69.
    • (1997) Prod Plann Control , vol.8 , pp. 255-269
    • Taleb, K.N.1    Gupta, S.M.2    Brennan, L.3
  • 52
    • 0031143697 scopus 로고    scopus 로고
    • Buffering from material recovery uncertainty in a recoverable manufacturing environment
    • Guide Jr VDR, Srivastava R. Buffering from material recovery uncertainty in a recoverable manufacturing environment. J Oper Res Soc 1997;48:519-29.
    • (1997) J Oper Res Soc , vol.48 , pp. 519-529
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 53
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson MR, Wang MH. Planning product disassembly for material recovery opportunities. Int J Prod Res 1995;33:3119-42.
    • (1995) Int J Prod Res , vol.33 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 54
    • 0029356018 scopus 로고
    • Disassembly and recycling of electronic consumer products: An overview
    • de Ron A, Penev K. Disassembly and recycling of electronic consumer products: an overview. Technovation 1995;15:363-74.
    • (1995) Technovation , vol.15 , pp. 363-374
    • De Ron, A.1    Penev, K.2
  • 55
    • 0030085256 scopus 로고    scopus 로고
    • Determination of a disassembly strategy
    • Penev K, Ron de A. Determination of a disassembly strategy. Int J Production Res 1996;34:495-506.
    • (1996) Int J Production Res , vol.34 , pp. 495-506
    • Penev, K.1    De Ron, A.2
  • 57
    • 0029405384 scopus 로고
    • Simulation, animation, and analysis of design disassembly for maintainability analysis
    • Vujosevic R, Raskar R, Yetukuri NV, Jothishankar, Juang SH. Simulation, animation, and analysis of design disassembly for maintainability analysis. Int J Prod Res 1995;33:2999-3022.
    • (1995) Int J Prod Res , vol.33 , pp. 2999-3022
    • Vujosevic, R.1    Raskar, R.2    Yetukuri, N.V.3    Jothishankar4    Juang, S.H.5
  • 59
    • 85024533129 scopus 로고    scopus 로고
    • Algorithm for multiple disassembly and parallel assemblies
    • Dutta D, Woo TC, Algorithm for multiple disassembly and parallel assemblies. Trans ASME 117:102-109.
    • Trans ASME , vol.117 , pp. 102-109
    • Dutta, D.1    Woo, T.C.2
  • 60
    • 84947652551 scopus 로고
    • Assembly/disassembly sequence planning
    • Yokota K, Brough DR. Assembly/disassembly sequence planning. Assembly Autom 1992;12:31-8.
    • (1992) Assembly Autom , vol.12 , pp. 31-38
    • Yokota, K.1    Brough, D.R.2
  • 61
    • 0028058444 scopus 로고    scopus 로고
    • Disassembly-oriented assessment methodology to support design for recycling
    • Zussman E, Kriwet A, Seliger G. Disassembly-oriented assessment methodology to support design for recycling. Ann CIRP 43:9-14.
    • Ann CIRP , vol.43 , pp. 9-14
    • Zussman, E.1    Kriwet, A.2    Seliger, G.3
  • 62
    • 0029708793 scopus 로고    scopus 로고
    • Probabilistic reactive disassembly planning
    • Geiger D, Zussman E. Probabilistic reactive disassembly planning. Ann CIRP 1996;45:49-52.
    • (1996) Ann CIRP , vol.45 , pp. 49-52
    • Geiger, D.1    Zussman, E.2
  • 64
    • 0027306693 scopus 로고
    • CAD system with product assembly/disassembly planning function
    • Arai E, Iwata K. CAD system with product assembly/disassembly planning function. Robotics and Comput Integrated Manuf 1993;10:41-8.
    • (1993) Robotics and Comput Integrated Manuf , vol.10 , pp. 41-48
    • Arai, E.1    Iwata, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.