메뉴 건너뛰기




Volumn 26, Issue 3, 2015, Pages 527-538

An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed

Author keywords

Ant colony optimization; Outsourcing; Parallel machine scheduling problem

Indexed keywords

ANT COLONY OPTIMIZATION; ARTIFICIAL INTELLIGENCE; BUSINESS MACHINES; MACHINERY; MANUFACTURE; MATHEMATICAL PROGRAMMING; OUTSOURCING; SCHEDULING;

EID: 84929521737     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-013-0811-5     Document Type: Article
Times cited : (36)

References (72)
  • 1
    • 84887624737 scopus 로고    scopus 로고
    • Efficient bi-objective ant colony approach to minimize total tardiness and system unavailability for a parallel machine scheduling problem
    • Ali Berrichi, A., & Yalaoui, F. (2013). Efficient bi-objective ant colony approach to minimize total tardiness and system unavailability for a parallel machine scheduling problem. International Journal of Advanced Manufacturing Technology,. doi:10.1007/s00170-013-4841-0.
    • (2013) International Journal of Advanced Manufacturing Technology
    • Ali Berrichi, A.1    Yalaoui, F.2
  • 4
    • 85027925803 scopus 로고    scopus 로고
    • Ant colony optimization algorithm for the Euclidean location-allocation problem with unknown number of facilities
    • Arnaout, J. (2013). Ant colony optimization algorithm for the Euclidean location-allocation problem with unknown number of facilities. Journal of Intelligent Manufacturing, 24(1), 45–54.
    • (2013) Journal of Intelligent Manufacturing , vol.24 , Issue.1 , pp. 45-54
    • Arnaout, J.1
  • 5
    • 54949097436 scopus 로고    scopus 로고
    • Arnaout, J., Musa, R., & Rabadi, G. (2008). Ant colony optimization algorithm to parallel machine scheduling problem with setups. In 4th IEEE Conference on Automation Science and Engineering
    • Arnaout, J., Musa, R., & Rabadi, G. (2008). Ant colony optimization algorithm to parallel machine scheduling problem with setups. In 4th IEEE Conference on Automation Science and Engineering.
  • 7
    • 84929522513 scopus 로고    scopus 로고
    • A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times, Journal of Intelligent Manufacturing:
    • Arnaout, J., Rabadi, G., & Musa, R. (2009). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing.
    • (2009) & Musa, R
    • Arnaout, J.1    Rabadi, G.2
  • 8
    • 78650175630 scopus 로고    scopus 로고
    • A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times
    • Arnaout, J., Rabadi, G., & Musa, R. (2010). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing, 21(6), 693–701.
    • (2010) Journal of Intelligent Manufacturing , vol.21 , Issue.6 , pp. 693-701
    • Arnaout, J.1    Rabadi, G.2    Musa, R.3
  • 9
    • 0002009274 scopus 로고
    • A dynamic priority rule for scheduling against due-dates
    • Baker, K. R., & Bertrand, J. W. M. (1982). A dynamic priority rule for scheduling against due-dates. Journal of Operations Management, 3, 37–42.
    • (1982) Journal of Operations Management , vol.3 , pp. 37-42
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 11
    • 84929523206 scopus 로고    scopus 로고
    • Applying ant colony optimization to solve the single machine total tardiness problem. Report Series SFB “Adaptive Information Systems and Modelling in Economics and Management Science”, 42
    • WU Vienna University of Economics and Business: Vienna
    • Bauer, A., Bullnheimer, B., Hartl, R. F., & Strauß, C. (1999). Applying ant colony optimization to solve the single machine total tardiness problem. Report Series SFB “Adaptive Information Systems and Modelling in Economics and Management Science”, 42. SFB Adaptive Information Systems and Modelling in Economics and Management Science, WU Vienna University of Economics and Business, Vienna.
    • (1999) SFB Adaptive Information Systems and Modelling in Economics and Management Science
    • Bauer, A.1    Bullnheimer, B.2    Hartl, R.F.3    Strauß, C.4
  • 12
    • 64449088021 scopus 로고    scopus 로고
    • Parallel-machine scheduling problems with sequence-dependent setup times using an aco, sa and vns hybrid algorithm
    • Behnamian, J., & Zandieh, M. (2009). Parallel-machine scheduling problems with sequence-dependent setup times using an aco, sa and vns hybrid algorithm. Expert Systems with Applications, 36(6), 9637–9644.
    • (2009) Expert Systems with Applications , vol.36 , Issue.6 , pp. 9637-9644
    • Behnamian, J.1    Zandieh, M.2
  • 13
    • 0035254165 scopus 로고    scopus 로고
    • A study of simple rules for subcontracting in make-to-order manufacturing
    • Bertrand, J. W. M., & Sridharan, V. (2001). A study of simple rules for subcontracting in make-to-order manufacturing. European Journal of Operational Research, 128(3):509–531.
    • (2001) European Journal of Operational Research , vol.128 , Issue.3 , pp. 509-531
    • Bertrand, J.W.M.1    Sridharan, V.2
  • 14
    • 67349243752 scopus 로고    scopus 로고
    • Order release strategies to control outsourced operations in a supply chain
    • Boulaksil, Y., & Fransoo, J. C. (2009). Order release strategies to control outsourced operations in a supply chain. International Journal of Production Economics, 119, 149–160.
    • (2009) International Journal of Production Economics , vol.119 , pp. 149-160
    • Boulaksil, Y.1    Fransoo, J.C.2
  • 16
    • 0033446619 scopus 로고    scopus 로고
    • An improved ant system algorithm for the vehicle routing problem
    • Bullnheimer, B., Hartl, R., & Strauss, C. (1999). An improved ant system algorithm for the vehicle routing problem. Annals of Operations Research, 89, 319–318.
    • (1999) Annals of Operations Research , vol.89 , pp. 318-319
    • Bullnheimer, B.1    Hartl, R.2    Strauss, C.3
  • 17
    • 65249125899 scopus 로고    scopus 로고
    • Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem
    • Chang, P.-T., Lin, K.-P., Pai, P.-F., Zhong, C.-Z., Lin, C.-H., & Hung, L.-T. (2008). Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem. International Journal of Production Research, 46(20), 5719–5759.
    • (2008) International Journal of Production Research , vol.46 , Issue.20 , pp. 5719-5759
    • Chang, P.-T.1    Lin, K.-P.2    Pai, P.-F.3    Zhong, C.-Z.4    Lin, C.-H.5    Hung, L.-T.6
  • 18
    • 34547786554 scopus 로고    scopus 로고
    • Development of a genetic algorithm for scheduling products with a multi-level structure
    • Chen, K. J., & Ji, P. (2007). Development of a genetic algorithm for scheduling products with a multi-level structure. International Journal of Advanced Manufacturing Technology, 33, 1229–1236.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , pp. 1229-1236
    • Chen, K.J.1    Ji, P.2
  • 19
    • 55049137385 scopus 로고    scopus 로고
    • Scheduling with subcontracting options
    • Chen, Z.-L., & Li, C.-L. (2008). Scheduling with subcontracting options. IIE Transactions, 40, 1171–1184.
    • (2008) IIE Transactions , vol.40 , pp. 1171-1184
    • Chen, Z.-L.1    Li, C.-L.2
  • 20
    • 26044467346 scopus 로고    scopus 로고
    • A new approach to job shop scheduling problems with due date constraints considering operating subcontracts
    • Chung, D., Lee, K., Shin, K., & Park, J. (2005). A new approach to job shop scheduling problems with due date constraints considering operating subcontracts. International Journal of Production Economics, 98, 238–250.
    • (2005) International Journal of Production Economics , vol.98 , pp. 238-250
    • Chung, D.1    Lee, K.2    Shin, K.3    Park, J.4
  • 21
    • 84873056463 scopus 로고    scopus 로고
    • Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
    • Chung, D., & Choi, B. (2012). Outsourcing and scheduling for two-machine ordered flow shop scheduling problems. European Journal of Operational Research, 226(1), 46–52.
    • (2012) European Journal of Operational Research , vol.226 , Issue.1 , pp. 46-52
    • Chung, D.1    Choi, B.2
  • 25
    • 27644543634 scopus 로고    scopus 로고
    • Ant colony optimization theory: A survey
    • Dorigo, M., & Blum, C. (2005). Ant colony optimization theory: A survey. Theoretical Computer Science, 344(2–3), 243–278.
    • (2005) Theoretical Computer Science , vol.344 , Issue.2-3 , pp. 243-278
    • Dorigo, M.1    Blum, C.2
  • 28
    • 31744439035 scopus 로고    scopus 로고
    • An ant-colony optimization algorithm for minimizing the completion-time variance of jobs in flowshops
    • Gajpal, Y., & Rajendran, C. (2006). An ant-colony optimization algorithm for minimizing the completion-time variance of jobs in flowshops. International Journal of Production Economics, 101, 259–272.
    • (2006) International Journal of Production Economics , vol.101 , pp. 259-272
    • Gajpal, Y.1    Rajendran, C.2
  • 29
    • 0038546313 scopus 로고    scopus 로고
    • An ant colony system with a new local search for the sequential ordering problem
    • Gambardella, L. M., & Dorigo, M. (2000). An ant colony system with a new local search for the sequential ordering problem. INFORMS Journal on Computing, 12, 237–255.
    • (2000) INFORMS Journal on Computing , vol.12 , pp. 237-255
    • Gambardella, L.M.1    Dorigo, M.2
  • 30
    • 33749652361 scopus 로고    scopus 로고
    • Information systems outsourcing: A literature analysis
    • Gonzalez, R., Gasco, J., & Llopis, J. (2006). Information systems outsourcing: A literature analysis. Information and Management, 43, 821–834.
    • (2006) Information and Management , vol.43 , pp. 821-834
    • Gonzalez, R.1    Gasco, J.2    Llopis, J.3
  • 32
    • 22744450247 scopus 로고    scopus 로고
    • A fast ant-colony algorithm for single-machine scheduling to minimize the sum of weighted tardiness of jobs
    • Holthaus, O., & Rajendran, C. (2005). A fast ant-colony algorithm for single-machine scheduling to minimize the sum of weighted tardiness of jobs. Journal of the Operational Research Society, 56, 947–953.
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 947-953
    • Holthaus, O.1    Rajendran, C.2
  • 33
    • 84871717100 scopus 로고    scopus 로고
    • Flexible job shop scheduling with due window—a two-pheromone ant colony approach
    • Huang, R., Yang, C., & Cheng, W. (2013). Flexible job shop scheduling with due window—a two-pheromone ant colony approach. International Journal of Production Economics, 141(2), 685–697.
    • (2013) International Journal of Production Economics , vol.141 , Issue.2 , pp. 685-697
    • Huang, R.1    Yang, C.2    Cheng, W.3
  • 35
    • 80053372003 scopus 로고    scopus 로고
    • An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times
    • Keskinturk, T., Yildirim, M. B., & Barut, M. (2012). An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times. Computers and Operations Research, 39(6), 1225–1235.
    • (2012) Computers and Operations Research , vol.39 , Issue.6 , pp. 1225-1235
    • Keskinturk, T.1    Yildirim, M.B.2    Barut, M.3
  • 36
    • 34547143626 scopus 로고    scopus 로고
    • Scalable platforms using ant colony optimization
    • Kumar, R., & Allada, V. (2007). Scalable platforms using ant colony optimization. Journal of Intelligent Manufacturing, 18(1), 127– 142.
    • (2007) Journal of Intelligent Manufacturing , vol.18 , Issue.1 , pp. 127-142
    • Kumar, R.1    Allada, V.2
  • 37
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Lee, Y. H., Jeong, C. S., & Moon, C. (2002). Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering, 43, 351–374.
    • (2002) Computers and Industrial Engineering , vol.43 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 38
    • 35548956964 scopus 로고    scopus 로고
    • Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed
    • Lee, I. S., & Sung, C. S. (2008a). Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research, 186, 931–952.
    • (2008) European Journal of Operational Research , vol.186 , pp. 931-952
    • Lee, I.S.1    Sung, C.S.2
  • 40
    • 79957688480 scopus 로고    scopus 로고
    • Two-stage production scheduling with an outsourcing option
    • Lee, K., & Choi, B. (2011). Two-stage production scheduling with an outsourcing option. European Journal of Operational Research, 213, 489–497.
    • (2011) European Journal of Operational Research , vol.213 , pp. 489-497
    • Lee, K.1    Choi, B.2
  • 41
    • 84857361431 scopus 로고    scopus 로고
    • Renovation scheduling to minimize user impact of a building that remains in operation
    • Lee, H.-Y. (2012). Renovation scheduling to minimize user impact of a building that remains in operation. Automation in Construction, 22(1), 398–405.
    • (2012) Automation in Construction , vol.22 , Issue.1 , pp. 398-405
    • Lee, H.-Y.1
  • 43
    • 33845332680 scopus 로고    scopus 로고
    • An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups
    • Liao, C.-J., & Juan, H.-C. (2007). An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups. Computers & Operations Research, 34(7), 1899–1909.
    • (2007) Computers & Operations Research , vol.34 , Issue.7 , pp. 1899-1909
    • Liao, C.-J.1    Juan, H.-C.2
  • 44
    • 84888391224 scopus 로고    scopus 로고
    • Ant colony optimization for unrelated parallel machine scheduling. International Journal of Advanced Manufacturing Technology
    • Lin, C.-W., Lin, Y.-K., & Hsieh, H.-T. (2013a). Ant colony optimization for unrelated parallel machine scheduling. International Journal of Advanced Manufacturing Technology, doi:10.1007/s00170-013-4766-7.
    • (2013) doi:10.1007/s00170-013-4766-7
    • Lin, C.-W.1    Lin, Y.-K.2    Hsieh, H.-T.3
  • 45
    • 39649117983 scopus 로고    scopus 로고
    • Development of new features of ant colony optimization for flowshop scheduling
    • Lin, B., Lu, C., Shyu, S., & Tsai, C. (2008). Development of new features of ant colony optimization for flowshop scheduling. International Journal of Production Economics, 112(2), 742–755.
    • (2008) International Journal of Production Economics , vol.112 , Issue.2 , pp. 742-755
    • Lin, B.1    Lu, C.2    Shyu, S.3    Tsai, C.4
  • 46
    • 84872370395 scopus 로고    scopus 로고
    • Application of ant colony optimization algorithm in process planning optimization
    • Liu, X.-J., & Yi, Hong. (2013b). Application of ant colony optimization algorithm in process planning optimization. Journal of Intelligent Manufacturing, 24(1), 1–13.
    • (2013) Journal of Intelligent Manufacturing , vol.24 , Issue.1 , pp. 1-13
    • Liu, X.-J.1    Yi, H.2
  • 47
    • 58149150064 scopus 로고    scopus 로고
    • Threshold accepting and ant colony optimization algorithms for scheduling m-machine flow shops with lot streaming
    • Marimuthu, S., Ponnambalam, S. G., & Jawahar, N. (2009). Threshold accepting and ant colony optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Materials Processing Technology, 209, 1026–1041.
    • (2009) Journal of Materials Processing Technology , vol.209 , pp. 1026-1041
    • Marimuthu, S.1    Ponnambalam, S.G.2    Jawahar, N.3
  • 48
    • 84958631637 scopus 로고    scopus 로고
    • EvoIASP, EvoSCONDI, EvoTel, EvoSTIM, EvoROB, and EvoFlight (pp
    • London, UK: Springer-Verlag
    • Merkle, D., & Middendorf, M. (2000). An ant algorithm with a new pheromone evaluation rule for total tardiness problems. In S. Cagnoni, R. Poli, Y. Li, B. Paechter, & T. C. Fogarty (Eds.), Real-world applications of evolutionary computing. EvoWorkshops 2000: EvoIASP, EvoSCONDI, EvoTel, EvoSTIM, EvoROB, and EvoFlight (pp. 287–296). London, UK: Springer-Verlag.
    • (2000) 287–296)
  • 49
    • 84875194263 scopus 로고    scopus 로고
    • Scheduling with an outsourcing option on both manufacturer and subcontractors
    • Mokhtari, H., & Abadi, I. N. K. (2013). Scheduling with an outsourcing option on both manufacturer and subcontractors. Computers & Operations Research, 40(5), 1234–1242.
    • (2013) Computers & Operations Research , vol.40 , Issue.5 , pp. 1234-1242
    • Mokhtari, H.1    Abadi, I.N.K.2
  • 50
    • 85016679255 scopus 로고    scopus 로고
    • Heuristics to minimize total weighted tardiness of jobs on unrelated parallel machines. In 4th IEEE international conference on automation science and engineering, Washington DC, USA
    • Monch, L. (2008). Heuristics to minimize total weighted tardiness of jobs on unrelated parallel machines. In 4th IEEE international conference on automation science and engineering, Washington DC, USA, August 23–26.
    • (2008) August , pp. 23-26
    • Monch, L.1
  • 51
    • 84892344246 scopus 로고    scopus 로고
    • Planning and scheduling in manufacturing and services. [S.l.], 2nd edition. Berlin: Springer p
    • Pinedo, M. L. (2009). Planning and scheduling in manufacturing and services. [S.l.], 2nd edition. Berlin: Springer p. 555.
    • (2009) 555
    • Pinedo, M.L.1
  • 52
    • 70649091024 scopus 로고    scopus 로고
    • Scheduling: Theory, algorithms and systems
    • Berlin: Springer
    • Pinedo, M. L. (2012). Scheduling: Theory, algorithms and systems, 4th Edition (693 p), Berlin: Springer.
    • (2012) 4th Edition (693 p)
    • Pinedo, M.L.1
  • 53
    • 40849085074 scopus 로고    scopus 로고
    • Optimal job sequence determination and operation machine allocation in flexible manufacturing systems: An approach using adaptive hierarchical ant colony algorithm
    • Prakash, A., Tiwari, M. K., & Shankar, R. (2008). Optimal job sequence determination and operation machine allocation in flexible manufacturing systems: An approach using adaptive hierarchical ant colony algorithm. Journal of Intelligent Manufacturing, 19(2), 161–173.
    • (2008) Journal of Intelligent Manufacturing , vol.19 , Issue.2 , pp. 161-173
    • Prakash, A.1    Tiwari, M.K.2    Shankar, R.3
  • 54
    • 38149033826 scopus 로고    scopus 로고
    • Coordinated logistics scheduling for in-house production and outsourcing
    • Qi, X. (2008). Coordinated logistics scheduling for in-house production and outsourcing. IEEE Transactions on Automation Science and Engineering, 5(1), 188–192.
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , Issue.1 , pp. 188-192
    • Qi, X.1
  • 55
    • 58149121493 scopus 로고    scopus 로고
    • Two-stage production scheduling with an option of outsourcing from a remote supplier
    • Qi, X. (2009). Two-stage production scheduling with an option of outsourcing from a remote supplier. Journal of Systems Science and Systems Engineering, 18(1), 1–15.
    • (2009) Journal of Systems Science and Systems Engineering , vol.18 , Issue.1 , pp. 1-15
    • Qi, X.1
  • 56
    • 78649316983 scopus 로고    scopus 로고
    • Outsourcing and production scheduling for a two-stage flow shop
    • Qi, X. (2011). Outsourcing and production scheduling for a two-stage flow shop. International Journal of Production Economics, 129(1), 43–50.
    • (2011) International Journal of Production Economics , vol.129 , Issue.1 , pp. 43-50
    • Qi, X.1
  • 57
    • 45149110066 scopus 로고    scopus 로고
    • Scheduling parallel batch processors with incompatible job families using ant colony optimization. In Proceedings of the 2006 IEEE international conference on automation science and engineering. Shangai, China
    • Raghavan, N. R. S., & Venkataramana, M. (2006). Scheduling parallel batch processors with incompatible job families using ant colony optimization. In Proceedings of the 2006 IEEE international conference on automation science and engineering. Shangai, China, October 7–10.
    • (2006) October , pp. 7-10
    • Raghavan, N.R.S.1    Venkataramana, M.2
  • 58
  • 60
    • 36448957975 scopus 로고    scopus 로고
    • Parameter′s setting of the ant colony algorithm applied in preventive maintenance optimization
    • Samrout, M., Kouta, R., Yalaoui, F., Chatelet, E., & Chebbo, N. (2007). Parameter$$\prime $$′s setting of the ant colony algorithm applied in preventive maintenance optimization. Journal of Intelligent Manufacturing, 18(6), 663–677.
    • (2007) Journal of Intelligent Manufacturing , vol.18 , Issue.6 , pp. 663-677
    • Samrout, M.1    Kouta, R.2    Yalaoui, F.3    Chatelet, E.4    Chebbo, N.5
  • 62
    • 6344253119 scopus 로고    scopus 로고
    • Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time
    • Shyu, S., Lin, B., & Yin, P. (2004). Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time. Computers and Industrial Engineering, 47, 181–193.
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 181-193
    • Shyu, S.1    Lin, B.2    Yin, P.3
  • 64
    • 79251639841 scopus 로고    scopus 로고
    • An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed
    • Tavares Neto, R. F., & Godinho Filho, M. (2011). An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed. Computers and Operations Research, 38, 1286–1293.
    • (2011) Computers and Operations Research , vol.38 , pp. 1286-1293
    • Tavares Neto, R.F.1    Godinho Filho, M.2
  • 65
    • 84870055990 scopus 로고    scopus 로고
    • Literature review regarding ant colony optimization applied to scheduling problems: Guidelines for implementation and directions for future research. Engineering Applications of Artificial Intelligence
    • Tavares Neto, R. F., & Godinho Filho, M. (2012). Literature review regarding ant colony optimization applied to scheduling problems: Guidelines for implementation and directions for future research. Engineering Applications of Artificial Intelligence. doi:10.1016/j.engappai.2012.03.011.
    • (2012) doi:10.1016/j.engappai.2012.03.011
    • Tavares Neto, R.F.1    Godinho Filho, M.2
  • 66
    • 84870055990 scopus 로고    scopus 로고
    • Literature review regarding ant colony optimization applied to scheduling problems: Guidelines for implementation and directions for future research
    • Tavares Neto, R. F., & Godinho Filho, M. (2013). Literature review regarding ant colony optimization applied to scheduling problems: Guidelines for implementation and directions for future research. Engineering Applications of Artificial Intelligence, 26(1), 150–161.
    • (2013) Engineering Applications of Artificial Intelligence , vol.26 , Issue.1 , pp. 150-161
    • Tavares Neto, R.F.1    Godinho Filho, M.2
  • 67
    • 79960194636 scopus 로고    scopus 로고
    • Makespan minimization on single batch-processing machine via ant colony optimization
    • Xu, R., Chen, H., & Li, X. (2012). Makespan minimization on single batch-processing machine via ant colony optimization. Computers and Operations Research, 39(3), 582–593.
    • (2012) Computers and Operations Research , vol.39 , Issue.3 , pp. 582-593
    • Xu, R.1    Chen, H.2    Li, X.3
  • 68
    • 70249124670 scopus 로고    scopus 로고
    • A paradigmatic and methodological review of research in outsourcing
    • Yadav, V., & Gupta, R. K. (2008). A paradigmatic and methodological review of research in outsourcing. Information Resources Management Journal, 21(1), 27–43.
    • (2008) Information Resources Management Journal , vol.21 , Issue.1 , pp. 27-43
    • Yadav, V.1    Gupta, R.K.2
  • 69
    • 43549123063 scopus 로고    scopus 로고
    • Multi-period vehicle routing and crew scheduling with outsourcing options
    • Zapfel, G., & Bogl, M. (2008). Multi-period vehicle routing and crew scheduling with outsourcing options. International Journal of Production Economics, 113, 980–996.
    • (2008) International Journal of Production Economics , vol.113 , pp. 980-996
    • Zapfel, G.1    Bogl, M.2
  • 70
    • 85016692847 scopus 로고    scopus 로고
    • Scheduling unrelated parallel machine to minimize total weighted tardiness using ant colony optimization. In Proceedings of IEEE international conference on automation and logistics, Jinan, China
    • Zhou, H., Li, Z., & Wu, X. (2007a). Scheduling unrelated parallel machine to minimize total weighted tardiness using ant colony optimization. In Proceedings of IEEE international conference on automation and logistics, Jinan, China, August 18–21.
    • (2007) August , pp. 18-21
    • Zhou, H.1    Li, Z.2    Wu, X.3
  • 71
    • 56349095561 scopus 로고    scopus 로고
    • Applying ant colony optimization algorithm to dynamic job shop scheduling problems
    • Zhou, R., Lee, H. P., & Nee, A. Y. C. (2008). Applying ant colony optimization algorithm to dynamic job shop scheduling problems. International Journal of Manufacturing Research, 3(3), 301–320.
    • (2008) International Journal of Manufacturing Research , vol.3 , Issue.3 , pp. 301-320
    • Zhou, R.1    Lee, H.P.2    Nee, A.Y.C.3
  • 72
    • 77956077156 scopus 로고    scopus 로고
    • Zhuo, X., Zhang, J., & Chen, W. (2007b). A new pheromone design in acs for solving jsp. In Proceedings of IEEE congress on evolutionary computation, 25–28 September, Singapore
    • Zhuo, X., Zhang, J., & Chen, W. (2007b). A new pheromone design in acs for solving jsp. In Proceedings of IEEE congress on evolutionary computation, 25–28 September, Singapore.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.