메뉴 건너뛰기




Volumn 103, Issue 2, 2006, Pages 810-825

Generating Pareto schedules with outsource and internal parallel resources

Author keywords

Machine utilization; Multi criteria; Number of late jobs; Outsourcing; Parallel machines; Pareto solutions; Scheduling; Supply chain scheduling

Indexed keywords

HEURISTIC METHODS; OUTSOURCING; PARAMETER ESTIMATION; PROBLEM SOLVING;

EID: 33745864880     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.11.010     Document Type: Article
Times cited : (27)

References (24)
  • 1
    • 8344240489 scopus 로고    scopus 로고
    • A Brownian approximation of a production-inventory system with a manufacturer that subcontracts
    • Bradley J.R. A Brownian approximation of a production-inventory system with a manufacturer that subcontracts. Operations Research 52 5 (2004) 765-784
    • (2004) Operations Research , vol.52 , Issue.5 , pp. 765-784
    • Bradley, J.R.1
  • 2
    • 0041912462 scopus 로고    scopus 로고
    • Quantitative comparison of approximate solution sets for bi-criteria optimization problems
    • Carlyle W.M., Fowler J.W., Gel E.S., and Kim B. Quantitative comparison of approximate solution sets for bi-criteria optimization problems. Decision Sciences 34 1 (2003) 63-82
    • (2003) Decision Sciences , vol.34 , Issue.1 , pp. 63-82
    • Carlyle, W.M.1    Fowler, J.W.2    Gel, E.S.3    Kim, B.4
  • 3
    • 0027912254 scopus 로고
    • Complexity of single machine, multi-criteria scheduling problems
    • Chen C.-L., and Bulfin R.L. Complexity of single machine, multi-criteria scheduling problems. European Journal of Operational Research 70 1 (1993) 115-125
    • (1993) European Journal of Operational Research , vol.70 , Issue.1 , pp. 115-125
    • Chen, C.-L.1    Bulfin, R.L.2
  • 4
    • 9444242730 scopus 로고    scopus 로고
    • Choi, H.R., Kim, H.S., Park, B.J., Park, Y.S., 2004. Multi-agent based integration scheduling system under supply chain management environment. Innovations in Applied Artificial Intelligence, Lecture Notes in Computer Science, vol. 3029, Springer, Berlin, pp. 249-263.
  • 5
    • 0034508368 scopus 로고    scopus 로고
    • Capacity allocation and outsourcing in a process industry
    • De Kok T.G. Capacity allocation and outsourcing in a process industry. International Journal of Production Economics 68 (2000) 229-239
    • (2000) International Journal of Production Economics , vol.68 , pp. 229-239
    • De Kok, T.G.1
  • 6
    • 0002542881 scopus 로고
    • Measuring labor-efficiency in post offices
    • Marchand M., Pestieau P., and Tulkens H. (Eds), North-Holland Publishing Company, Amsterdam
    • Deprins D., Simar L., and Tulkens H. Measuring labor-efficiency in post offices. In: Marchand M., Pestieau P., and Tulkens H. (Eds). The Performance of Public Enterprises: Concepts and Measurements (1984), North-Holland Publishing Company, Amsterdam
    • (1984) The Performance of Public Enterprises: Concepts and Measurements
    • Deprins, D.1    Simar, L.2    Tulkens, H.3
  • 7
    • 50749136055 scopus 로고
    • A simulated annealing heuristic for scheduling in a flowshop with bicriteria
    • Gangadharan R., and Rajendran C. A simulated annealing heuristic for scheduling in a flowshop with bicriteria. Computers & Industrial Engineering 27 (1994) 473-476
    • (1994) Computers & Industrial Engineering , vol.27 , pp. 473-476
    • Gangadharan, R.1    Rajendran, C.2
  • 8
    • 13544276184 scopus 로고    scopus 로고
    • Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs
    • Gupta J.N.D., and Ruiz-Torres A.J. Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs. European Journal of Operational Research 167 3 (2005) 679-695
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 679-695
    • Gupta, J.N.D.1    Ruiz-Torres, A.J.2
  • 9
    • 0029343603 scopus 로고
    • Minimizing the number of tardy jobs for m parallel machines
    • Ho J.C., and Chang Y.L. Minimizing the number of tardy jobs for m parallel machines. European Journal of Operational Research 84 (1995) 343-355
    • (1995) European Journal of Operational Research , vol.84 , pp. 343-355
    • Ho, J.C.1    Chang, Y.L.2
  • 11
    • 0042363451 scopus 로고    scopus 로고
    • Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost
    • Kim B. Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost. International Journal of Production Economics 86 (2003) 63-80
    • (2003) International Journal of Production Economics , vol.86 , pp. 63-80
    • Kim, B.1
  • 12
    • 0031075568 scopus 로고    scopus 로고
    • Decomposition and hybrid simulated annealing heuristics for the parallel machine total tardiness problem
    • Koulamas C. Decomposition and hybrid simulated annealing heuristics for the parallel machine total tardiness problem. Naval Research Logistics 44 (1997) 109-125
    • (1997) Naval Research Logistics , vol.44 , pp. 109-125
    • Koulamas, C.1
  • 13
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • Kreipl S., and Pinedo M. Planning and scheduling in supply chains: An overview of issues in practice. Production and Operations Management 13 (2004) 77-92
    • (2004) Production and Operations Management , vol.13 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 14
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Lee Y.H., Jeong C.S., and Moon C. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering 43 (2002) 351-374
    • (2002) Computers and Industrial Engineering , vol.43 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 15
    • 0742266962 scopus 로고    scopus 로고
    • The impact of outsourcing on the transaction costs and boundaries of manufacturing
    • McCarthy I., and Anagnostou A. The impact of outsourcing on the transaction costs and boundaries of manufacturing. International Journal of Production Economics 88 (2004) 61-71
    • (2004) International Journal of Production Economics , vol.88 , pp. 61-71
    • McCarthy, I.1    Anagnostou, A.2
  • 16
    • 4344704194 scopus 로고    scopus 로고
    • Minimizing the weighted number of tardy jobs on parallel processors
    • M'Hallah R., and Bulfin R.L. Minimizing the weighted number of tardy jobs on parallel processors. European Journal of Operational Research 160 (2005) 471-484
    • (2005) European Journal of Operational Research , vol.160 , pp. 471-484
    • M'Hallah, R.1    Bulfin, R.L.2
  • 17
    • 0000062028 scopus 로고
    • An n job, one machine sequencing algorithm for minimizing the number of late jobs
    • Moore J.M. An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Science 15 (1968) 102-109
    • (1968) Management Science , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 18
    • 4444290997 scopus 로고    scopus 로고
    • Managing quality while outsourcing
    • Puich M., and Walker K. Managing quality while outsourcing. BioPharm International 17-9 (2004) 60-61
    • (2004) BioPharm International , vol.17-9 , pp. 60-61
    • Puich, M.1    Walker, K.2
  • 19
    • 33745859959 scopus 로고    scopus 로고
    • Ruiz-Torres, A.J., Barton, R., 2001. Assessment procedure for multiple Pareto solution sets. Sixth International Conference of the Decision Sciences Institute, Chihuahua, Mexico, 2001 Proceedings, CD, Paper 61.
  • 20
    • 6344219984 scopus 로고    scopus 로고
    • Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling
    • Ruiz-Torres A., and López F. Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling. Computers and Industrial Engineering 47 (2004) 107-121
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 107-121
    • Ruiz-Torres, A.1    López, F.2
  • 21
    • 33745818260 scopus 로고    scopus 로고
    • Ruiz-Torres, A.J., López, F., 2005. Analysis of alternative evaluation methods for multi-criteria problems, Working Paper.
  • 22
    • 0030192321 scopus 로고    scopus 로고
    • Scheduling in flowshop and cellular manufacturing systems with multiple objectives-A genetic algorithmic approach
    • Sridhar J., and Rajendran C. Scheduling in flowshop and cellular manufacturing systems with multiple objectives-A genetic algorithmic approach. Production Planning and Control 7 (1996) 374-382
    • (1996) Production Planning and Control , vol.7 , pp. 374-382
    • Sridhar, J.1    Rajendran, C.2
  • 23
    • 0035283872 scopus 로고    scopus 로고
    • Analysis of supplier buyer relationships using resource constrained project scheduling strategies
    • Tukel O.I., and Wasti S.N. Analysis of supplier buyer relationships using resource constrained project scheduling strategies. European Journal of Operational Research 129 (2001) 271-276
    • (2001) European Journal of Operational Research , vol.129 , pp. 271-276
    • Tukel, O.I.1    Wasti, S.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.