-
1
-
-
38049077958
-
Tactical capacity management under capacity flexibility in make-to-stock systems
-
Alp, O. and Tan, T. (2008) Tactical capacity management under capacity flexibility in make-to-stock systems. IIE Transactions, 40, pp. 221-237.
-
(2008)
IIE Transactions
, vol.40
, pp. 221-237
-
-
Alp, O.1
Tan, T.2
-
2
-
-
0035435909
-
Capacity acquisition, subcontracting, and lot sizing
-
Atamturk, A. and Hochbaum, D. S. (2001) Capacity acquisition, subcontracting, and lot sizing. Management Science, 47, pp. 1081-1100.
-
(2001)
Management Science
, vol.47
, pp. 1081-1100
-
-
Atamturk, A.1
Hochbaum, D.S.2
-
3
-
-
55049131286
-
Measuring the value of outsourcing
-
Bazinet, C. G., Kahn, S. A. and Smith, S. J. (1998) Measuring the value of outsourcing. Best's Review, 99, pp. 85-88.
-
(1998)
Best's Review
, vol.99
, pp. 85-88
-
-
Bazinet, C.G.1
Kahn, S.A.2
Smith, S.J.3
-
4
-
-
0035254165
-
A study of simple rules for subcontracting in make-to-order manufacturing
-
Bertrand, J. W. M. and Sridharan, V. (2001) A study of simple rules for subcontracting in make-to-order manufacturing. European Journal of Operational Research, 128, pp. 509-531.
-
(2001)
European Journal of Operational Research
, vol.128
, pp. 509-531
-
-
Bertrand, J.W.M.1
Sridharan, V.2
-
5
-
-
8344240489
-
A Brownian approximation of a production-inventory system with a manufacturer that subcontracts
-
Bradley, J. R. (2004) A Brownian approximation of a production-inventory system with a manufacturer that subcontracts. Operations Research, 52, pp. 765-784.
-
(2004)
Operations Research
, vol.52
, pp. 765-784
-
-
Bradley, J.R.1
-
7
-
-
26044467346
-
A new approach to job shop scheduling problems with due date constraints considering operation subcontracts
-
Chung, D., Lee, K., Shin, K. and Park, J. (2005) A new approach to job shop scheduling problems with due date constraints considering operation subcontracts. International Journal of Production Economics, 98, pp. 238-250.
-
(2005)
International Journal of Production Economics
, vol.98
, pp. 238-250
-
-
Chung, D.1
Lee, K.2
Shin, K.3
Park, J.4
-
8
-
-
55049118330
-
How to think strategically about outsourcing
-
Craumer, M. (2002) How to think strategically about outsourcing
-
(2002)
-
-
Craumer, M.1
-
9
-
-
0008612376
-
-
Graduate School of Business Administration, Harvard University, Boston, MA
-
Day, J. S. (1956) Subcontracting policy in the airframe industry, Graduate School of Business Administration, Harvard University, Boston, MA
-
(1956)
Subcontracting Policy in the Airframe Industry
-
-
Day, J.S.1
-
10
-
-
84976822151
-
"Strong" NP-completeness results: Motivation, examples, and implications
-
Garey, M. R. and Johnson, D. S. (1978) "Strong" NP-completeness results: Motivation, examples, and implications. Journal of the Association for Computing Machinery, 25, pp. 499-508.
-
(1978)
Journal of the Association for Computing Machinery
, vol.25
, pp. 499-508
-
-
Garey, M.R.1
Johnson, D.S.2
-
12
-
-
55049126323
-
Subcontracting's subtle subversions
-
Ioannou, L. (1995) Subcontracting's subtle subversions. International Business, pp. 20-22.
-
(1995)
International Business
, pp. 20-22
-
-
Ioannou, L.1
-
13
-
-
85125334963
-
Subcontracting, coordination, flexibility, and production smoothing in aggregate planning
-
Kamien, M. I. and Li, L. (1990) Subcontracting, coordination, flexibility, and production smoothing in aggregate planning. Management Science, 36, pp. 1352-1363.
-
(1990)
Management Science
, vol.36
, pp. 1352-1363
-
-
Kamien, M.I.1
Li, L.2
-
14
-
-
0034188026
-
Continuous-time models for production scheduling in constrained subcontracting conditions
-
Kogan, K. (2000) Continuous-time models for production scheduling in constrained subcontracting conditions. INFOR, 38, pp. 113-125.
-
(2000)
INFOR
, vol.38
, pp. 113-125
-
-
Kogan, K.1
-
15
-
-
27144544777
-
Outsourcing is not the enemy
-
Kolawa, A. (2004) Outsourcing is not the enemy. Wall Street Journal, p. B2.
-
(2004)
Wall Street Journal
, pp. 2
-
-
Kolawa, A.1
-
16
-
-
0031380482
-
Multi-period part selection and loading problems in flexible manufacturing systems
-
Lee, D. -H., Lim, S. -K., Lee, G. -C., Jun, H. -B. and Kim, Y. -D. (1997) Multi-period part selection and loading problems in flexible manufacturing systems. Computers and Industrial Engineering, 33, pp. 541-544.
-
(1997)
Computers and Industrial Engineering
, vol.33
, pp. 541-544
-
-
Lee, D.-H.1
Lim, S.-K.2
Lee, G.-C.3
Jun, H.-B.4
Kim, Y.-D.5
-
17
-
-
0036642595
-
Advanced planning and scheduling with outsourcing in manufacturing supply chain
-
Lee, Y. H., Jeong, C. S. and Moon, C. (2002) Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering, 43, pp. 351-374.
-
(2002)
Computers and Industrial Engineering
, vol.43
, pp. 351-374
-
-
Lee, Y.H.1
Jeong, C.S.2
Moon, C.3
-
18
-
-
0000438412
-
Approximation algorithms for scheduling unrelated parallel machines
-
Lenstra, J. K., Shmoys, D. B. and Tardos, E. (1990) Approximation algorithms for scheduling unrelated parallel machines. Mathematical Programming, 46, pp. 259-271.
-
(1990)
Mathematical Programming
, vol.46
, pp. 259-271
-
-
Lenstra, J.K.1
Shmoys, D.B.2
Tardos, E.3
-
19
-
-
0031251498
-
Duplication of machines and subcontracting of parts in the presence of alternative cell locations
-
Logendran, R. and Puvanunt, V. (1997) Duplication of machines and subcontracting of parts in the presence of alternative cell locations. Computers and Industrial Engineering, 33, pp. 235-238.
-
(1997)
Computers and Industrial Engineering
, vol.33
, pp. 235-238
-
-
Logendran, R.1
Puvanunt, V.2
-
20
-
-
0031076935
-
A methodology for simultaneously dealing with machine duplication and part subcontracting in cellular manufacturing systems
-
Logendran, R. and Ramakrishna, P. (1997) A methodology for simultaneously dealing with machine duplication and part subcontracting in cellular manufacturing systems. Computers and Operations Research, 24, pp. 97-116.
-
(1997)
Computers and Operations Research
, vol.24
, pp. 97-116
-
-
Logendran, R.1
Ramakrishna, P.2
-
21
-
-
0003438602
-
-
Prentice-Hall, Upper Saddle River, NJ
-
Pinedo, M. (2002) Scheduling: Theory, Algorithms, and Systems,, Prentice-Hall, Upper Saddle River, NJ
-
(2002)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
22
-
-
0020709337
-
Analysis of a linear programming heuristic for scheduling unrelated parallel machines
-
Potts, C. N. (1985) Analysis of a linear programming heuristic for scheduling unrelated parallel machines. Discrete Applied Mathematics, 10, pp. 155-164.
-
(1985)
Discrete Applied Mathematics
, vol.10
, pp. 155-164
-
-
Potts, C.N.1
-
24
-
-
38149033826
-
Coordinated logistics scheduling for in-house production and outsourcing
-
Qi, X. (2008) Coordinated logistics scheduling for in-house production and outsourcing. IEEE Transactions on Automation Science and Engineering, 5, pp. 188-192.
-
(2008)
IEEE Transactions on Automation Science and Engineering
, vol.5
, pp. 188-192
-
-
Qi, X.1
-
25
-
-
0038309442
-
An approximation algorithm for the generalized assignment problem
-
Shmoys, D. B. and Tardos, E. (1993) An approximation algorithm for the generalized assignment problem. Mathematical Programming, 62, pp. 461-474.
-
(1993)
Mathematical Programming
, vol.62
, pp. 461-474
-
-
Shmoys, D.B.1
Tardos, E.2
-
26
-
-
3242663060
-
Production and subcontracting strategies for manufacturers with limited capacity and volatile demand
-
Tan, B. and Gershwin, S. B. (2004) Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Annals of Operations Research, 125, pp. 205-232.
-
(2004)
Annals of Operations Research
, vol.125
, pp. 205-232
-
-
Tan, B.1
Gershwin, S.B.2
-
27
-
-
0032689596
-
Coordinating investment, production, and subcontracting
-
Van Mieghem, J. A. (1999) Coordinating investment, production, and subcontracting. Management Science, 45, pp. 954-971.
-
(1999)
Management Science
, vol.45
, pp. 954-971
-
-
Van Mieghem, J.A.1
-
28
-
-
3543138970
-
Subcontracting within the supply chain for electronics assembly manufacture
-
Webster, M., Alder, C. and Muhlemann, A. P. (1997) Subcontracting within the supply chain for electronics assembly manufacture. International Journal of Operations and Production Management, 17, pp. 827-841.
-
(1997)
International Journal of Operations and Production Management
, vol.17
, pp. 827-841
-
-
Webster, M.1
Alder, C.2
Muhlemann, A.P.3
-
29
-
-
18744383359
-
A production-inventory system with Markovian capacity and outsourcing option
-
Yang, J., Qi, X. and Xia, Y. (2005) A production-inventory system with Markovian capacity and outsourcing option. Operations Research, 53, pp. 328-349.
-
(2005)
Operations Research
, vol.53
, pp. 328-349
-
-
Yang, J.1
Qi, X.2
Xia, Y.3
|