메뉴 건너뛰기




Volumn , Issue , 2006, Pages 507-512

Scheduling parallel batch processors with incompatible job families using ant colony optimization

Author keywords

Batch processor; Heuristics and ant colony optimization; Scheduling; Total weighted tardiness

Indexed keywords

ARTIFICIAL INTELLIGENCE; JOB SHOP SCHEDULING; PARALLEL PROCESSING SYSTEMS; SCHEDULING; SCHEDULING ALGORITHMS; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 45149110066     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/COASE.2006.326933     Document Type: Conference Paper
Times cited : (25)

References (20)
  • 1
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part ii: Shop-floor control
    • R. Uzsoy, C.-Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry part ii: Shop-floor control," IIE transactions, vol. 26, no. 5, pp. 44-55, 1994.
    • (1994) IIE transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 3
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • S. Webster and K. R. Baker, "Scheduling groups of jobs on a single machine," Operations research, vol. 43, no. 4, pp. 692-703, 1995.
    • (1995) Operations research , vol.43 , Issue.4 , pp. 692-703
    • Webster, S.1    Baker, K.R.2
  • 5
    • 33746921229 scopus 로고    scopus 로고
    • M. Mathirajan and A. I. . Sivakumar, A literature review, classification and simple meta-anlysis on scheduling of batch processors in semiconductor, International Journal of Advanced Manufacturing Technology, January 2006.
    • M. Mathirajan and A. I. . Sivakumar, "A literature review, classification and simple meta-anlysis on scheduling of batch processors in semiconductor," International Journal of Advanced Manufacturing Technology, January 2006.
  • 6
    • 45149087142 scopus 로고    scopus 로고
    • N. R. S. Raghavan and M. Venkataramana, Scheduling parallel batch processors with incompatible job families to minimize total weighted completion time, Department of Management Studies, Indian Institute of Science, Tech. Rep., 2006.
    • N. R. S. Raghavan and M. Venkataramana, "Scheduling parallel batch processors with incompatible job families to minimize total weighted completion time," Department of Management Studies, Indian Institute of Science, Tech. Rep., 2006.
  • 7
    • 77957077792 scopus 로고
    • A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness
    • E. L. Lawler, "A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness," Annals of Discrete Mathematics, vol. 1, pp. 343-362, 1977.
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 343-362
    • Lawler, E.L.1
  • 8
    • 0032003105 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness on a batch processing machine with incompatible job families
    • S. V. Mehta and R. Uzsoy, "Minimizing total weighted tardiness on a batch processing machine with incompatible job families," IIE Transactions, vol. 30, pp. 165-178, 1998.
    • (1998) IIE Transactions , vol.30 , pp. 165-178
    • Mehta, S.V.1    Uzsoy, R.2
  • 9
    • 1542405476 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness on single batch process machine with incompatible job families
    • Dresden, Germany
    • A. Devpura, J. W. Fowler, M. Carlyle, and I. Perez, "Minimizing total weighted tardiness on single batch process machine with incompatible job families," in Proceedings of the Symposium on Operations Research, Dresden, Germany, 2000, pp. 366-371.
    • (2000) Proceedings of the Symposium on Operations Research , pp. 366-371
    • Devpura, A.1    Fowler, J.W.2    Carlyle, M.3    Perez, I.4
  • 10
    • 4544293356 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness on a single batch process machine with compatible job families
    • I. C. Perez, J. W. Fowler, and W. M. Carlyle, "Minimizing total weighted tardiness on a single batch process machine with compatible job families," Computers & Operations Research, vol. 32, pp. 327-341, 2005.
    • (2005) Computers & Operations Research , vol.32 , pp. 327-341
    • Perez, I.C.1    Fowler, J.W.2    Carlyle, W.M.3
  • 11
    • 1542685255 scopus 로고    scopus 로고
    • Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
    • April
    • H. Balasubramanian, L. Mönch, J. Fowler, and M. Pfund, "Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness," International Journal of Production Research, vol. 42, no. 8, pp. 1621-1638, April 2004.
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1621-1638
    • Balasubramanian, H.1    Mönch, L.2    Fowler, J.3    Pfund, M.4
  • 12
    • 0031211263 scopus 로고    scopus 로고
    • Scheduling parallel machines to minimize total weighted and unweighted tardiness
    • B. Alidaee and D. Rosa, "Scheduling parallel machines to minimize total weighted and unweighted tardiness," Computers and Operations Research, vol. 24, no. 8, pp. 775-788, 1997.
    • (1997) Computers and Operations Research , vol.24 , Issue.8 , pp. 775-788
    • Alidaee, B.1    Rosa, D.2
  • 14
    • 0034612523 scopus 로고    scopus 로고
    • Inspiration for optimization from social insect behaviour
    • July
    • E. Bonabeau, M. Dorigo, and G. Theraulaz, "Inspiration for optimization from social insect behaviour," Nature, vol. 406, pp. 39-42, July 2000.
    • (2000) Nature , vol.406 , pp. 39-42
    • Bonabeau, E.1    Dorigo, M.2    Theraulaz, G.3
  • 16
    • 0142258724 scopus 로고    scopus 로고
    • An ant colony system approach for scheduling problems
    • K.-C. Ying and C.-J. Liao, "An ant colony system approach for scheduling problems," Production Planning & Control, vol. 14, pp. 68-75, 2003.
    • (2003) Production Planning & Control , vol.14 , pp. 68-75
    • Ying, K.-C.1    Liao, C.-J.2
  • 17
    • 0036682205 scopus 로고    scopus 로고
    • C. Gagné, W. WL Price, and M. Gravel, Comparing an aco algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times, Journal of the Operational Research Society, 53, pp. 895-906, 2002.
    • C. Gagné, W. WL Price, and M. Gravel, "Comparing an aco algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times," Journal of the Operational Research Society, vol. 53, pp. 895-906, 2002.
  • 18
    • 33845332680 scopus 로고    scopus 로고
    • An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups
    • In Press
    • C.-J. Liao and H.-C. Juan, "An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups," Computers and Operations Research, In Press.
    • Computers and Operations Research
    • Liao, C.-J.1    Juan, H.-C.2
  • 20
    • 34447273350 scopus 로고    scopus 로고
    • Static multi-processor scheduling with ant colony optimisation & local search,
    • Master's thesis, Artificial Intelligence School of Informatics, University of Edinburgh
    • G. Ritchie, "Static multi-processor scheduling with ant colony optimisation & local search," Master's thesis, Artificial Intelligence School of Informatics, University of Edinburgh, 2003.
    • (2003)
    • Ritchie, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.