메뉴 건너뛰기




Volumn 186, Issue 3, 2008, Pages 931-952

Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed

Author keywords

Due date related measures; Outsourcing strategy; Single machine scheduling

Indexed keywords

COST REDUCTION; ELECTRONICS INDUSTRY; HEURISTIC ALGORITHMS; NUMERICAL METHODS; SCHEDULING;

EID: 35548956964     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2007.02.015     Document Type: Article
Times cited : (48)

References (12)
  • 1
    • 0033353994 scopus 로고    scopus 로고
    • Heuristic procedures for scheduling job families with set-ups and due dates
    • Baker K.R. Heuristic procedures for scheduling job families with set-ups and due dates. Naval Research Logistics 46 (1999) 978-991
    • (1999) Naval Research Logistics , vol.46 , pp. 978-991
    • Baker, K.R.1
  • 2
    • 0036815272 scopus 로고    scopus 로고
    • Competition and outsourcing with scale economies
    • Cachon G.P., and Harker P.T. Competition and outsourcing with scale economies. Management Science 48 (2002) 1314-1333
    • (2002) Management Science , vol.48 , pp. 1314-1333
    • Cachon, G.P.1    Harker, P.T.2
  • 3
    • 27944484415 scopus 로고    scopus 로고
    • Minimizing total tardiness of orders with reentrant lots in hybrid flowshop
    • Choi S.W., Kim Y.D., and Lee G.C. Minimizing total tardiness of orders with reentrant lots in hybrid flowshop. International Journal of Production Research 43 (2005) 2149-2167
    • (2005) International Journal of Production Research , vol.43 , pp. 2149-2167
    • Choi, S.W.1    Kim, Y.D.2    Lee, G.C.3
  • 6
    • 2442616969 scopus 로고    scopus 로고
    • Vendor managed category management - an outsourcing solution in retailing
    • Kaipia R., and Tanskanen K. Vendor managed category management - an outsourcing solution in retailing. Journal of Purchasing and Supply Management 9 (2003) 165-175
    • (2003) Journal of Purchasing and Supply Management , vol.9 , pp. 165-175
    • Kaipia, R.1    Tanskanen, K.2
  • 7
    • 0042363451 scopus 로고    scopus 로고
    • Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost
    • Kim B. Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost. International Journal of Production Economics 86 (2003) 63-80
    • (2003) International Journal of Production Economics , vol.86 , pp. 63-80
    • Kim, B.1
  • 8
    • 0034516883 scopus 로고    scopus 로고
    • Integration of assembly and fabrication for make-to-order production
    • Kolisch R. Integration of assembly and fabrication for make-to-order production. International Journal of Production Economics 68 (2000) 287-306
    • (2000) International Journal of Production Economics , vol.68 , pp. 287-306
    • Kolisch, R.1
  • 9
    • 0028550668 scopus 로고
    • The total tardiness problem: Review and extensions
    • Koulamas C. The total tardiness problem: Review and extensions. Operations Research 42 (1994) 1025-1041
    • (1994) Operations Research , vol.42 , pp. 1025-1041
    • Koulamas, C.1
  • 10
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Lee Y.H., Jeong C.S., and Moon C. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computer & Industrial Engineering 43 (2002) 351-374
    • (2002) Computer & Industrial Engineering , vol.43 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 12
    • 84912978525 scopus 로고
    • Single machine tardiness sequencing heuristics
    • Potts C.N., and Van Wassenhove L.N. Single machine tardiness sequencing heuristics. IIE Transactions 23 (1991) 346-354
    • (1991) IIE Transactions , vol.23 , pp. 346-354
    • Potts, C.N.1    Van Wassenhove, L.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.