메뉴 건너뛰기




Volumn 213, Issue 3, 2011, Pages 489-497

Two-stage production scheduling with an outsourcing option

Author keywords

Approximation algorithm; Flow shop scheduling; NP completeness; Outsourcing; Scheduling

Indexed keywords

FLOW-SHOP SCHEDULING; LATEST COMPLETION TIME; MAKESPAN; NP-COMPLETENESS; NP-HARD; OUTSOURCE; SOLVABLE CASE; TWO-STAGE PRODUCTION; WEIGHTED SUM;

EID: 79957688480     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2011.03.037     Document Type: Article
Times cited : (53)

References (17)
  • 1
    • 0035435909 scopus 로고    scopus 로고
    • Capacity acquisition, subcontracting, and lot sizing
    • A. Atamturk, and D.S. Hochbaum Capacity acquisition, subcontracting, and lot sizing Management Science 47 2001 1081 1100 (Pubitemid 34192807)
    • (2001) Management Science , vol.47 , Issue.8 , pp. 1081-1100
    • Atamturk, A.1    Hochbaum, D.S.2
  • 2
    • 0035254165 scopus 로고    scopus 로고
    • Study of simple rules for subcontracting in make-to-order manufacturing
    • DOI 10.1016/S0377-2217(99)00371-9
    • J.W.M. Bertrand, and V. Sridharan A study of simple rules for subcontracting in make-to-order manufacturing European Journal of Operational Research 128 2001 509 531 (Pubitemid 32034399)
    • (2001) European Journal of Operational Research , vol.128 , Issue.3 , pp. 509-531
    • Bertrand, J.W.M.1    Sridharan, V.2
  • 3
    • 8344240489 scopus 로고    scopus 로고
    • A Brownian approximation of a production-inventory system with a manufacturer that subcontracts
    • J.R. Bradley A Brownian approximation of a production-inventory system with a manufacturer that subcontracts Operations Research 52 2004 765 784
    • (2004) Operations Research , vol.52 , pp. 765-784
    • Bradley, J.R.1
  • 4
    • 0036815272 scopus 로고    scopus 로고
    • Competition and outsourcing with scale economies
    • G.P. Cachon, and P.T. Harker Competition and outsourcing with scale economies Management Science 48 2002 1314 1333 (Pubitemid 35427816)
    • (2002) Management Science , vol.48 , Issue.10 , pp. 1314-1333
    • Cachon, G.P.1    Harker, P.T.2
  • 5
    • 55049137385 scopus 로고    scopus 로고
    • Scheduling with subcontracting options
    • Z.-L. Chen, and C.-L. Li Scheduling with subcontracting options IIE Transactions 40 2008 1171 1184
    • (2008) IIE Transactions , vol.40 , pp. 1171-1184
    • Chen, Z.-L.1    Li, C.-L.2
  • 6
    • 26044467346 scopus 로고    scopus 로고
    • A new approach to job shop scheduling problems with due date constraints considering operation subcontracts
    • DOI 10.1016/j.ijpe.2004.05.023, PII S0925527305000149, Production Research: Facing the Challenges in the New Millenium
    • D. Chung, K. Lee, K. Shin, and J. Park A new approach to job shop scheduling problems with due date constraints considering operation subcontracts International Journal of Production Economics 98 2005 238 250 (Pubitemid 41406184)
    • (2005) International Journal of Production Economics , vol.98 , Issue.2 , pp. 238-250
    • Chung, D.1    Lee, K.2    Shin, K.3    Park, J.4
  • 7
    • 0003075019 scopus 로고
    • Optimal two and three-stage production schedules with set-up times included
    • S.M. Johnson Optimal two and three-stage production schedules with set-up times included Naval Research Logistics Quarterly 1 1954 61 68
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 8
    • 35548956964 scopus 로고    scopus 로고
    • Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed
    • DOI 10.1016/j.ejor.2007.02.015, PII S0377221707002342
    • I.S. Lee, and C.S. Sung Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed European Journal of Operational Research 186 2008 931 952 (Pubitemid 350016640)
    • (2008) European Journal of Operational Research , vol.186 , Issue.3 , pp. 931-952
    • Lee, I.S.1    Sung, C.S.2
  • 9
    • 37349027573 scopus 로고    scopus 로고
    • Single machine scheduling with outsourcing allowed
    • DOI 10.1016/j.ijpe.2007.02.036, PII S0925527307001053
    • I.S. Lee, and C.S. Sung Single machine scheduling with outsourcing allowed International Journal of Production Economics 101 2008 623 634 (Pubitemid 350299157)
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 623-634
    • Lee, I.S.1    Sung, C.S.2
  • 10
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • DOI 10.1016/S0360-8352(02)00079-7, PII S0360835202000797
    • Y.H. Lee, C.S. Jeong, and C. Moon Advanced planning and scheduling with outsourcing in manufacturing supply chain Computers and Industrial Engineering 43 2002 351 374 (Pubitemid 34551917)
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 11
    • 0027906666 scopus 로고
    • An approximation algorithm for the m-machine permutation flow shop scheduling problem with controllable processing times
    • E. Nowicki An approximation algorithm for the m-machine permutation flow shop scheduling problem with controllable processing times European Journal of Operational Research 70 1993 342 349
    • (1993) European Journal of Operational Research , vol.70 , pp. 342-349
    • Nowicki, E.1
  • 12
    • 0023983808 scopus 로고
    • A two-machine flow shop scheduling problem with controllable job processing times
    • DOI 10.1016/0377-2217(88)90355-4
    • E. Nowicki, and S. Zdrzalka A two-machine flow shop scheduling problem with controllable job processing times European Journal of Operational Research 34 1988 208 220 (Pubitemid 18574372)
    • (1988) European Journal of Operational Research , vol.34 , Issue.2 , pp. 208-220
    • Nowicki, E.1    Zdrzalka, S.2
  • 13
    • 38149033826 scopus 로고    scopus 로고
    • Coordinated logistics scheduling for in-house production and outsourcing
    • X. Qi Coordinated logistics scheduling for in-house production and outsourcing IEEE Transactions on Automation Science and Engineering 5 2008 188 192
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , pp. 188-192
    • Qi, X.1
  • 14
    • 58149121493 scopus 로고    scopus 로고
    • Two-stage production scheduling with an option of outsourcing from a remote supplier
    • X. Qi Two-stage production scheduling with an option of outsourcing from a remote supplier Journal of System Science and System Engineering 18 2009 1 15
    • (2009) Journal of System Science and System Engineering , vol.18 , pp. 1-15
    • Qi, X.1
  • 15
    • 33745864880 scopus 로고    scopus 로고
    • Generating Pareto schedules with outsource and internal parallel resources
    • DOI 10.1016/j.ijpe.2005.11.010, PII S0925527306001034
    • A.J. Ruiz-Torres, J.C. Ho, and F.J. López Generating Pareto schedules with outsource and internal parallel resources International Journal of Production Economics 103 2006 810 825 (Pubitemid 44038509)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 810-825
    • Ruiz-Torres, A.J.1    Ho, J.C.2    Lopez, F.J.3
  • 17
    • 18744383359 scopus 로고    scopus 로고
    • A production-inventory system with markovian capacity and outsourcing option
    • DOI 10.1287/opre.1040.0165
    • J. Yang, X. Qi, and Y. Xia A production-inventory system with Markovian capacity and outsourcing option Operations Research 53 2005 328 349 (Pubitemid 40666162)
    • (2005) Operations Research , vol.53 , Issue.2 , pp. 328-349
    • Yang, J.1    Qi, X.2    Xia, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.