메뉴 건너뛰기




Volumn 5, Issue 1, 2008, Pages 188-192

Coordinated logistics scheduling for in-house production and outsourcing

Author keywords

Logistics; Outsourcing; Scheduling

Indexed keywords

DYNAMIC PROGRAMMING; OUTSOURCING; PROBLEM SOLVING; PRODUCTION ENGINEERING; SCHEDULING; SUPPLY CHAIN MANAGEMENT;

EID: 38149033826     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2006.887159     Document Type: Article
Times cited : (63)

References (24)
  • 1
    • 0030289711 scopus 로고    scopus 로고
    • Lot scheduling in a two-machine cell with swapping devices
    • A. Agnetis, D. Pacciarelli, and F. Rossi, "Lot scheduling in a two-machine cell with swapping devices," Trans. Inst. Ind. Eng., vol. 28, pp. 911-917, 1996.
    • (1996) Trans. Inst. Ind. Eng , vol.28 , pp. 911-917
    • Agnetis, A.1    Pacciarelli, D.2    Rossi, F.3
  • 2
    • 0035435909 scopus 로고    scopus 로고
    • Capacity acquisition, subcontracting, and lot sizing
    • A. Atamturk and D. S. Hochbaum, "Capacity acquisition, subcontracting, and lot sizing," Manage. Sci., vol. 47, pp. 1081-1100, 2001.
    • (2001) Manage. Sci , vol.47 , pp. 1081-1100
    • Atamturk, A.1    Hochbaum, D.S.2
  • 3
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • U. Bilge and G. Ulusoy, "A time window approach to simultaneous scheduling of machines and material handling system in an FMS," Oper. Res., vol. 43, pp. 1058-1070, 1995.
    • (1995) Oper. Res , vol.43 , pp. 1058-1070
    • Bilge, U.1    Ulusoy, G.2
  • 4
    • 8344240489 scopus 로고    scopus 로고
    • A Brownian approximation of a production-inventory system with a manufacturer that subcontracts
    • J. R. Bradley, "A Brownian approximation of a production-inventory system with a manufacturer that subcontracts," Oper. Res., vol. 52, pp. 765-784, 2004.
    • (2004) Oper. Res , vol.52 , pp. 765-784
    • Bradley, J.R.1
  • 5
    • 28044431608 scopus 로고    scopus 로고
    • Optimization, of processing and delivery decisions involving third-party machines
    • X. Cai, C.-Y. Lee, and G. L. Vairaktarakis, "Optimization, of processing and delivery decisions involving third-party machines," Nonlinear Anal., vol. 63, pp. 2269-2278, 2005.
    • (2005) Nonlinear Anal , vol.63 , pp. 2269-2278
    • Cai, X.1    Lee, C.-Y.2    Vairaktarakis, G.L.3
  • 6
    • 2642510666 scopus 로고    scopus 로고
    • Machine scheduling with job delivery coordination
    • Y.-C. Chang and C.-Y. Lee, "Machine scheduling with job delivery coordination," Eur. J. Oper. Res., vol. 158, pp. 470-487, 2004.
    • (2004) Eur. J. Oper. Res , vol.158 , pp. 470-487
    • Chang, Y.-C.1    Lee, C.-Y.2
  • 7
    • 0030216821 scopus 로고    scopus 로고
    • Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
    • Z.-L. Chen, "Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs," Eur. J. Oper. Res., vol. 93, pp. 49-60, 1996.
    • (1996) Eur. J. Oper. Res , vol.93 , pp. 49-60
    • Chen, Z.-L.1
  • 9
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Z.-L. Chen and G. L. Vairaktarakis, "Integrated scheduling of production and distribution operations," Manag. Sei., vol. 51, pp. 614-628, 2005.
    • (2005) Manag. Sei , vol.51 , pp. 614-628
    • Chen, Z.-L.1    Vairaktarakis, G.L.2
  • 10
    • 0030263888 scopus 로고    scopus 로고
    • Single machine scheduling with, batch deliveries
    • T. C. E. Cheng, V. S. Gordon, and M. Y. Kovalyov, "Single machine scheduling with, batch deliveries," Eur. J. Oper. Res., vol. 94, no. 2, pp. 277-283, 1996.
    • (1996) Eur. J. Oper. Res , vol.94 , Issue.2 , pp. 277-283
    • Cheng, T.C.E.1    Gordon, V.S.2    Kovalyov, M.Y.3
  • 11
    • 0035561146 scopus 로고    scopus 로고
    • Single supplier scheduling for multiple deliveries
    • T. C. E. Cheng and M. Y. Kovalyov, "Single supplier scheduling for multiple deliveries," Ann. Oper. Res., vol. 107, pp. 51-63, 2001.
    • (2001) Ann. Oper. Res , vol.107 , pp. 51-63
    • Cheng, T.C.E.1    Kovalyov, M.Y.2
  • 12
    • 26044467346 scopus 로고    scopus 로고
    • A new approach to job shop scheduling problems with due date constraints considering operation subcontracts
    • D. Chung, K. Lee, K. Shin, and J. Park, "A new approach to job shop scheduling problems with due date constraints considering operation subcontracts," Int. J. Prod. Econ., vol. 98, no. 2, pp. 238-250, 2005.
    • (2005) Int. J. Prod. Econ , vol.98 , Issue.2 , pp. 238-250
    • Chung, D.1    Lee, K.2    Shin, K.3    Park, J.4
  • 13
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • N. G. Hall and C N. Potts, "Supply chain scheduling: Batching and delivery," Oper. Res., vol. 51, pp. 566-584, 2003.
    • (2003) Oper. Res , vol.51 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 14
    • 24144473403 scopus 로고    scopus 로고
    • The coordination of scheduling and batch, deliveries
    • _, 'The coordination of scheduling and batch, deliveries," Ann. Oper. Res., vol. 135, pp. 41-64, 2005.
    • (2005) Ann. Oper. Res , vol.135 , pp. 41-64
    • Hall, N.G.1    Potts, C.N.2
  • 15
    • 0027906623 scopus 로고
    • On scheduling to minimize earliness-tardiness and batch delivery costs with a common due-date
    • J. W. Herrmann and C.-Y. Lee, "On scheduling to minimize earliness-tardiness and batch delivery costs with a common due-date," Eur. J. Oper. Res., vol. 70, pp. 272-288, 1993.
    • (1993) Eur. J. Oper. Res , vol.70 , pp. 272-288
    • Herrmann, J.W.1    Lee, C.-Y.2
  • 16
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • C.-Y. Lee and Z.-L. Chen, "Machine scheduling with transportation considerations," J. Sched., vol. 4, pp. 3-24, 2001.
    • (2001) J. Sched , vol.4 , pp. 3-24
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 17
    • 10444261222 scopus 로고    scopus 로고
    • Machine scheduling with deliveries to two customer locations
    • C-L. Li, G. Vairaktarakis, and C.-Y. Lee, "Machine scheduling with deliveries to two customer locations," Eur. J. Oper. Res., vol. 164, pp. 39-51, 2005.
    • (2005) Eur. J. Oper. Res , vol.164 , pp. 39-51
    • C-L, L.1    Vairaktarakis, G.2    Lee, C.-Y.3
  • 18
    • 18744400261 scopus 로고    scopus 로고
    • A logistics scheduling model: Inventory cost reduction by batching
    • X. Qi, "A logistics scheduling model: Inventory cost reduction by batching," Naval Res. Logist., vol. 52, pp. 312-320, 2005.
    • (2005) Naval Res. Logist , vol.52 , pp. 312-320
    • Qi, X.1
  • 19
    • 33646355472 scopus 로고    scopus 로고
    • A logistics scheduling model: Scheduling and transshipment for two processing centers
    • _, "A logistics scheduling model: scheduling and transshipment for two processing centers," Trans. Inst. Ind. Eng., vol. 38, pp. 609-618, 2006.
    • (2006) Trans. Inst. Ind. Eng , vol.38 , pp. 609-618
    • Qi, X.1
  • 20
    • 0030790585 scopus 로고    scopus 로고
    • Scheduling a two-machine flow-shop with travel times to minimize maximum, lateness
    • J. W. Stevens and D. D. Gemmill, "Scheduling a two-machine flow-shop with travel times to minimize maximum, lateness," Int. J. Prod. Res., vol. 35, pp. 1-15, 1997.
    • (1997) Int. J. Prod. Res , vol.35 , pp. 1-15
    • Stevens, J.W.1    Gemmill, D.D.2
  • 21
    • 0032689596 scopus 로고    scopus 로고
    • Coordinating investment, production, and subcontracting
    • J. A. Van Mieghem, "Coordinating investment, production, and subcontracting," Manag. Sci., vol. 45, pp. 954-971, 1999.
    • (1999) Manag. Sci , vol.45 , pp. 954-971
    • Van Mieghem, J.A.1
  • 22
    • 0034319401 scopus 로고    scopus 로고
    • Parallel machine scheduling with, batch, delivery costs
    • G. Wang and T. C. E. Cheng, "Parallel machine scheduling with, batch, delivery costs," Int. J. Prod. Econ., vol. 68, pp. 177-183, 2000.
    • (2000) Int. J. Prod. Econ , vol.68 , pp. 177-183
    • Wang, G.1    Cheng, T.C.E.2
  • 23
    • 30544435206 scopus 로고    scopus 로고
    • Production and transport logistics scheduling with two transport mode choices
    • H. Wang and C.-Y. Lee, "Production and transport logistics scheduling with two transport mode choices," Nov. Res. Logist., vol. 52, pp. 796-809, 2005.
    • (2005) Nov. Res. Logist , vol.52 , pp. 796-809
    • Wang, H.1    Lee, C.-Y.2
  • 24
    • 18744383359 scopus 로고    scopus 로고
    • A production-inventory system, with Markovian capacity and outsourcing option
    • J. Yang, X. Qi, and Y. Xia, "A production-inventory system, with Markovian capacity and outsourcing option," Oper. Res., vol. 53, pp. 328-349, 2005.
    • (2005) Oper. Res , vol.53 , pp. 328-349
    • Yang, J.1    Qi, X.2    Xia, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.