-
1
-
-
0027676858
-
Integrated genetic algorithm for optimization of space structures
-
Adeli, H.; Cheng, N. 1993. Integrated genetic algorithm for optimization of space structures, Journal of Aerospace Engineering 6(4): 315-328. http://dx.doi.org/10.1061/(ASCE)0893-1321(1993)6:4(315)
-
(1993)
Journal of Aerospace Engineering
, vol.6
, Issue.4
, pp. 315-328
-
-
Adeli, H.1
Cheng, N.2
-
3
-
-
33644753509
-
-
West Sussex, United Kingdom: John Wiley and Sons
-
Adeli, H.; Sarma, K. 2006. Cost optimization of structures-fuzzy logic, genetic algorithm, and parallel computing. West Sussex, United Kingdom: John Wiley and Sons. 222 p. http://dx.doi.org/10.1002/0470867353
-
(2006)
Cost Optimization of Structures-Fuzzy Logic, Genetic Algorithm, and Parallel Computing
-
-
Adeli, H.1
Sarma, K.2
-
4
-
-
78650349618
-
Optimization of project time-cost trade-off problem with discounted cash flows
-
Ammar, M. 2011. Optimization of project time-cost trade-off problem with discounted cash flows, Journal of Construction Engineering and Management 137(1): 65-71. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000256
-
(2011)
Journal of Construction Engineering and Management
, vol.137
, Issue.1
, pp. 65-71
-
-
Ammar, M.1
-
5
-
-
62549119569
-
Price A. Delivering best value in highways major maintenance schemes: Case study
-
Ansell, M.; Holmes, M.; Evans, R.; Pasquire, C. 2009. Price A. Delivering best value in highways major maintenance schemes: case study, Journal of Construction Engineering and Management 135(4): 235-245. http://dx.doi.org/10.1061/(ASCE)0733-9364(2009)135:4(235)
-
(2009)
Journal of Construction Engineering and Management
, vol.135
, Issue.4
, pp. 235-245
-
-
Ansell, M.1
Holmes, M.2
Evans, R.3
Pasquire, C.4
-
6
-
-
77955334631
-
Quantitative methods for design-build team selection
-
Asmar, M.; Lotfallah, W.; Whited, G.; Hanna, A. 2010. Quantitative methods for design-build team selection, Journal of Construction Engineering and Management 136(8): 904-912. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000194
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.8
, pp. 904-912
-
-
Asmar, M.1
Lotfallah, W.2
Whited, G.3
Hanna, A.4
-
7
-
-
1842588967
-
Generating future land-use and transportation plans for high-growth cities using a genetic algorithm
-
Balling, R; Powell, B.; Saito, M. 2004. Generating future land-use and transportation plans for high-growth cities using a genetic algorithm, Computer-Aided Civil and Infrastructure Engineering 19(3): 213-222. http://dx.doi.org/10.1111/j.1467-8667.2004.00349.x
-
(2004)
Computer-Aided Civil and Infrastructure Engineering
, vol.19
, Issue.3
, pp. 213-222
-
-
Balling, R.1
Powell, B.2
Saito, M.3
-
8
-
-
4544318435
-
The LP/IP hybrid method for construction time-cost trade-off analysis
-
Burns, S.; Liu, L.; Feng, C. 1996. The LP/IP hybrid method for construction time-cost trade-off analysis, Construction Management and Economics 14(3): 265-276. http://dx.doi.org/10.1080/014461996373511
-
(1996)
Construction Management and Economics
, vol.14
, Issue.3
, pp. 265-276
-
-
Burns, S.1
Liu, L.2
Feng, C.3
-
9
-
-
80054102975
-
Multicriteria synthesis of trigeneration systems considering economic and environmental aspects
-
Carvalho, M.; Lozano, M.; Serra, L. 2012. Multicriteria synthesis of trigeneration systems considering economic and environmental aspects, Applied Energy 91(1): 245-254. http://dx.doi.org/10.1016/j.apenergy.2011.09.029
-
(2012)
Applied Energy
, vol.91
, Issue.1
, pp. 245-254
-
-
Carvalho, M.1
Lozano, M.2
Serra, L.3
-
10
-
-
79955524773
-
Determination of pareto frontier in multi-objective maintenance optimization
-
Certa, A.; Galante, G.; Lupo, T.; Passannanti, G. 2011. Determination of pareto frontier in multi-objective maintenance optimization, Reliability Engineering and System Safety 96(7): 861-867. http://dx.doi.org/10.1016/j.ress.2010.12.019
-
(2011)
Reliability Engineering and System Safety
, vol.96
, Issue.7
, pp. 861-867
-
-
Certa, A.1
Galante, G.2
Lupo, T.3
Passannanti, G.4
-
11
-
-
63549109485
-
A two-phase ga model for resource-constrained project scheduling
-
Chen, P.; Weng, H. 2009. A two-phase ga model for resource-constrained project scheduling, Automation in Construction 18(4): 485-498. http://dx.doi.org/10.1016/j.autcon.2008.11.003
-
(2009)
Automation in Construction
, vol.18
, Issue.4
, pp. 485-498
-
-
Chen, P.1
Weng, H.2
-
13
-
-
33748325851
-
Comparison of two evolutionary algorithms for optimization of bridge deck repairs
-
Elbehairy, H.; Elbeltagi, E.; Hegazy, T.; Soudki, K. 2006. Comparison of two evolutionary algorithms for optimization of bridge deck repairs, Computer-Aided Civil and Infrastructure Engineering 21(8): 561-572. http://dx.doi.org/10.1111/j.1467-8667.2006.00458.x
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.8
, pp. 561-572
-
-
Elbehairy, H.1
Elbeltagi, E.2
Hegazy, T.3
Soudki, K.4
-
14
-
-
22344432656
-
Comparison among five evolutionary-based optimization algorithms
-
Elbeltagi, E.; Hegazy, T.; Grierson, D. 2005. Comparison among five evolutionary-based optimization algorithms, Advanced Engineering Informatics 19(1): 43-53. http://dx.doi.org/10.1016/j.aei.2005.01.004
-
(2005)
Advanced Engineering Informatics
, vol.19
, Issue.1
, pp. 43-53
-
-
Elbeltagi, E.1
Hegazy, T.2
Grierson, D.3
-
15
-
-
0141929393
-
Availability allocation to repairable systems with genetic algorithms: A multi-objective formulation
-
Elegbede, C.; Adjallah, K. 2003. Availability allocation to repairable systems with genetic algorithms: a multi-objective formulation, Reliability Engineering & System Safety 82(3): 319-330. http://dx.doi.org/10.1016/j.ress.2003.08.001
-
(2003)
Reliability Engineering & System Safety
, vol.82
, Issue.3
, pp. 319-330
-
-
Elegbede, C.1
Adjallah, K.2
-
16
-
-
15944361924
-
Time-cost-quality trade-off analysis for highway construction
-
El-Rayes, K.; Kandil, A. 2005. Time-cost-quality trade-off analysis for highway construction, Journal of Construction Engineering and Management 131(4): 477-486. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:4(477)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 477-486
-
-
El-Rayes, K.1
Kandil, A.2
-
17
-
-
0031185451
-
Using genetic algorithm to solve construction time-cost trade-off problems
-
Feng, C.; Liu, L.; Burns, S. 1997. Using genetic algorithm to solve construction time-cost trade-off problems, Journal of Computing in Civil Engineering 11(3): 184-189. http://dx.doi.org/10.1061/(ASCE)0887-3801(1997)11:3(184)
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.1
Liu, L.2
Burns, S.3
-
19
-
-
77952950281
-
Multiobjective optimization of time-cost trade-off using harmony search
-
Geem, Z. 2010. Multiobjective optimization of time-cost trade-off using harmony search, Journal of Construction Engineering and Management 136(6): 711-716. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000167
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.6
, pp. 711-716
-
-
Geem, Z.1
-
22
-
-
0033497302
-
Optimization of construction time-cost trade-off analysis using genetic algorithms
-
Hegazy, T. 1999. Optimization of construction time-cost trade-off analysis using genetic algorithms, Canadian Journal of Civil Engineering 26(6): 685-697. http://dx.doi.org/10.1139/l99-031
-
(1999)
Canadian Journal of Civil Engineering
, vol.26
, Issue.6
, pp. 685-697
-
-
Hegazy, T.1
-
23
-
-
0035509424
-
Simplified spreadsheet solutions II: Overall schedule optimization
-
Hegazy, T.; Ersahin, T. 2001. Simplified spreadsheet solutions II: overall schedule optimization, Journal of Construction Engineering and Management 127(6): 469-475. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:6(469)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.6
, pp. 469-475
-
-
Hegazy, T.1
Ersahin, T.2
-
25
-
-
1842484493
-
Genetic algorithm for optimization of infrastructure investment under time-resource constraint
-
Hsieh, T.; Liu, H. 2004. Genetic algorithm for optimization of infrastructure investment under time-resource constraint, Computer-Aided Civil and Infrastructure Engineering 19(3): 203-212. http://dx.doi.org/10.1111/j.1467-8667.2004.00348.x
-
(2004)
Computer-Aided Civil and Infrastructure Engineering
, vol.19
, Issue.3
, pp. 203-212
-
-
Hsieh, T.1
Liu, H.2
-
26
-
-
67449103896
-
Optimum design for smoke-control system in buildings considering robustness using CFD and genetic algorithms
-
Huang, H.; Ooka, R.; Chen, H.; Kato, S. 2009. Optimum design for smoke-control system in buildings considering robustness using CFD and genetic algorithms, Building and Environment 44(11): 2218-2227. http://dx.doi.org/10.1016/j.buildenv.2009.02.002
-
(2009)
Building and Environment
, vol.44
, Issue.11
, pp. 2218-2227
-
-
Huang, H.1
Ooka, R.2
Chen, H.3
Kato, S.4
-
27
-
-
84862892224
-
Construction project cash flow planning using the pareto optimality efficiency network model
-
Jiang, A.; Issa, R.; Malek, M. 2011. Construction project cash flow planning using the pareto optimality efficiency network model, Journal of Civil Engineering and Management 17(4): 510-519. http://dx.doi.org/10.3846/13923730.2011.604537
-
(2011)
Journal of Civil Engineering and Management
, vol.17
, Issue.4
, pp. 510-519
-
-
Jiang, A.1
Issa, R.2
Malek, M.3
-
28
-
-
75649121877
-
Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction
-
Kandil, A.; El-Rayes, K.; El-Anwar, O. 2010. Optimization research: enhancing the robustness of large-scale multiobjective optimization in construction, Journal of Construction Engineering and Management 136(1): 17-25. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000140
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.1
, pp. 17-25
-
-
Kandil, A.1
El-Rayes, K.2
El-Anwar, O.3
-
29
-
-
33745727034
-
Multi-objective optimization using genetic algorithms: A tutorial
-
Konak, A.; Coit, D.; Smith, A. 2006. Multi-objective optimization using genetic algorithms: a tutorial, Reliability Engineering & System Safety 91(9): 992-1007. http://dx.doi.org/10.1016/j.ress.2005.11.018
-
(2006)
Reliability Engineering & System Safety
, vol.91
, Issue.9
, pp. 992-1007
-
-
Konak, A.1
Coit, D.2
Smith, A.3
-
30
-
-
59249106913
-
A support vector machine model for contractor prequalification
-
Lam, K.; Palaneeswaran, E.; Yu, C. 2009. A support vector machine model for contractor prequalification, Automation in Construction 18(3): 321-329. http://dx.doi.org/10.1016/j.autcon.2008.09.007
-
(2009)
Automation in Construction
, vol.18
, Issue.3
, pp. 321-329
-
-
Lam, K.1
Palaneeswaran, E.2
Yu, C.3
-
31
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
Li, H.; Love, P. 1997. Using improved genetic algorithms to facilitate time-cost optimization, Journal of Construction Engineering and Management 123(3): 233-237. http://dx.doi.org/10.1061/(ASCE)0733-9364(1997)123:3(233)
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
32
-
-
81055140309
-
Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization
-
Liu, C.; Zhao, C.; Xu, Q. 2012. Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization, Chemical Engineering Science 68(1): 202-214. http://dx.doi.org/10.1016/j.ces.2011.09.024
-
(2012)
Chemical Engineering Science
, vol.68
, Issue.1
, pp. 202-214
-
-
Liu, C.1
Zhao, C.2
Xu, Q.3
-
33
-
-
0029470313
-
Construction time-cost trade-off analysis using LP/IP hybrid method
-
Liu, L.; Burns, S.; Feng, C. 1995. Construction time-cost trade-off analysis using LP/IP hybrid method, Journal of Construction Engineering and Management 121(4): 446-454. http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:4(446)
-
(1995)
Journal of Construction Engineering and Management
, vol.121
, Issue.4
, pp. 446-454
-
-
Liu, L.1
Burns, S.2
Feng, C.3
-
34
-
-
1642586240
-
A multiobjective genetic algorithm approach to the optimization of the technical specifications of a nuclear safety system
-
Marseguerra, M.; Zio, E.; Podofillini, L. 2004. A multiobjective genetic algorithm approach to the optimization of the technical specifications of a nuclear safety system, Reliability Engineering & System Safety 84(1): 87-99. http://dx.doi.org/10.1016/S0951-8320(03)00175-3
-
(2004)
Reliability Engineering & System Safety
, vol.84
, Issue.1
, pp. 87-99
-
-
Marseguerra, M.1
Zio, E.2
Podofillini, L.3
-
35
-
-
4544221624
-
RAMS+C informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms
-
Martorell, S.; Villanueva, J.; Carlos, S.; Nebot, Y.; Sanchez, A.; Pitarch, J. 2005. RAMS+C informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms, Reliability Engineering & System Safety 87(1): 65-75. http://dx.doi.org/10.1016/j.ress.2004.04.009
-
(2005)
Reliability Engineering & System Safety
, vol.87
, Issue.1
, pp. 65-75
-
-
Martorell, S.1
Villanueva, J.2
Carlos, S.3
Nebot, Y.4
Sanchez, A.5
Pitarch, J.6
-
36
-
-
79953821012
-
Non-dominated ranked genetic algorithm for a multi-objective mixed-model assembly line sequencing problem
-
Moradi, H.; Zandieh, M.; Mahdavi, I. 2011. Non-dominated ranked genetic algorithm for a multi-objective mixed-model assembly line sequencing problem, International Journal of Production Research 49(12): 3479-3499. http://dx.doi.org/10.1080/00207540903433882
-
(2011)
International Journal of Production Research
, vol.49
, Issue.12
, pp. 3479-3499
-
-
Moradi, H.1
Zandieh, M.2
Mahdavi, I.3
-
37
-
-
0027545671
-
Schedule compression using the direct stiffness method
-
Moselhi, O. 1993. Schedule compression using the direct stiffness method, Canadian Journal of Civil Engineering 20(1): 65-72. http://dx.doi.org/10.1139/l93-007
-
(1993)
Canadian Journal of Civil Engineering
, vol.20
, Issue.1
, pp. 65-72
-
-
Moselhi, O.1
-
38
-
-
49749102449
-
Optimizing construction time and cost using ant colony optimization approach
-
Ng, S.; Zhang, Y. 2006. Optimizing construction time and cost using ant colony optimization approach, Journal of Construction Engineering and Management 134(9): 721-728. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:9(721)
-
(2006)
Journal of Construction Engineering and Management
, vol.134
, Issue.9
, pp. 721-728
-
-
Ng, S.1
Zhang, Y.2
-
40
-
-
0342275420
-
A structural method of computing project cost polygons
-
Prager, W. 1963. A structural method of computing project cost polygons, Management Science 9(3): 394-404. http://dx.doi.org/10.1287/mnsc.9.3.394
-
(1963)
Management Science
, vol.9
, Issue.3
, pp. 394-404
-
-
Prager, W.1
-
41
-
-
33644679131
-
The optimisation of energy systems by using 3E factor: The case studies
-
Rogoža, A.; Čiuprinskas, K.; Šiupšinskas, G. 2006. The optimisation of energy systems by using 3E factor: the case studies, Journal of Civil Engineering and Management 12(1): 63-68.
-
(2006)
Journal of Civil Engineering and Management
, vol.12
, Issue.1
, pp. 63-68
-
-
Rogoža, A.1
Čiuprinskas, K.2
Šiupšinskas, G.3
-
42
-
-
27544470030
-
The multiobjective discrete optimization problem: A weighted min-max two-stage optimization approach and a bicriteria algorithm
-
Sayin, S.; Kouvelis, P. 2005. The multiobjective discrete optimization problem: a weighted min-max two-stage optimization approach and a bicriteria algorithm, Management Science 51(10): 1572-1581. http://dx.doi.org/10.1287/mnsc.1050.0413
-
(2005)
Management Science
, vol.51
, Issue.10
, pp. 1572-1581
-
-
Sayin, S.1
Kouvelis, P.2
-
43
-
-
52249089613
-
Global optimization of trusses with a modified genetic algorithm
-
Šešok, D.; Belevicius, R. 2008. Global optimization of trusses with a modified genetic algorithm, Journal of Civil Engineering and Management 14(3): 147-154. http://dx.doi.org/10.3846/1392-3730.2008.14.10
-
(2008)
Journal of Civil Engineering and Management
, vol.14
, Issue.3
, pp. 147-154
-
-
Šešok, D.1
Belevicius, R.2
-
44
-
-
77950249932
-
Global optimization of grillages using simulated annealing and high performance computing
-
Šešok, D.; Mockus, J.; Belevicius, R.; Kaceniauskas, A. 2010. Global optimization of grillages using simulated annealing and high performance computing, Journal of Civil Engineering and Management 16(1): 95-101. http://dx.doi.org/10.3846/jcem.2010.09
-
(2010)
Journal of Civil Engineering and Management
, vol.16
, Issue.1
, pp. 95-101
-
-
Šešok, D.1
Mockus, J.2
Belevicius, R.3
Kaceniauskas, A.4
-
45
-
-
19244376018
-
A simple CPM time-cost trade-off algorithm
-
Siemens, N. 1971. A simple CPM time-cost trade-off algorithm, Management Science 17(6): 354-363. http://dx.doi.org/10.1287/mnsc.17.6.B354
-
(1971)
Management Science
, vol.17
, Issue.6
, pp. 354-363
-
-
Siemens, N.1
-
46
-
-
84862853830
-
A new synthesis method of structural, technological and safety decisions (SyMAD-3)
-
Simanaviciene, R.; Liaudanskiene, R.; Ustinovichius, L. 2012. A new synthesis method of structural, technological and safety decisions (SyMAD-3), Journal of Civil Engineering and Management 18(2): 265-276. http://dx.doi.org/10.3846/13923730.2012.666504
-
(2012)
Journal of Civil Engineering and Management
, vol.18
, Issue.2
, pp. 265-276
-
-
Simanaviciene, R.1
Liaudanskiene, R.2
Ustinovichius, L.3
-
47
-
-
79960021719
-
Mathematical modelling of dispute proceedings between investors and third parties on allegedly violated third-party rights
-
Šostak, O.; Vakrinien, S. 2011. Mathematical modelling of dispute proceedings between investors and third parties on allegedly violated third-party rights, Journal of Civil Engineering and Management 17(1): 126-136. http://dx.doi.org/10.3846/13923730.2011.560628
-
(2011)
Journal of Civil Engineering and Management
, vol.17
, Issue.1
, pp. 126-136
-
-
Šostak, O.1
Vakrinien, S.2
-
48
-
-
81855184564
-
Quality management programs in the construction industry: Best value compared with other methodologies
-
Sullivan, K. 2011. Quality management programs in the construction industry: best value compared with other methodologies, Journal of Management in Engineering 27(4): 210-219. http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000054
-
(2011)
Journal of Management in Engineering
, vol.27
, Issue.4
, pp. 210-219
-
-
Sullivan, K.1
-
49
-
-
62749140792
-
Design and management strategies for mixed public private transportation networks: A meta-heuristic approach
-
Unnikrishnan, A.; Valsaraj, V.; Damnjanovic, I. 2009. Design and management strategies for mixed public private transportation networks: a meta-heuristic approach, Computer-Aided Civil and Infrastructure Engineering 24(4): 266-279. http://dx.doi.org/10.1111/j.1467-8667.2008.00587.x
-
(2009)
Computer-Aided Civil and Infrastructure Engineering
, vol.24
, Issue.4
, pp. 266-279
-
-
Unnikrishnan, A.1
Valsaraj, V.2
Damnjanovic, I.3
-
50
-
-
77953765281
-
Integrated load optimization of elastic-plastic axisymmetric plates at shakedown
-
Venskus, A.; Kalanta, S.; Atkočiu¯nas, J.; Ulitinas, T. 2010. Integrated load optimization of elastic-plastic axisymmetric plates at shakedown, Journal of Civil Engineering and Management 16(2): 203-208. http://dx.doi.org/10.3846/jcem.2010.22
-
(2010)
Journal of Civil Engineering and Management
, vol.16
, Issue.2
, pp. 203-208
-
-
Venskus, A.1
Kalanta, S.2
Atkočiunas, J.3
Ulitinas, T.4
-
51
-
-
12744266507
-
Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
-
Zheng, D.; Ng, S. 2005b. Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front, Journal of Construction Engineering and Management 131(2): 176-186. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:2(176)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.2
, pp. 176-186
-
-
Zheng, D.1
Ng, S.2
-
52
-
-
2342615793
-
Applying a genetic algorithm-based multiobjective approach for timecost optimization
-
Zheng, D.; Ng, S.; Kumaraswamy, M. 2004. Applying a genetic algorithm-based multiobjective approach for timecost optimization, Journal of Construction Engineering and Management 130(2): 168-176. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:2(168)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.2
, pp. 168-176
-
-
Zheng, D.1
Ng, S.2
Kumaraswamy, M.3
-
53
-
-
12344265028
-
Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
-
Zheng, D.; Ng, S.; Kumaraswamy, M. 2005a. Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization, Journal of Construction Engineering and Management 131(1): 81-91. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:1(81)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 81-91
-
-
Zheng, D.1
Ng, S.2
Kumaraswamy, M.3
|