Construction project cash flow planning using the pareto optimality efficiency network model

Author keywords

Cash flow planning; Multiple objective; Network model; Pareto optimality

Indexed keywords

BUDGET CONSTRAINT; CASH FLOW; CASH FLOW MANAGEMENT; CASH-FLOW FORECASTS; CONSTRUCTION PROJECTS; DECISION MAKING TOOL; FINANCIAL MARKET; MULTI OBJECTIVE; MULTIPLE-OBJECTIVE; NETWORK MODELS; PARETO-OPTIMALITY; PROJECT COST; REAL-WORLD PROBLEM; REASONABLE ACCURACY;

EID: 84862892224     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/13923730.2011.604537     Document Type: Article
Times cited : (28)

References (18)
  • 1
    • 0035452591 scopus 로고    scopus 로고
    • A linear programming model for cash flow management in the Brazilian construction industry
    • DOI 10.1080/01446190110044834
    • Barbosa, P. S. F.; Pimentel, P. R. 2001. A linear programming model for cash flow management in the Brazilian construction industry, Construction Management and Economics 19(5): 469-479. (Pubitemid 32635988)
    • (2001) Construction Management and Economics , vol.19 , Issue.5 , pp. 469-479
    • Barbosa, P.S.F.1    Pimentel, P.R.2
  • 2
    • 30644462480 scopus 로고    scopus 로고
    • A novel multiple linear regression model for forecasting S-curves
    • DOI 10.1108/09699980610646511
    • Blyth, K.; Kaka, A. 2006. A novel multiple linear regression model for forecasting S-curves, Engineering, Construction and Architectural Management 13(1): 82-95. doi:10.1108/09699980610646511 (Pubitemid 43089137)
    • (2006) Engineering, Construction and Architectural Management , vol.13 , Issue.1 , pp. 82-95
    • Blyth, K.1    Kaka, A.2
  • 3
    • 0036142437 scopus 로고    scopus 로고
    • An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows
    • DOI 10.1080/01446190110089718
    • Chiu, H. N.; Tsai, D. M. 2002. An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows, Construction Management and Economics 20(1): 55-66. doi:10.1080/ 01446190110089718 (Pubitemid 34057506)
    • (2002) Construction Management and Economics , vol.20 , Issue.1 , pp. 55-66
    • Chiu H.N. Tsai, D.M.1
  • 4
    • 13944269539 scopus 로고    scopus 로고
    • Finance-based scheduling of construction projects using integer programming
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(15)
    • Elazouni, A. M.; Gab-Allah, A. A. 2004. Finance-based scheduling of construction projects using integer programming, Journal of Construction Engineering and Management ASCE 130(1): 15-24. doi:10.1061/(ASCE)0733-9364(2004) 130:1(15) (Pubitemid 40265401)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 15-24
    • Elazouni, A.M.1    Gab-Allah, A.A.2
  • 5
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(400)
    • Elazouni, A. M.; Metwally, F. G. 2005. Finance-based scheduling: tool to maximize project profit using improved genetic algorithms, Journal of Construction Engineering and Management ASCE 131(4): 400-412. doi:10.1061/(ASCE)0733-9364(2005)131:4(400) (Pubitemid 40430136)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 400-412
    • Elazouni, A.M.1    Metwally, F.G.2
  • 6
    • 0041545757 scopus 로고
    • Preliminary cumulative cash flow analysis
    • Gates, M.; Scarpa, A. 1979. Preliminary cumulative cash flow analysis, Cost Engineering 21(6): 243-249.
    • (1979) Cost Engineering , vol.21 , Issue.6 , pp. 243-249
    • Gates, M.1    Scarpa, A.2
  • 8
    • 84948869101 scopus 로고
    • Net cashflow models: Are they reliable?
    • doi:10.1080/01446199100000023
    • Kaka, A. P.; Price, A. D. F. 1991. Net cashflow models: Are they reliable?, Construction Management and Economics 9(3): 291-308. doi:10.1080/01446199100000023
    • (1991) Construction Management and Economics , vol.9 , Issue.3 , pp. 291-308
    • Kaka, A.P.1    Price, A.D.F.2
  • 9
    • 0344463113 scopus 로고
    • Modelling standard cost commitment curves for contractors cash flow forecasting
    • doi:10.1080/01446199300000027
    • Kaka, A. P.; Price, A. D. F. 1993. Modelling standard cost commitment curves for contractors cash flow forecasting, Construction Management and Economics 11(4): 271-283. doi:10.1080/01446199300000027
    • (1993) Construction Management and Economics , vol.11 , Issue.4 , pp. 271-283
    • Kaka, A.P.1    Price, A.D.F.2
  • 10
    • 0001785657 scopus 로고    scopus 로고
    • Towards more flexible and accurate cash flow forecasting
    • Kaka, A. P. 1996. Towards more flexible and accurate cash flow forecasting, Construction Management and Economics 14(1): 35-44. doi:10.1080/01446199600000005 (Pubitemid 126662944)
    • (1996) Construction Management and Economics , vol.14 , Issue.1 , pp. 35-44
    • Kaka, A.P.1
  • 11
    • 0001418264 scopus 로고
    • Economic optimization of construction project scheduling
    • Karshenas, S.; Haber, D. 1990. Economic optimization of construction project scheduling, Construction Management and Economics 8 (2): 135-146.
    • (1990) Construction Management and Economics , vol.8 , Issue.2 , pp. 135-146
    • Karshenas, S.1    Haber, D.2
  • 12
    • 45849109552 scopus 로고    scopus 로고
    • Resource-constrained construction project scheduling model for profit maximization considering cash flow
    • doi:10.1016/j.autcon.2008.04.006
    • Liu, S.-S.; Wang, C.-J. 2008. Resource-constrained construction project scheduling model for profit maximization considering cash flow, Automation in Construction 17(8): 966-974. doi:10.1016/j.autcon.2008.04.006
    • (2008) Automation in Construction , vol.17 , Issue.8 , pp. 966-974
    • Liu, S.-S.1    Wang, C.-J.2
  • 13
    • 77449159674 scopus 로고    scopus 로고
    • Two-stage profit optimization model for linear scheduling problems considering cash flow
    • doi:10.1080/01446190903233111
    • Liu, S.-S.; Wang, C.-J. 2009. Two-stage profit optimization model for linear scheduling problems considering cash flow, Construction Management and Economics 27(11): 1023-1037. doi:10.1080/01446190903233111
    • (2009) Construction Management and Economics , vol.27 , Issue.11 , pp. 1023-1037
    • Liu, S.-S.1    Wang, C.-J.2
  • 14
    • 78649279880 scopus 로고    scopus 로고
    • Profit optimization for multiple scheduling problems considering cash flow
    • doi:10.1061/(ASCE)CO.1943-7862.0000235
    • Liu, S.-S.; Wang, C.-J. 2010. Profit optimization for multiple scheduling problems considering cash flow, Journal of Construction Engineering and Management ASCE 136(12): 1268-1278. doi:10.1061/(ASCE)CO.1943-7862.0000235
    • (2010) Journal of Construction Engineering and Management ASCE , vol.136 , Issue.12 , pp. 1268-1278
    • Liu, S.-S.1    Wang, C.-J.2
  • 15
    • 0004551714 scopus 로고
    • Resource-based model for automatic cash-flow forecasting
    • doi:10.1080/01446199500000058
    • Navon, R. 1995. Resource-based model for automatic cash-flow forecasting, Construction Management and Economics 13(6): 501-510. doi:10.1080/ 01446199500000058
    • (1995) Construction Management and Economics , vol.13 , Issue.6 , pp. 501-510
    • Navon, R.1
  • 16
    • 0029764712 scopus 로고    scopus 로고
    • Company-level cash-flow management
    • doi:10.1061/(ASCE)0733-9364(1996)122:1(22)
    • Navon, R. 1996. Company-level cash-flow management, Journal of Construction Engineering and Management ASCE 122(1): 22-29. doi:10.1061/(ASCE) 0733-9364(1996)122:1(22)
    • (1996) Journal of Construction Engineering and Management ASCE , vol.122 , Issue.1 , pp. 22-29
    • Navon, R.1
  • 17
    • 26644469855 scopus 로고    scopus 로고
    • Cash flow forecasting model for general contractors using moving weights of cost categories
    • DOI 10.1061/(ASCE)0742-597X(2005)21:4(164)
    • Park, H. K.; Han, S. H.; Russell, J. S. 2005. Cash flow forecasting model for general contractors using moving weights of cost categories, Journal of Management in Engineering ASCE 21(4): 164-172. doi:10.1061/(ASCE)0742-597X(2005) 21:4(164) (Pubitemid 41441335)
    • (2005) Journal of Management in Engineering , vol.21 , Issue.4 , pp. 164-172
    • Park, H.K.1    Han, S.H.2    Russell, J.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.