메뉴 건너뛰기




Volumn 136, Issue 8, 2010, Pages 904-912

Quantitative methods for design-build team selection

Author keywords

Bids; Construction industry; Design build; Monte Carlo method; Quantitative analysis; Selection

Indexed keywords

BRIDGE REPLACEMENT; DESIGN/BUILD; EVALUATION PROCESS; HIGHWAY PROJECTS; HUMAN ERRORS; MATHEMATICAL ANALYSIS; MINNEAPOLIS; MISSISSIPPI RIVER; MONTE CARLO; POTENTIAL SOURCES; PROJECT DELIVERY SYSTEMS; QUALITATIVE CRITERIA; QUANTITATIVE ANALYSIS; QUANTITATIVE METHOD; SCORE NORMALIZATION; SELECTION PROCESS; SPACE VOLUME; STATISTICAL SAMPLING; TECHNICAL ASPECTS; TRANSPORTATION AGENCIES; WEIGHTING MODEL;

EID: 77955334631     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000194     Document Type: Article
Times cited : (31)

References (21)
  • 3
    • 0000813914 scopus 로고
    • Scoring and profitability models for evaluating and selecting engineering projects
    • OPREAI 0030-364X, 10.1287/opre.13.4.550
    • Dean, B. V., and Nishry, M. J. (1965). " Scoring and profitability models for evaluating and selecting engineering projects.." Oper. Res. OPREAI 0030-364X, 13, 550-569. 10.1287/opre.13.4.550
    • (1965) Oper. Res. , vol.13 , pp. 550-569
    • Dean, B.V.1    Nishry, M.J.2
  • 4
    • 32944469606 scopus 로고    scopus 로고
    • Comparing procurement methods for design-build projects
    • DOI 10.1061/(ASCE)0733-9364(2006)132:3(230)
    • El Wardani, M. A., Messner, J. I., and Horman, M. J. (2006). " Comparing procurement methods for design/build projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (3), 230-238. 10.1061/(ASCE)0733-9364(2006)132: 3(230) (Pubitemid 43260123)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 230-238
    • El Wardani, M.A.1    Messner, J.I.2    Horman, M.J.3
  • 5
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • CMECF3 0144-6193, 10.1080/014461900407356
    • Fong, P. S.-W., and Choi, S. K.-Y. (2000). " Final contractor selection using the analytical hierarchy process.." Constr. Manage. Econom. CMECF3 0144-6193, 18, 547-557. 10.1080/014461900407356
    • (2000) Constr. Manage. Econom. , vol.18 , pp. 547-557
    • Fong, P.S.-W.1    Choi, S.K.-Y.2
  • 6
    • 0010137271 scopus 로고    scopus 로고
    • Best-value contracting criteria
    • CSTEDM 0274-9696
    • Gransberg, D. D., and Ellicott, M. A. (1997). " Best-value contracting criteria.." Cost Eng. CSTEDM 0274-9696, 39 (6), 31-34.
    • (1997) Cost Eng. , vol.39 , Issue.6 , pp. 31-34
    • Gransberg, D.D.1    Ellicott, M.A.2
  • 7
    • 77955335206 scopus 로고    scopus 로고
    • Does design/build project delivery affect the future of the public engineer?
    • (CD-ROM), Transportation Research Board of the National Academies, Washington, D.C.
    • Gransberg, D. D., and Molenaar, K. R. (2003). " Does design/build project delivery affect the future of the public engineer? " Proc., Transportation Research Record: TRB 2008 Annual Meeting (CD-ROM), Transportation Research Board of the National Academies, Washington, D.C., 13-20.
    • (2003) Proc., Transportation Research Record: TRB 2008 Annual Meeting , pp. 13-20
    • Gransberg, D.D.1    Molenaar, K.R.2
  • 9
    • 0033366422 scopus 로고    scopus 로고
    • Design-build contract award methods for transportation projects
    • DOI 10.1061/(ASCE)0733-947X(1999)125:6(565)
    • Gransberg, D. D., and Senadheera, S. P. (1999). " Design-build contract award methods for transportation projects.." J. Transp. Eng. JTPEDI 0733-947X, 125 (6), 265-267. 10.1061/(ASCE)0733-947X(1999)125:6(565) (Pubitemid 30498979)
    • (1999) Journal of Transportation Engineering , vol.125 , Issue.6 , pp. 565-567
    • Gransberg, D.D.1    Senadheera, S.P.2
  • 10
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequalification data: Selection criteria and project success factors
    • CMECF3 0144-6193, 10.1080/01446199700000002
    • Hatush, Z., and Skitmore, M. (1997). " Evaluating contractor prequalification data: Selection criteria and project success factors.." Constr. Manage. Econom. CMECF3 0144-6193, 15, 129-147. 10.1080/01446199700000002
    • (1997) Constr. Manage. Econom. , vol.15 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 11
    • 0032023054 scopus 로고    scopus 로고
    • Contractor selection using multicriteria utility theory: An additive model
    • BUSCBC 0360-1323, 10.1016/S0360-1323(97)00016-4
    • Hatush, Z., and Skitmore, M. R. (1998). " Contractor selection using multicriteria utility theory: An additive model.." Build. Environ. BUSCBC 0360-1323, 33 (2-3), 105-115. 10.1016/S0360-1323(97)00016-4
    • (1998) Build. Environ. , vol.33 , Issue.23 , pp. 105-115
    • Hatush, Z.1    Skitmore, M.R.2
  • 12
    • 0026838162 scopus 로고
    • Multiparameter bidding system-innovation in contract administration
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1992)118:1(142)
    • Herbsman, Z., and Ellis, R. (1992). " Multiparameter bidding system-innovation in contract administration.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 118 (1), 142-150. 10.1061/(ASCE)0733-9364(1992)118:1(142)
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 142-150
    • Herbsman, Z.1    Ellis, R.2
  • 14
    • 77955310283 scopus 로고    scopus 로고
    • Minnesota DOT Minnesota DOT website, (July 15, 2008)
    • Minnesota DOT. (2007). " Instructions to proposers.." Minnesota DOT website, 〈 http://www.dot.state.mn.us/i35wbridge/rebuild/contractor. html 〉 (July 15, 2008).
    • (2007) Instructions to Proposers
  • 15
    • 0032208060 scopus 로고    scopus 로고
    • Model for public sector design/build project selection
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1998)124:6(467)
    • Molenaar, K. R., and Songer, A. D. (1998). " Model for public sector design/build project selection.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (6), 467-479. 10.1061/(ASCE)0733-9364(1998)124:6(467)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 467-479
    • Molenaar, K.R.1    Songer, A.D.2
  • 16
    • 3242721188 scopus 로고    scopus 로고
    • Targeting optimum value in public sector projects through best value'-focused contractor selection
    • 10.1108/09699980310509390
    • Palaneeswaran, E., Kumaraswamy, M., and Ng, T. (2003). " Targeting optimum value in public sector projects through best value'-focused contractor selection.." Construc. Architect. Manage., 10 (6), 418-431. 10.1108/09699980310509390
    • (2003) Construc. Architect. Manage. , vol.10 , Issue.6 , pp. 418-431
    • Palaneeswaran, E.1    Kumaraswamy, M.2    Ng, T.3
  • 19
    • 0042951149 scopus 로고
    • Decision models for analysis and evaluation of construction contractors
    • CMECF3 0144-6193, 10.1080/01446199200000018
    • Russell, J. S. (1992). " Decision models for analysis and evaluation of construction contractors.." Constr. Manage. Econom. CMECF3 0144-6193, 10, 185-202. 10.1080/01446199200000018
    • (1992) Constr. Manage. Econom. , vol.10 , pp. 185-202
    • Russell, J.S.1
  • 20
    • 33646543687 scopus 로고    scopus 로고
    • Legal challenge to a best-value procurement system
    • LMEEAZ 1532-6748, 10.1061/(ASCE)1532-6748(2006)6:1(20)
    • Shane, J. S., Gransberg, D. D., Molenaar, K. R., and Gladake, J. R. (2006). " Legal challenge to a best-value procurement system.." Leadership Manage. Eng. LMEEAZ 1532-6748, 6 (1), 20-25. 10.1061/(ASCE)1532- 6748(2006)6:1(20)
    • (2006) Leadership Manage. Eng. , vol.6 , Issue.1 , pp. 20-25
    • Shane, J.S.1    Gransberg, D.D.2    Molenaar, K.R.3    Gladake, J.R.4
  • 21
    • 12344271940 scopus 로고    scopus 로고
    • A fuzzy decision framework for contractor selection
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(62)
    • Singh, D., and Tiong, R. L. K. (2005). " A fuzzy decision framework for contractor selection.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (1), 62-70. 10.1061/(ASCE)0733-9364(2005)131:1(62) (Pubitemid 40135233)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 62-70
    • Singh, D.1    Tiong, R.L.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.