메뉴 건너뛰기




Volumn 18, Issue 1, 2015, Pages 67-84

A comparative study of multi criteria decision making approaches for risks assessment in supply chain

Author keywords

Alternatives; Analytical network process; ANP; MOORA; Multi objective optimisation by ratio analysis; Risks; SCM; Supply chain management

Indexed keywords


EID: 84918512693     PISSN: 17460972     EISSN: 17460980     Source Type: Journal    
DOI: 10.1504/IJBIS.2015.066128     Document Type: Article
Times cited : (32)

References (63)
  • 1
    • 33748693686 scopus 로고    scopus 로고
    • Modelling the metrics of lean, agile and leagile supply chain: An ANP-based approach
    • Agarwal, A. and Shankar, R. (2005) 'Modelling the metrics of lean, agile and leagile supply chain: an ANP-based approach', European Journal of Operational Research, Vol. 173, No. 1, pp.211-225.
    • (2005) European Journal of Operational Research , vol.173 , Issue.1 , pp. 211-225
    • Agarwal, A.1    Shankar, R.2
  • 3
    • 59349113588 scopus 로고    scopus 로고
    • Selection of lean manufacturing system using analytical network process - A case study
    • Anand, G. and Kodali, R. (2009) 'Selection of lean manufacturing system using analytical network process - a case study', Journal of Manufacturing Technology Management, Vol. 20, No. 2, pp.258-289.
    • (2009) Journal of Manufacturing Technology Management , vol.20 , Issue.2 , pp. 258-289
    • Anand, G.1    Kodali, R.2
  • 4
    • 84873908906 scopus 로고    scopus 로고
    • Development of analytic network process for the selection of material handling systems in the design of flexible manufacturing systems FMS
    • Anand, G., Kodali, B.R. and Kumar, S. (2011) 'Development of analytic network process for the selection of material handling systems in the design of flexible manufacturing systems FMS', Journal of Advances in Management Research, Vol. 8, No. 1, pp.123-147.
    • (2011) Journal of Advances in Management Research , vol.8 , Issue.1 , pp. 123-147
    • Anand, G.1    Kodali, B.R.2    Kumar, S.3
  • 6
    • 33747140007 scopus 로고    scopus 로고
    • Use of analytic network process in vendor selection decisions
    • Bayazit, O. (2006) 'Use of analytic network process in vendor selection decisions', Benchmarking: An International Journal, Vol. 13, No. 5, pp.566-579.
    • (2006) Benchmarking: An International Journal , vol.13 , Issue.5 , pp. 566-579
    • Bayazit, O.1
  • 7
    • 27844542118 scopus 로고    scopus 로고
    • An empirically derived agenda of critical research issues for managing supply-chain disruptions
    • Blackhurst, J. (2005) 'An empirically derived agenda of critical research issues for managing supply-chain disruptions', International Journal of Production Research, Vol. 43, No. 19, pp.4067-4081.
    • (2005) International Journal of Production Research , vol.43 , Issue.19 , pp. 4067-4081
    • Blackhurst, J.1
  • 10
    • 84918512211 scopus 로고    scopus 로고
    • The MOORA method and its application to privatization a transition economy, control and cybernetics
    • Brauers, W.K.M. and Zavadskas, E.K. (2006) 'The MOORA method and its application to privatization a transition economy, control and cybernetics', Systems Research Institute of the Polish Academy of Sciences, Vol. 352, No. 2, pp.445-469.
    • (2006) Systems Research Institute of the Polish Academy of Sciences , vol.352 , Issue.2 , pp. 445-469
    • Brauers, W.K.M.1    Zavadskas, E.K.2
  • 11
    • 70949104994 scopus 로고    scopus 로고
    • Robustness of the multiobjective MOORA method with a test for the facilities sector, Technological and Economic Development of Economy
    • Brauers, W.K.M. and Zavadskas, E.K. (2009) 'Robustness of the multiobjective MOORA method with a test for the facilities sector', Technological and Economic Development of Economy: Baltic Journal on Sustainability, Vol. 152, No. 2, pp.352-375.
    • (2009) Baltic Journal on Sustainability , vol.152 , Issue.2 , pp. 352-375
    • Brauers, W.K.M.1    Zavadskas, E.K.2
  • 12
    • 53349156737 scopus 로고    scopus 로고
    • Multi objective decision making for road design
    • Brauers, W.K.M., Zavadskas, E.K., Peldschus, F. and Turskis, Z. (2008) 'Multi objective decision making for road design', Transport, Vol. 23, No. 3, pp.183-193.
    • (2008) Transport , vol.23 , Issue.3 , pp. 183-193
    • Brauers, W.K.M.1    Zavadskas, E.K.2    Peldschus, F.3    Turskis, Z.4
  • 14
    • 84876346130 scopus 로고    scopus 로고
    • Supply chain risk assessment during new product development: A group decision making approach using numeric and linguistic data
    • Chaudhuri, A. Mohanty, B.K. and Singh, K.N. (2013) 'Supply chain risk assessment during new product development: a group decision making approach using numeric and linguistic data', International Journal of Production Research, Vol. 51, No. 10, pp.2790-2804.
    • (2013) International Journal of Production Research , vol.51 , Issue.10 , pp. 2790-2804
    • Chaudhuri, A.1    Mohanty, B.K.2    Singh, K.N.3
  • 15
    • 84873455421 scopus 로고    scopus 로고
    • Supply chain operational risk mitigation: A collaborative approach
    • Chen, J., Amrik, S.S. and Daniel, I.P. (2013) 'Supply chain operational risk mitigation: a collaborative approach', International Journal of Production Research, Vol. 57, No. 1, pp.2186-2199.
    • (2013) International Journal of Production Research , vol.57 , Issue.1 , pp. 2186-2199
    • Chen, J.1    Amrik, S.S.2    Daniel, I.P.3
  • 16
    • 0033634601 scopus 로고    scopus 로고
    • The agile supply chain, competing in volatile markets
    • Christopher, M. (2000) 'The agile supply chain, competing in volatile markets', Industrial Marketing Management, Vol. 29, No. 1, pp.37-44.
    • (2000) Industrial Marketing Management , vol.29 , Issue.1 , pp. 37-44
    • Christopher, M.1
  • 17
    • 84918586722 scopus 로고    scopus 로고
    • Development of a media selection model using the analytic network process
    • Coulter, K. and Sarkis, J. (2006) 'Development of a media selection model using the analytic network process', International Journal of advertising, Vol. 24, No. 2, pp.192-215.
    • (2006) International Journal of Advertising , vol.24 , Issue.2 , pp. 192-215
    • Coulter, K.1    Sarkis, J.2
  • 18
    • 71749087256 scopus 로고    scopus 로고
    • A fuzzy analytic network process ANP model for measurement of the sectoral competition level SCL
    • Dagdeviren, M. and Yuksel, I. (2007) 'A fuzzy analytic network process ANP model for measurement of the sectoral competition level SCL', Expert Systems with Applications, Vol. 37, No. 2, pp.1005-1014.
    • (2007) Expert Systems with Applications , vol.37 , Issue.2 , pp. 1005-1014
    • Dagdeviren, M.1    Yuksel, I.2
  • 19
    • 84893055058 scopus 로고    scopus 로고
    • Comparative evaluation of Indian technical institutions using fuzzy AHP and MOORA
    • Das, M.C., Sarkar, B. and Ray, S. (2012) 'Comparative evaluation of Indian technical institutions using fuzzy AHP and MOORA', Int. J. Multicriteria Decision Making, Vol. 2, No. 1, pp.74-93.
    • (2012) Int. J. Multicriteria Decision Making , vol.2 , Issue.1 , pp. 74-93
    • Das, M.C.1    Sarkar, B.2    Ray, S.3
  • 20
  • 21
    • 84880008446 scopus 로고    scopus 로고
    • Application of MOORA method for parametric optimization of milling process
    • Dindigul
    • Gadakh, V.S. (2011) 'Application of MOORA method for parametric optimization of milling process', International Journal of Applied Engineering Research, Vol. 1, No. 4, p.11, Dindigul.
    • (2011) International Journal of Applied Engineering Research , vol.1 , Issue.4 , pp. 11
    • Gadakh, V.S.1
  • 22
    • 3042734985 scopus 로고    scopus 로고
    • Information systems in supply chain integration and management
    • Gunasekaran, A. and Ngai, E.W.T. (2004) 'Information systems in supply chain integration and management', European Journal of Operational Research, Vol. 159, No. 2, pp.269-295.
    • (2004) European Journal of Operational Research , vol.159 , Issue.2 , pp. 269-295
    • Gunasekaran, A.1    Ngai, E.W.T.2
  • 24
    • 0033702654 scopus 로고    scopus 로고
    • Environmental supply chain dynamics
    • Hall, J. (2000) 'Environmental supply chain dynamics', Journal of Cleaner Production, Vol. 8, No. 6, pp.455-471.
    • (2000) Journal of Cleaner Production , vol.8 , Issue.6 , pp. 455-471
    • Hall, J.1
  • 25
    • 20944448179 scopus 로고    scopus 로고
    • Association between supply chain glitches and operating performance
    • Hendricks, K.B. and Singhal, V.R., (2005) 'Association between supply chain glitches and operating performance', Management Science, Vol. 51, No. 5, pp.695-711.
    • (2005) Management Science , vol.51 , Issue.5 , pp. 695-711
    • Hendricks, K.B.1    Singhal, V.R.2
  • 26
    • 33748259237 scopus 로고    scopus 로고
    • Selection of logistics service provider: An analytic network process ANP approach
    • Jharkharia, S. and Shankar, R. (2007) 'Selection of logistics service provider: an analytic network process ANP approach', Omega, Vol. 35, No. 3, pp.274-289.
    • (2007) Omega , vol.35 , Issue.3 , pp. 274-289
    • Jharkharia, S.1    Shankar, R.2
  • 27
    • 53349124719 scopus 로고    scopus 로고
    • Multicriteria evaluation of inner climate by using MOORA method
    • Kalibatas, D. and Turskis, Z. (2008) 'Multicriteria evaluation of inner climate by using MOORA method', Information Technology and Control, Vol. 37, No. 1, pp.79-83.
    • (2008) Information Technology and Control , vol.37 , Issue.1 , pp. 79-83
    • Kalibatas, D.1    Turskis, Z.2
  • 28
    • 84856443299 scopus 로고    scopus 로고
    • Application of multi-objective optimization on the basis of ratio analysis MOORA, method for material selection
    • Karande, P. and Chakraborty, S. (2012) 'Application of multi-objective optimization on the basis of ratio analysis MOORA, method for material selection', Mater. Des., Vol. 37, pp.317-324
    • (2012) Mater. Des. , vol.37 , pp. 317-324
    • Karande, P.1    Chakraborty, S.2
  • 29
    • 0032675021 scopus 로고    scopus 로고
    • Agility, adaptability and leanness: A comparison of concepts and a study of practice
    • Katayama, H. and Bennett, D. (1999) 'Agility, adaptability and leanness: a comparison of concepts and a study of practice', International Journal of Production Economics, Vol. 60, No. 61, pp.43-51.
    • (1999) International Journal of Production Economics , vol.60 , Issue.61 , pp. 43-51
    • Katayama, H.1    Bennett, D.2
  • 30
    • 73049089364 scopus 로고    scopus 로고
    • An analytic network process approach to measuring design change impacts in modular products
    • Lee, H., Seol, H., Sung, N., Hong, Y.S. and Park, Y. (2010) 'An analytic network process approach to measuring design change impacts in modular products', Journal of Engineering Design, Vol. 21, No. 1, pp.75-91.
    • (2010) Journal of Engineering Design , vol.21 , Issue.1 , pp. 75-91
    • Lee, H.1    Seol, H.2    Sung, N.3    Hong, Y.S.4    Park, Y.5
  • 31
    • 0001443953 scopus 로고    scopus 로고
    • Introduction to the special issue on global supply chain management
    • Lee, H.L. and Ng, S.M. (1997) 'Introduction to the special issue on global supply chain management', Production and Operations Management, Vol. 6, No. 3, pp.191-192.
    • (1997) Production and Operations Management , vol.6 , Issue.3 , pp. 191-192
    • Lee, H.L.1    Ng, S.M.2
  • 32
    • 0037360383 scopus 로고    scopus 로고
    • Cause, consequence and control: Towards a theoretical and practical model of operational risk
    • Lewis, M.A. (2003) 'Cause, consequence and control: towards a theoretical and practical model of operational risk', Journal of Operations Management, Vol. 21, No. 2, pp.205-224.
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 205-224
    • Lewis, M.A.1
  • 34
  • 35
    • 0032115861 scopus 로고    scopus 로고
    • An assessment of survey research in POM: From constructs to theory
    • Malhotra, M.K. and Grover, V. (1998) 'An assessment of survey research in POM: from constructs to theory', Journal of Operations Management, Vol. 16, No. 17, pp.407-425.
    • (1998) Journal of Operations Management , vol.16 , Issue.17 , pp. 407-425
    • Malhotra, M.K.1    Grover, V.2
  • 36
    • 72749116861 scopus 로고    scopus 로고
    • A selection of material using a novel type decision-making method: Preference selection index method
    • Maniya, K. and Bhatt, M.G. (2010) 'A selection of material using a novel type decision-making method: preference selection index method', Materials and Design, Vol. 31, No. 4, pp.1785-1789.
    • (2010) Materials and Design , vol.31 , Issue.4 , pp. 1785-1789
    • Maniya, K.1    Bhatt, M.G.2
  • 37
    • 80053197785 scopus 로고    scopus 로고
    • An alternative multiple attribute decision making methodology for solving optimal facility layout design selection problems
    • Maniya, K. and Bhatt, M.G. (2011) 'An alternative multiple attribute decision making methodology for solving optimal facility layout design selection problems', Computers & Industrial Engineering, Vol. 61, No. 3, pp.542-549.
    • (2011) Computers & Industrial Engineering , vol.61 , Issue.3 , pp. 542-549
    • Maniya, K.1    Bhatt, M.G.2
  • 39
    • 0032785135 scopus 로고    scopus 로고
    • A methodology for analyzing alternatives for agile manufacturing business processes
    • Meade, L. and Sarkis, J. (1999) 'A methodology for analyzing alternatives for agile manufacturing business processes', International Journal of Production Research, Vol. 37, No. 2, pp.241-261.
    • (1999) International Journal of Production Research , vol.37 , Issue.2 , pp. 241-261
    • Meade, L.1    Sarkis, J.2
  • 40
    • 0344240982 scopus 로고    scopus 로고
    • Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
    • Naylor, J.B., Naim, M.M. and Berry, D. (1999) 'Leagility: integrating the lean and agile manufacturing paradigms in the total supply chain', International Journal of Production Economics, Vol. 62, No. 2, pp.107-118.
    • (1999) International Journal of Production Economics , vol.62 , Issue.2 , pp. 107-118
    • Naylor, J.B.1    Naim, M.M.2    Berry, D.3
  • 41
    • 84868611935 scopus 로고    scopus 로고
    • A simulation study on strategy to mitigate leadtime uncertainty risk in the context of information sharing
    • Padmapriya, P. and Kaur, A. (2012) 'A simulation study on strategy to mitigate leadtime uncertainty risk in the context of information sharing', Int. J. of Logistics Systems and Management, Vol. 13, No. 4, pp.483-508.
    • (2012) Int. J. of Logistics Systems and Management , vol.13 , Issue.4 , pp. 483-508
    • Padmapriya, P.1    Kaur, A.2
  • 44
    • 14044273554 scopus 로고    scopus 로고
    • Analyzing alternatives in reverse logistics for end-of-life computers
    • Ravi, V., Shankar, R. and Tiwari, M.K. (2005) 'Analyzing alternatives in reverse logistics for end-of-life computers', Comput. & Indust. Eng., Vol. 48, No. 2, pp.327-356.
    • (2005) Comput. & Indust. Eng. , vol.48 , Issue.2 , pp. 327-356
    • Ravi, V.1    Shankar, R.2    Tiwari, M.K.3
  • 45
    • 84857340164 scopus 로고    scopus 로고
    • A formal method for analysing and assessing operational risk in supply chains
    • Rossi, T. and Pero, M. (2012) 'A formal method for analysing and assessing operational risk in supply chains', Int. J. Operational Research, Vol. 13, No. 1, pp.90-109.
    • (2012) Int. J. Operational Research , vol.13 , Issue.1 , pp. 90-109
    • Rossi, T.1    Pero, M.2
  • 47
    • 79961111364 scopus 로고    scopus 로고
    • Applications of analytic network process in entertainment
    • Saaty, T.L. (2009) 'Applications of analytic network process in entertainment', Iranian Journal of Operations Research, Vol. 1, No. 2, pp.41-55.
    • (2009) Iranian Journal of Operations Research , vol.1 , Issue.2 , pp. 41-55
    • Saaty, T.L.1
  • 48
    • 84874656003 scopus 로고    scopus 로고
    • Quantifying risks in a supply chain through integration of fuzzy AHP and fuzzy TOPSIS
    • Samvedi, A., Jain, V. and Chan, F.T.S (2013) 'Quantifying risks in a supply chain through integration of fuzzy AHP and fuzzy TOPSIS', International Journal of Production Research, Vol. 51, No. 8, pp.2433-2442.
    • (2013) International Journal of Production Research , vol.51 , Issue.8 , pp. 2433-2442
    • Samvedi, A.1    Jain, V.2    Chan, F.T.S.3
  • 49
    • 84877782951 scopus 로고    scopus 로고
    • Selection and protection of suppliers in a supply chain with disruption risks
    • Sawik, T. (2013) 'Selection and protection of suppliers in a supply chain with disruption risks', Int. J. of Logistics Systems and Management, Vol. 15, Nos. 2/3, pp.143-159.
    • (2013) Int. J. of Logistics Systems and Management , vol.15 , Issue.2-3 , pp. 143-159
    • Sawik, T.1
  • 51
    • 84879338022 scopus 로고    scopus 로고
    • Supply chain risk management and organisational decision making: A case study of a major Japanese automotive firm
    • Shimizu, T., Park, Y. and Hong, P. (2013) 'Supply chain risk management and organisational decision making: a case study of a major Japanese automotive firm', Int. J. of Services and Operations Management, Vol. 15, No. 3, pp.293-312.
    • (2013) Int. J. of Services and Operations Management , vol.15 , Issue.3 , pp. 293-312
    • Shimizu, T.1    Park, Y.2    Hong, P.3
  • 52
    • 80052064861 scopus 로고    scopus 로고
    • JIT practices in supply chains: A review and modelling for supplier base reduction for electronics industry
    • Singh, O.P. and Chand, S. (2010) 'JIT practices in supply chains: a review and modelling for supplier base reduction for electronics industry', Int. J. Logistics Systems and Management, Vol. 6, No. 1, pp.113-130.
    • (2010) Int. J. Logistics Systems and Management , vol.6 , Issue.1 , pp. 113-130
    • Singh, O.P.1    Chand, S.2
  • 54
    • 0032597106 scopus 로고    scopus 로고
    • Eutionary decision support for distributed virtual design in modular product manufacturing
    • Subbu, R. (1999) 'Eutionary decision support for distributed virtual design in modular product manufacturing', Production Planning & Control, Vol. 10, No. 7, pp.627-642.
    • (1999) Production Planning & Control , vol.10 , Issue.7 , pp. 627-642
    • Subbu, R.1
  • 57
    • 34247509719 scopus 로고    scopus 로고
    • Consumers risk and quality control in a collaborative supply chain
    • Tapiero, C.S. (2007) 'Consumers risk and quality control in a collaborative supply chain', European Journal of Operational Research, Vol. 182, No. 2, pp.683-694.
    • (2007) European Journal of Operational Research , vol.182 , Issue.2 , pp. 683-694
    • Tapiero, C.S.1
  • 58
    • 84864683347 scopus 로고    scopus 로고
    • An information-exchange perspective on supply-chain risk management: Systemic organisational motives and cognitive barriers
    • Vilko, J., Rumpu, A. and Koivuniemi, J. (2012) 'An information-exchange perspective on supply-chain risk management: systemic organisational motives and cognitive barriers', Int. J. of Logistics Systems and Management, Vol. 12, No. 4, pp.460-482.
    • (2012) Int. J. of Logistics Systems and Management , vol.12 , Issue.4 , pp. 460-482
    • Vilko, J.1    Rumpu, A.2    Koivuniemi, J.3
  • 60
    • 67651232410 scopus 로고    scopus 로고
    • Enterprise risk management: Small business scorecard analysis
    • Wu, D. and Olson, D.L. (2009) 'Enterprise risk management: small business scorecard analysis', Production Planning & Control, Vol. 20, No. 4, pp.362-369.
    • (2009) Production Planning & Control , vol.20 , Issue.4 , pp. 362-369
    • Wu, D.1    Olson, D.L.2
  • 62
    • 33750984231 scopus 로고    scopus 로고
    • Selecting knowledge management strategies by using the analytic network process
    • Wu, W.W. and Lee, Y.T. (2007) 'Selecting knowledge management strategies by using the analytic network process', Expert Systems with Applications, Vol. 32, No. 3, pp.841-847.
    • (2007) Expert Systems with Applications , vol.32 , Issue.3 , pp. 841-847
    • Wu, W.W.1    Lee, Y.T.2
  • 63
    • 77951130190 scopus 로고    scopus 로고
    • Postponement in supply chain risk management: A complexity perspective
    • Yang, B. and Yang, Y. (2010) 'Postponement in supply chain risk management: a complexity perspective', International Journal of Production Research, Vol. 48, No. 7, pp.1901-1912.
    • (2010) International Journal of Production Research , vol.48 , Issue.7 , pp. 1901-1912
    • Yang, B.1    Yang, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.