메뉴 건너뛰기




Volumn 46, Issue 1, 2008, Pages 197-216

Lot streaming in a multiple product permutation flow shop with intermingling

Author keywords

Integer programming; Lot streaming; Production planning; Scheduling

Indexed keywords

COMPUTATIONAL METHODS; INTEGER PROGRAMMING; JOB ANALYSIS; PROBLEM SOLVING; PRODUCT DEVELOPMENT; SCHEDULING;

EID: 36249032554     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600930065     Document Type: Article
Times cited : (38)

References (29)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E. and Zawack, D., The shifting bottleneck procedure for job shop scheduling. Mgmt. Sci., 1988, 34, 391-401.
    • (1988) Mgmt. Sci , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A., Gupta, J.N.D. and Aldowaisan, T., A review of scheduling research involving setup considerations. Omega, 1999, 27, 219-239.
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 3
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • Baker, K.R., Lot streaming in the two-machine flow shop with setup times. Ann. Oper. Res, 1995, 57, 1-11.
    • (1995) Ann. Oper. Res , vol.57 , pp. 1-11
    • Baker, K.R.1
  • 4
    • 0000994184 scopus 로고
    • A comparative study of lot streaming procedures
    • Baker, K.R. and Jia, D., A comparative study of lot streaming procedures. Omega, 1993, 21, 561-566.
    • (1993) Omega , vol.21 , pp. 561-566
    • Baker, K.R.1    Jia, D.2
  • 5
    • 33644634541 scopus 로고    scopus 로고
    • Lot streaming with variable sublots: An integer programming formulation
    • Biskup, D. and Feldmann, M., Lot streaming with variable sublots: an integer programming formulation. J. Oper. Res. Soc., 2005, 57, 296-303.
    • (2005) J. Oper. Res. Soc , vol.57 , pp. 296-303
    • Biskup, D.1    Feldmann, M.2
  • 6
    • 27744497229 scopus 로고    scopus 로고
    • A comprehensive review of lot streaming
    • Chang, J.H. and Chiu, H.N., A comprehensive review of lot streaming. Int. J. Prod. Res., 2005, 43, 1515-1536.
    • (2005) Int. J. Prod. Res , vol.43 , pp. 1515-1536
    • Chang, J.H.1    Chiu, H.N.2
  • 7
    • 0031186470 scopus 로고    scopus 로고
    • Lot streaming in job-shop scheduling
    • Dauzère-Pérès, S. and Lasserre, J.B., Lot streaming in job-shop scheduling. Oper. Res., 1997, 45, 584-595.
    • (1997) Oper. Res , vol.45 , pp. 584-595
    • Dauzère-Pérès, S.1    Lasserre, J.B.2
  • 9
    • 0016952078 scopus 로고
    • The complexity of flowshop and jobshop scheduling
    • Garey, M.R., Johnson, D.S. and Sethi, R., The complexity of flowshop and jobshop scheduling. Math. Oper. Res., 1976, 1, 117-129.
    • (1976) Math. Oper. Res , vol.1 , pp. 117-129
    • Garey, M.R.1    Johnson, D.S.2    Sethi, R.3
  • 10
    • 3543079267 scopus 로고    scopus 로고
    • Scheduling and lot streaming in flowshops with no-wait in process
    • Hall, N.G., Laporte, G., Selvarajah, E. and Sriskandarajah, C., Scheduling and lot streaming in flowshops with no-wait in process. J. Schedul., 2003, 6, 339-354.
    • (2003) J. Schedul , vol.6 , pp. 339-354
    • Hall, N.G.1    Laporte, G.2    Selvarajah, E.3    Sriskandarajah, C.4
  • 11
    • 17444386020 scopus 로고    scopus 로고
    • Scheduling and lot Streaming in two-machine open shops with no-wait in process
    • Hall, N.G., Laporte, G., Selvarajah, E. and Sriskandarajah, C., Scheduling and lot Streaming in two-machine open shops with no-wait in process. Nav. Res. Log., 2005, 52, 261-275.
    • (2005) Nav. Res. Log , vol.52 , pp. 261-275
    • Hall, N.G.1    Laporte, G.2    Selvarajah, E.3    Sriskandarajah, C.4
  • 12
    • 0003075019 scopus 로고
    • 2Optimal two- and three-stage production schedules with setup time included
    • Johnson, S.M., 2Optimal two- and three-stage production schedules with setup time included. Nav. Res. Log. Q., 1954, 1, 61-68.
    • (1954) Nav. Res. Log. Q , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 14
    • 0033702610 scopus 로고    scopus 로고
    • Evaluation of the potential benefits of lot streaming in flow-shop systems
    • Kalir, A.A. and Sarin, S.C., Evaluation of the potential benefits of lot streaming in flow-shop systems. Int. J. Prod. Eco., 2000, 66, 131-142.
    • (2000) Int. J. Prod. Eco , vol.66 , pp. 131-142
    • Kalir, A.A.1    Sarin, S.C.2
  • 15
    • 0013356811 scopus 로고    scopus 로고
    • A near-optimal heuristic for the sequencing problem in multiple-batch flow shops with small equal sublots
    • Kalir, A.A. and Sarin, S.C., A near-optimal heuristic for the sequencing problem in multiple-batch flow shops with small equal sublots. Omega, 2001, 29, 577-584.
    • (2001) Omega , vol.29 , pp. 577-584
    • Kalir, A.A.1    Sarin, S.C.2
  • 16
    • 0037372761 scopus 로고    scopus 로고
    • Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups
    • Kalir, A.A. and Sarin, S.C., Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups. J. Combin. Optimiz., 2003, 7, 23-44.
    • (2003) J. Combin. Optimiz , vol.7 , pp. 23-44
    • Kalir, A.A.1    Sarin, S.C.2
  • 17
    • 0033708147 scopus 로고    scopus 로고
    • Lot streaming and scheduling heuristics for m-machine no-wait flowshops
    • Kumar, S., Bagchi, T.P. and Sriskandarajah, C., Lot streaming and scheduling heuristics for m-machine no-wait flowshops. Comput. Ind. Engng, 2000, 38, 149-172.
    • (2000) Comput. Ind. Engng , vol.38 , pp. 149-172
    • Kumar, S.1    Bagchi, T.P.2    Sriskandarajah, C.3
  • 18
    • 0007634676 scopus 로고
    • Joint lot sizing and sequencing with genetic algorithms for scheduling: Evolving the chromosome structure
    • edited by S. Forrest, pp, Morgan Kaufmann: San Francisco
    • Lee, I., Sikora, R. and Shaw, M.J., Joint lot sizing and sequencing with genetic algorithms for scheduling: evolving the chromosome structure. In Proceedings of the Fifth International Conference on Genetic Algorithms, edited by S. Forrest, pp. 383-389, 1993 (Morgan Kaufmann: San Francisco).
    • (1993) Proceedings of the Fifth International Conference on Genetic Algorithms , pp. 383-389
    • Lee, I.1    Sikora, R.2    Shaw, M.J.3
  • 19
    • 0031492360 scopus 로고    scopus 로고
    • Current trends in deterministic scheduling
    • Lee, C.-Y., Lei, L. and Pinedo, M., Current trends in deterministic scheduling. Ann. Oper. Res., 1997, 70, 1-41.
    • (1997) Ann. Oper. Res , vol.70 , pp. 1-41
    • Lee, C.-Y.1    Lei, L.2    Pinedo, M.3
  • 20
    • 0000237789 scopus 로고
    • On the job-shop scheduling problem
    • Manne, A.S., On the job-shop scheduling problem. Oper. Res., 1960, 8, 219-223.
    • (1960) Oper. Res , vol.8 , pp. 219-223
    • Manne, A.S.1
  • 21
    • 0024925432 scopus 로고
    • Flow shop scheduling with lot streaming
    • Potts, C.N. and Baker, K.R., Flow shop scheduling with lot streaming. Oper. Res. Lett., 1989, 8, 297-303.
    • (1989) Oper. Res. Lett , vol.8 , pp. 297-303
    • Potts, C.N.1    Baker, K.R.2
  • 22
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • Potts, C.N. and Van Wassenhove, L.N., Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. J. Oper. Res. Soc., 1992, 43, 395-406.
    • (1992) J. Oper. Res. Soc , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 23
    • 0032178227 scopus 로고    scopus 로고
    • Lot streaming in open shops
    • Sen, A. and Benli, O.S., Lot streaming in open shops. Oper. Res. Lett., 1999, 23, 135-142.
    • (1999) Oper. Res. Lett , vol.23 , pp. 135-142
    • Sen, A.1    Benli, O.S.2
  • 24
    • 0032190044 scopus 로고    scopus 로고
    • Optimal streaming of a single job in a two-stage flow shop
    • Şen, A., Topaloǧu, E. and Benli, Ö.S., Optimal streaming of a single job in a two-stage flow shop. Eur. J. Oper. Res., 1998, 110, 42-62.
    • (1998) Eur. J. Oper. Res , vol.110 , pp. 42-62
    • Şen, A.1    Topaloǧu, E.2    Benli, O.S.3
  • 25
    • 0033363409 scopus 로고    scopus 로고
    • Lot streaming and scheduling multiple products in two-machine no-wait flowshops
    • Sriskandarajah, C. and Wagneur, E., Lot streaming and scheduling multiple products in two-machine no-wait flowshops. IIE Trans., 1999, 31, 695-707.
    • (1999) IIE Trans , vol.31 , pp. 695-707
    • Sriskandarajah, C.1    Wagneur, E.2
  • 26
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch, D. and Baker, K.R., Basic techniques for lot streaming. Oper. Res., 1993, 41, 1065-1076.
    • (1993) Oper. Res , vol.41 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.R.2
  • 27
    • 0026896286 scopus 로고
    • Two- and three-machine flow shop scheduling problems with equal sized transfer batches
    • Vickson, R.G. and Alfredsson, B.E., Two- and three-machine flow shop scheduling problems with equal sized transfer batches. Int. J. Prod. Res, 1992, 30, 1551-1574.
    • (1992) Int. J. Prod. Res , vol.30 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2
  • 28
    • 0029378595 scopus 로고
    • Optimal lot streaming for multiple products in a two-machine flow shop
    • Vickson, R.G., Optimal lot streaming for multiple products in a two-machine flow shop. Eur. J. Oper. Res., 1995, 85, 556-575.
    • (1995) Eur. J. Oper. Res , vol.85 , pp. 556-575
    • Vickson, R.G.1
  • 29
    • 13444302670 scopus 로고    scopus 로고
    • Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
    • Zhang, W., Changyu, Y., Liu, J. and Linn, R.J., Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops. Int. J. Prod. Eco., 2005, 96, 189-200.
    • (2005) Int. J. Prod. Eco , vol.96 , pp. 189-200
    • Zhang, W.1    Changyu, Y.2    Liu, J.3    Linn, R.J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.