메뉴 건너뛰기




Volumn 96, Issue 2, 2005, Pages 189-200

Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops

Author keywords

Heuristics; Hybrid flowshop; Lot streaming; Mean completion time

Indexed keywords

ALGORITHMS; HEURISTIC PROGRAMMING; INDUSTRIAL ECONOMICS; INDUSTRIAL MANAGEMENT; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MATHEMATICAL MODELS; PROBLEM SOLVING; PRODUCTION ENGINEERING; SCHEDULING;

EID: 13444302670     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2004.04.005     Document Type: Article
Times cited : (63)

References (30)
  • 1
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • Baker K.R. Lot streaming in the two-machine flow shop with setup times. Annals of Operations Research. 57:1995;1-11
    • (1995) Annals of Operations Research , vol.57 , pp. 1-11
    • Baker, K.R.1
  • 3
    • 84985818856 scopus 로고
    • Solution procedures for the lot-streaming problem
    • Baker K.R, Pyke D.F. Solution procedures for the lot-streaming problem. Decision Sciences. 21:1990;475-491
    • (1990) Decision Sciences , vol.21 , pp. 475-491
    • Baker, K.R.1    Pyke, D.F.2
  • 4
    • 0028698198 scopus 로고
    • Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
    • Cetinkaya F.C. Lot streaming in a two-stage flow shop with set-up, processing and removal times separated. Journal of Operational Research Society. 45:1994;1445-1455
    • (1994) Journal of Operational Research Society , vol.45 , pp. 1445-1455
    • Cetinkaya, F.C.1
  • 5
    • 0031076263 scopus 로고    scopus 로고
    • Lot streaming with detached setups in three-machine flow shops
    • Chen J., Steiner G. Lot streaming with detached setups in three-machine flow shops. European Journal of Operational Research. 96:1996;591-611
    • (1996) European Journal of Operational Research , vol.96 , pp. 591-611
    • Chen, J.1    Steiner, G.2
  • 6
    • 0013289896 scopus 로고    scopus 로고
    • Approximation methods for discrete lot streaming in flow shops
    • Chen J., Steiner G. Approximation methods for discrete lot streaming in flow shops. Operations Research Letters. 21:1997;139-145
    • (1997) Operations Research Letters , vol.21 , pp. 139-145
    • Chen, J.1    Steiner, G.2
  • 11
    • 84985801774 scopus 로고
    • Repetitive lots flow-time reductions through sequencing and dynamic batch sizing
    • Jacobs F.R., Bragg D.J. Repetitive lots flow-time reductions through sequencing and dynamic batch sizing. Decision Sciences. 19:1988;281-294
    • (1988) Decision Sciences , vol.19 , pp. 281-294
    • Jacobs, F.R.1    Bragg, D.J.2
  • 13
    • 0033702610 scopus 로고    scopus 로고
    • Evaluation of the potential benefits of lot streaming in flow-shop systems
    • Kalir A.A., Sarin S.C. Evaluation of the potential benefits of lot streaming in flow-shop systems. International Journal of Production Economics. 66(2):2000;131-142
    • (2000) International Journal of Production Economics , vol.66 , Issue.2 , pp. 131-142
    • Kalir, A.A.1    Sarin, S.C.2
  • 18
    • 0026819776 scopus 로고
    • A multi-stage parallel-processor flowshop problem with minimum flowtime
    • Rajendran C., Chaudhuri D. A multi-stage parallel-processor flowshop problem with minimum flowtime. European Journal Operation Research. 57:1992;111-122
    • (1992) European Journal Operation Research , vol.57 , pp. 111-122
    • Rajendran, C.1    Chaudhuri, D.2
  • 19
    • 0000659781 scopus 로고
    • A system for managing job shop production
    • Reiter S. A system for managing job shop production. Journal of Business. 34:1966;371-393
    • (1966) Journal of Business , vol.34 , pp. 371-393
    • Reiter, S.1
  • 22
    • 0033363409 scopus 로고    scopus 로고
    • Lot streaming and scheduling multiple product in two-machine no-wait flow shops
    • Sriskandarajah C., Wagneur E. Lot streaming and scheduling multiple product in two-machine no-wait flow shops. IIE Transaction. 31:1999;695-707
    • (1999) IIE Transaction , vol.31 , pp. 695-707
    • Sriskandarajah, C.1    Wagneur, E.2
  • 23
    • 0027662155 scopus 로고
    • Batch scheduling to minimize cycle time, flow time, and processing cost
    • Steiner G., Truscott W.G. Batch scheduling to minimize cycle time, flow time, and processing cost. IIE Transactions. 25:1993;90-97
    • (1993) IIE Transactions , vol.25 , pp. 90-97
    • Steiner, G.1    Truscott, W.G.2
  • 25
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch D., Baker K.R. Basic techniques for lot streaming. Operations Research. 41:1993;1065-1076
    • (1993) Operations Research , vol.41 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.R.2
  • 26
    • 0030291549 scopus 로고    scopus 로고
    • The impact of lot sizing and sequencing in manufacturing performance in a two-stage hybrid flow shop
    • Tsubone H., Ohba H., Uetake T. The impact of lot sizing and sequencing in manufacturing performance in a two-stage hybrid flow shop. International Journal of Production Research. 34:1996;3037-3053
    • (1996) International Journal of Production Research , vol.34 , pp. 3037-3053
    • Tsubone, H.1    Ohba, H.2    Uetake, T.3
  • 27
    • 0029378595 scopus 로고
    • Optimal lot streaming for multiple products in a two-machine flow shop
    • Vickson R.G. Optimal lot streaming for multiple products in a two-machine flow shop. European Journal of Operational Research. 85:1995;556-575
    • (1995) European Journal of Operational Research , vol.85 , pp. 556-575
    • Vickson, R.G.1
  • 28
    • 0026896286 scopus 로고
    • Two and three machines flow shop scheduling problems with equal sized transfer batches
    • Vickson R.G, Alfredsson B.E. Two and three machines flow shop scheduling problems with equal sized transfer batches. International Journal of Production Research. 30:1992;1551-1574
    • (1992) International Journal of Production Research , vol.30 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.