-
1
-
-
21844508729
-
Lot streaming in the two-machine flow shop with setup times
-
Baker K.R. Lot streaming in the two-machine flow shop with setup times. Annals of Operations Research. 57:1995;1-11
-
(1995)
Annals of Operations Research
, vol.57
, pp. 1-11
-
-
Baker, K.R.1
-
3
-
-
84985818856
-
Solution procedures for the lot-streaming problem
-
Baker K.R, Pyke D.F. Solution procedures for the lot-streaming problem. Decision Sciences. 21:1990;475-491
-
(1990)
Decision Sciences
, vol.21
, pp. 475-491
-
-
Baker, K.R.1
Pyke, D.F.2
-
4
-
-
0028698198
-
Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
-
Cetinkaya F.C. Lot streaming in a two-stage flow shop with set-up, processing and removal times separated. Journal of Operational Research Society. 45:1994;1445-1455
-
(1994)
Journal of Operational Research Society
, vol.45
, pp. 1445-1455
-
-
Cetinkaya, F.C.1
-
5
-
-
0031076263
-
Lot streaming with detached setups in three-machine flow shops
-
Chen J., Steiner G. Lot streaming with detached setups in three-machine flow shops. European Journal of Operational Research. 96:1996;591-611
-
(1996)
European Journal of Operational Research
, vol.96
, pp. 591-611
-
-
Chen, J.1
Steiner, G.2
-
6
-
-
0013289896
-
Approximation methods for discrete lot streaming in flow shops
-
Chen J., Steiner G. Approximation methods for discrete lot streaming in flow shops. Operations Research Letters. 21:1997;139-145
-
(1997)
Operations Research Letters
, vol.21
, pp. 139-145
-
-
Chen, J.1
Steiner, G.2
-
11
-
-
84985801774
-
Repetitive lots flow-time reductions through sequencing and dynamic batch sizing
-
Jacobs F.R., Bragg D.J. Repetitive lots flow-time reductions through sequencing and dynamic batch sizing. Decision Sciences. 19:1988;281-294
-
(1988)
Decision Sciences
, vol.19
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
12
-
-
10444255675
-
Scheduling hybrid flowshops in printed circuit board assembly lines
-
Jin Z.H., Ohno K., Ito T., Elmaghraby S.E. Scheduling hybrid flowshops in printed circuit board assembly lines. Production and Operations Management. 11(2):2002;216-230
-
(2002)
Production and Operations Management
, vol.11
, Issue.2
, pp. 216-230
-
-
Jin, Z.H.1
Ohno, K.2
Ito, T.3
Elmaghraby, S.E.4
-
13
-
-
0033702610
-
Evaluation of the potential benefits of lot streaming in flow-shop systems
-
Kalir A.A., Sarin S.C. Evaluation of the potential benefits of lot streaming in flow-shop systems. International Journal of Production Economics. 66(2):2000;131-142
-
(2000)
International Journal of Production Economics
, vol.66
, Issue.2
, pp. 131-142
-
-
Kalir, A.A.1
Sarin, S.C.2
-
15
-
-
0007634676
-
Joint lot sizing and sequencing with genetic algorithms for scheduling: Evolving the chromosome structure
-
Lee, I., Sikora, R., Shaw, M.J., 1993. Joint lot sizing and sequencing with genetic algorithms for scheduling: Evolving the chromosome structure. Proceedings of the Fifth International Conference on Genetic Algorithms, pp. 383-389.
-
(1993)
Proceedings of the Fifth International Conference on Genetic Algorithms
, pp. 383-389
-
-
Lee, I.1
Sikora, R.2
Shaw, M.J.3
-
18
-
-
0026819776
-
A multi-stage parallel-processor flowshop problem with minimum flowtime
-
Rajendran C., Chaudhuri D. A multi-stage parallel-processor flowshop problem with minimum flowtime. European Journal Operation Research. 57:1992;111-122
-
(1992)
European Journal Operation Research
, vol.57
, pp. 111-122
-
-
Rajendran, C.1
Chaudhuri, D.2
-
19
-
-
0000659781
-
A system for managing job shop production
-
Reiter S. A system for managing job shop production. Journal of Business. 34:1966;371-393
-
(1966)
Journal of Business
, vol.34
, pp. 371-393
-
-
Reiter, S.1
-
22
-
-
0033363409
-
Lot streaming and scheduling multiple product in two-machine no-wait flow shops
-
Sriskandarajah C., Wagneur E. Lot streaming and scheduling multiple product in two-machine no-wait flow shops. IIE Transaction. 31:1999;695-707
-
(1999)
IIE Transaction
, vol.31
, pp. 695-707
-
-
Sriskandarajah, C.1
Wagneur, E.2
-
23
-
-
0027662155
-
Batch scheduling to minimize cycle time, flow time, and processing cost
-
Steiner G., Truscott W.G. Batch scheduling to minimize cycle time, flow time, and processing cost. IIE Transactions. 25:1993;90-97
-
(1993)
IIE Transactions
, vol.25
, pp. 90-97
-
-
Steiner, G.1
Truscott, W.G.2
-
25
-
-
0000611941
-
Basic techniques for lot streaming
-
Trietsch D., Baker K.R. Basic techniques for lot streaming. Operations Research. 41:1993;1065-1076
-
(1993)
Operations Research
, vol.41
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
26
-
-
0030291549
-
The impact of lot sizing and sequencing in manufacturing performance in a two-stage hybrid flow shop
-
Tsubone H., Ohba H., Uetake T. The impact of lot sizing and sequencing in manufacturing performance in a two-stage hybrid flow shop. International Journal of Production Research. 34:1996;3037-3053
-
(1996)
International Journal of Production Research
, vol.34
, pp. 3037-3053
-
-
Tsubone, H.1
Ohba, H.2
Uetake, T.3
-
27
-
-
0029378595
-
Optimal lot streaming for multiple products in a two-machine flow shop
-
Vickson R.G. Optimal lot streaming for multiple products in a two-machine flow shop. European Journal of Operational Research. 85:1995;556-575
-
(1995)
European Journal of Operational Research
, vol.85
, pp. 556-575
-
-
Vickson, R.G.1
-
28
-
-
0026896286
-
Two and three machines flow shop scheduling problems with equal sized transfer batches
-
Vickson R.G, Alfredsson B.E. Two and three machines flow shop scheduling problems with equal sized transfer batches. International Journal of Production Research. 30:1992;1551-1574
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1551-1574
-
-
Vickson, R.G.1
Alfredsson, B.E.2
|