메뉴 건너뛰기




Volumn 31, Issue 12, 2004, Pages 2003-2020

Lot streaming models with a limited number of capacitated transporters in multistage batch production systems

Author keywords

Batch production system; Lot streaming; Mathematical programming model; Processing batch; Transfer batch

Indexed keywords

HEURISTIC METHODS; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; PERFORMANCE; PROBLEM SOLVING;

EID: 2642565955     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(03)00159-X     Document Type: Article
Times cited : (24)

References (19)
  • 2
    • 0000659781 scopus 로고
    • A system for managing job shop production
    • Reiter S. A system for managing job shop production Journal of Business 34 1966 371-393
    • (1966) Journal of Business , vol.34 , pp. 371-393
    • Reiter, S.1
  • 3
    • 84985755271 scopus 로고
    • Optimal and heuristic models for lot splitting in a flow shop
    • Kropp D.H. Smunt T.L. Optimal and heuristic models for lot splitting in a flow shop Decision Sciences 21 1990 691-709
    • (1990) Decision Sciences , vol.21 , pp. 691-709
    • Kropp, D.H.1    Smunt, T.L.2
  • 4
    • 0025657214 scopus 로고
    • Synchronous manufacturing as in OPT: From practice to theory
    • Ronen B. Starr M.K. Synchronous manufacturing as in OPT: From practice to theory Computers and Industrial Engineering 18 1990 585-600
    • (1990) Computers and Industrial Engineering , vol.18 , pp. 585-600
    • Ronen, B.1    Starr, M.K.2
  • 5
    • 38249039204 scopus 로고
    • Production scheduling with capacity constrained transportation activities
    • Truscott W. Production scheduling with capacity constrained transportation activities Journal of Operations Management 6 1986 333-348
    • (1986) Journal of Operations Management , vol.6 , pp. 333-348
    • Truscott, W.1
  • 6
    • 84985818856 scopus 로고
    • Solution procedures for the lot-streaming problem
    • Baker K.R. Pyke D.F. Solution procedures for the lot-streaming problem Decision Sciences 21 1990 475-491
    • (1990) Decision Sciences , vol.21 , pp. 475-491
    • Baker, K.R.1    Pyke, D.F.2
  • 7
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch D. Baker K.R. Basic techniques for lot streaming Operations Research 41 1993 1065-1076
    • (1993) Operations Research , vol.41 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.R.2
  • 8
    • 0031076263 scopus 로고    scopus 로고
    • Lot streaming with detached setups in three-machine flow shops
    • Chen J. Steiner G. Lot streaming with detached setups in three-machine flow shops European Journal of Operational Research 96 1997 591-611
    • (1997) European Journal of Operational Research , vol.96 , pp. 591-611
    • Chen, J.1    Steiner, G.2
  • 9
    • 0032262156 scopus 로고    scopus 로고
    • Lot streaming with attached setups in three-machine flow shops
    • Chen J. Steiner G. Lot streaming with attached setups in three-machine flow shops IIE Transactions 30 1998 1075-1084
    • (1998) IIE Transactions , vol.30 , pp. 1075-1084
    • Chen, J.1    Steiner, G.2
  • 11
    • 0035598113 scopus 로고    scopus 로고
    • Optimal solutions for the single batches, flow shop, lot-streaming problem with equal sublots
    • Kalir A.A. Sarin S.C. Optimal solutions for the single batches, flow shop, lot-streaming problem with equal sublots Decision Sciences 32 2001 387-397
    • (2001) Decision Sciences , vol.32 , pp. 387-397
    • Kalir, A.A.1    Sarin, S.C.2
  • 12
    • 0026896286 scopus 로고
    • Two- and three-machine flow shop scheduling problems with equal sized transfer batches
    • Vickson R.G. Alfredsson B.E. Two- and three-machine flow shop scheduling problems with equal sized transfer batches International Journal of Production Research 30 1992 1551-1574
    • (1992) International Journal of Production Research , vol.30 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2
  • 13
    • 0028698198 scopus 로고
    • Lot-streaming in a two-stage flow shop with set-up, processing and removal times separated
    • Cetinkaya F.C. Lot-streaming in a two-stage flow shop with set-up, processing and removal times separated Journal of Operational Research Society 45 1994 1445-1455
    • (1994) Journal of Operational Research Society , vol.45 , pp. 1445-1455
    • Cetinkaya, F.C.1
  • 14
    • 0029378595 scopus 로고
    • Optimal lot streaming for multiple products in a two-machine flow shop
    • Vickson R.G. Optimal lot streaming for multiple products in a two-machine flow shop European Journal of Operational Research 85 1995 556-575
    • (1995) European Journal of Operational Research , vol.85 , pp. 556-575
    • Vickson, R.G.1
  • 15
    • 0016572027 scopus 로고
    • Manufacturing cycle time determination for a multistage economic quantity model
    • Szendrovits A.L. Manufacturing cycle time determination for a multistage economic quantity model Management Science 22 1975 298-308
    • (1975) Management Science , vol.22 , pp. 298-308
    • Szendrovits, A.L.1
  • 16
    • 0017984961 scopus 로고
    • Economic batch quantity in a multistage production system
    • Goyal S.K. Economic batch quantity in a multistage production system International Journal of Production Research 16 1978 267-273
    • (1978) International Journal of Production Research , vol.16 , pp. 267-273
    • Goyal, S.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.