Volumn 32, Issue 2, 2013, Pages 392-401

MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints

Author keywords

Availability constraint; Dynamic lot sizing and scheduling; Flow shop; MIP based heuristic; Mixed integer programming; Sequence dependent setup

Indexed keywords

AVAILABILITY CONSTRAINTS; DYNAMIC LOT-SIZING; FLOW-SHOPS; MIP-BASED HEURISTIC; MIXED-INTEGER PROGRAMMING; SEQUENCE DEPENDENT SETUPS;

EID: 84875260385     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2013.01.002     Document Type: Article
Times cited : (45)

References (33)
  • 2
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • R. Aggoune Minimizing the makespan for the flow shop scheduling problem with availability constraints European Journal of Operational Research 153 2004 534 543
    • (2004) European Journal of Operational Research , vol.153 , pp. 534-543
    • Aggoune, R.1
  • 4
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • C.R. Cassady, and E. Kutanoglu Integrating preventive maintenance planning and production scheduling for a single machine IEEE Transactions on Reliability 54 2 2005 304 309
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 5
    • 0042204356 scopus 로고    scopus 로고
    • Integrated production planning and scheduling on automobile assembly lines
    • H.-S. Yan, Q.-F. Xia, M.-R. Zhu, X.-L. Liu, and Z.-M. Guo Integrated production planning and scheduling on automobile assembly lines IIE Transactions 35 8 2003 711 725
    • (2003) IIE Transactions , vol.35 , Issue.8 , pp. 711-725
    • Yan, H.-S.1    Xia, Q.-F.2    Zhu, M.-R.3    Liu, X.-L.4    Guo, Z.-M.5
  • 7
    • 77957696176 scopus 로고    scopus 로고
    • Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing
    • A. Ghodratnama, M. Rabbani, R. Tavakkoli-Moghaddam, and A. Baboli Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing Journal of Manufacturing Systems 29 2010 1 9
    • (2010) Journal of Manufacturing Systems , vol.29 , pp. 1-9
    • Ghodratnama, A.1    Rabbani, M.2    Tavakkoli-Moghaddam, R.3    Baboli, A.4
  • 8
    • 84877325249 scopus 로고    scopus 로고
    • An optimal production and inspection strategy with preventive maintenance error and rework
    • 10.1016/j.jmsy.2012.07.010
    • Y.-C. Chen An optimal production and inspection strategy with preventive maintenance error and rework Journal of Manufacturing Systems 32 1 2013 99 106 10.1016/j.jmsy.2012.07.010
    • (2013) Journal of Manufacturing Systems , vol.32 , Issue.1 , pp. 99-106
    • Chen, Y.-C.1
  • 9
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • H.M. Wagner, and T.M. Whithin Dynamic version of the economic lot size model Management Science 5 1958 89 96
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whithin, T.M.2
  • 11
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • B. Karimi, S.M.T. Fatemi Ghomi, and J.M. Wilson The capacitated lot sizing problem: A review of models and algorithms Omega 31 5 2003 365 378
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 12
    • 77349118693 scopus 로고    scopus 로고
    • Dynamic capacitated lot-sizing problems: A classification and review of solution approaches
    • L. Buschkühl, F. Sahling, S. Helber, and H. Tempelmeier Dynamic capacitated lot-sizing problems: a classification and review of solution approaches OR Spectrum 32 2010 231 261
    • (2010) OR Spectrum , vol.32 , pp. 231-261
    • Buschkühl, L.1    Sahling, F.2    Helber, S.3    Tempelmeier, H.4
  • 13
    • 0008655177 scopus 로고    scopus 로고
    • The general lotsizing and scheduling problem
    • B. Fleischmann, and H. Meyr The general lotsizing and scheduling problem OR Spectrum 19 1 1997 11 21
    • (1997) OR Spectrum , vol.19 , Issue.1 , pp. 11-21
    • Fleischmann, B.1    Meyr, H.2
  • 14
    • 0012651174 scopus 로고    scopus 로고
    • Scheduling printed circuit board production systems using the two-level scheduling approach
    • F.-R. Lin, M.J. Shaw, and A. Locascio Scheduling printed circuit board production systems using the two-level scheduling approach Journal of Manufacturing Systems 16 2 1997 129 149
    • (1997) Journal of Manufacturing Systems , vol.16 , Issue.2 , pp. 129-149
    • Lin, F.-R.1    Shaw, M.J.2    Locascio, A.3
  • 15
    • 0042824640 scopus 로고    scopus 로고
    • Multi-level, single-machine lotsizing and scheduling (with initial inventory)
    • A. Kimms Multi-level, single-machine lotsizing and scheduling (with initial inventory) European Journal of Operational Research 89 1 1996 86 99
    • (1996) European Journal of Operational Research , vol.89 , Issue.1 , pp. 86-99
    • Kimms, A.1
  • 16
    • 0032206520 scopus 로고    scopus 로고
    • Some insights into proportional lotsizing and scheduling
    • A. Kimms, and A. Drexl Some insights into proportional lotsizing and scheduling Journal of the Operational Research 49 11 1998 1196 1205
    • (1998) Journal of the Operational Research , vol.49 , Issue.11 , pp. 1196-1205
    • Kimms, A.1    Drexl, A.2
  • 17
    • 33748884885 scopus 로고    scopus 로고
    • Simultaneous lot sizing and scheduling for multi-product multi-level production
    • G. Fandel, and C. Stammen-Hegene Simultaneous lot sizing and scheduling for multi-product multi-level production International Journal of Production Economics 104 2 2006 308 316
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 308-316
    • Fandel, G.1    Stammen-Hegene, C.2
  • 18
    • 77955661126 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
    • M. Mohammadi, S.M.T. Fatemi Ghomi, B. Karimi, and S.A. Torabi Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups Journal of Intelligent Manufacturing 21 2010 501 510
    • (2010) Journal of Intelligent Manufacturing , vol.21 , pp. 501-510
    • Mohammadi, M.1    Fatemi Ghomi, S.M.T.2    Karimi, B.3    Torabi, S.A.4
  • 19
    • 0034631279 scopus 로고    scopus 로고
    • Rolling-horizon lot-sizing when setup times are sequence-dependent
    • A.R. Clark, and S.J. Clark Rolling-horizon lot-sizing when setup times are sequence-dependent International Journal of Production Research 38 10 2000 2287 2308
    • (2000) International Journal of Production Research , vol.38 , Issue.10 , pp. 2287-2308
    • Clark, A.R.1    Clark, S.J.2
  • 20
    • 79951579589 scopus 로고    scopus 로고
    • Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups
    • M. Mohammadi, and S.M.T. Fatemi Ghomi Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups Expert Systems with Applications 38 2011 7201 7207
    • (2011) Expert Systems with Applications , vol.38 , pp. 7201-7207
    • Mohammadi, M.1    Fatemi Ghomi, S.M.T.2
  • 22
    • 0000049036 scopus 로고    scopus 로고
    • Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
    • C.Y. Lee Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint Operations Research Letters 20 1997 129 139
    • (1997) Operations Research Letters , vol.20 , pp. 129-139
    • Lee, C.Y.1
  • 23
    • 76349087153 scopus 로고    scopus 로고
    • A survey of scheduling with deterministic machine availability constraints
    • Y. Ma, C. Chu, and C. Zuo A survey of scheduling with deterministic machine availability constraints Computers and Industrial Engineering 58 2 2010 199 211
    • (2010) Computers and Industrial Engineering , vol.58 , Issue.2 , pp. 199-211
    • Ma, Y.1    Chu, C.2    Zuo, C.3
  • 24
    • 84857642720 scopus 로고    scopus 로고
    • A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints
    • H. Hadda A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints Optimization Letters 6 2012 559 569
    • (2012) Optimization Letters , vol.6 , pp. 559-569
    • Hadda, H.1
  • 26
    • 27644520542 scopus 로고    scopus 로고
    • Flow shop scheduling problem with limited machine availability: A heuristic approach
    • R. Aggoune, and M.-C. Portmann Flow shop scheduling problem with limited machine availability: a heuristic approach International Journal of Production Economics 99 2006 4 15
    • (2006) International Journal of Production Economics , vol.99 , pp. 4-15
    • Aggoune, R.1    Portmann, M.-C.2
  • 27
    • 77958468455 scopus 로고    scopus 로고
    • Scheduling hybrid flow shop problem with non-fixed availability constraints
    • W. Besbes, J. Teghem, and T. Loukil Scheduling hybrid flow shop problem with non-fixed availability constraints European Journal of Industrial Engineering 4 4 2010 413 433
    • (2010) European Journal of Industrial Engineering , vol.4 , Issue.4 , pp. 413-433
    • Besbes, W.1    Teghem, J.2    Loukil, T.3
  • 28
    • 78650731225 scopus 로고    scopus 로고
    • A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints
    • C. Zhao, and H. Tang A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints Optimization Letters 5 2011 183 190
    • (2011) Optimization Letters , vol.5 , pp. 183-190
    • Zhao, C.1    Tang, H.2
  • 31
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • C.Y. Lee, and Z.L. Chen Scheduling jobs and maintenance activities on parallel machines Naval Research Logistics 47 2000 145 165
    • (2000) Naval Research Logistics , vol.47 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 32
    • 5644274147 scopus 로고    scopus 로고
    • The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    • D. Gupta, and T. Magnusson The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times Computers & Operations Research 32 2005 727 747
    • (2005) Computers & Operations Research , vol.32 , pp. 727-747
    • Gupta, D.1    Magnusson, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.