-
1
-
-
23944437350
-
A cooperative virtual prototyping system for mechatronic solution elements based assembly
-
Publisher: Elsevier
-
Shen Q., Gausemeier J., Bauch J., and Radkowski C. A cooperative virtual prototyping system for mechatronic solution elements based assembly. Advanced Engineering Informatics 19 (2005) 169-177 Publisher: Elsevier
-
(2005)
Advanced Engineering Informatics
, vol.19
, pp. 169-177
-
-
Shen, Q.1
Gausemeier, J.2
Bauch, J.3
Radkowski, C.4
-
2
-
-
2642586428
-
Agent-based composable simulation for virtual prototyping of fluid power system
-
Publisher: Elsevier
-
Xiang W., Fok S.C., and Thimm G. Agent-based composable simulation for virtual prototyping of fluid power system. Computers in Industry 54 (2004) 237-251 Publisher: Elsevier
-
(2004)
Computers in Industry
, vol.54
, pp. 237-251
-
-
Xiang, W.1
Fok, S.C.2
Thimm, G.3
-
4
-
-
1442334770
-
A virtual prototyping system for rapid product development
-
Publisher: Elsevier
-
Choi S.H., and Chan A.M.M. A virtual prototyping system for rapid product development. Computer-Aided Design 36 (2004) 401-412 Publisher: Elsevier
-
(2004)
Computer-Aided Design
, vol.36
, pp. 401-412
-
-
Choi, S.H.1
Chan, A.M.M.2
-
5
-
-
45949090913
-
-
M. Sarshar, P. Christiansson, J. Winter, Towards virtual prototyping in the construction industry: the case study of the DIVERCITY project, Proceedings of the World IT Conference for Design and Construction, 18-24 Feb 2004, Langkawi, Malaysia, 2004, pp. 581-588. Publisher: CIDB.
-
M. Sarshar, P. Christiansson, J. Winter, Towards virtual prototyping in the construction industry: the case study of the DIVERCITY project, Proceedings of the World IT Conference for Design and Construction, 18-24 Feb 2004, Langkawi, Malaysia, 2004, pp. 581-588. Publisher: CIDB.
-
-
-
-
6
-
-
33749826089
-
Generation of a construction planning from a 3D CAD model
-
Publisher: Elsevier
-
de Vries B., and Harink M.J. Generation of a construction planning from a 3D CAD model. Automation in Construction 16 (2007) 13-18 Publisher: Elsevier
-
(2007)
Automation in Construction
, vol.16
, pp. 13-18
-
-
de Vries, B.1
Harink, M.J.2
-
7
-
-
33751501800
-
Supporting the constructability review with 3D/4D models
-
Publisher: Taylor & Francis
-
Hartmann T., and Fischer M. Supporting the constructability review with 3D/4D models. Building Research & Information 35 1 (2007) 70-80 Publisher: Taylor & Francis
-
(2007)
Building Research & Information
, vol.35
, Issue.1
, pp. 70-80
-
-
Hartmann, T.1
Fischer, M.2
-
8
-
-
0037332769
-
A virtual construction environment for preconstruction planning
-
Publisher: Elsevier
-
Waly A.F., and Thabet W.Y. A virtual construction environment for preconstruction planning. Automation in Construction 12 (2002) 139-154 Publisher: Elsevier
-
(2002)
Automation in Construction
, vol.12
, pp. 139-154
-
-
Waly, A.F.1
Thabet, W.Y.2
-
9
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
Publisher: ASCE
-
Koo B., and Fischer M. Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management 126 4 (2000) 251-260 Publisher: ASCE
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
11
-
-
34147115212
-
A virtual prototyping system for simulating construction processes
-
10.1016/j.autcon.2006.09.007 Publisher: Elsevier
-
Huang T., Kong C.W., Guo H.L., Baldwin A., and Li H. A virtual prototyping system for simulating construction processes. Automation in Construction (2006) 10.1016/j.autcon.2006.09.007 Publisher: Elsevier
-
(2006)
Automation in Construction
-
-
Huang, T.1
Kong, C.W.2
Guo, H.L.3
Baldwin, A.4
Li, H.5
-
13
-
-
0038286508
-
Productivity in manufacturing and the length of the working day: evidence from the 1880 census of manufactures
-
Publisher: Elsevier
-
Atack J., Bateman F., and Margo R.A. Productivity in manufacturing and the length of the working day: evidence from the 1880 census of manufactures. Explorations in Economic History 40 2 (2003) 170-194 Publisher: Elsevier
-
(2003)
Explorations in Economic History
, vol.40
, Issue.2
, pp. 170-194
-
-
Atack, J.1
Bateman, F.2
Margo, R.A.3
-
14
-
-
34248184575
-
-
Taylor&Francis
-
Bing S., and Ye J. A framework of virtual prototyping environment for the design and analysis of mechanical mechanism with clearance. Virtual and Physical Prototyping vol. 2(1) (March 2007), Taylor&Francis 21-28
-
(2007)
Virtual and Physical Prototyping
, vol.2 1
, pp. 21-28
-
-
Bing, S.1
Ye, J.2
|