-
1
-
-
70449518083
-
Cooperation of human and machines in assembly lines
-
J. Krüger, T. Lien, and A. Verl, "Cooperation of human and machines in assembly lines," CIRP Ann.-Manuf. Technol., vol. 58, no. 2, pp. 628-646, 2009.
-
(2009)
CIRP Ann.-Manuf. Technol.
, vol.58
, Issue.2
, pp. 628-646
-
-
Krüger, J.1
Lien, T.2
Verl, A.3
-
2
-
-
78651075251
-
Artificial cognition in production systems
-
Jan.
-
A. Bannat et al., "Artificial cognition in production systems," Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 148-174, Jan. 2011.
-
(2011)
Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 148-174
-
-
Bannat, A.1
-
3
-
-
84856238651
-
Development of production robot system that can assemble products with cable and connector
-
R. Haraguchi, Y. Domae, K. Shiratsuchi, Y. Kitaaki, H. Okuda, A. Noda, K. Sumi, T. Matsuno, S. Kaneko, and T. Fukuda, "Development of production robot system that can assemble products with cable and connector," J. Robot. Mechatronics, vol. 23, no. 6, pp. 939-939, 2011.
-
(2011)
J. Robot. Mechatronics
, vol.23
, Issue.6
, pp. 939-939
-
-
Haraguchi, R.1
Domae, Y.2
Shiratsuchi, K.3
Kitaaki, Y.4
Okuda, H.5
Noda, A.6
Sumi, K.7
Matsuno, T.8
Kaneko, S.9
Fukuda, T.10
-
4
-
-
34147098971
-
Methodology and themes of human-robot interaction: A growing research field
-
K. Dautenhahn, "Methodology and themes of human-robot interaction: A growing research field," Int. J. Adv. Robot. Syst., vol. 4, no. 1, pp. 103-108, 2007.
-
(2007)
Int. J. Adv. Robot. Syst.
, vol.4
, Issue.1
, pp. 103-108
-
-
Dautenhahn, K.1
-
5
-
-
40549104177
-
Human robot collaboration: A literature review and augmented reality approach in design
-
S. Green, M. Billinghurst, X. Chen, and J. Chase, "Human robot collaboration: A literature review and augmented reality approach in design," Int. J. Adv. Robot. Syst., vol. 5, no. 1, pp. 1-18, 2007.
-
(2007)
Int. J. Adv. Robot. Syst.
, vol.5
, Issue.1
, pp. 1-18
-
-
Green, S.1
Billinghurst, M.2
Chen, X.3
Chase, J.4
-
6
-
-
84855347440
-
A multiscale assembly and packaging system for manufacturing of complex micro-nano devices
-
Jan.
-
A. N. Das, R. Murthy, D. O. Popa, and H. E. Stephanou, "A multiscale assembly and packaging system for manufacturing of complex micro-nano devices," Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 160-170, Jan. 2012.
-
(2012)
Trans. Autom. Sci. Eng.
, vol.9
, Issue.1
, pp. 160-170
-
-
Das, A.N.1
Murthy, R.2
Popa, D.O.3
Stephanou, H.E.4
-
7
-
-
77956227754
-
Robust model-based online fault detection for mating process of electric connectors in robotic wiring harness assembly systems
-
J. Huang, P. Di, T. Fukuda, and T. Matsuno, "Robust model-based online fault detection for mating process of electric connectors in robotic wiring harness assembly systems," IEEE Trans. Control Syst. Technol., vol. 18, no. 5, pp. 1207-1215, 2010.
-
(2010)
IEEE Trans. Control Syst. Technol.
, vol.18
, Issue.5
, pp. 1207-1215
-
-
Huang, J.1
Di, P.2
Fukuda, T.3
Matsuno, T.4
-
8
-
-
40849096005
-
Model-based intelligent fault detection and diagnosis for mating electric connectors in robotic wiring harness assembly systems
-
J. Huang, T. Fukuda, and T. Matsuno, "Model-based intelligent fault detection and diagnosis for mating electric connectors in robotic wiring harness assembly systems," IEEE/ASME Trans. Mechatronics, vol. 13, no. 1, pp. 86-94, 2008.
-
(2008)
IEEE/ASME Trans. Mechatronics
, vol.13
, Issue.1
, pp. 86-94
-
-
Huang, J.1
Fukuda, T.2
Matsuno, T.3
-
10
-
-
84866893070
-
The rise of the robot worker
-
E. Guizzo and E. Ackerman, "The rise of the robot worker," IEEE Spectrum, vol. 49, no. 10, pp. 34-41, 2012.
-
(2012)
IEEE Spectrum
, vol.49
, Issue.10
, pp. 34-41
-
-
Guizzo, E.1
Ackerman, E.2
-
11
-
-
82555192164
-
An assembly strategy scheduling method for human and robot coordinated cell manufacturing
-
F. Chen, K. Sekiyama, H. Sasaki, J. Huang, B. Sun, and T. Fukuda, "An assembly strategy scheduling method for human and robot coordinated cell manufacturing," Int. J. Intel. Comput. Cybern., vol. 4, no. 4, pp. 487-510, 2011.
-
(2011)
Int. J. Intel. Comput. Cybern.
, vol.4
, Issue.4
, pp. 487-510
-
-
Chen, F.1
Sekiyama, K.2
Sasaki, H.3
Huang, J.4
Sun, B.5
Fukuda, T.6
-
12
-
-
0742307440
-
Deadlock control methods in automated manufacturing systems
-
M. P. Fanti and M. Zhou, "Deadlock control methods in automated manufacturing systems," IEEE Trans. Syst., Man, Cybern., Part A: Syst. Humans, vol. 34, no. 1, pp. 5-22, 2004.
-
(2004)
IEEE Trans. Syst., Man, Cybern., Part A: Syst. Humans
, vol.34
, Issue.1
, pp. 5-22
-
-
Fanti, M.P.1
Zhou, M.2
-
13
-
-
84871741730
-
Deadlock-free control of automated manufacturing systems with flexible routes and assembly operations using petri nets
-
Jan.
-
H. Hu, M. Zhou, Z. Li, and G. Tang, "Deadlock-free control of automated manufacturing systems with flexible routes and assembly operations using petri nets," Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 109-121, Jan. 2013.
-
(2013)
Trans. Autom. Sci. Eng.
, vol.9
, Issue.1
, pp. 109-121
-
-
Hu, H.1
Zhou, M.2
Li, Z.3
Tang, G.4
-
14
-
-
67349136225
-
-
New York, NY USA: Wiley
-
G. Monkman, S. Hesse, R. Steinmann, and H. Schunk, Robot Grippers. New York, NY, USA: Wiley, 2007.
-
(2007)
Robot Grippers
-
-
Monkman, G.1
Hesse, S.2
Steinmann, R.3
Schunk, H.4
-
15
-
-
0021161421
-
Minimizing costs of resource requirements in project networks subject to a fixed completion time
-
R. Möhring, "Minimizing costs of resource requirements in project networks subject to a fixed completion time," Oper. Res., pp. 89-120, 1984.
-
(1984)
Oper. Res
, pp. 89-120
-
-
Möhring, R.1
-
16
-
-
78049444992
-
A neurogenetic approach for the resource-constrained project scheduling problem
-
A. Agarwal, S. Colak, and S. Erenguc, "A neurogenetic approach for the resource-constrained project scheduling problem," Comput. Oper. Res., vol. 38, no. 1, pp. 44-50, 2011.
-
(2011)
Comput. Oper. Res.
, vol.38
, Issue.1
, pp. 44-50
-
-
Agarwal, A.1
Colak, S.2
Erenguc, S.3
-
17
-
-
77953872383
-
A survey of variants and extensions of the resource-constrained project scheduling problem
-
S. Hartmann and D. Briskorn, "A survey of variants and extensions of the resource-constrained project scheduling problem," Eur. J. Oper. Res., vol. 207, no. 1, pp. 1-14, 2010.
-
(2010)
Eur. J. Oper. Res.
, vol.207
, Issue.1
, pp. 1-14
-
-
Hartmann, S.1
Briskorn, D.2
-
18
-
-
78049425864
-
Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems
-
F. Ballestín and R. Blanco, "Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems," Comput. Oper. Res., vol. 38, no. 1, pp. 51-62, 2011.
-
(2011)
Comput. Oper. Res.
, vol.38
, Issue.1
, pp. 51-62
-
-
Ballestín, F.1
Blanco, R.2
-
19
-
-
0035280765
-
Optimization guided lower and upper bounds for the resource investment problem
-
A. Drexl and A. Kimms, "Optimization guided lower and upper bounds for the resource investment problem," J. Oper. Res. Soc., pp. 340-351, 2001.
-
(2001)
J. Oper. Res. Soc
, pp. 340-351
-
-
Drexl, A.1
Kimms, A.2
-
20
-
-
15844401264
-
A new heuristic for the multi-mode resource investment problem
-
C. Hsu and D. Kim, "A new heuristic for the multi-mode resource investment problem," J. Oper. Res. Soc., vol. 56, no. 4, pp. 406-413, 2004.
-
(2004)
J. Oper. Res. Soc.
, vol.56
, Issue.4
, pp. 406-413
-
-
Hsu, C.1
Kim, D.2
-
21
-
-
33847297058
-
A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
-
S. Shadrokh and F. Kianfar, "A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty," Eur. J. Oper. Res., vol. 181, no. 1, pp. 86-101, 2007.
-
(2007)
Eur. J. Oper. Res.
, vol.181
, Issue.1
, pp. 86-101
-
-
Shadrokh, S.1
Kianfar, F.2
-
22
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
J. Blazewicz, J. Lenstra, and A. Kan, "Scheduling subject to resource constraints: classification and complexity," Discrete Appl. Math., vol. 5, no. 1, pp. 11-24, 1983.
-
(1983)
Discrete Appl. Math.
, vol.5
, Issue.1
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.2
Kan, A.3
-
23
-
-
85055840680
-
-
London, U.K.: Chapman & Hall
-
J. Leung, Handbook of Scheduling: Algorithms, Models, and Performance Analysis. London, U.K.: Chapman & Hall, 2004, vol. 1.
-
(2004)
Handbook of Scheduling: Algorithms, Models, and Performance Analysis
, vol.1
-
-
Leung, J.1
-
24
-
-
0003163669
-
Task matching and scheduling in heterogeneous computing environments using a genetic-algorithm-based approach
-
L. Wang, H. Siegel, V. Roychowdhury, and A. Maciejewski, "Task matching and scheduling in heterogeneous computing environments using a genetic-algorithm-based approach," J. Parallel Distrib. Comput., vol. 47, no. 1, pp. 8-22, 1997.
-
(1997)
J. Parallel Distrib. Comput.
, vol.47
, Issue.1
, pp. 8-22
-
-
Wang, L.1
Siegel, H.2
Roychowdhury, V.3
MacIejewski, A.4
-
25
-
-
33644978280
-
Evolutionary multi-objective optimization: A historical view of the field
-
C. C. Coello, "Evolutionary multi-objective optimization: a historical view of the field," IEEE Comput. Intell. Mag., vol. 1, no. 1, pp. 28-36, 2006.
-
(2006)
IEEE Comput. Intell. Mag.
, vol.1
, Issue.1
, pp. 28-36
-
-
Coello, C.C.1
-
26
-
-
69949178759
-
Observations on using problem-specific genetic algorithm for multiprocessor real-time task scheduling
-
Y. Li, Y. Yang, L. Zhou, and R. Zhu, "Observations on using problem-specific genetic algorithm for multiprocessor real-time task scheduling," Int. J. Innovative Comput. Inform. Control, vol. 5, no. 9, pp. 2531-2540, 2009.
-
(2009)
Int. J. Innovative Comput. Inform. Control
, vol.5
, Issue.9
, pp. 2531-2540
-
-
Li, Y.1
Yang, Y.2
Zhou, L.3
Zhu, R.4
-
27
-
-
77953051205
-
Task scheduling in multiprocessor system using genetic algorithm
-
S. Gupta, G. Agarwal, and V. Kumar, "Task scheduling in multiprocessor system using genetic algorithm," in Proc. IEEE 2nd Int. Conf. Mach. Learn. Comput. (ICMLC'10), 2010, pp. 267-271.
-
(2010)
Proc. IEEE 2nd Int. Conf. Mach. Learn. Comput. (ICMLC'10)
, pp. 267-271
-
-
Gupta, S.1
Agarwal, G.2
Kumar, V.3
-
28
-
-
80053914853
-
Modified genetic algorithm for multiobjective task scheduling on heterogeneous computing system
-
O. Sathappan, P. Chitra, P. Venkatesh, and M. Prabhu, "Modified genetic algorithm for multiobjective task scheduling on heterogeneous computing system," Int. J. Inform. Technol. Commun. Convergence, vol. 1, no. 2, pp. 146-158, 2011.
-
(2011)
Int. J. Inform. Technol. Commun. Convergence
, vol.1
, Issue.2
, pp. 146-158
-
-
Sathappan, O.1
Chitra, P.2
Venkatesh, P.3
Prabhu, M.4
-
29
-
-
0025417235
-
Efficient scheduling algorithms for real-time multiprocessor systems
-
K. Ramamritham, J. Stankovic, and P. Shiah, "Efficient scheduling algorithms for real-time multiprocessor systems," IEEE Trans. Parallel Distrib. Syst., vol. 1, no. 2, pp. 184-194, 1990.
-
(1990)
IEEE Trans. Parallel Distrib. Syst.
, vol.1
, Issue.2
, pp. 184-194
-
-
Ramamritham, K.1
Stankovic, J.2
Shiah, P.3
-
30
-
-
79960204163
-
A survey of hard real-time scheduling for multiprocessor systems
-
R. I. Davis and A. Burns, "A survey of hard real-time scheduling for multiprocessor systems," ACM Comput. Surveys (CSUR), vol. 43, no. 4, p. 35, 2011.
-
(2011)
ACM Comput. Surveys (CSUR)
, vol.43
, Issue.4
, pp. 35
-
-
Davis, R.I.1
Burns, A.2
-
31
-
-
41549146820
-
Integrating job parallelism in real-time scheduling theory
-
S. Collette, L. Cucu, and J. Goossens, "Integrating job parallelism in real-time scheduling theory," Inform. Processing Lett., vol. 106, no. 5, pp. 180-187, 2008.
-
(2008)
Inform. Processing Lett.
, vol.106
, Issue.5
, pp. 180-187
-
-
Collette, S.1
Cucu, L.2
Goossens, J.3
-
33
-
-
7044222041
-
Optimal robot task scheduling based on genetic algorithms
-
P. Zacharia and N. Aspragathos, "Optimal robot task scheduling based on genetic algorithms," Robot. Comput.-Integr. Manuf., vol. 21, no. 1, pp. 67-79, 2005.
-
(2005)
Robot. Comput.-Integr. Manuf.
, vol.21
, Issue.1
, pp. 67-79
-
-
Zacharia, P.1
Aspragathos, N.2
-
34
-
-
3042585794
-
Integration of task scheduling, action planning, and control in robotic manufacturing systems
-
M. Song, T. Tarn, and N. Xi, "Integration of task scheduling, action planning, and control in robotic manufacturing systems," Proc. IEEE, vol. 88, no. 7, pp. 1097-1107, 2000.
-
(2000)
Proc. IEEE
, vol.88
, Issue.7
, pp. 1097-1107
-
-
Song, M.1
Tarn, T.2
Xi, N.3
-
36
-
-
0011465377
-
The return to straight-line depreciation: An analysis of a change in accounting method
-
T. Archibald, "The return to straight-line depreciation: An analysis of a change in accounting method," J. Account. Res., pp. 164-180, 1967.
-
(1967)
J. Account. Res
, pp. 164-180
-
-
Archibald, T.1
-
37
-
-
0020271514
-
On the complexity of fixed-priority scheduling of periodic, real-time tasks
-
J. Leung and J. Whitehead, "On the complexity of fixed-priority scheduling of periodic, real-time tasks," Perform. Eval., vol. 2, no. 4, pp. 237-250, 1982.
-
(1982)
Perform. Eval.
, vol.2
, Issue.4
, pp. 237-250
-
-
Leung, J.1
Whitehead, J.2
-
38
-
-
0030109034
-
Scheduling aperiodic tasks in dynamic priority systems
-
M. Spuri and G. Buttazzo, "Scheduling aperiodic tasks in dynamic priority systems," Real-Time Syst., vol. 10, no. 2, pp. 179-210, 1996.
-
(1996)
Real-Time Syst.
, vol.10
, Issue.2
, pp. 179-210
-
-
Spuri, M.1
Buttazzo, G.2
|