Application of Delphi method on critical success factors in joint ventures projects in Malaysian construction industry
-
C.O. Egbu, K.L. Tong (Eds.)
-
Adnan H., Morledge R. Application of Delphi method on critical success factors in joint ventures projects in Malaysian construction industry. Proceedings of the First Scottish Conference for PROBE, Glasgow Caledonian University, 18-19 November, UK 2003, C.O. Egbu, K.L. Tong (Eds.).
-
(2003)
Proceedings of the First Scottish Conference for PROBE, Glasgow Caledonian University, 18-19 November, UK
-
-
Adnan, H.1
Morledge, R.2
-
2
-
-
0036836295
-
The effects of construction delays on project delivery in Nigerian construction industry
-
Aibinu A.A., Jagboro G.O. The effects of construction delays on project delivery in Nigerian construction industry. Int. J. Proj. Manag. 2002, 20(8):593-599.
-
(2002)
Int. J. Proj. Manag.
, vol.20
, Issue.8
, pp. 593-599
-
-
Aibinu, A.A.1
Jagboro, G.O.2
-
3
-
-
84861143214
-
Design and build: a survey of construction contractors' views
-
Akintoye A. Design and build: a survey of construction contractors' views. J. Constr. Manag. Econ. 1994, 12(2):155-163.
-
(1994)
J. Constr. Manag. Econ.
, vol.12
, Issue.2
, pp. 155-163
-
-
Akintoye, A.1
-
4
-
-
2242459831
-
Analysis of factors influencing project cost estimating practice
-
Akintoye A. Analysis of factors influencing project cost estimating practice. Constr. Manag. Econ. 2000, 18(1):77-89.
-
(2000)
Constr. Manag. Econ.
, vol.18
, Issue.1
, pp. 77-89
-
-
Akintoye, A.1
-
5
-
-
0000365630
-
Project procurement system selection model
-
Alhazmi T., McCaffer R. Project procurement system selection model. J. Constr. Eng. Manag. 2000, 126(3):176-184.
-
(2000)
J. Constr. Eng. Manag.
, vol.126
, Issue.3
, pp. 176-184
-
-
Alhazmi, T.1
McCaffer, R.2
-
6
-
-
82455214926
-
Cost performance for building construction projects in Klang Valley
-
Ali A.S., Kamaruzzaman S.N. Cost performance for building construction projects in Klang Valley. J. Build. Perform. 2010, 1(1):110-118.
-
(2010)
J. Build. Perform.
, vol.1
, Issue.1
, pp. 110-118
-
-
Ali, A.S.1
Kamaruzzaman, S.N.2
-
7
-
-
84908072296
-
-
Retrieved from
-
Altman D., Burton N., Cuthill I., Festing M., Hutton J., Playle L. Why do a pilot study? Retrieved from. http://www.nc3rs.org.uk/downloaddoc.asp?id=400.
-
Why do a pilot study?
-
-
Altman, D.1
Burton, N.2
Cuthill, I.3
Festing, M.4
Hutton, J.5
Playle, L.6
-
8
-
-
77958138408
-
Three-stage least-squares analysis of time and cost overruns in construction contracts
-
Anastasopoulos P.C., Labi S., Mannering F.L., Sinha K.C., Bhargava A. Three-stage least-squares analysis of time and cost overruns in construction contracts. J. Constr. Eng. Manag. 2010, 136(11):1207-1218.
-
(2010)
J. Constr. Eng. Manag.
, vol.136
, Issue.11
, pp. 1207-1218
-
-
Anastasopoulos, P.C.1
Labi, S.2
Mannering, F.L.3
Sinha, K.C.4
Bhargava, A.5
-
10
-
-
0004562581
-
Accuracy in estimating
-
The Chartered Institute of Building, Ascot
-
Ashworth A., Skitmore M. Accuracy in estimating. Occasional Paper 27 1983, The Chartered Institute of Building, Ascot.
-
(1983)
Occasional Paper 27
-
-
Ashworth, A.1
Skitmore, M.2
-
11
-
-
84874365086
-
Cost overrun factors in construction industry of Pakistan
-
Azhar N., Rizwan U., Farooqui, Ahmed S.M. Cost overrun factors in construction industry of Pakistan. Proceedings of the First International Conference on Construction in Developing Countries (ICCIDC-I), August 4-5, 2008, Karachi, Pakistan 2008, 499-508.
-
(2008)
Proceedings of the First International Conference on Construction in Developing Countries (ICCIDC-I), August 4-5, 2008, Karachi, Pakistan
, pp. 499-508
-
-
Azhar, N.1
Rizwan, U.2
Farooqui, A.S.M.3
-
12
-
-
0030212023
-
The concept of project complexity - a review
-
Baccarini D. The concept of project complexity - a review. Int. J. Proj. Manag. 1996, 14(4):201-204.
-
(1996)
Int. J. Proj. Manag.
, vol.14
, Issue.4
, pp. 201-204
-
-
Baccarini, D.1
-
13
-
-
84901286661
-
Improving predictability of construction project outcomes through intentional management of indirect construction costs
-
(April, 2014)
-
Becker T.C., Jaselskis E.J., El-gafy M. Improving predictability of construction project outcomes through intentional management of indirect construction costs. J. Constr. Eng. Manag. 2014, (April, 2014). 10.1061/(ASCE)CO.1943-7862.0000845.
-
(2014)
J. Constr. Eng. Manag.
-
-
Becker, T.C.1
Jaselskis, E.J.2
El-gafy, M.3
-
14
-
-
84873719825
-
Cost overrun and auction format in small size public works
-
Bucciol A., Chillemi O., Palazzi G. Cost overrun and auction format in small size public works. Eur. J. Polit. Econ. 2013, 30(Iss. Jun):35-42.
-
(2013)
Eur. J. Polit. Econ.
, vol.30
, Issue.ISS. JUN.
, pp. 35-42
-
-
Bucciol, A.1
Chillemi, O.2
Palazzi, G.3
-
15
-
-
0036132114
-
Compressing construction durations: lessons learned from Hong Kong building projects
-
Chan D.W.M., Kumaraswamy M.M. Compressing construction durations: lessons learned from Hong Kong building projects. Int. J. Proj. Manag. 2002, 20:23-35.
-
(2002)
Int. J. Proj. Manag.
, vol.20
, pp. 23-35
-
-
Chan, D.W.M.1
Kumaraswamy, M.M.2
-
16
-
-
79960663355
-
Identifying the critical success factors for target cost contracts in the construction industry
-
Chan W.M., Chan A.P.C., Lam P.T.I., Wong J.M.W. Identifying the critical success factors for target cost contracts in the construction industry. J. Facil. Manag. 2010, 8(3):179-201.
-
(2010)
J. Facil. Manag.
, vol.8
, Issue.3
, pp. 179-201
-
-
Chan, W.M.1
Chan, A.P.C.2
Lam, P.T.I.3
Wong, J.M.W.4
-
17
-
-
84900302502
-
-
Construction Industry Development Board, Malaysia, Kuala Lumpur
-
CIDB The Construction Industry Directory 2005, Construction Industry Development Board, Malaysia, Kuala Lumpur.
-
(2005)
The Construction Industry Directory
-
-
-
18
-
-
84908078494
-
-
Construction Industry Development Board, Malaysia, Kuala Lumpur
-
CIDB The Malaysian Industry Excellence Award (MCiEA 2005) 2005, Construction Industry Development Board, Malaysia, Kuala Lumpur.
-
(2005)
The Malaysian Industry Excellence Award (MCiEA 2005)
-
-
-
20
-
-
84908078492
-
-
The Construction Industry Institute, (Accessed via: (April, 2014))
-
CII Performance Assessment. CII Benchmarking Measurement Categories 2014, The Construction Industry Institute, (Accessed via: https://www.construction-institute.org/benchmarking/measures.cfm?section=pa (April, 2014)).
-
(2014)
Performance Assessment. CII Benchmarking Measurement Categories
-
-
-
21
-
-
33744745571
-
Definitive estimating for construction projects at remote sites
-
Cleveland B.W. Definitive estimating for construction projects at remote sites. Cost Eng. 1995, 37(10):34-39.
-
(1995)
Cost Eng.
, vol.37
, Issue.10
, pp. 34-39
-
-
Cleveland, B.W.1
-
23
-
-
0344894852
-
Estimating project and activity duration: a risk management approach using network analysis
-
Dawood N. Estimating project and activity duration: a risk management approach using network analysis. Constr. Manag. Econ. 1998, 16(1):41-48.
-
(1998)
Constr. Manag. Econ.
, vol.16
, Issue.1
, pp. 41-48
-
-
Dawood, N.1
-
24
-
-
25144449661
-
Six steps to project success
-
DeMarco A.A. Six steps to project success. Cost Eng. 2005, 47(9):12-13.
-
(2005)
Cost Eng.
, vol.47
, Issue.9
, pp. 12-13
-
-
DeMarco, A.A.1
-
26
-
-
38249017819
-
Reasons for overrun in public sector construction projects in Nigeria
-
Dlakwa M., Culpin F. Reasons for overrun in public sector construction projects in Nigeria. Int. J. Proj. Manag. 1990, 8(4):237-241.
-
(1990)
Int. J. Proj. Manag.
, vol.8
, Issue.4
, pp. 237-241
-
-
Dlakwa, M.1
Culpin, F.2
-
27
-
-
84874610458
-
Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects
-
Doloi H. Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects. J. Constr. Eng. Manag. 2013, 139(3):267-279.
-
(2013)
J. Constr. Eng. Manag.
, vol.139
, Issue.3
, pp. 267-279
-
-
Doloi, H.1
-
28
-
-
84859216741
-
Analysing factors affecting delays in Indian construction projects
-
Doloi H., Sawhney A., Iyer K.C., Rentala S. Analysing factors affecting delays in Indian construction projects. Int. J. Proj. Manag. 2012, 30(4):479-489.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, Issue.4
, pp. 479-489
-
-
Doloi, H.1
Sawhney, A.2
Iyer, K.C.3
Rentala, S.4
-
30
-
-
0442322098
-
Welcome to a New White Elephant
-
17 August.
-
Ellis, W., 1985. Welcome to a New White Elephant. Financial Times. 17 August.
-
(1985)
Financial Times
-
-
Ellis, W.1
-
32
-
-
72749098970
-
Relationship between duration and cost of Malaysian construction projects
-
Endut I.R., Akintoye A., Kelly J. Relationship between duration and cost of Malaysian construction projects. Proceedings of the International Conference in the Built Environment in the 21st Century (ICiBE 2006), 13-15th June, 2006, Kuala Lumpur 2006.
-
(2006)
Proceedings of the International Conference in the Built Environment in the 21st Century (ICiBE 2006), 13-15th June, 2006, Kuala Lumpur
-
-
Endut, I.R.1
Akintoye, A.2
Kelly, J.3
-
34
-
-
0036319174
-
Underestimating costs in public works projects
-
Flyvbjerg B., Holms M.S., Buhl S. Underestimating costs in public works projects. J. Am. Plan. Assoc. 2002, 68(3):279-295.
-
(2002)
J. Am. Plan. Assoc.
, vol.68
, Issue.3
, pp. 279-295
-
-
Flyvbjerg, B.1
Holms, M.S.2
Buhl, S.3
-
35
-
-
0037242979
-
How common and how large are cost overruns in transport infrastructure projects?
-
Flyvbjerg B., Holms M.S., Buhl S. How common and how large are cost overruns in transport infrastructure projects?. Transp. Rev. 2003, 23(1):71-88.
-
(2003)
Transp. Rev.
, vol.23
, Issue.1
, pp. 71-88
-
-
Flyvbjerg, B.1
Holms, M.S.2
Buhl, S.3
-
36
-
-
0442328937
-
What causes cost overrun in transport infrastructure projects?
-
Flyvbjerg B., Skamris M.K., Buhl S.L. What causes cost overrun in transport infrastructure projects?. Transp. Rev. 2004, 24(1):3-18.
-
(2004)
Transp. Rev.
, vol.24
, Issue.1
, pp. 3-18
-
-
Flyvbjerg, B.1
Skamris, M.K.2
Buhl, S.L.3
-
37
-
-
0003474909
-
The performance and impact of rail mass transit in developing countries
-
Transport Research Laboratory, Crowthorne, Berkshire, England
-
Fourancre P.R., Alport R.J., Thompson J.M. The performance and impact of rail mass transit in developing countries. TRRL Research Report 278 1990, Transport Research Laboratory, Crowthorne, Berkshire, England.
-
(1990)
TRRL Research Report 278
-
-
Fourancre, P.R.1
Alport, R.J.2
Thompson, J.M.3
-
38
-
-
0038721064
-
Causes of delay and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study
-
Frimpong Y., Oluwoye J., Crawford L. Causes of delay and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study. Int. J. Proj. Manag. 2003, 21(5):321-326.
-
(2003)
Int. J. Proj. Manag.
, vol.21
, Issue.5
, pp. 321-326
-
-
Frimpong, Y.1
Oluwoye, J.2
Crawford, L.3
-
39
-
-
43949162865
-
Exposure envelopes: an assessment of the exposure to time and cost overruns during construction projects
-
Hajarat A.D., Smith J.N. Exposure envelopes: an assessment of the exposure to time and cost overruns during construction projects. Int. J. Proj. Manag. 1993, 11(4):227-231.
-
(1993)
Int. J. Proj. Manag.
, vol.11
, Issue.4
, pp. 227-231
-
-
Hajarat, A.D.1
Smith, J.N.2
-
40
-
-
0032667061
-
Indirect cost categorization and allocation by construction contractors
-
Holland N.L., Hobson D. Indirect cost categorization and allocation by construction contractors. J. Archit. Eng. 1999, 5(2):49-56.
-
(1999)
J. Archit. Eng.
, vol.5
, Issue.2
, pp. 49-56
-
-
Holland, N.L.1
Hobson, D.2
-
41
-
-
84986170608
-
Contractor selection innovation: examination of two decades' published research
-
Holt G.D. Contractor selection innovation: examination of two decades' published research. Constr. Innov. 2010, 10(3):304-328.
-
(2010)
Constr. Innov.
, vol.10
, Issue.3
, pp. 304-328
-
-
Holt, G.D.1
-
42
-
-
84884555792
-
Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria
-
Ibironke O.T., Oladinrin T.O., Eboreime I.V. Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. J. Constr. Dev. Ctries. 2013, 18(1):53-72.
-
(2013)
J. Constr. Dev. Ctries.
, vol.18
, Issue.1
, pp. 53-72
-
-
Ibironke, O.T.1
Oladinrin, T.O.2
Eboreime, I.V.3
-
43
-
-
77952191060
-
An investigation of status of the Malaysian construction industry
-
Ibrahim A.R., Roy M.H., Ahmed Z., Imtiaz G. An investigation of status of the Malaysian construction industry. Benchmarking 2010, 17(2):294-308.
-
(2010)
Benchmarking
, vol.17
, Issue.2
, pp. 294-308
-
-
Ibrahim, A.R.1
Roy, M.H.2
Ahmed, Z.3
Imtiaz, G.4
-
44
-
-
84858827980
-
Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria
-
Idoro G. Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. J. Eng. Des. Technol. 2012, 10(1):7-33.
-
(2012)
J. Eng. Des. Technol.
, vol.10
, Issue.1
, pp. 7-33
-
-
Idoro, G.1
-
45
-
-
0025494340
-
Predictors of cost-overrun rates
-
Jahren C.T., Ashe A.M. Predictors of cost-overrun rates. J. Constr. Eng. Manag. 1990, 116(3):548-552.
-
(1990)
J. Constr. Eng. Manag.
, vol.116
, Issue.3
, pp. 548-552
-
-
Jahren, C.T.1
Ashe, A.M.2
-
46
-
-
0001361084
-
Relationship between value and duration of construction projects
-
Kaka A., Price A.D.F. Relationship between value and duration of construction projects. Constr. Manag. Econ. 1991, 9(4):381-400.
-
(1991)
Constr. Manag. Econ.
, vol.9
, Issue.4
, pp. 381-400
-
-
Kaka, A.1
Price, A.D.F.2
-
47
-
-
0039997969
-
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
-
Kaming P.F., Olomolaiye P.O., Holt G.D., Harris F.C. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Constr. Manag. Econ. 1997, 15(1):83-94.
-
(1997)
Constr. Manag. Econ.
, vol.15
, Issue.1
, pp. 83-94
-
-
Kaming, P.F.1
Olomolaiye, P.O.2
Holt, G.D.3
Harris, F.C.4
-
48
-
-
3342982872
-
The importance of the early phase: the case of construction and building projects
-
Kolltveit B.J., Gronhaug K. The importance of the early phase: the case of construction and building projects. Int. J. Proj. Manag. 2004, 22(7):545-551.
-
(2004)
Int. J. Proj. Manag.
, vol.22
, Issue.7
, pp. 545-551
-
-
Kolltveit, B.J.1
Gronhaug, K.2
-
49
-
-
16444365584
-
Delays and cost increases in the construction of private residential projects in Kuwait
-
Koushki P.A., Al-Rashid K., Kartam N. Delays and cost increases in the construction of private residential projects in Kuwait. Constr. Manag. Econ. 2005, 23(3):285-294.
-
(2005)
Constr. Manag. Econ.
, vol.23
, Issue.3
, pp. 285-294
-
-
Koushki, P.A.1
Al-Rashid, K.2
Kartam, N.3
-
50
-
-
3042664421
-
Design and analysis of pilot studies: recommendations for good practice
-
Lancaster G.A., Dodd S., Williamson P.R. Design and analysis of pilot studies: recommendations for good practice. J. Eval. Clin. Pract. 2004, 10(2):307-312.
-
(2004)
J. Eval. Clin. Pract.
, vol.10
, Issue.2
, pp. 307-312
-
-
Lancaster, G.A.1
Dodd, S.2
Williamson, P.R.3
-
53
-
-
72749126807
-
Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries
-
Le-Hoai L., Lee Y.D., Lee J.Y. Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries. KSCE J. Civ. Eng. 2009, 12(6):367-377.
-
(2009)
KSCE J. Civ. Eng.
, vol.12
, Issue.6
, pp. 367-377
-
-
Le-Hoai, L.1
Lee, Y.D.2
Lee, J.Y.3
-
54
-
-
33645966777
-
Comparative analysis of cost estimates of major public investment projects
-
Magnussen O.M., Olsson N.O.E. Comparative analysis of cost estimates of major public investment projects. Int. J. Proj. Manag. 2006, 24:281-288.
-
(2006)
Int. J. Proj. Manag.
, vol.24
, pp. 281-288
-
-
Magnussen, O.M.1
Olsson, N.O.E.2
-
55
-
-
0000725583
-
Causes of delay and cost overruns in Nigerian construction industry
-
Mansfield N., Ugwu O., Doran T. Causes of delay and cost overruns in Nigerian construction industry. Int. J. Proj. Manag. 1994, 12(4):245-260.
-
(1994)
Int. J. Proj. Manag.
, vol.12
, Issue.4
, pp. 245-260
-
-
Mansfield, N.1
Ugwu, O.2
Doran, T.3
-
56
-
-
84875784665
-
Preliminary study on causative factors leading to construction cost overrun
-
Memon A.H., Ismail A.R., Azis A.A. Preliminary study on causative factors leading to construction cost overrun. Int. J. Sustain. Constr. Eng. Technol. 2011, 2(1):57-71.
-
(2011)
Int. J. Sustain. Constr. Eng. Technol.
, vol.2
, Issue.1
, pp. 57-71
-
-
Memon, A.H.1
Ismail, A.R.2
Azis, A.A.3
-
57
-
-
84908080374
-
-
Accessed via:, (November, 2013)
-
Memon A.H., Ismail A.R., Ade Asmi A., Nor Hazana A. Using Structural Equation Modelling to Assess Effects of Construction Resource Related Factors on Cost Overrun Accessed via:, (November, 2013). http://www.idosi.org/wasj/WASJ21(mae)13/2.pdf.
-
Using Structural Equation Modelling to Assess Effects of Construction Resource Related Factors on Cost Overrun
-
-
Memon, A.H.1
Ismail, A.R.2
Ade Asmi, A.3
Nor Hazana, A.4
-
58
-
-
0003197981
-
Cost overruns in public works
-
Aldine, Chicago, (Reprint no. 114 (Berkeley: Institute of Urban and Regional Development, University of California)), W.A. Niskanen, A.C. Harberger, R.H. Havemen, R. Turvey, R. Zeckhauser (Eds.)
-
Merewitz L. Cost overruns in public works. Benefits-Cost and Policy Analysis 1973, 277-295. Aldine, Chicago, (Reprint no. 114 (Berkeley: Institute of Urban and Regional Development, University of California)). W.A. Niskanen, A.C. Harberger, R.H. Havemen, R. Turvey, R. Zeckhauser (Eds.).
-
(1973)
Benefits-Cost and Policy Analysis
, pp. 277-295
-
-
Merewitz, L.1
-
60
-
-
0009949847
-
Reducing IT project complexity
-
Murray J.R. Reducing IT project complexity. Inf. Strateg. 2000, 16(3):30-39.
-
(2000)
Inf. Strateg.
, vol.16
, Issue.3
, pp. 30-39
-
-
Murray, J.R.1
-
61
-
-
84896377998
-
Cost performance in construction industry of Pakistan
-
Nawaz T., Shareef N.A., Ikram A.A. Cost performance in construction industry of Pakistan. Ind. Eng. Lett. 2013, 3(2):19-33.
-
(2013)
Ind. Eng. Lett.
, vol.3
, Issue.2
, pp. 19-33
-
-
Nawaz, T.1
Shareef, N.A.2
Ikram, A.A.3
-
62
-
-
84869097725
-
Satisfaction assessment in construction projects: a conceptual framework
-
Nzekwe-Excel C. Satisfaction assessment in construction projects: a conceptual framework. Built Environ. Proj. Asset Manag. 2012, 2(1):86-102.
-
(2012)
Built Environ. Proj. Asset Manag.
, vol.2
, Issue.1
, pp. 86-102
-
-
Nzekwe-Excel, C.1
-
63
-
-
1642538212
-
Cost overruns in road construction - what are their sizes and determinants?
-
Odeck J. Cost overruns in road construction - what are their sizes and determinants?. Transp. Policy 2004, 11(1):43-53.
-
(2004)
Transp. Policy
, vol.11
, Issue.1
, pp. 43-53
-
-
Odeck, J.1
-
64
-
-
0028570358
-
Practice of construction industry development at the crossroads
-
Ofori G. Practice of construction industry development at the crossroads. Habitat Int. 1994, 18(2):41-56.
-
(1994)
Habitat Int.
, vol.18
, Issue.2
, pp. 41-56
-
-
Ofori, G.1
-
65
-
-
0032431968
-
Cost-time performance of public sector housing projects in Nigeria
-
Okuwoga A.A. Cost-time performance of public sector housing projects in Nigeria. J. Habitat Int. 1998, 22(4):389-395.
-
(1998)
J. Habitat Int.
, vol.22
, Issue.4
, pp. 389-395
-
-
Okuwoga, A.A.1
-
66
-
-
84878935256
-
Causes of cost overruns in transport infrastructure projects in Asia: their significance and relationship with project size
-
Park Y., Papadopoulou Theopisti C. Causes of cost overruns in transport infrastructure projects in Asia: their significance and relationship with project size. Built Environ. Proj. Asset Manag. 2012, 2(2):195-216.
-
(2012)
Built Environ. Proj. Asset Manag.
, vol.2
, Issue.2
, pp. 195-216
-
-
Park, Y.1
Papadopoulou, T.C.2
-
67
-
-
84908073789
-
Analysis of tender sum forecasting by quantity surveyors and contractors in South Africa
-
Pearl R.G., Akintoye A., Bowen P.A., Hardcastle C. Analysis of tender sum forecasting by quantity surveyors and contractors in South Africa. J. Phys. Dev. Sci. Acta Stuctilla 2003, 10(1/2):5-35.
-
(2003)
J. Phys. Dev. Sci. Acta Stuctilla
, vol.10
, Issue.1-2
, pp. 5-35
-
-
Pearl, R.G.1
Akintoye, A.2
Bowen, P.A.3
Hardcastle, C.4
-
70
-
-
28444442290
-
Comparative variability in tender bids for refurbishment and new build work
-
Quah L.K. Comparative variability in tender bids for refurbishment and new build work. Constr. Manag. Econ. 1992, 10(3):263-269.
-
(1992)
Constr. Manag. Econ.
, vol.10
, Issue.3
, pp. 263-269
-
-
Quah, L.K.1
-
71
-
-
84857173239
-
Analysis of time and cost overrun in Malaysian construction
-
Ramanathan C., Potty N.S., Idrus A.B. Analysis of time and cost overrun in Malaysian construction. Adv. Mater. Res. 2012, 452-453:1002-1008.
-
(2012)
Adv. Mater. Res.
, pp. 1002-1008
-
-
Ramanathan, C.1
Potty, N.S.2
Idrus, A.B.3
-
72
-
-
84986146084
-
The assessment of risk in conservation refurbishment projects
-
Reyes J., Mansfield J. The assessment of risk in conservation refurbishment projects. Struct. Surv. 2001, 19(5):238-244.
-
(2001)
Struct. Surv.
, vol.19
, Issue.5
, pp. 238-244
-
-
Reyes, J.1
Mansfield, J.2
-
73
-
-
84891415771
-
Root-cause analysis of construction-cost overruns
-
(No. Accessed via: (April, 2014))
-
Rosenfeld Y. Root-cause analysis of construction-cost overruns. J. Constr. Eng. Manag. 2014, 40. (No. Accessed via: http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000789 (April, 2014)).
-
(2014)
J. Constr. Eng. Manag.
, vol.40
-
-
Rosenfeld, Y.1
-
74
-
-
34248402903
-
Causes and effects of delays in Malaysian construction industry
-
Sambasivan M., Soon Y.W. Causes and effects of delays in Malaysian construction industry. Int. J. Proj. Manag. 2007, 25(5):517-526.
-
(2007)
Int. J. Proj. Manag.
, vol.25
, Issue.5
, pp. 517-526
-
-
Sambasivan, M.1
Soon, Y.W.2
-
75
-
-
70350057607
-
Time, cost, and quality in a road building project
-
San Cristóbal J. Time, cost, and quality in a road building project. J. Constr. Eng. Manag. 2009, 135(11):1271-1274. 10.1061/(ASCE)CO.1943-7862.0000094.
-
(2009)
J. Constr. Eng. Manag.
, vol.135
, Issue.11
, pp. 1271-1274
-
-
San Cristóbal, J.1
-
76
-
-
0031423446
-
Inaccuracy of traffic forecasts and cost estimates on large transport projects
-
Skamris M.K., Flyvbjerg B. Inaccuracy of traffic forecasts and cost estimates on large transport projects. Transp. Policy 1997, 4(3):141-146.
-
(1997)
Transp. Policy
, vol.4
, Issue.3
, pp. 141-146
-
-
Skamris, M.K.1
Flyvbjerg, B.2
-
77
-
-
85010404909
-
Cost overruns in public construction projects: the case of Jordan
-
(Retrieved from
-
Sweis G.J., Sweis R., Rumman M.A., Hussein R.A., Dahiya S.E. Cost overruns in public construction projects: the case of Jordan. J. Am. Sci. 2013, 9(7):134-141. (Retrieved from http://www.jofamericanscience.org/journals/am-sci/am0907s/020_19897am0907s_134_141.pdf).
-
(2013)
J. Am. Sci.
, vol.9
, Issue.7
, pp. 134-141
-
-
Sweis, G.J.1
Sweis, R.2
Rumman, M.A.3
Hussein, R.A.4
Dahiya, S.E.5
|