-
1
-
-
38849153568
-
Conceptual delay mitigation model using a project learning approach in practice
-
Abdul-Rahman, H., Yahya, I., Berawi, A. and Wah, L.W. (2008), “Conceptual delay mitigation model using a project learning approach in practice”, Construction Management and Economics, Vol. 26, pp. 15-27.
-
(2008)
Construction Management and Economics
, vol.26
, pp. 15-27
-
-
Abdul-Rahman, H.1
Yahya, I.2
Berawi, A.3
Wah, L.W.4
-
2
-
-
30844441627
-
Delay mitigation in the Malaysian construction industry
-
Abdul-Rahman, H., Berawi, A., Mohamed, O., Othman, M. and Yahya, I. (2006), “Delay mitigation in the Malaysian construction industry”, Journal of Construction Engineering and Management, Vol. 132 No. 2, pp. 125-133.
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.2
, pp. 125-133
-
-
Abdul-Rahman, H.1
Berawi, A.2
Mohamed, O.3
Othman, M.4
Yahya, I.5
-
3
-
-
27644463257
-
Delays in construction: a brief study of the Florida construction industry
-
Clemson University Clemson, SC (final report, Miami, FL)
-
Ahmed, S.M., Azhar, S., Kappagantula, P. and Gollapudi, D. (2003), “Delays in construction: a brief study of the Florida construction industry”, Proceedings of the 39th Annual Conference of the Associated Schools of Construction, Clemson University, Clemson, SC (final report, Miami, FL).
-
(2003)
Proceedings of the 39th Annual Conference of the Associated Schools of Construction
-
-
Ahmed, S.M.1
Azhar, S.2
Kappagantula, P.3
Gollapudi, D.4
-
4
-
-
0036836295
-
The effects of construction delays on project delivery in Nigerian construction industry
-
Aibinu, A.A. and Jagboro, G.O. (2002), “The effects of construction delays on project delivery in Nigerian construction industry”, International Journal of Project Management, Vol. 20 No. 8, pp. 593-9.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.8
, pp. 593-599
-
-
Aibinu, A.A.1
Jagboro, G.O.2
-
5
-
-
33847327339
-
The significant factors causing delay of building construction projects in Malaysia
-
8.
-
Alaghbari, M.W., Khadir, M.R.A., Salim, A. and Emawati,. (2007), “The significant factors causing delay of building construction projects in Malaysia”, Journal of Engineering, Construction and Architectural Management, Vol. 14 No. 2, 8, pp. 192-206, 8.
-
(2007)
Journal of Engineering, Construction and Architectural Management
, vol.14
, Issue.2-8
, pp. 192-206
-
-
Alaghbari, M.W.1
Khadir, M.R.A.2
Salim, A.3
Emawati4
-
6
-
-
0033118345
-
Delay in public utility projects in Saudi Arabia
-
Al-Khalil, M. and Al-Ghafly, M. (1999 a), “Delay in public utility projects in Saudi Arabia”, International Journal of Project Management, Vol. 17 No. 2, pp. 101-6.
-
(1999)
International Journal of Project Management
, vol.17
, Issue.2
, pp. 101-106
-
-
Al-Khalil, M.1
Al-Ghafly, M.2
-
7
-
-
4143113321
-
Important causes of delay in public utility projects in Saudi Arabia
-
Al-Khalil, M. and Al-Ghafly, M. (1999 b), “Important causes of delay in public utility projects in Saudi Arabia”, Journal of Construction Management and Economics, Vol. 17 No. 5, pp. 647-655.
-
(1999)
Journal of Construction Management and Economics
, vol.17
, Issue.5
, pp. 647-655
-
-
Al-Khalil, M.1
Al-Ghafly, M.2
-
8
-
-
54249110189
-
Identifying the important causes of delays in building construction projects
-
available at: http://eprints.Qut.edu.au/secure/00004156/01/Bali-Conference-2003.doc.
-
Alwi, S. and Hampson, K. (2003), “Identifying the important causes of delays in building construction projects”, Proceedings of the 9th East Asia-Pacific Conference on Structural Engineering and Construction, Bali, Indonesia, available at: http://eprints.Qut.edu.au/secure/00004156/01/Bali-Conference-2003.doc.
-
(2003)
Proceedings of the 9th East Asia-Pacific Conference on Structural Engineering and Construction, Bali, Indonesia
-
-
Alwi, S.1
Hampson, K.2
-
9
-
-
0006865274
-
Reasons for delays in public projects in Turkey
-
Arditi, D., Akan, G. and Gurdamar, S. (1985), “Reasons for delays in public projects in Turkey”, Journal of Construction Management and Economics, Vol. 3 No. 12, pp. 171-181.
-
(1985)
Journal of Construction Management and Economics
, vol.3
, Issue.12
, pp. 171-181
-
-
Arditi, D.1
Akan, G.2
Gurdamar, S.3
-
10
-
-
33645965860
-
Causes of delay in large construction projects
-
Assaf, S.A. and Al-Hejji, S. (2006), “Causes of delay in large construction projects”, International Journal of Project Management, Vol. 24 No. 4, pp. 349-357.
-
(2006)
International Journal of Project Management
, vol.24
, Issue.4
, pp. 349-357
-
-
Assaf, S.A.1
Al-Hejji, S.2
-
11
-
-
84927635730
-
Cause of delay in large building construction projects
-
Assaf, S.A., Al-Khalil, M. and Al-Hazmi, M. (1995), “Cause of delay in large building construction projects”, Journal of Management in Engineering, Vol. 11 No. 2, pp. 45-50.
-
(1995)
Journal of Management in Engineering
, vol.11
, Issue.2
, pp. 45-50
-
-
Assaf, S.A.1
Al-Khalil, M.2
Al-Hazmi, M.3
-
12
-
-
0030287181
-
An evaluation of construction time performance in the building industry
-
Chan, D. and Kumaraswamy, M. (1996), “An evaluation of construction time performance in the building industry”, Journal of Building and Environmental, Vol. 31 No. 6, pp. 569-578.
-
(1996)
Journal of Building and Environmental
, vol.31
, Issue.6
, pp. 569-578
-
-
Chan, D.1
Kumaraswamy, M.2
-
13
-
-
0036132114
-
Compressing construction duration: lessons learned from Hong Kong Building Projects
-
Chan, D. and Kumaraswamy, M. (2002), “Compressing construction duration: lessons learned from Hong Kong Building Projects”, International Journal of Project Management, Vol. 20 No. 1, pp. 23-35.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.1
, pp. 23-35
-
-
Chan, D.1
Kumaraswamy, M.2
-
14
-
-
0025494340
-
Predictors of cost overrun rates
-
Charles, T.J. and Andrew, M.A. (1990), “Predictors of cost overrun rates”, Journal of Construction Engineering and Management, ASCE, Vol. 116 No. 3, pp. 548-552.
-
(1990)
Journal of Construction Engineering and Management, ASCE
, vol.116
, Issue.3
, pp. 548-552
-
-
Charles, T.J.1
Andrew, M.A.2
-
16
-
-
84992971872
-
Information about rising construction costs in Washington state
-
report No. 360-705-7821, Department of Transportation, Washington State.
-
Dayton, K. and Erickson, D. (2006), “Information about rising construction costs in Washington state”, report No. 360-705-7821, Department of Transportation, Washington State.
-
(2006)
-
-
Dayton, K.1
Erickson, D.2
-
17
-
-
84862940656
-
Risk management in building projects: contractors' perspective
-
Enshassi, A., Mohammed, S. and Abu Mosa, J. (2008), “Risk management in building projects: contractors' perspective”, Emirates Journal for Engineering Research, Vol. 13 No. 1, pp. 29-44.
-
(2008)
Emirates Journal for Engineering Research
, vol.13
, Issue.1
, pp. 29-44
-
-
Enshassi, A.1
Mohammed, S.2
Abu Mosa, J.3
-
18
-
-
77949815607
-
Contributors to construction delays in Palestine
-
Enshassi, A., Lisk, R., Sawalhi, I. and Radwan, I. (2003), “Contributors to construction delays in Palestine”, The Journal of American Institute of Constructors, Vol. 27 No. 2, pp. 45-53.
-
(2003)
The Journal of American Institute of Constructors
, vol.27
, Issue.2
, pp. 45-53
-
-
Enshassi, A.1
Lisk, R.2
Sawalhi, I.3
Radwan, I.4
-
19
-
-
33751295266
-
Significant factors causing delay in UAE construction industry
-
Faridi, A.S. and El-Sayegh, S.M. (2006), “Significant factors causing delay in UAE construction industry”, Construction Management and Economics, Vol. 24, pp. 1167-76.
-
(2006)
Construction Management and Economics
, vol.24
, pp. 1167-1176
-
-
Faridi, A.S.1
El-Sayegh, S.M.2
-
20
-
-
26444517032
-
Fire services installation related contributors of construction delay
-
Fong, N., Wong, L.Y. and Wong, L.T. (2006), “Fire services installation related contributors of construction delay”, Journal of Building and Environment, Vol. 41, pp. 211-222.
-
(2006)
Journal of Building and Environment
, vol.41
, pp. 211-222
-
-
Fong, N.1
Wong, L.Y.2
Wong, L.T.3
-
21
-
-
0038721064
-
Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study
-
Frimpongs, Y., Oluwoye, J. and Crawford, L. (2003), “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study”, International Journal of Project Management, Vol. 21 No. 5, pp. 321-6.
-
(2003)
International Journal of Project Management
, vol.21
, Issue.5
, pp. 321-326
-
-
Frimpongs, Y.1
Oluwoye, J.2
Crawford, L.3
-
23
-
-
0039997969
-
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
-
Kaming, P., Olomolaiye, P., Holt, G. and Harris, F.C. (1997), “Factors influencing construction time and cost overruns on high-rise projects in Indonesia”, Journal of Construction Management and Economics, Vol. 15 No. 1, pp. 83-94.
-
(1997)
Journal of Construction Management and Economics
, vol.15
, Issue.1
, pp. 83-94
-
-
Kaming, P.1
Olomolaiye, P.2
Holt, G.3
Harris, F.C.4
-
24
-
-
16444365584
-
Delays and cost increases in the construction of private residential projects in Kuwait
-
Koushki, P.A., Al-Rashid, K. and Kartam, N. (2005), “Delays and cost increases in the construction of private residential projects in Kuwait”, Journal of Construction Management and Economics, Vol. 23 No. 3, pp. 285-294.
-
(2005)
Journal of Construction Management and Economics
, vol.23
, Issue.3
, pp. 285-294
-
-
Koushki, P.A.1
Al-Rashid, K.2
Kartam, N.3
-
26
-
-
0001798497
-
Contributors to construction delays
-
Kumaraswamy, M.M. and Chan, D. (1998), “Contributors to construction delays”, Journal of Construction Management and Economics, Vol. 16 No. 1, pp. 17-29.
-
(1998)
Journal of Construction Management and Economics
, vol.16
, Issue.1
, pp. 17-29
-
-
Kumaraswamy, M.M.1
Chan, D.2
-
27
-
-
33646751898
-
Construction delay in Hong Kong civil engineering projects
-
Lo, T., Fung, I. and Tung, K. (2006), “Construction delay in Hong Kong civil engineering projects”, Journal of Construction Engineering and Management, Vol. 132 No. 6, pp. 636-649.
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.6
, pp. 636-649
-
-
Lo, T.1
Fung, I.2
Tung, K.3
-
28
-
-
84992957706
-
Causes of delay in the construction industry in Lebanon
-
Mezher, T.C. and Tawil, W. (1998), “Causes of delay in the construction industry in Lebanon”, Engineering Construction and Architectural Management, Vol. 5 No. 3, pp. 252-260.
-
(1998)
Engineering Construction and Architectural Management
, vol.5
, Issue.3
, pp. 252-260
-
-
Mezher, T.C.1
Tawil, W.2
-
29
-
-
67649460424
-
Cost and time overruns in public sector projects
-
Morris, S. (1990), “Cost and time overruns in public sector projects”, Economic and Political Weekly, Vol. xxv No. 47, pp. M 154-168.
-
(1990)
Economic and Political Weekly
, vol.25
, Issue.47
, pp. 154-168
-
-
Morris, S.1
-
30
-
-
0036132474
-
Causes of construction delay: traditional contracts
-
Odeh, A. and Battaineh, H.T. (2002), “Causes of construction delay: traditional contracts”, International Journal of Project Management, Vol. 20 No. 1, pp. 67-73.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.1
, pp. 67-73
-
-
Odeh, A.1
Battaineh, H.T.2
-
31
-
-
0030074893
-
Construction delays in a fast-growing economy: comparing Thailand with other economics
-
Ogunlana, S., Promkuntong, K. and Jearkjirm, V. (1996), “Construction delays in a fast-growing economy: comparing Thailand with other economics”, International Journal of Project Management, Vol. 14 No. 1, pp. 37-45.
-
(1996)
International Journal of Project Management
, vol.14
, Issue.1
, pp. 37-45
-
-
Ogunlana, S.1
Promkuntong, K.2
Jearkjirm, V.3
-
32
-
-
84930124504
-
Causes of high costs of construction in Nigeria
-
Okpala, C.C. and Aniekwu, A.N. (1988), “Causes of high costs of construction in Nigeria”, Journal of Construction Engineering and Management, ASCE, Vol. 114 No. 2, pp. 233-4.
-
(1988)
Journal of Construction Engineering and Management, ASCE
, vol.114
, Issue.2
, pp. 233-234
-
-
Okpala, C.C.1
Aniekwu, A.N.2
-
33
-
-
84993065311
-
Palestine Contractors Union
-
Reports 2004 Palestine Contractors Union
-
Palestine Contractors Union (2004), Reports 2004, Palestine Contractors Union.
-
(2004)
-
-
-
36
-
-
34248402903
-
Causes and effects of delays in Malaysian construction industry
-
Sambasivan, M. and Soon, Y. (2007), “Causes and effects of delays in Malaysian construction industry”, International Journal of Project Management, Vol. 25 No. 5, pp. 517-526.
-
(2007)
International Journal of Project Management
, vol.25
, Issue.5
, pp. 517-526
-
-
Sambasivan, M.1
Soon, Y.2
-
37
-
-
33645711074
-
Cost and time overruns in highway construction
-
paper presented at 4th Transportation Conference of the Canadian Society for Civil Engineering, Montreal, Quebec, June 5-8.
-
Vidalis, M.S. and Najafi, T.F. (2002), “Cost and time overruns in highway construction”, paper presented at 4th Transportation Conference of the Canadian Society for Civil Engineering, Montreal, Quebec, June 5-8.
-
(2002)
-
-
Vidalis, M.S.1
Najafi, T.F.2
-
38
-
-
84993060221
-
An analysis of the distribution of time variance for building projects
-
Wang, J., Fisher, N., Sun, C. and Wu, D. (2003), “An analysis of the distribution of time variance for building projects”, The International Journal of Construction Management, Vol. 3 No. 1, pp. 73-82.
-
(2003)
The International Journal of Construction Management
, vol.3
, Issue.1
, pp. 73-82
-
-
Wang, J.1
Fisher, N.2
Sun, C.3
Wu, D.4
-
39
-
-
0023594272
-
Concurrent delays in construction projects
-
Zaki, M.K. and James, E.D. (1987), “Concurrent delays in construction projects”, Journal of Construction Engineering and Management, ASCE, Vol. 113 No. 4, pp. 591-602.
-
(1987)
Journal of Construction Engineering and Management, ASCE
, vol.113
, Issue.4
, pp. 591-602
-
-
Zaki, M.K.1
James, E.D.2
-
40
-
-
77949833895
-
A stage-by-stage factor control frame work for cost estimation of construction projects
-
paper presented at Owners Driving Innovation International Conference, available at: http://flybjerg.Plan.aau.dk/JAPAASPUBLISH ED.pelf.
-
Zhu, K. and Lin, L. (2004), “A stage-by-stage factor control frame work for cost estimation of construction projects”, paper presented at Owners Driving Innovation International Conference, available at: http://flybjerg.Plan.aau.dk/JAPAASPUBLISH ED.pelf.
-
(2004)
-
-
Zhu, K.1
Lin, L.2
|