Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria

Author keywords

Contractor; Cost overrun; Non excusable delays; Time overrun

Indexed keywords


EID: 84884555792     PISSN: 18236499     EISSN: 21804222     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (41)

References (31)
  • 1
    • 0032072617 scopus 로고    scopus 로고
    • Factors of nonexcusable delays that influence contractor's performance.
    • Abd Majid, M.Z. and McCaffer, R. (1998) Factors of nonexcusable delays that influence contractor's performance. Journal of Management and Engineering, 14(3): 42-49.
    • (1998) Journal of Management and Engineering , vol.14 , Issue.3 , pp. 42-49
    • Abd Majid, M.Z.1    McCaffer, R.2
  • 2
    • 84884574499 scopus 로고    scopus 로고
    • Analysis of construction delay factor: A Korean perspective
    • Proceedings: The 7th Asia Pacific Industrial Engineering and Management Systems Conference. Bangkok, Thailand, 17-20 December
    • Acharya, N.K., Lee, Y.D., Kim, S.Y. and Lee, J.C. (2006). Analysis of construction delay factor: A Korean perspective. Proceedings: The 7th Asia Pacific Industrial Engineering and Management Systems Conference. Bangkok, Thailand, 17-20 December.
    • (2006)
    • Acharya, N.K.1    Lee, Y.D.2    Kim, S.Y.3    Lee, J.C.4
  • 3
    • 0036836295 scopus 로고    scopus 로고
    • The effects of construction delays on project in Nigeria construction industry
    • Aibinu, A. and Jagboro, G. (2002). The effects of construction delays on project in Nigeria construction industry. International Journal of Project Management, 20(8): 593-599.
    • (2002) International Journal of Project Management , vol.20 , Issue.8 , pp. 593-599
    • Aibinu, A.1    Jagboro, G.2
  • 4
    • 2142789312 scopus 로고
    • Controlling cost in the construction industry
    • Ajanlekoko, J.O. (1987). Controlling cost in the construction industry. Lagos QS Digest, 1(1): 8-12.
    • (1987) Lagos QS Digest , vol.1 , Issue.1 , pp. 8-12
    • Ajanlekoko, J.O.1
  • 5
    • 4143113321 scopus 로고    scopus 로고
    • Important causes of delay in public utility projects in Saudi Arabia
    • Al-Khalil, M.I. and Al-Ghafly, M.A. (1999). Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5): 647-655.
    • (1999) Construction Management and Economics , vol.17 , Issue.5 , pp. 647-655
    • Al-Khalil, M.I.1    Al-Ghafly, M.A.2
  • 8
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan D.M.W. and Kumaraswamy, M.M. (1996). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1): 55-63.
    • (1996) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.M.W.1    Kumaraswamy, M.M.2
  • 9
    • 84875034171 scopus 로고    scopus 로고
    • Current risk management applications in Turkish construction industry
    • Gaziantep University
    • Duran, O. (2006). Current risk management applications in Turkish construction industry. MSc diss. Gaziantep University.
    • (2006) MSc diss
    • Duran, O.1
  • 11
    • 0038721064 scopus 로고    scopus 로고
    • Causes of delay and cost overruns in construction of groundwater projects in a development countries, Ghana as a case study
    • Frimpong, Y., Oluwoye, J. and Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a development countries, Ghana as a case study. International Journal of Project Management, 21(5): 321-326.
    • (2003) International Journal of Project Management , vol.21 , Issue.5 , pp. 321-326
    • Frimpong, Y.1    Oluwoye, J.2    Crawford, L.3
  • 14
    • 16444365584 scopus 로고    scopus 로고
    • Delays and cost increase in the construction of private residential projects in Kuwait
    • Koushki, P.A., Al-Rashid, K. and Kartam, N. (2005). Delays and cost increase in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3): 285-294.
    • (2005) Construction Management and Economics , vol.23 , Issue.3 , pp. 285-294
    • Koushki, P.A.1    Al-Rashid, K.2    Kartam, N.3
  • 15
    • 56749181092 scopus 로고    scopus 로고
    • Quantifying schedule risk in construction projects using Bayesian belief networks
    • Luu, V., Kim, S., Van Tuan, N. and Ogunlana, S. (2009). Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management, 27(1): 39-50.
    • (2009) International Journal of Project Management , vol.27 , Issue.1 , pp. 39-50
    • Luu, V.1    Kim, S.2    Van Tuan, N.3    Ogunlana, S.4
  • 17
    • 84875018605 scopus 로고    scopus 로고
    • Causes and effect of delays in Aceh construction industry
    • Universiti Teknologi Malaysia
    • Majid, I.A. (2006). Causes and effect of delays in Aceh construction industry. MSc diss. Universiti Teknologi Malaysia.
    • (2006) MSc diss
    • Majid, I.A.1
  • 20
    • 9144224919 scopus 로고    scopus 로고
    • A study on project success factors in large construction projects in Vietnam
    • Nguyen, L.D., Ogunlana, S.O. and Lan, D.T.X. (2004) A study on project success factors in large construction projects in Vietnam. Engineering, Construction and Management, 11(6): 404-413.
    • (2004) Engineering, Construction and Management , vol.11 , Issue.6 , pp. 404-413
    • Nguyen, L.D.1    Ogunlana, S.O.2    Lan, D.T.X.3
  • 21
    • 0002733516 scopus 로고
    • Construction time influencing factors: The contractor's perspective
    • Nkado, R.N. (1995). Construction time influencing factors: The contractor's perspective. Construction Management and Economics, 13(1): 81-89.
    • (1995) Construction Management and Economics , vol.13 , Issue.1 , pp. 81-89
    • Nkado, R.N.1
  • 23
    • 2142785483 scopus 로고    scopus 로고
    • The causes and effects of construction delays on completion cost of housing project in Nigeria
    • Odeyinka, H.A. and Yusuf, A. (1997). The causes and effects of construction delays on completion cost of housing project in Nigeria. Journal of Financial Management and Property Construction, 2(3): 31-44.
    • (1997) Journal of Financial Management and Property Construction , vol.2 , Issue.3 , pp. 31-44
    • Odeyinka, H.A.1    Yusuf, A.2
  • 24
    • 0030074893 scopus 로고    scopus 로고
    • Construction delays in a fast-growing economy: Comparing Thailand with other economies
    • Ogunlana, S.O., Promkuntong, K. and Jearkjirm, V. (1996). Construction delays in a fast-growing economy: Comparing Thailand with other economies. International Journal of Project Management, 14(1): 37-45.
    • (1996) International Journal of Project Management , vol.14 , Issue.1 , pp. 37-45
    • Ogunlana, S.O.1    Promkuntong, K.2    Jearkjirm, V.3
  • 26
    • 85015938290 scopus 로고    scopus 로고
    • A probabilistic schedule delay analysis in construction projects by using fuzzy logic incorporated with relative importance index (RII) method
    • Middle East Technical University
    • Ozdemir, M. (2010). A probabilistic schedule delay analysis in construction projects by using fuzzy logic incorporated with relative importance index (RII) method. MSc diss. Middle East Technical University.
    • (2010) MSc diss
    • Ozdemir, M.1
  • 27
    • 34248402903 scopus 로고    scopus 로고
    • Causes and effects of delays in Malaysian construction industry
    • Sambasivan, M. and Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5): 517-526.
    • (2007) International Journal of Project Management , vol.25 , Issue.5 , pp. 517-526
    • Sambasivan, M.1    Soon, Y.W.2
  • 28
    • 84875165498 scopus 로고    scopus 로고
    • Dispute resolution in relation to delay of construction projects
    • Universiti Teknologi Malaysia
    • Soon, T.K. (2010). Dispute resolution in relation to delay of construction projects. MSc diss. Universiti Teknologi Malaysia.
    • (2010) MSc diss
    • Soon, T.K.1
  • 29
    • 84884537163 scopus 로고    scopus 로고
    • Types of Construction Delays
    • Available at:[Accessed on 7 July 2011]
    • Trauner, T. (2009). Types of Construction Delays. Available at: http://www.downloadit.org/learningresources.php?promoCode=&partnerID=&content=steowery&storyID=1581e [Accessed on 7 July 2011].
    • (2009)
    • Trauner, T.1
  • 30
    • 12444278405 scopus 로고
    • Turnkey construction for building in Malaysia
    • in managing construction worldwide. Vol. In Lanley, P.R. and Harlow, P.A. (eds.). Construction Management and Organization in Perspective. Ascot, UK: Chartered Institute of Building
    • Yong, P.H. (1988). Turnkey construction for building in Malaysia, in managing construction worldwide. Vol. 3. In Lanley, P.R. and Harlow, P.A. (eds.). Construction Management and Organization in Perspective. Ascot, UK: Chartered Institute of Building, 284-295.
    • (1988) , vol.3 , pp. 284-295
    • Yong, P.H.1
  • 31
    • 34447566136 scopus 로고    scopus 로고
    • Understanding the key risks in construction projects in China
    • Zou, P., Zhang, G. and Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6): 601-614.
    • (2007) International Journal of Project Management , vol.25 , Issue.6 , pp. 601-614
    • Zou, P.1    Zhang, G.2    Wang, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.