Factors affecting contractors' risk of cost overburden
-
Akinci, B., and Fischer, M. (1998). " Factors affecting contractors' risk of cost overburden.." J. Manage. Eng. JMENEA 0742-597X, 14 (1), 67-76. 10.1061/(ASCE)0742-597X(1998)14:1(67) (Pubitemid 128633455)
-
(1998)
Journal of Management in Engineering
, vol.14
, Issue.1
, pp. 67-76
-
-
Akinci, B.1
Fischer, M.2
-
2
-
-
0035454421
-
Methodology for determining price variation in project execution
-
DOI 10.1061/(ASCE)0733-9364(2001)127:5(367)
-
Akpan, E. O. P., and Igwe, O. (2001). " Methodology for determining price variation in project execution.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (5), 367-373. 10.1061/(ASCE)0733-9364(2001)127:5(367) (Pubitemid 33073865)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.5
, pp. 367-373
-
-
Akpan, E.O.P.1
Igwe, O.2
-
3
-
-
0033883312
-
Construction delay: A quantitative analysis
-
DOI 10.1016/S0263-7863(98)00060-X
-
Al-Momani, A. H. (2000). " Construction delay: A quantitative analysis.." Int. J. Proj. Manage. IPMAEL 0263-7863, 18 (1), 51-59. 10.1016/S0263-7863(98)00060-X (Pubitemid 30509472)
-
(2000)
International Journal of Project Management
, vol.18
, Issue.1
, pp. 51-59
-
-
Al-Momani, A.H.1
-
4
-
-
13944265044
-
Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
-
DOI 10.1061/(ASCE)0733-9364(2003)129:4(405)
-
Attalla, M., and Hegazy, T. (2003). " Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 405-411. 10.1061/(ASCE)0733- 9364(2003)129:4(405) (Pubitemid 40265454)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 405-411
-
-
Attalla, M.1
Hegazy, T.2
-
5
-
-
56349131897
-
-
" Tech. Re No. FHWA/IN/JTRP-04/7, Indiana Dept. of Transportation, Indianapolis
-
Bordat, C., McCullouch, B. G., Labi, S., and Sinha, K. C. (2004). " An analysis of cost overruns and time delays of INDOT projects.." Tech. Rep. No. FHWA/IN/JTRP-04/7, Indiana Dept. of Transportation, Indianapolis.
-
(2004)
An Analysis of Cost Overruns and Time Delays of INDOT Projects
-
-
Bordat, C.1
McCullouch, B.G.2
Labi, S.3
Sinha, K.C.4
-
6
-
-
0031078243
-
A comparative study of causes of time overruns in Hong Kong construction projects
-
IPMAEL 0263-7863, (),. 10.1016/S0263-7863(96)00039-7
-
Chan, D. W. M., and Kumaraswamy, M. M. (1997). " A comparative study of causes of time overruns in Hong Kong construction projects.." Int. J. Proj. Manage. IPMAEL 0263-7863, 15 (1), 55-63. 10.1016/S0263-7863(96)00039-7
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.1
, pp. 55-63
-
-
Chan, D.W.M.1
Kumaraswamy, M.M.2
-
7
-
-
0036162657
-
Reasons for cost and schedule increase for engineering design projects
-
DOI 10.1061/(ASCE)0742-597X(2002)18:1(29)
-
Chang, A. S. (2002). " Reasons for cost and schedule increase for engineering design projects.." J. Manage. Eng. JMENEA 0742-597X, 18 (1), 29-36. 10.1061/(ASCE)0742-597X(2002)18:1(29) (Pubitemid 34125201)
-
(2002)
Journal of Management in Engineering
, vol.18
, Issue.1
, pp. 29-36
-
-
Chang, A.S.-T.1
-
8
-
-
33749575089
-
Using fuzzy decision making for the evaluation of the project management internal efficiency
-
DOI 10.1016/j.dss.2005.04.001, PII S0167923605000618
-
Dweiri, F. T., and Kablan, M. M. (2006). " Using fuzzy decision making for the evaluation of the project management internal efficiency.." Decision Support Sys. DSSYDK 0167-9236, 42 (2), 712-726. 10.1016/j.dss.2005.04. 001 (Pubitemid 44537470)
-
(2006)
Decision Support Systems
, vol.42
, Issue.2
, pp. 712-726
-
-
Dweiri, F.T.1
Kablan, M.M.2
-
9
-
-
0036319174
-
Underestimating costs in Public Works Projects: Error or Lie?
-
Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2002). " Underestimating costs in public works projects: Error or lie? " J. Am. Plan. Assn. JAPAD9 0194-4363, 68 (3), 279-295. 10.1080/01944360208976273 (Pubitemid 34811225)
-
(2002)
Journal of the American Planning Association
, vol.68
, Issue.3
, pp. 279-296
-
-
Flyvbjerg, B.1
Holm, M.S.2
Buhl, S.3
-
10
-
-
0037242979
-
How common and how large are cost overruns in transport infrastructure projects?
-
DOI 10.1080/01441640309904
-
Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2003). " How common and how large are cost overruns in transport infrastructure projects. ?" Transport Rev. ZZZZZZ 0033-8974, 23 (1), 71-88. 10.1080/01441640309904 (Pubitemid 36108766)
-
(2003)
Transport Reviews
, vol.23
, Issue.1
, pp. 71-88
-
-
Flyvbjerg, B.1
Holm, M.K.S.2
Buhl, S.L.3
-
11
-
-
0442328937
-
What causes cost overrun in transport infrastructure projects?
-
DOI 10.1080/0144164032000080494
-
Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2004). " What causes cost overrun in transport infrastructure projects? " Transport Rev. ZZZZZZ 0033-8974, 24 (1), 3-18. 10.1080/0144164032000080494 (Pubitemid 38187880)
-
(2004)
Transport Reviews
, vol.24
, Issue.1
, pp. 3-18
-
-
Flyvbjerg, B.1
Skamris Holm, M.K.2
Buhl, S.L.3
-
12
-
-
0038721064
-
Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study
-
DOI 10.1016/S0263-7863(02)00055-8
-
Frimpong, Y., Oluwoyeb, J., and Crawford, L. (2003). " Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.." Int. J. Proj. Manage. IPMAEL 0263-7863, 21 (5), 321-326. 10.1016/S0263-7863(02)00055-8 (Pubitemid 36689540)
-
(2003)
International Journal of Project Management
, vol.21
, Issue.5
, pp. 321-326
-
-
Frimpong, Y.1
Oluwoye, J.2
Crawford, L.3
-
13
-
-
56349122591
-
Estimating cost discrepancies in highway contracts: A multistep econometric approach
-
JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(2008)134:12(953)
-
Gkritza, K., and Labi, S. (2008). " Estimating cost discrepancies in highway contracts: A multistep econometric approach.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (12), 953-962. 10.1061/(ASCE)0733-9364(2008)134: 12(953)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.12
, pp. 953-962
-
-
Gkritza, K.1
Labi, S.2
-
14
-
-
77955331395
-
Cost overruns on state of Washington construction contracts
-
" TRREDM 0361-1981
-
Hinze, J., Selstead, G., and Mahoney, J. P. (1992). " Cost overruns on state of Washington construction contracts.." Transp. Res. Rec. TRREDM 0361-1981, 1351, 87-93.
-
(1992)
Transp. Res. Rec.
, vol.1351
, pp. 87-93
-
-
Hinze, J.1
Selstead, G.2
Mahoney, J.P.3
-
15
-
-
77958117816
-
-
Re Prepared for Federal Highway Administration, U.S. DOT, Washington, D.C
-
Jacoby, C. (2001). " Report on supplemental agreement reasons, AASHTO-FHWA project cost overrun study.." Rep. Prepared for Federal Highway Administration, U.S. DOT, Washington, D.C.
-
(2001)
Report on Supplemental Agreement Reasons, AASHTO-FHWA Project Cost Overrun Study
-
-
Jacoby, C.1
-
16
-
-
0025494340
-
Predictors of cost-overrun rates
-
JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1990)116:3(548)
-
Jahren, C., and Ashe, A. (1990). " Predictors of cost-overrun rates.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (3), 548-551. 10.1061/(ASCE)0733-9364(1990)116:3(548)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.3
, pp. 548-551
-
-
Jahren, C.1
Ashe, A.2
-
18
-
-
0039997969
-
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
-
Kaming, P., Olomolaiye, P., Holt, G., and Harris, F. (1997). " Factors influencing construction time and cost overruns on high-rise projects in Indonesia.." Constr. Manage. Econom. CMECF3 0144-6193, 15 (1), 83-94. 10.1080/014461997373132 (Pubitemid 127679842)
-
(1997)
Construction Management and Economics
, vol.15
, Issue.1
, pp. 83-94
-
-
Kaming, P.F.1
Olomolaiye, P.O.2
Holt, G.D.3
Harris, F.C.4
-
19
-
-
12744251343
-
Use of fuzzy logic for predicting design cost overruns on building projects
-
DOI 10.1061/(ASCE)0733-9364(2002)128:6(503)
-
Knight, K., and Fayek, A. M. (2002). " Use of fuzzy logic for predicting design cost overruns on building projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (6), 503-512. 10.1061/(ASCE)0733-9364(2002)128: 6(503) (Pubitemid 40265514)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.6
, pp. 503-512
-
-
Knight, K.1
Fayek, A.R.2
-
20
-
-
70450139071
-
-
" Final Re, Virginia Transportation Research Council, Charlottesville, Va
-
Kyte, C. A., Perfater, M. A., Haynes, S., and Lee, H. W. (2004). " Developing and validating a highway construction project cost estimation tool.." Final Rep., Virginia Transportation Research Council, Charlottesville, Va.
-
(2004)
Developing and Validating A Highway Construction Project Cost Estimation Tool
-
-
Kyte, C.A.1
Perfater, M.A.2
Haynes, S.3
Lee, H.W.4
-
21
-
-
33646751898
-
Construction delays in Hong Kong civil engineering projects
-
DOI 10.1061/(ASCE)0733-9364(2006)132:6(636)
-
Lo, T. Y., Fung, I. W. H., and Tung, K. C. F. (2006). " Construction delays in Hong Kong civil engineering projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (6), 636-649. 10.1061/(ASCE)0733-9364(2006)132:6(636) (Pubitemid 43747849)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.6
, pp. 636-649
-
-
Lo, T.Y.1
Fung, I.W.H.2
Tung, K.C.F.3
-
22
-
-
77952089434
-
The statistical analysis of crash-frequency data: A review and assessment of methodological alternatives
-
TRAGDB 0191-2607
-
Lord, D., and Mannering, F. L. (2010). " The statistical analysis of crash-frequency data: A review and assessment of methodological alternatives.." Transp. Res., Part A TRAGDB 0191-2607, 44 (5), 291-305.
-
(2010)
Transp. Res., Part A
, vol.44
, Issue.5
, pp. 291-305
-
-
Lord, D.1
Mannering, F.L.2
-
23
-
-
0020971923
-
An econometric analysis of vehicle use in multivehicle households
-
Mannering, F. (1983). " An econometric analysis of vehicle use in multivehicle households.." Transp. Res., Part A TRAGDB 0191-2607, 17 (3), 183-189. 10.1016/0191-2607(83)90040-7 (Pubitemid 13577874)
-
(1983)
Transportation Research, Part A: General
, vol.17 A
, Issue.3
, pp. 183-189
-
-
Mannering Fred, L.1
-
24
-
-
29044442114
-
Using Weibull analysis for evaluation of cost and schedule performance
-
DOI 10.1061/(ASCE)0733-9364(2005)131:12(1257)
-
Nassar, K. M., Gunnarsson, H. G., and Hegab, M. Y. (2005). " Using Weibull analysis for evaluation of cost and schedule performance.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (12), 1257-1262. 10.1061/(ASCE)0733- 9364(2005)131:12(1257) (Pubitemid 41788463)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.12
, pp. 1257-1262
-
-
Nassar, K.M.1
Gunnarsson, H.G.2
Hegab, M.Y.3
-
26
-
-
27644442570
-
-
" Re Prepared for NCHRP Project 20-07/Task 152, Transportation Research Board, Washington, D.C
-
Schexnayder, C., Weber, S., and Fiori, C. (2003). " Project cost estimating: A synthesis of highway practice.." Rep. Prepared for NCHRP Project 20-07/Task 152, Transportation Research Board, Washington, D.C.
-
(2003)
Project Cost Estimating: A Synthesis of Highway Practice
-
-
Schexnayder, C.1
Weber, S.2
Fiori, C.3
-
27
-
-
33947408713
-
Fuzzy numbers in cost range estimating
-
DOI 10.1061/(ASCE)0733-9364(2007)133:4(325)
-
Shaheen, A. A., Fayek, A. R., and AbouRizk, S. M. (2007). " Fuzzy numbers in cost range estimating.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (4), 325-334. 10.1061/(ASCE)0733-9364(2007)133:4(325) (Pubitemid 46447968)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.4
, pp. 325-334
-
-
Shaheen, A.A.1
Fayek, A.R.2
Abourizk, S.M.3
-
28
-
-
0032094065
-
Modeling the endogeneity of lane-mean speeds and lane-speed deviations: A structural equations approach
-
PII S0965856498000032
-
Shankar, V., and Mannering, F. (1998). " Modeling the endogeneity of lane-mean speeds and lane-speed deviations: A structural equations approach.." Transp. Res., Part A: Policy Pract. TRPPEC 0965-8564, 32 (5), 311-322. 10.1016/S0965-8564(98)00003-2 (Pubitemid 128714045)
-
(1998)
Transportation Research Part A: Policy and Practice
, vol.32
, Issue.5
, pp. 311-322
-
-
Shankar, V.1
Mannering, F.2
-
29
-
-
33746190783
-
Modeling cost escalation in large infrastructure projects
-
DOI 10.1061/(ASCE)0733-9364(2006)132:8(853)
-
Touran, A., and Lopez, R. (2006). " Modeling cost escalation in large infrastructure projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (8), 853-860. 10.1061/(ASCE)0733-9364(2006)132:8(853) (Pubitemid 44090932)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.8
, pp. 853-860
-
-
Touran, A.1
Lopez, R.2
-
30
-
-
33645701713
-
-
Re No. 96-21, The Florida Legislature, Tallahassee, Fla., 〈〉 (November 2007)
-
Turcotte, J. (1996). " Review of the Florida Department of Transportation's performance in controlling construction cost overruns and establishing accountability for these problems.." Rep. No. 96-21, The Florida Legislature, Tallahassee, Fla., 〈 http://www.oppaga.state.fl.us/ reports/pdf/9621rpt.pdf 〉 (November 2007).
-
(1996)
Review of the Florida Department of Transportation's Performance in Controlling Construction Cost Overruns and Establishing Accountability for These Problems
-
-
Turcotte, J.1
-
31
-
-
56349159730
-
-
〈〉 (December 2003)
-
Wagner, T. (1998). " Highway construction program.." 〈 http://www.state.de.us/auditor/highway.pdf 〉 (December 2003).
-
(1998)
Highway Construction Program
-
-
Wagner, T.1
-
32
-
-
85069304767
-
-
Chapman & Hall/CRC, Boca Raton, Fla.. 10.1201/9780203497111
-
Washington, S. P., Karlaftis, M. G., and Mannering, F. L. (2003). Statistical and econometric methods for transportation data analysis, Chapman & Hall/CRC, Boca Raton, Fla.. 10.1201/9780203497111
-
(2003)
Statistical and Econometric Methods for Transportation Data Analysis
-
-
Washington, S.P.1
Karlaftis, M.G.2
Mannering, F.L.3
-
33
-
-
13844297452
-
Bidding ratios to predict highway project costs
-
DOI 10.1108/09699980510576880
-
Williams, T. P. (2005). " Bidding ratios to predict highway project costs.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 12 (1), 38-51. 10.1108/09699980510576880 (Pubitemid 40242601)
-
(2005)
Engineering, Construction and Architectural Management
, vol.12
, Issue.1
, pp. 38-51
-
-
Williams, T.P.1
-
34
-
-
12744266507
-
Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
-
DOI 10.1061/(ASCE)0733-9364(2005)131:2(176)
-
Zheng, D. X. M., and Ng, T. S. (2005). " Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (2), 176-186. 10.1061/(ASCE)0733-9364(2005)131:2(176) (Pubitemid 40155177)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.2
, pp. 176-186
-
-
Zheng, D.X.M.1
Ng, S.T.2
|