Volumn 136, Issue 11, 2010, Pages 1207-1218

Three-stage least-squares analysis of time and cost overruns in construction contracts

Author keywords

Construction costs; Construction planning; Forecasting; Project management; Statistical models

Indexed keywords

BIDDING PROCESS; COMPLETION TIME; CONSTRUCTION CONTRACT; CONSTRUCTION COSTS; CONSTRUCTION PLANNING; CONSTRUCTION PROJECTS; COST OVERRUNS; EMPIRICAL EVIDENCE; FINAL COSTS; HIGHWAY PROJECTS; INDIANA; LEAST SQUARES ANALYSIS; LEAST-SQUARES TECHNIQUES; RESEARCH STUDIES; STATISTICAL MODELS; TIME OVERRUN;

EID: 77958138408     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000225     Document Type: Article
Times cited : (66)

References (34)
  • 1
    • 0031705846 scopus 로고    scopus 로고
    • Factors affecting contractors' risk of cost overburden
    • Akinci, B., and Fischer, M. (1998). " Factors affecting contractors' risk of cost overburden.." J. Manage. Eng. JMENEA 0742-597X, 14 (1), 67-76. 10.1061/(ASCE)0742-597X(1998)14:1(67) (Pubitemid 128633455)
    • (1998) Journal of Management in Engineering , vol.14 , Issue.1 , pp. 67-76
    • Akinci, B.1    Fischer, M.2
  • 2
    • 0035454421 scopus 로고    scopus 로고
    • Methodology for determining price variation in project execution
    • DOI 10.1061/(ASCE)0733-9364(2001)127:5(367)
    • Akpan, E. O. P., and Igwe, O. (2001). " Methodology for determining price variation in project execution.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (5), 367-373. 10.1061/(ASCE)0733-9364(2001)127:5(367) (Pubitemid 33073865)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.5 , pp. 367-373
    • Akpan, E.O.P.1    Igwe, O.2
  • 3
    • 0033883312 scopus 로고    scopus 로고
    • Construction delay: A quantitative analysis
    • DOI 10.1016/S0263-7863(98)00060-X
    • Al-Momani, A. H. (2000). " Construction delay: A quantitative analysis.." Int. J. Proj. Manage. IPMAEL 0263-7863, 18 (1), 51-59. 10.1016/S0263-7863(98)00060-X (Pubitemid 30509472)
    • (2000) International Journal of Project Management , vol.18 , Issue.1 , pp. 51-59
    • Al-Momani, A.H.1
  • 4
    • 13944265044 scopus 로고    scopus 로고
    • Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(405)
    • Attalla, M., and Hegazy, T. (2003). " Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 405-411. 10.1061/(ASCE)0733- 9364(2003)129:4(405) (Pubitemid 40265454)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 405-411
    • Attalla, M.1    Hegazy, T.2
  • 6
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • IPMAEL 0263-7863, (),. 10.1016/S0263-7863(96)00039-7
    • Chan, D. W. M., and Kumaraswamy, M. M. (1997). " A comparative study of causes of time overruns in Hong Kong construction projects.." Int. J. Proj. Manage. IPMAEL 0263-7863, 15 (1), 55-63. 10.1016/S0263-7863(96)00039-7
    • (1997) Int. J. Proj. Manage. , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 7
    • 0036162657 scopus 로고    scopus 로고
    • Reasons for cost and schedule increase for engineering design projects
    • DOI 10.1061/(ASCE)0742-597X(2002)18:1(29)
    • Chang, A. S. (2002). " Reasons for cost and schedule increase for engineering design projects.." J. Manage. Eng. JMENEA 0742-597X, 18 (1), 29-36. 10.1061/(ASCE)0742-597X(2002)18:1(29) (Pubitemid 34125201)
    • (2002) Journal of Management in Engineering , vol.18 , Issue.1 , pp. 29-36
    • Chang, A.S.-T.1
  • 8
    • 33749575089 scopus 로고    scopus 로고
    • Using fuzzy decision making for the evaluation of the project management internal efficiency
    • DOI 10.1016/j.dss.2005.04.001, PII S0167923605000618
    • Dweiri, F. T., and Kablan, M. M. (2006). " Using fuzzy decision making for the evaluation of the project management internal efficiency.." Decision Support Sys. DSSYDK 0167-9236, 42 (2), 712-726. 10.1016/j.dss.2005.04. 001 (Pubitemid 44537470)
    • (2006) Decision Support Systems , vol.42 , Issue.2 , pp. 712-726
    • Dweiri, F.T.1    Kablan, M.M.2
  • 9
    • 0036319174 scopus 로고    scopus 로고
    • Underestimating costs in Public Works Projects: Error or Lie?
    • Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2002). " Underestimating costs in public works projects: Error or lie? " J. Am. Plan. Assn. JAPAD9 0194-4363, 68 (3), 279-295. 10.1080/01944360208976273 (Pubitemid 34811225)
    • (2002) Journal of the American Planning Association , vol.68 , Issue.3 , pp. 279-296
    • Flyvbjerg, B.1    Holm, M.S.2    Buhl, S.3
  • 10
    • 0037242979 scopus 로고    scopus 로고
    • How common and how large are cost overruns in transport infrastructure projects?
    • DOI 10.1080/01441640309904
    • Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2003). " How common and how large are cost overruns in transport infrastructure projects. ?" Transport Rev. ZZZZZZ 0033-8974, 23 (1), 71-88. 10.1080/01441640309904 (Pubitemid 36108766)
    • (2003) Transport Reviews , vol.23 , Issue.1 , pp. 71-88
    • Flyvbjerg, B.1    Holm, M.K.S.2    Buhl, S.L.3
  • 11
    • 0442328937 scopus 로고    scopus 로고
    • What causes cost overrun in transport infrastructure projects?
    • DOI 10.1080/0144164032000080494
    • Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2004). " What causes cost overrun in transport infrastructure projects? " Transport Rev. ZZZZZZ 0033-8974, 24 (1), 3-18. 10.1080/0144164032000080494 (Pubitemid 38187880)
    • (2004) Transport Reviews , vol.24 , Issue.1 , pp. 3-18
    • Flyvbjerg, B.1    Skamris Holm, M.K.2    Buhl, S.L.3
  • 12
    • 0038721064 scopus 로고    scopus 로고
    • Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study
    • DOI 10.1016/S0263-7863(02)00055-8
    • Frimpong, Y., Oluwoyeb, J., and Crawford, L. (2003). " Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.." Int. J. Proj. Manage. IPMAEL 0263-7863, 21 (5), 321-326. 10.1016/S0263-7863(02)00055-8 (Pubitemid 36689540)
    • (2003) International Journal of Project Management , vol.21 , Issue.5 , pp. 321-326
    • Frimpong, Y.1    Oluwoye, J.2    Crawford, L.3
  • 13
    • 56349122591 scopus 로고    scopus 로고
    • Estimating cost discrepancies in highway contracts: A multistep econometric approach
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(2008)134:12(953)
    • Gkritza, K., and Labi, S. (2008). " Estimating cost discrepancies in highway contracts: A multistep econometric approach.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (12), 953-962. 10.1061/(ASCE)0733-9364(2008)134: 12(953)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.12 , pp. 953-962
    • Gkritza, K.1    Labi, S.2
  • 14
    • 77955331395 scopus 로고
    • Cost overruns on state of Washington construction contracts
    • " TRREDM 0361-1981
    • Hinze, J., Selstead, G., and Mahoney, J. P. (1992). " Cost overruns on state of Washington construction contracts.." Transp. Res. Rec. TRREDM 0361-1981, 1351, 87-93.
    • (1992) Transp. Res. Rec. , vol.1351 , pp. 87-93
    • Hinze, J.1    Selstead, G.2    Mahoney, J.P.3
  • 16
    • 0025494340 scopus 로고
    • Predictors of cost-overrun rates
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1990)116:3(548)
    • Jahren, C., and Ashe, A. (1990). " Predictors of cost-overrun rates.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (3), 548-551. 10.1061/(ASCE)0733-9364(1990)116:3(548)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.3 , pp. 548-551
    • Jahren, C.1    Ashe, A.2
  • 18
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • Kaming, P., Olomolaiye, P., Holt, G., and Harris, F. (1997). " Factors influencing construction time and cost overruns on high-rise projects in Indonesia.." Constr. Manage. Econom. CMECF3 0144-6193, 15 (1), 83-94. 10.1080/014461997373132 (Pubitemid 127679842)
    • (1997) Construction Management and Economics , vol.15 , Issue.1 , pp. 83-94
    • Kaming, P.F.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4
  • 19
    • 12744251343 scopus 로고    scopus 로고
    • Use of fuzzy logic for predicting design cost overruns on building projects
    • DOI 10.1061/(ASCE)0733-9364(2002)128:6(503)
    • Knight, K., and Fayek, A. M. (2002). " Use of fuzzy logic for predicting design cost overruns on building projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (6), 503-512. 10.1061/(ASCE)0733-9364(2002)128: 6(503) (Pubitemid 40265514)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 503-512
    • Knight, K.1    Fayek, A.R.2
  • 21
    • 33646751898 scopus 로고    scopus 로고
    • Construction delays in Hong Kong civil engineering projects
    • DOI 10.1061/(ASCE)0733-9364(2006)132:6(636)
    • Lo, T. Y., Fung, I. W. H., and Tung, K. C. F. (2006). " Construction delays in Hong Kong civil engineering projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (6), 636-649. 10.1061/(ASCE)0733-9364(2006)132:6(636) (Pubitemid 43747849)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.6 , pp. 636-649
    • Lo, T.Y.1    Fung, I.W.H.2    Tung, K.C.F.3
  • 22
    • 77952089434 scopus 로고    scopus 로고
    • The statistical analysis of crash-frequency data: A review and assessment of methodological alternatives
    • TRAGDB 0191-2607
    • Lord, D., and Mannering, F. L. (2010). " The statistical analysis of crash-frequency data: A review and assessment of methodological alternatives.." Transp. Res., Part A TRAGDB 0191-2607, 44 (5), 291-305.
    • (2010) Transp. Res., Part A , vol.44 , Issue.5 , pp. 291-305
    • Lord, D.1    Mannering, F.L.2
  • 23
    • 0020971923 scopus 로고
    • An econometric analysis of vehicle use in multivehicle households
    • Mannering, F. (1983). " An econometric analysis of vehicle use in multivehicle households.." Transp. Res., Part A TRAGDB 0191-2607, 17 (3), 183-189. 10.1016/0191-2607(83)90040-7 (Pubitemid 13577874)
    • (1983) Transportation Research, Part A: General , vol.17 A , Issue.3 , pp. 183-189
    • Mannering Fred, L.1
  • 24
    • 29044442114 scopus 로고    scopus 로고
    • Using Weibull analysis for evaluation of cost and schedule performance
    • DOI 10.1061/(ASCE)0733-9364(2005)131:12(1257)
    • Nassar, K. M., Gunnarsson, H. G., and Hegab, M. Y. (2005). " Using Weibull analysis for evaluation of cost and schedule performance.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (12), 1257-1262. 10.1061/(ASCE)0733- 9364(2005)131:12(1257) (Pubitemid 41788463)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.12 , pp. 1257-1262
    • Nassar, K.M.1    Gunnarsson, H.G.2    Hegab, M.Y.3
  • 27
    • 33947408713 scopus 로고    scopus 로고
    • Fuzzy numbers in cost range estimating
    • DOI 10.1061/(ASCE)0733-9364(2007)133:4(325)
    • Shaheen, A. A., Fayek, A. R., and AbouRizk, S. M. (2007). " Fuzzy numbers in cost range estimating.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (4), 325-334. 10.1061/(ASCE)0733-9364(2007)133:4(325) (Pubitemid 46447968)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.4 , pp. 325-334
    • Shaheen, A.A.1    Fayek, A.R.2    Abourizk, S.M.3
  • 28
    • 0032094065 scopus 로고    scopus 로고
    • Modeling the endogeneity of lane-mean speeds and lane-speed deviations: A structural equations approach
    • PII S0965856498000032
    • Shankar, V., and Mannering, F. (1998). " Modeling the endogeneity of lane-mean speeds and lane-speed deviations: A structural equations approach.." Transp. Res., Part A: Policy Pract. TRPPEC 0965-8564, 32 (5), 311-322. 10.1016/S0965-8564(98)00003-2 (Pubitemid 128714045)
    • (1998) Transportation Research Part A: Policy and Practice , vol.32 , Issue.5 , pp. 311-322
    • Shankar, V.1    Mannering, F.2
  • 29
    • 33746190783 scopus 로고    scopus 로고
    • Modeling cost escalation in large infrastructure projects
    • DOI 10.1061/(ASCE)0733-9364(2006)132:8(853)
    • Touran, A., and Lopez, R. (2006). " Modeling cost escalation in large infrastructure projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (8), 853-860. 10.1061/(ASCE)0733-9364(2006)132:8(853) (Pubitemid 44090932)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.8 , pp. 853-860
    • Touran, A.1    Lopez, R.2
  • 31
    • 56349159730 scopus 로고    scopus 로고
    • 〈〉 (December 2003)
    • Wagner, T. (1998). " Highway construction program.." 〈 http://www.state.de.us/auditor/highway.pdf 〉 (December 2003).
    • (1998) Highway Construction Program
    • Wagner, T.1
  • 33
    • 13844297452 scopus 로고    scopus 로고
    • Bidding ratios to predict highway project costs
    • DOI 10.1108/09699980510576880
    • Williams, T. P. (2005). " Bidding ratios to predict highway project costs.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 12 (1), 38-51. 10.1108/09699980510576880 (Pubitemid 40242601)
    • (2005) Engineering, Construction and Architectural Management , vol.12 , Issue.1 , pp. 38-51
    • Williams, T.P.1
  • 34
    • 12744266507 scopus 로고    scopus 로고
    • Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
    • DOI 10.1061/(ASCE)0733-9364(2005)131:2(176)
    • Zheng, D. X. M., and Ng, T. S. (2005). " Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (2), 176-186. 10.1061/(ASCE)0733-9364(2005)131:2(176) (Pubitemid 40155177)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.2 , pp. 176-186
    • Zheng, D.X.M.1    Ng, S.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.