Volumn 10, Issue 1, 2012, Pages 7-33

Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria

Author keywords

Construction industry; Contracts; Document management; Nigeria; Procurement management; Project management; Project performance; Project planning

Indexed keywords

DOCUMENT MANAGEMENT; NIGERIA; PROCUREMENT MANAGEMENT; PROJECT PERFORMANCE; PROJECT PLANNING;

EID: 84858827980     PISSN: 17260531     EISSN: None     Source Type: Journal    
DOI: 10.1108/17260531211211863     Document Type: Article
Times cited : (6)

References (46)
  • 1
    • 84861143214 scopus 로고
    • Design and build: a survey of construction contractors' views
    • Akintoye, A. (1994), “Design and build: a survey of construction contractors' views”, Construction Management and Economics, Vol. 12, pp. 155-63.
    • (1994) Construction Management and Economics , vol.12 , pp. 155-163
    • Akintoye, A.1
  • 2
    • 0003360631 scopus 로고
    • Procurement systems for building
    • in Brandon, P. (Ed.) UK BSP Professional Books, London
    • Bennett, J. (1992), “Procurement systems for building”, in Brandon, P. (Ed.), Quantity Surveying Techniques – New Direction, UK BSP Professional Books, London.
    • (1992) Quantity Surveying Techniques – New Direction
    • Bennett, J.1
  • 4
    • 0003320485 scopus 로고    scopus 로고
    • Evaluation of enhanced design and build system – a case study of hospital project
    • Chan, A.P.C. (2001), “Evaluation of enhanced design and build system – a case study of hospital project”, Construction Management and Economics, Vol. 18, pp. 863-71.
    • (2001) Construction Management and Economics , vol.18 , pp. 863-871
    • Chan, A.P.C.1
  • 7
    • 0037294151 scopus 로고    scopus 로고
    • An empirical analysis of the relationship between project planning and project success
    • Dvir, D., Raz, T. and Shenhar, J. (2003), “An empirical analysis of the relationship between project planning and project success”, International Journal of Project Management, Vol. 21 No. 2, pp. 1-7.
    • (2003) International Journal of Project Management , vol.21 , Issue.2 , pp. 1-7
    • Dvir, D.1    Raz, T.2    Shenhar, J.3
  • 13
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequalification data: selection criteria and project success factors
    • Hatush, Z. and Skitmore, M. (1997), “Evaluating contractor prequalification data: selection criteria and project success factors”, Construction Management and Economics, Vol. 15, pp. 129-47.
    • (1997) Construction Management and Economics , vol.15 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 14
    • 0035454607 scopus 로고    scopus 로고
    • Cost analysis between Saber and design-bid-build contracting methods
    • Henry, E. and Brothers, H.S. (2001), “Cost analysis between Saber and design-bid-build contracting methods”, Journal of Construction Engineering and Management, Vol. 127 No. 5, pp. 359-66.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.5 , pp. 359-366
    • Henry, E.1    Brothers, H.S.2
  • 19
    • 77950234173 scopus 로고    scopus 로고
    • Comparative study of direct labour and design-tender-construct procurement systems in Nigeria
    • PhD thesis, University of Lagos, Lagos
    • Idoro, G.I. (2007), “Comparative study of direct labour and design-tender-construct procurement systems in Nigeria”, PhD thesis, University of Lagos, Lagos.
    • (2007)
    • Idoro, G.I.1
  • 21
    • 84858847107 scopus 로고    scopus 로고
    • A comparative study of the use of procurement systems in the construction industries of Finland and Nigeria
    • Idoro, G.I. and Iyagba, R.R. (2008), “A comparative study of the use of procurement systems in the construction industries of Finland and Nigeria”, The Professional Builder, Journal of the Nigerian Institute of Building, September, pp. 40-50.
    • (2008) The Professional Builder, Journal of the Nigerian Institute of Building , Issue.September , pp. 40-50
    • Idoro, G.I.1    Iyagba, R.R.2
  • 26
    • 2142750268 scopus 로고    scopus 로고
    • Key determinants of performance of DBB projects in Singapore
    • Ling, F.Y.Y. (2004), “Key determinants of performance of DBB projects in Singapore”, Building Research and Information, Vol. 32 No. 2, pp. 128-39.
    • (2004) Building Research and Information , vol.32 , Issue.2 , pp. 128-139
    • Ling, F.Y.Y.1
  • 27
    • 84858822348 scopus 로고    scopus 로고
    • Performance evaluation of alternative project procurement methods
    • Research Brief, Department of Building, School of Design and Environment, National University of Singapore, Singapore
    • Ling, F.Y.Y. and Chan, S.L. (2002), “Performance evaluation of alternative project procurement methods”, Research Brief, Department of Building, School of Design and Environment, National University of Singapore, Singapore.
    • (2002)
    • Ling, F.Y.Y.1    Chan, S.L.2
  • 30
    • 0000610842 scopus 로고
    • Determinants of performance in the traditional building process
    • Mohsini, R.A. and Davidson, C.H. (1992), “Determinants of performance in the traditional building process”, Construction Management Economics, Vol. 10 No. 4, pp. 343-59.
    • (1992) Construction Management Economics , vol.10 , Issue.4 , pp. 343-359
    • Mohsini, R.A.1    Davidson, C.H.2
  • 32
    • 84860352725 scopus 로고
    • Procurement systems and project performance
    • Occasional Paper 45, Chartered Institute of Building, London
    • Naoum, S.G. (1991), “Procurement systems and project performance”, Occasional Paper 45, Chartered Institute of Building, London.
    • (1991)
    • Naoum, S.G.1
  • 33
    • 0042013739 scopus 로고    scopus 로고
    • An investigation into the performance of management contracts and the traditional method of building procurement
    • PhD thesis, Brunel University, London
    • Naoum, S.G. (1999), “An investigation into the performance of management contracts and the traditional method of building procurement”, PhD thesis, Brunel University, London.
    • (1999)
    • Naoum, S.G.1
  • 36
    • 79954452706 scopus 로고    scopus 로고
    • Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry
    • Ojo, S.O., Adeyemi, A.Y. and Ikpo, J.J. (2000), “Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry”, Journal of Financial Management in Construction and Property, Vol. 5 Nos 1/2, pp. 105-8.
    • (2000) Journal of Financial Management in Construction and Property , vol.5 , Issue.1-2 , pp. 105-108
    • Ojo, S.O.1    Adeyemi, A.Y.2    Ikpo, J.J.3
  • 37
    • 0001926527 scopus 로고    scopus 로고
    • Project success: definitions and management techniques
    • Pinto, J.K. and Slevin, D.P. (1998), “Project success: definitions and management techniques”, Project Management Journal, Vol. 19 No. 1, pp. 67-71.
    • (1998) Project Management Journal , vol.19 , Issue.1 , pp. 67-71
    • Pinto, J.K.1    Slevin, D.P.2
  • 39
    • 19944423175 scopus 로고    scopus 로고
    • Business performance measurement in construction engineering organisations
    • Robinson, H., Anumba, C., Carillo, P. and Al-Ghassani, A. (2005), “Business performance measurement in construction engineering organisations”, Measuring Business Excellence, Vol. 9 No. 1, pp. 13-22.
    • (2005) Measuring Business Excellence , vol.9 , Issue.1 , pp. 13-22
    • Robinson, H.1    Anumba, C.2    Carillo, P.3    Al-Ghassani, A.4
  • 40
    • 84858856324 scopus 로고
    • The influence of procurement forms on project performance
    • Proceedings of CIB 86 Conference on Advancing Building Technology, Vol. 8, September, Washington, DC, USA
    • Rowlinson, S.M. and Newcombe, R. (1986), “The influence of procurement forms on project performance”, Proceedings of CIB 86 Conference on Advancing Building Technology, Vol. 8, September, Washington, DC, USA, pp. 3617-24.
    • (1986) , pp. 3617-3624
    • Rowlinson, S.M.1    Newcombe, R.2
  • 42
    • 0033877450 scopus 로고    scopus 로고
    • The design-build approach: an overview
    • Tenah, K.A. (2000), “The design-build approach: an overview”, Cost Engineering, Vol. 42 No. 3, pp. 31-7.
    • (2000) Cost Engineering , vol.42 , Issue.3 , pp. 31-37
    • Tenah, K.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.