-
1
-
-
12344251452
-
Process model for administrating construction claims
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:2(84)
-
Abdul-Malak, M. A., El-Saadi, M. M., and, Abou-Zeid, M. G. (2002). " Process model for administrating construction claims." J. Manage. Eng., 18 (2), 84-94. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:2(84)
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.2
, pp. 84-94
-
-
Abdul-Malak, M.A.1
El-Saadi, M.M.2
Abou-Zeid, M.G.3
-
3
-
-
32844455911
-
The relationship between distribution of control, fairness and potential for dispute in the claims handling process
-
CMECF3 0144-6193 10.1080/14697010500226954
-
Aibinu, A. A. (2006). " The relationship between distribution of control, fairness and potential for dispute in the claims handling process." Constr. Manage. Econ., 24 (1), 45-54. CMECF3 0144-6193 10.1080/14697010500226954
-
(2006)
Constr. Manage. Econ.
, vol.24
, Issue.1
, pp. 45-54
-
-
Aibinu, A.A.1
-
4
-
-
33745311973
-
Construction delays and their causative factors in Nigeria
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:7(667)
-
Aibinu, A. A., and, Odeyinka, H. A. (2006). " Construction delays and their causative factors in Nigeria." J. Constr. Eng. Manage., 132 (7), 667-677. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:7(667)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.7
, pp. 667-677
-
-
Aibinu, A.A.1
Odeyinka, H.A.2
-
5
-
-
0006449731
-
-
2nd Ed. ASQ Press, Milwaukee, WI
-
Andersen, B., and, Fagerhaug, T. (2006). Root cause analysis: Simplified tools and techniques, 2nd Ed., ASQ Press, Milwaukee, WI.
-
(2006)
Root Cause Analysis: Simplified Tools and Techniques
-
-
Andersen, B.1
Fagerhaug, T.2
-
6
-
-
84927635730
-
Causes of delay in large building construction projects
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1995)11:2(45)
-
Assaf, S. A., Al-Khalil, M., and, Al-Hazmi, M. (1995). " Causes of delay in large building construction projects." J. Manage. Eng., 11 (2), 45-50. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1995)11:2(45)
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.2
, pp. 45-50
-
-
Assaf, S.A.1
Al-Khalil, M.2
Al-Hazmi, M.3
-
7
-
-
0031078243
-
A comparative study of causes of time overruns in Hong Kong construction projects
-
IPMAEL
-
Chan, D. W. M., and, Kumaraswamy, M. M. (1997). " A comparative study of causes of time overruns in Hong Kong construction projects." Int. J. Proj. Manage., 15 (1), 55-63. IPMAEL
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.1
, pp. 55-63
-
-
Chan, D.W.M.1
Kumaraswamy, M.M.2
-
8
-
-
0036162657
-
Reasons for cost and schedule increase for engineering design projects
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:1(29)
-
Chang, A. S. T. (2002). " Reasons for cost and schedule increase for engineering design projects." J. Manage. Eng., 18 (1), 29-36. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:1(29)
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.1
, pp. 29-36
-
-
Chang, A.S.T.1
-
9
-
-
0022025262
-
Construction claims: Frequency and severity
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1985)111:1(74)
-
Diekmann, J. E., and, Nelson, M. C. (1985). " Construction claims: Frequency and severity." J. Constr. Eng. Manage., 111 (1), 74-81. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1985)111:1(74)
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.1
, pp. 74-81
-
-
Diekmann, J.E.1
Nelson, M.C.2
-
10
-
-
0027873891
-
Construction cost factors in Nigeria
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(698)
-
Elinwa, A. U., and, Buba, S. A. (1993). " Construction cost factors in Nigeria." J. Constr. Eng. Manage., 119 (4), 698-713. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(698)
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 698-713
-
-
Elinwa, A.U.1
Buba, S.A.2
-
11
-
-
0037242979
-
How common and how large are cost overruns in transport infrastructure projects?
-
0144-1647 10.1080/01441640309904
-
Flyvbjerg, B., Holm, M. K. S., and, Buhl, S. L. (2003). " How common and how large are cost overruns in transport infrastructure projects? " Transp. Rev., 23 (1), 71-88. 0144-1647 10.1080/01441640309904
-
(2003)
Transp. Rev.
, vol.23
, Issue.1
, pp. 71-88
-
-
Flyvbjerg, B.1
Holm, M.K.S.2
Buhl, S.L.3
-
12
-
-
0442328937
-
What causes cost overrun in transport infrastructure projects?
-
0144-1647 10.1080/0144164032000080494a
-
Flyvbjerg, B., Holm, M. K. S., and, Buhl, S. L. (2004). " What causes cost overrun in transport infrastructure projects? " Transp. Rev., 24 (1), 3-18. 0144-1647 10.1080/0144164032000080494a
-
(2004)
Transp. Rev.
, vol.24
, Issue.1
, pp. 3-18
-
-
Flyvbjerg, B.1
Holm, M.K.S.2
Buhl, S.L.3
-
13
-
-
0003921398
-
-
Prentice Hall, Upper Saddle River, NJ
-
Hendrickson, C., and, Au, T. (1989). Project management for construction fundamental concepts for owners, engineers, architects and builders, Prentice Hall, Upper Saddle River, NJ.
-
(1989)
Project Management for Construction Fundamental Concepts for Owners, Engineers, Architects and Builders
-
-
Hendrickson, C.1
Au, T.2
-
14
-
-
37248999300
-
Construction claims and disputes and the business culture of construction in Japan
-
JPEPE3 1052-3928 10.1061/(ASCE)1052-3928(2008)134:1(119)
-
Iwamatsu, J., Akiyama, T., and, Endo, K. (2008). " Construction claims and disputes and the business culture of construction in Japan." J. Prof. Issues Eng. Educ. Pract., 134 (1), 119-127. JPEPE3 1052-3928 10.1061/(ASCE)1052-3928(2008)134:1(119)
-
(2008)
J. Prof. Issues Eng. Educ. Pract.
, vol.134
, Issue.1
, pp. 119-127
-
-
Iwamatsu, J.1
Akiyama, T.2
Endo, K.3
-
15
-
-
0025494340
-
Predictors of cost-overrun rates
-
10.1061/(ASCE)0733-9364(1990)116:3(548) JCEMD4 0733-9364
-
Jahren, C. T., and, Ashe, A. M. (1990). " Predictors of cost-overrun rates." J. Constr. Eng. Manage., 116 (3), 548-552. 10.1061/(ASCE)0733- 9364(1990)116:3(548) JCEMD4 0733-9364
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.3
, pp. 548-552
-
-
Jahren, C.T.1
Ashe, A.M.2
-
16
-
-
0039997969
-
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
-
JPEPE3 0144-6193 10.1080/014461997373132
-
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and, Harris, F. C. (1997). " Factors influencing construction time and cost overruns on high-rise projects in Indonesia." J. Prof. Issues Eng. Educ. Pract., 15 (1), 83-94. JPEPE3 0144-6193 10.1080/014461997373132
-
(1997)
J. Prof. Issues Eng. Educ. Pract.
, vol.15
, Issue.1
, pp. 83-94
-
-
Kaming, P.F.1
Olomolaiye, P.O.2
Holt, G.D.3
Harris, F.C.4
-
18
-
-
43949112967
-
Discriminant analysis for predicting ranges of cost variance in international construction projects
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:6(398)
-
Kim, D. Y., Han, S. H., and, Kim, H. (2008). " Discriminant analysis for predicting ranges of cost variance in international construction projects." J. Constr. Eng. Manage., 134 (6), 398-410. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:6(398)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.6
, pp. 398-410
-
-
Kim, D.Y.1
Han, S.H.2
Kim, H.3
-
19
-
-
84993110215
-
Conflicts, claims and disputes in construction
-
0969-9988 10.1108/eb021042
-
Kumaraswamy, M. M. (1997). " Conflicts, claims and disputes in construction." Eng. Construct. Architect. Manage., 4 (2), 95-111. 0969-9988 10.1108/eb021042
-
(1997)
Eng. Construct. Architect. Manage.
, vol.4
, Issue.2
, pp. 95-111
-
-
Kumaraswamy, M.M.1
-
21
-
-
13944252642
-
Significant sources of construction claims
-
0265-1416
-
Kumaraswamy, M. M., and, Yogeswaran, K. (1998). " Significant sources of construction claims." Int. Constr. Law Rev., 15 (1), 144-160. 0265-1416
-
(1998)
Int. Constr. Law Rev.
, vol.15
, Issue.1
, pp. 144-160
-
-
Kumaraswamy, M.M.1
Yogeswaran, K.2
-
22
-
-
34250678968
-
International treatise on construction specification problems from a legal perspective
-
JPEPE3 1052-3928 10.1061/(ASCE)1052-3928(2007)133:3(229)
-
Lam, P. T. I., Kumaraswamy, M. M., and, Ng, T. S. T. (2007). " International treatise on construction specification problems from a legal perspective." J. Prof. Issues Eng. Educ. Pract., 133 (3), 229-237. JPEPE3 1052-3928 10.1061/(ASCE)1052-3928(2007)133:3(229)
-
(2007)
J. Prof. Issues Eng. Educ. Pract.
, vol.133
, Issue.3
, pp. 229-237
-
-
Lam, P.T.I.1
Kumaraswamy, M.M.2
Ng, T.S.T.3
-
23
-
-
43949143480
-
Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports
-
JUPDDM 0733-9488 10.1061/(ASCE)0733-9488(2008)134:2(59)
-
Lee, J. K. (2008). " Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports." J. Urban Plann. Dev., 134 (2), 59-62. JUPDDM 0733-9488 10.1061/(ASCE)0733-9488(2008)134: 2(59)
-
(2008)
J. Urban Plann. Dev.
, vol.134
, Issue.2
, pp. 59-62
-
-
Lee, J.K.1
-
25
-
-
33646751898
-
Construction delays in Hong Kong civil engineering projects
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:6(636)
-
Lo, T. Y., Fung, I. W. H., and, Tung, K. C. F. (2006). " Construction delays in Hong Kong civil engineering projects." J. Constr. Eng. Manage., 132 (6), 636-649. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006) 132:6(636)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.6
, pp. 636-649
-
-
Lo, T.Y.1
Fung, I.W.H.2
Tung, K.C.F.3
-
26
-
-
34248586649
-
Contractor's opportunistic bidding behavior and equilibrium price level in the construction market
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:6(409)
-
Lo, W., Lin, C. L., and, Yan, M. R. (2007). " Contractor's opportunistic bidding behavior and equilibrium price level in the construction market." J. Constr. Eng. Manage., 133 (6), 409-416. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:6(409)
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.6
, pp. 409-416
-
-
Lo, W.1
Lin, C.L.2
Yan, M.R.3
-
27
-
-
0030074893
-
Construction delays in a fast-growing economy: Comparing Thailand with other economies
-
IPMAEL
-
Ogunlana, S. O., Promkuntong, K., and, Jearkjirm, V. (1996). " Construction delays in a fast-growing economy: Comparing Thailand with other economies." Int. J. Proj. Manage., 14 (1), 37-45. IPMAEL
-
(1996)
Int. J. Proj. Manage.
, vol.14
, Issue.1
, pp. 37-45
-
-
Ogunlana, S.O.1
Promkuntong, K.2
Jearkjirm, V.3
-
28
-
-
84930124504
-
Causes of high costs of construction in Nigeria
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1988)114:2(233)
-
Okpala, D. C., and, Aniekwu, A. N. (1988). " Causes of high costs of construction in Nigeria." J. Constr. Eng. Manage., 114 (2), 233-244. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1988)114:2(233)
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.2
, pp. 233-244
-
-
Okpala, D.C.1
Aniekwu, A.N.2
-
29
-
-
58349101427
-
-
BSP Professional Books, Oxford, UK
-
Powell-Smith, V., and, Stephenson, D. (1989). Civil engineering claims, BSP Professional Books, Oxford, UK.
-
(1989)
Civil Engineering Claims
-
-
Powell-Smith, V.1
Stephenson, D.2
-
30
-
-
0027101397
-
-
American Association of Cost Engineers, Morgantown, WV
-
Pressoir, S. (1992). Are you contracting for success?, American Association of Cost Engineers, Morgantown, WV, 1-8.
-
(1992)
Are You Contracting for Success?
, pp. 1-8
-
-
Pressoir, S.1
-
31
-
-
4043085022
-
Planning for claims: An ethnography of industry culture
-
JCEMD4 10.1080/014461904200026324 0144-6193
-
Rooke, J., Seymour, D., and, Fellows, R. (2004). " Planning for claims: An ethnography of industry culture." Constr. Manage. Econ., 22, 655-662. JCEMD4 10.1080/014461904200026324 0144-6193
-
(2004)
Constr. Manage. Econ.
, vol.22
, pp. 655-662
-
-
Rooke, J.1
Seymour, D.2
Fellows, R.3
-
32
-
-
84891472171
-
-
Research Rep. No. 2006636, National Building Research Institute, Technion-Israel Institute of Technology, Haifa, Israel
-
Rosenfeld, Y., and, Ben-Oz, H. (2007). " Identifying and analyzing root causes for defects in residential construction." Research Rep. No. 2006636, National Building Research Institute, Technion-Israel Institute of Technology, Haifa, Israel.
-
(2007)
Identifying and Analyzing Root Causes for Defects in Residential Construction
-
-
Rosenfeld, Y.1
Ben-Oz, H.2
-
33
-
-
84891419011
-
-
Research Rep. No. 2013013, National Building Research Institute, Technion-Israel Institute of Technology, Haifa, Israel
-
Rosenfeld, Y., and, Iuclea, S. (2011). " Root causes for cost overrun in construction." Research Rep. No. 2013013, National Building Research Institute, Technion-Israel Institute of Technology, Haifa, Israel.
-
(2011)
Root Causes for Cost Overrun in Construction
-
-
Rosenfeld, Y.1
Iuclea, S.2
-
34
-
-
34248402903
-
Causes and effects of delays in Malaysian construction industry
-
IPMAEL 0263-7863 10.1016/j.ijproman.2006.11.007
-
Sambasivan, M., and, Soon, Y. W. (2007). " Causes and effects of delays in Malaysian construction industry." Int. J. Proj. Manage., 25 (5), 517-526. IPMAEL 0263-7863 10.1016/j.ijproman.2006.11.007
-
(2007)
Int. J. Proj. Manage.
, vol.25
, Issue.5
, pp. 517-526
-
-
Sambasivan, M.1
Soon, Y.W.2
-
35
-
-
0028754078
-
Construction claims and disputes: Causes and cost/time overruns
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994)120:4(785)
-
Semple, C., Hartman, F. T., and, Jergeas, G. (1994). " Construction claims and disputes: Causes and cost/time overruns." J. Constr. Eng. Manage., 120 (4), 785-795. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994)120: 4(785)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 785-795
-
-
Semple, C.1
Hartman, F.T.2
Jergeas, G.3
-
37
-
-
84891409093
-
-
2nd Ed. Addison Wesley Longman, Harlow, England, UK
-
Turner, D. F., and, Turner, A. (1999). Building contract claims and disputes, 2nd Ed., Addison Wesley Longman, Harlow, England, UK.
-
(1999)
Building Contract Claims and Disputes
-
-
Turner, D.F.1
Turner, A.2
-
38
-
-
0031237542
-
Improving the management of claims on construction contracts: Contractors' perspective
-
CMECF3 0144-6193
-
Vidogah, W., and, Ndekugri, I. (1997). " Improving the management of claims on construction contracts: Contractors' perspective." Constr. Manage. Econ., 13 (5), 37-44. CMECF3 0144-6193
-
(1997)
Constr. Manage. Econ.
, vol.13
, Issue.5
, pp. 37-44
-
-
Vidogah, W.1
Ndekugri, I.2
-
39
-
-
0003680449
-
-
ASQ Press, Milwaukee, WI
-
Wilson, P. F., Dell, L. D., and, Anderson, G. F. (1993). Root cause analysis: A tool for total quality management, ASQ Press, Milwaukee, WI.
-
(1993)
Root Cause Analysis: A Tool for Total Quality Management
-
-
Wilson, P.F.1
Dell, L.D.2
Anderson, G.F.3
-
40
-
-
27744473626
-
Statistical analysis of causes for design change in highway construction on Taiwan
-
IPMAEL 10.1016/j.ijproman.2004.07.010
-
Wu, C. H., Hsieh, T. Y., and, Cheng, W. L. (2005). " Statistical analysis of causes for design change in highway construction on Taiwan." Int. J. Proj. Manage., 23, 554-563. IPMAEL 10.1016/j.ijproman.2004.07.010
-
(2005)
Int. J. Proj. Manage.
, vol.23
, pp. 554-563
-
-
Wu, C.H.1
Hsieh, T.Y.2
Cheng, W.L.3
-
41
-
-
33745212283
-
Construction claims in the United Arab Emirates: Causes, severity, and frequency
-
IPMAEL
-
Zaneldin, E. (2006). " Construction claims in the United Arab Emirates: Causes, severity, and frequency." Int. J. Proj. Manage., 24 (5), 453-459. IPMAEL
-
(2006)
Int. J. Proj. Manage.
, vol.24
, Issue.5
, pp. 453-459
-
-
Zaneldin, E.1
-
42
-
-
57849120658
-
Applying dependency structure matrix and Monte Carlo simulation to predict change in construction project
-
Zhao, Z. Y., Lv, Q. L., and, You, W. Y. (2008). " Applying dependency structure matrix and Monte Carlo simulation to predict change in construction project." Proc., 7th Int. Conf. on Machine Learning and Cybernetics, Kunming, China, 670-675.
-
(2008)
Proc. 7th Int. Conf. on Machine Learning and Cybernetics, Kunming, China
, pp. 670-675
-
-
Zhao, Z.Y.1
Lv, Q.L.2
You, W.Y.3
|