메뉴 건너뛰기




Volumn 9, Issue 2, 2014, Pages 95-105

A survey on assembly lines and its types

Author keywords

assembly lines; line balancing; survey

Indexed keywords


EID: 84901603471     PISSN: 20950233     EISSN: 20950241     Source Type: Journal    
DOI: 10.1007/s11465-014-0302-1     Document Type: Review
Times cited : (45)

References (85)
  • 4
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker C, Scholl A. A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 2006, 168(3): 694-715.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 6
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science, 1986, 32(8): 909-932.
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 7
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh S, Gagnon R. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 1989, 27(4): 637-670.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.2
  • 8
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel E, Sarin S. A survey of the assembly line balancing procedures. Production Planning and Control, 1998, 9(5): 414-434.
    • (1998) Production Planning and Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.2
  • 9
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl A, Becker C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 2006, 168(3): 666-693.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 11
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
    • Urban T L, Chiang W C. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times. European Journal of Operational Research, 2006, 168(3): 109-120.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 109-120
    • Urban, T.L.1    Chiang, W.C.2
  • 13
    • 9344260225 scopus 로고    scopus 로고
    • System reconfiguration to avoid deadlocks in automated manufacturing systems
    • D'Souza K, Khator S. System reconfiguration to avoid deadlocks in automated manufacturing systems. Computers & Industrial Engineering, 1997, 32(2): 445-465.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.2 , pp. 445-465
    • D'Souza, K.1    Khator, S.2
  • 16
    • 0034418438 scopus 로고    scopus 로고
    • Efficient algorithms for buffer space allocation
    • Gershwin S, Schor J. Efficient algorithms for buffer space allocation. Annals of Operations Research, 2000, 93(1/4): 117-144.
    • (2000) Annals of Operations Research , vol.93 , Issue.1-4 , pp. 117-144
    • Gershwin, S.1    Schor, J.2
  • 17
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • Thomopoulos N T. Mixed model line balancing with smoothed station assignments. Management Science, 1970, 16(9): 593-603.
    • (1970) Management Science , vol.16 , Issue.9 , pp. 593-603
    • Thomopoulos, N.T.1
  • 19
    • 0030192703 scopus 로고    scopus 로고
    • Genetic algorithms for assembly line balancing with various objectives
    • Kim Y K, Kim Y J, Kim Y, 0, 0. Genetic algorithms for assembly line balancing with various objectives. Computers & Industrial Engineering, 1996, 30(3): 397-409.
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.3 , pp. 397-409
    • Kim, Y.K.1    Kim, Y.J.2    Kim, Y.3
  • 20
    • 10444289741 scopus 로고    scopus 로고
    • A genetic algorithm based approach to the mixed model assembly line balancing problem of type II
    • Simaria A S, Vilarinho P M. A genetic algorithm based approach to the mixed model assembly line balancing problem of type II. Computers & Industrial Engineering, 2004, 47(4): 391-407.
    • (2004) Computers & Industrial Engineering , vol.47 , Issue.4 , pp. 391-407
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 21
    • 13544275547 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
    • Mansouri S A. A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. European Journal of Operational Research, 2005, 167(3): 696-716.
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 696-716
    • Mansouri, S.A.1
  • 22
    • 0037508541 scopus 로고    scopus 로고
    • Assembly line balancing in a mixed-model sequencing environment with synchronous transfers
    • Karabati S, Sayin S. Assembly line balancing in a mixed-model sequencing environment with synchronous transfers. European Journal of Operational Research, 2003, 149(2): 417-429.
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 417-429
    • Karabati, S.1    Sayin, S.2
  • 23
    • 0000945761 scopus 로고    scopus 로고
    • A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines
    • Kim Y K, Kim J Y, Kim Y. A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Applied Intelligence, 2000a, 13(3): 247-258.
    • (2000) Applied Intelligence , vol.13 , Issue.3 , pp. 247-258
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 24
    • 25144469836 scopus 로고    scopus 로고
    • An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
    • Kim Y K, Kim J Y, Kim Y A. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research, 2006, 168(3): 838-852.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 838-852
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.A.3
  • 27
    • 77956658470 scopus 로고    scopus 로고
    • Integrated procedure of balancing and sequencing for mixed-model assembly lines: a multi-objective evolutionary approach
    • Hwang R, Katayama H. Integrated procedure of balancing and sequencing for mixed-model assembly lines: a multi-objective evolutionary approach. International Journal of Production Research, 2010, 48(21): 6417-6441.
    • (2010) International Journal of Production Research , vol.48 , Issue.21 , pp. 6417-6441
    • Hwang, R.1    Katayama, H.2
  • 28
    • 84857124013 scopus 로고    scopus 로고
    • Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines
    • Mosadegh H, Zandieh M, Fatemi Ghomi S M T. Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines. Applied Soft Computing, 2012, 12(4): 1359-1370.
    • (2012) Applied Soft Computing , vol.12 , Issue.4 , pp. 1359-1370
    • Mosadegh, H.1    Zandieh, M.2    Fatemi Ghomi, S.M.T.3
  • 31
    • 0028531312 scopus 로고
    • U-line Line Balancing Problem
    • Miltenburg J, Wijngaard J. U-line Line Balancing Problem. Management Science, 1994, 40(10): 1378-1388.
    • (1994) Management Science , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg, J.1    Wijngaard, J.2
  • 32
    • 0034688394 scopus 로고    scopus 로고
    • The effect of breakdowns on U-shaped production lines
    • Miltenburg J. The effect of breakdowns on U-shaped production lines. International Journal of Production Research, 2000, 38(2): 353-364.
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 353-364
    • Miltenburg, J.1
  • 34
    • 0004114132 scopus 로고
    • Portland, OR: Productivity Press
    • Sekine K. One-Piece Flow. Productivity Press, Portland, OR, 1992.
    • (1992) One-Piece Flow
    • Sekine, K.1
  • 37
    • 0347711882 scopus 로고    scopus 로고
    • A comparison of U-line and straightline performances under stochastic task times
    • Chand S, Zeng T. A comparison of U-line and straightline performances under stochastic task times. Manufacturing and Service Operations Management, 2001, 3(2): 138-150.
    • (2001) Manufacturing and Service Operations Management , vol.3 , Issue.2 , pp. 138-150
    • Chand, S.1    Zeng, T.2
  • 39
  • 40
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • Lee T O, Kim Y, Kim Y K. Two-sided assembly line balancing to maximize work relatedness and slackness. Computers & Industrial Engineering, 2001, 40(3): 273-292.
    • (2001) Computers & Industrial Engineering , vol.40 , Issue.3 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 42
    • 79955916213 scopus 로고    scopus 로고
    • An advanced multiobjective genetic algorithm design for the time and space assembly line balancing problem
    • Chica M, Cordón Ó, Damas S. An advanced multiobjective genetic algorithm design for the time and space assembly line balancing problem. Computers & Industrial Engineering, 2011, 61(1): 103-117.
    • (2011) Computers & Industrial Engineering , vol.61 , Issue.1 , pp. 103-117
    • Chica, M.1    Cordón2    Damas, S.3
  • 43
    • 84869496192 scopus 로고    scopus 로고
    • Akbarpour Shirazi M. A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
    • Hamta N, Fatemi G S M T, Jolai F. Akbarpour Shirazi M. A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect. International Journal of Production Economics, 2013, 141(1): 99-111.
    • (2013) International Journal of Production Economics , vol.141 , Issue.1 , pp. 99-111
    • Hamta, N.1    Fatemi, G.S.M.T.2    Jolai, F.3
  • 45
    • 80053189489 scopus 로고    scopus 로고
    • A solution procedure for type E-simple assembly line balancing problem
    • Wei N C, Chao I M, 0. A solution procedure for type E-simple assembly line balancing problem. Computers & Industrial Engineering, 2011, 61(3): 824-830.
    • (2011) Computers & Industrial Engineering , vol.61 , Issue.3 , pp. 824-830
    • Wei, N.C.1    Chao, I.M.2
  • 46
    • 79952633743 scopus 로고    scopus 로고
    • Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS
    • Nourmohammadi A, Zandieh M. Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS. International Journal of Production Research, 2011, 49(10): 2833-2855.
    • (2011) International Journal of Production Research , vol.49 , Issue.10 , pp. 2833-2855
    • Nourmohammadi, A.1    Zandieh, M.2
  • 47
    • 79751537157 scopus 로고    scopus 로고
    • Multi-objective optimization of a stochastic assembly line balancing: a hybrid simulated annealing algorithm
    • Cakir B, Altiparmak F, Dengiz B. Multi-objective optimization of a stochastic assembly line balancing: a hybrid simulated annealing algorithm. Computers & Industrial Engineering, 2011, 60(3): 376-384.
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.3 , pp. 376-384
    • Cakir, B.1    Altiparmak, F.2    Dengiz, B.3
  • 48
    • 29344438441 scopus 로고    scopus 로고
    • Multi-objective assembly line balancing via a modified ant colony optimization technique
    • Mcmullen P R, Tarasewich P. Multi-objective assembly line balancing via a modified ant colony optimization technique. International Journal of Production Research, 2006, 44(1): 27-42.
    • (2006) International Journal of Production Research , vol.44 , Issue.1 , pp. 27-42
    • McMullen, P.R.1    Tarasewich, P.2
  • 49
    • 0030241346 scopus 로고    scopus 로고
    • A knowledge-based system for solving multi-objective assembly line balancing problems
    • Malakooti B, Kumar A. A knowledge-based system for solving multi-objective assembly line balancing problems. International Journal of Production Research, 1996, 34(9): 2533-2552.
    • (1996) International Journal of Production Research , vol.34 , Issue.9 , pp. 2533-2552
    • Malakooti, B.1    Kumar, A.2
  • 50
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed-model production line balancing problem
    • Askin R G, Zhou M. A parallel station heuristic for the mixed-model production line balancing problem. International Journal of Production Research, 1997, 35(11): 3095-3105.
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 51
    • 0030785015 scopus 로고    scopus 로고
    • A goal programming approach to mixed-model assembly line balancing problem
    • Gokcen H, Erel E. A goal programming approach to mixed-model assembly line balancing problem. International Journal of Production Economics, 1997, 48(2): 177-185.
    • (1997) International Journal of Production Economics , vol.48 , Issue.2 , pp. 177-185
    • Gokcen, H.1    Erel, E.2
  • 52
    • 0036771306 scopus 로고    scopus 로고
    • A hybrid genetic algorithm approach on multi-objective of assembly planning problem
    • Chen R S, Lu K Y, Yu S C. A hybrid genetic algorithm approach on multi-objective of assembly planning problem. Engineering Applications of Artificial Intelligence, 2002, 15(5): 447-457.
    • (2002) Engineering Applications of Artificial Intelligence , vol.15 , Issue.5 , pp. 447-457
    • Chen, R.S.1    Lu, K.Y.2    Yu, S.C.3
  • 53
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho P M, Simaria A S. A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations. International Journal of Production Research, 2002, 40(6): 1405-1420.
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 54
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • Bukchin J, Rubinovitz J. A weighted approach for assembly line design with station paralleling and equipment selection. IIE Transactions, 2003, 35(1): 73-85.
    • (2003) IIE Transactions , vol.35 , Issue.1 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, J.2
  • 55
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini R, Grassi A, Rimini B. A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem. International Journal of Production Economics, 2006, 102(2): 226-243.
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 56
    • 33645509107 scopus 로고    scopus 로고
    • Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems
    • Baykasoglu A. Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems. Journal of Intelligent Manufacturing, 2006, 17(2): 217-232.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.2 , pp. 217-232
    • Baykasoglu, A.1
  • 57
    • 39449130408 scopus 로고    scopus 로고
    • Multi-objective balancing of assembly lines by population heuristics
    • Nearchou A C. Multi-objective balancing of assembly lines by population heuristics. International Journal of Production Research, 2008, 46(8): 2275-2297.
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2275-2297
    • Nearchou, A.C.1
  • 60
    • 17444430405 scopus 로고    scopus 로고
    • Coello Coello and Nareli Cruz Cortes. Solving Multi objective Optimization Problems using an Artificial Immune System
    • Carlos A. Coello Coello and Nareli Cruz Cortes. Solving Multi objective Optimization Problems using an Artificial Immune System. Genetic Programming and Evolvable Machines, 2005, 6: 163-190.
    • (2005) Genetic Programming and Evolvable Machines , vol.6 , pp. 163-190
    • Carlos, A.1
  • 65
    • 70450032857 scopus 로고    scopus 로고
    • Performance assessment of generalized differential evolution with a given set of constrained multi-objective test problems
    • Kukkonen S, Lampinen J. Performance assessment of generalized differential evolution with a given set of constrained multi-objective test problems, in: Proceeding of Congress on Evolutionary Computation. CEC' 09, 2009, 1943-1950.
    • (2009) Proceeding of Congress on Evolutionary Computation. CEC' 09 , pp. 1943-1950
    • Kukkonen, S.1    Lampinen, J.2
  • 66
    • 84876982191 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm for mixed-model assembly line rebalancing
    • Yang C, Gao J, Sun L. A multi-objective genetic algorithm for mixed-model assembly line rebalancing. Computers & Industrial Engineering, 2013, 65(1): 109-116.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.1 , pp. 109-116
    • Yang, C.1    Gao, J.2    Sun, L.3
  • 67
    • 0020848902 scopus 로고
    • A branch and bound algorithm for assembly line balancing problems with formulation irregularities
    • Johnson R V. A branch and bound algorithm for assembly line balancing problems with formulation irregularities. Management Science, 1983, 29(11): 1309-1324.
    • (1983) Management Science , vol.29 , Issue.11 , pp. 1309-1324
    • Johnson, R.V.1
  • 68
    • 0023329266 scopus 로고
    • Choice of assembly line design under task learning
    • Boucher T O. Choice of assembly line design under task learning. International Journal of Production Research, 1978, 25(4): 513-524.
    • (1978) International Journal of Production Research , vol.25 , Issue.4 , pp. 513-524
    • Boucher, T.O.1
  • 69
    • 0024033958 scopus 로고
    • Line balancing with task learning effects
    • Chakravarty A K. Line balancing with task learning effects. IIE Transactions, 1988, 20(2): 186-193.
    • (1988) IIE Transactions , vol.20 , Issue.2 , pp. 186-193
    • Chakravarty, A.K.1
  • 70
    • 0025603598 scopus 로고
    • An efficient heuristic for solving stochastic assembly line balancing problems
    • Shin D. An efficient heuristic for solving stochastic assembly line balancing problems. Computers & Industrial Engineering, 1990, 18(3): 285-295.
    • (1990) Computers & Industrial Engineering , vol.18 , Issue.3 , pp. 285-295
    • Shin, D.1
  • 71
    • 0025429668 scopus 로고
    • Abandoning the moving assembly line: Models of human operators and job sequencing
    • Buzacott J A. Abandoning the moving assembly line: Models of human operators and job sequencing. International Journal of Production Research, 1990, 28(5): 821-839.
    • (1990) International Journal of Production Research , vol.28 , Issue.5 , pp. 821-839
    • Buzacott, J.A.1
  • 73
    • 0026239015 scopus 로고
    • The effect of machine breakdowns and interstage storage on the performance of production line systems
    • Hillier F S, So K C. The effect of machine breakdowns and interstage storage on the performance of production line systems. International Journal of Production Research, 1991, 29(10): 2043-2055.
    • (1991) International Journal of Production Research , vol.29 , Issue.10 , pp. 2043-2055
    • Hillier, F.S.1    So, K.C.2
  • 75
    • 0038480082 scopus 로고    scopus 로고
    • Using ant techniques to solve the assembly line balancing problem
    • McMullen P R, Tarasewich P. Using ant techniques to solve the assembly line balancing problem. IIE Transactions, 2003, 35(7): 605-607.
    • (2003) IIE Transactions , vol.35 , Issue.7 , pp. 605-607
    • McMullen, P.R.1    Tarasewich, P.2
  • 76
    • 34548567778 scopus 로고    scopus 로고
    • Modeling and analysis of a mixed-model assembly line with stochastic operation times
    • Zhao X, Liu J, Ohn K, et al. Modeling and analysis of a mixed-model assembly line with stochastic operation times. Naval Research Logistics, 2007, 54(6): 681-691.
    • (2007) Naval Research Logistics , vol.54 , Issue.6 , pp. 681-691
    • Zhao, X.1    Liu, J.2    Ohn, K.3
  • 77
    • 25144504530 scopus 로고    scopus 로고
    • A heuristic solution for fuzzy mixed-model line balancing problem
    • Hop N V. A heuristic solution for fuzzy mixed-model line balancing problem. European Journal of Operational Research, 2006, 168(3): 798-810.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 798-810
    • Hop, N.V.1
  • 78
  • 79
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie C L, Young H H. A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering, 1965, 16: 23-29.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 80
    • 0018698137 scopus 로고
    • Computational experience with a stochastic assembly line balancing algorithm
    • Kao E P C. Computational experience with a stochastic assembly line balancing algorithm. Computers & Operations Research, 1979, 6(2): 79-86.
    • (1979) Computers & Operations Research , vol.6 , Issue.2 , pp. 79-86
    • Kao, E.P.C.1
  • 81
    • 0019610050 scopus 로고
    • Analysis of a preference order assembly line problem
    • Sniedovich M. Analysis of a preference order assembly line problem. Management Science, 1981, 27(9): 1067-1080.
    • (1981) Management Science , vol.27 , Issue.9 , pp. 1067-1080
    • Sniedovich, M.1
  • 84
    • 79958174505 scopus 로고    scopus 로고
    • Strategic Robust Mixed model assembly line balancing based on scenario planning
    • Xu W, Xiao T. Strategic Robust Mixed model assembly line balancing based on scenario planning. Tsinghua Science and Technology, 2011, 16(3): 308-314.
    • (2011) Tsinghua Science and Technology , vol.16 , Issue.3 , pp. 308-314
    • Xu, W.1    Xiao, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.