메뉴 건너뛰기




Volumn 141, Issue 1, 2013, Pages 99-111

A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect

Author keywords

Assembly line balancing; Flexible operation times; Hybrid PSO; Learning effect; Multi objective optimization; Sequence dependent setup times

Indexed keywords

ASSEMBLY LINE BALANCING; FLEXIBLE OPERATION; HYBRID PSO; LEARNING EFFECTS; MULTI OBJECTIVE OPTIMIZATIONS (MOO); SEQUENCE-DEPENDENT SETUP TIME;

EID: 84869496192     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.03.013     Document Type: Article
Times cited : (163)

References (55)
  • 1
    • 33745000941 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
    • A. Allahverdi Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times International Journal of Production Economics 103 2006 386 400
    • (2006) International Journal of Production Economics , vol.103 , pp. 386-400
    • Allahverdi, A.1
  • 2
    • 36849023499 scopus 로고    scopus 로고
    • Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    • C. Andres, C. Miralles, and R. Pastor Balancing and scheduling tasks in assembly lines with sequence-dependent setup times European Journal of Operational Research 187 2008 1212 1223
    • (2008) European Journal of Operational Research , vol.187 , pp. 1212-1223
    • Andres, C.1    Miralles, C.2    Pastor, R.3
  • 3
    • 33751255097 scopus 로고    scopus 로고
    • Ant algorithms for a time and space constrained assembly line balancing problem
    • J. Bautista, and J. Pereira Ant algorithms for a time and space constrained assembly line balancing problem European Journal of Operational Research 177 2007 2016 2032
    • (2007) European Journal of Operational Research , vol.177 , pp. 2016-2032
    • Bautista, J.1    Pereira, J.2
  • 4
    • 67349094635 scopus 로고    scopus 로고
    • A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic
    • J. Behnamian, S.M.T. Fatemi Ghomi, and M. Zandieh A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic Expert Systems with Applications 36 2009 11057 11069
    • (2009) Expert Systems with Applications , vol.36 , pp. 11057-11069
    • Behnamian, J.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 6
    • 33845260328 scopus 로고    scopus 로고
    • A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs
    • Y. Bukchin, and I. Rabinowitch A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs European Journal of Operational Research 174 2006 492 508
    • (2006) European Journal of Operational Research , vol.174 , pp. 492-508
    • Bukchin, Y.1    Rabinowitch, I.2
  • 8
    • 0001096735 scopus 로고
    • Genetics and random keys for sequencing and optimization
    • J. Bean Genetics and random keys for sequencing and optimization ORSA Journal on Computing 6 2 1994 154 160
    • (1994) ORSA Journal on Computing , vol.6 , Issue.2 , pp. 154-160
    • Bean, J.1
  • 9
    • 55149094562 scopus 로고    scopus 로고
    • A dynamic programming based heuristic for the assembly line balancing problem
    • J. Bautista, and J. Pereira A dynamic programming based heuristic for the assembly line balancing problem European Journal of Operational Research 194 2009 787 794
    • (2009) European Journal of Operational Research , vol.194 , pp. 787-794
    • Bautista, J.1    Pereira, J.2
  • 10
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • C. Becker, and A. Scholl A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 3 2006 694 715
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 11
    • 0345201636 scopus 로고    scopus 로고
    • Single-machine scheduling with learning considerations
    • D. Biskup Single-machine scheduling with learning considerations European Journal of Operational Research 115 1999 173 178
    • (1999) European Journal of Operational Research , vol.115 , pp. 173-178
    • Biskup, D.1
  • 12
    • 79751537157 scopus 로고    scopus 로고
    • Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm
    • B. Cakir, F. Altiparmak, and B. Dengiz Multi-objective optimization of a stochastic assembly line balancing: a hybrid simulated annealing algorithm Computers & Industrial Engineering 60 2011 376 384
    • (2011) Computers & Industrial Engineering , vol.60 , pp. 376-384
    • Cakir, B.1    Altiparmak, F.2    Dengiz, B.3
  • 13
    • 0036771306 scopus 로고    scopus 로고
    • A hybrid genetic algorithm approach on multi-objective of assembly planning problem
    • R.S. Chen, K.Y. Lu, and S.C. Yu A hybrid genetic algorithm approach on multi-objective of assembly planning problem Engineering Applications of Artificial Intelligence 15 2002 447 457
    • (2002) Engineering Applications of Artificial Intelligence , vol.15 , pp. 447-457
    • Chen, R.S.1    Lu, K.Y.2    Yu, S.C.3
  • 14
    • 79952041840 scopus 로고    scopus 로고
    • A new diversity induction mechanism for a multi-objective ant colony algorithm to solve a real-world time and space assembly line balancing problem
    • M. Chica, O. Cordón, S. Damas, and J. Bautista A new diversity induction mechanism for a multi-objective ant colony algorithm to solve a real-world time and space assembly line balancing problem Memetic Computing 3 2011 15 24
    • (2011) Memetic Computing , vol.3 , pp. 15-24
    • Chica, M.1    Cordón, O.2    Damas, S.3    Bautista, J.4
  • 16
    • 25144463243 scopus 로고    scopus 로고
    • Optimal allocation of work in assembly lines for lots with homogenous learning
    • Y. Cohen, G. Vitner, and S.C. Sarin Optimal allocation of work in assembly lines for lots with homogenous learning European Journal of Operational Research 168 3 2006 922 931
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 922-931
    • Cohen, Y.1    Vitner, G.2    Sarin, S.C.3
  • 19
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • E. Erel, and S.C. Sarin A survey of the assembly line balancing procedures Production Planning & Control 9 5 1998 414 434
    • (1998) Production Planning & Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 20
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • R. Gamberini, A. Grassi, and B. Rimini A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem International Journal of Production Economics 102 2006 226 243
    • (2006) International Journal of Production Economics , vol.102 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 21
    • 0001474336 scopus 로고
    • An algorithm for the line balancing problem
    • A.L. Gutjahr, and G.L. Nemhauser An algorithm for the line balancing problem Management Science 11 2 1964 308 315
    • (1964) Management Science , vol.11 , Issue.2 , pp. 308-315
    • Gutjahr, A.L.1    Nemhauser, G.L.2
  • 23
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • S. Ghosh, and R.J. Gagnon A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems International Journal of Production Research 27 4 1989 637 670
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 25
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
    • M.I. Henig Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems Computers & Operations Research 13 1986 443 449
    • (1986) Computers & Operations Research , vol.13 , pp. 443-449
    • Henig, M.I.1
  • 26
    • 79751526578 scopus 로고    scopus 로고
    • Multi-objective approaches to balance mixed-model assembly lines for model mixes having precedence conflicts and duplicable common tasks
    • Y. Kara, C. Özgüven, N.Y. Seçme, and C.T. Chang Multi-objective approaches to balance mixed-model assembly lines for model mixes having precedence conflicts and duplicable common tasks International Journal of Advanced Manufacturing Technology 52 2011 725 737
    • (2011) International Journal of Advanced Manufacturing Technology , vol.52 , pp. 725-737
    • Kara, Y.1    Özgüven, C.2    Seçme, N.Y.3    Chang, C.T.4
  • 27
    • 0030192703 scopus 로고    scopus 로고
    • Genetic algorithms for assembly line balancing with various objectives
    • Y.K. Kim, Y.J. Kim, and Y. Kim Genetic algorithms for assembly line balancing with various objectives Computers & Industrial Engineering 30 3 1996 397 409
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.3 , pp. 397-409
    • Kim, Y.K.1    Kim, Y.J.2    Kim, Y.3
  • 32
    • 38049000847 scopus 로고    scopus 로고
    • Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
    • C. Miralles, J.P. García-Sabater, C. Andrés, and M. Cardós Branch and bound procedures for solving the assembly line worker assignment and balancing problem: application to sheltered work centres for disabled Discrete Applied Mathematics 156 2008 352 367
    • (2008) Discrete Applied Mathematics , vol.156 , pp. 352-367
    • Miralles, C.1    García-Sabater, J.P.2    Andrés, C.3    Cardós, M.4
  • 35
    • 34748923503 scopus 로고    scopus 로고
    • Balancing large assembly lines by a new heuristic based on differential evolution method
    • A.C. Nearchou Balancing large assembly lines by a new heuristic based on differential evolution method International Journal of Advanced Manufacturing Technology 34 2007 1016 1029
    • (2007) International Journal of Advanced Manufacturing Technology , vol.34 , pp. 1016-1029
    • Nearchou, A.C.1
  • 36
    • 78650310064 scopus 로고    scopus 로고
    • Maximizing production rate and workload smoothing in assembly lines using particle swarm optimization
    • A.C. Nearchou Maximizing production rate and workload smoothing in assembly lines using particle swarm optimization International Journal of Production Economics 129 2011 242 250
    • (2011) International Journal of Production Economics , vol.129 , pp. 242-250
    • Nearchou, A.C.1
  • 38
    • 79952633743 scopus 로고    scopus 로고
    • Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS
    • A. Nourmohammadi, and M. Zandieh Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS International Journal of Production Research 49 2011 2833 2855
    • (2011) International Journal of Production Research , vol.49 , pp. 2833-2855
    • Nourmohammadi, A.1    Zandieh, M.2
  • 39
    • 39449130408 scopus 로고    scopus 로고
    • Multi-objective balancing of assembly lines by population heuristics
    • A.C. Nearchou Multi-objective balancing of assembly lines by population heuristics International Journal of Production Research 46 8 2008 2275 2297
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2275-2297
    • Nearchou, A.C.1
  • 40
    • 75849138540 scopus 로고    scopus 로고
    • Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
    • U. Ozcan Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm European Journal of Operational Research 205 2010 81 97
    • (2010) European Journal of Operational Research , vol.205 , pp. 81-97
    • Ozcan, U.1
  • 43
    • 63649124111 scopus 로고    scopus 로고
    • A variable neighborhood search for job shop scheduling with set-up times to minimize makespan
    • V. Roshanaei, B. Naderi, F. Jolai, and M. Khalili A variable neighborhood search for job shop scheduling with set-up times to minimize makespan Future Generation Computer Systems 25 2009 654 661
    • (2009) Future Generation Computer Systems , vol.25 , pp. 654-661
    • Roshanaei, V.1    Naderi, B.2    Jolai, F.3    Khalili, M.4
  • 47
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • A. Scholl, and C. Becker State-of-the-art exact and heuristic solution procedures for simple assembly line balancing European Journal of Operational Research 168 2006 666 693
    • (2006) European Journal of Operational Research , vol.168 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 48
    • 71749092272 scopus 로고    scopus 로고
    • A multi-objective PSO for job-shop scheduling problems
    • D.Y. Sha, and H.H. Lin A multi-objective PSO for job-shop scheduling problems Expert Systems with Applications 37 2010 1065 1070
    • (2010) Expert Systems with Applications , vol.37 , pp. 1065-1070
    • Sha, D.Y.1    Lin, H.H.2
  • 49
    • 78649835376 scopus 로고    scopus 로고
    • A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks
    • S.A. Seyed-Alagheband, S.M.T. Fatemi Ghomi, and M. Zandieh A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks International Journal of Production Research 49 3 2011 805 825
    • (2011) International Journal of Production Research , vol.49 , Issue.3 , pp. 805-825
    • Seyed-Alagheband, S.A.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 50
    • 59349112769 scopus 로고    scopus 로고
    • 2-ANTBAL: An ant colony optimization algorithm for balancing two-sided assembly lines
    • A.S. Simaria, and P.M. Vilarinho 2-ANTBAL: an ant colony optimization algorithm for balancing two-sided assembly lines Computers & Industrial Engineering 56 2009 489 506
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 489-506
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 53
  • 55
    • 39449124682 scopus 로고    scopus 로고
    • A review of the current applications of genetic algorithms in assembly line balancing
    • S.O. Tasan, and S. Tunali A review of the current applications of genetic algorithms in assembly line balancing Journal of Intelligent Manufacturing 19 2008 49 69
    • (2008) Journal of Intelligent Manufacturing , vol.19 , pp. 49-69
    • Tasan, S.O.1    Tunali, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.