메뉴 건너뛰기




Volumn , Issue , 2008, Pages 1752-1760

Mixed model assembly line balancing problem with fuzzy operation times and drifting operations

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY LINE BALANCING PROBLEMS; CHANCE-CONSTRAINED PROGRAMMING; COMPUTATIONAL RESULTS; FUZZY OPERATIONS; FUZZY SIMULATIONS; HYBRID INTELLIGENT ALGORITHMS; MIXED MODELS; MIXED-MODEL ASSEMBLY LINES; TASK ELEMENTS; TIME MINIMIZATIONS; TOTAL WORKS;

EID: 60749129511     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2008.4736263     Document Type: Conference Paper
Times cited : (16)

References (40)
  • 1
    • 0001188971 scopus 로고
    • Genetic algorithms for combinatorial optimization: The assemble line balancing problem
    • Anderson, E. J., and M. C. Ferris. 1994. Genetic algorithms for combinatorial optimization: The assemble line balancing problem. ORSA Journal on Computing 6 (2):161-183.
    • (1994) ORSA Journal on Computing , vol.6 , Issue.2 , pp. 161-183
    • Anderson, E.J.1    Ferris, M.C.2
  • 2
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • Arcus, A. L. 1966. COMSOAL: A computer method of sequencing operations for assembly lines. International Journal of Production Research 4 (4):259-277.
    • (1966) International Journal of Production Research , vol.4 , Issue.4 , pp. 259-277
    • Arcus, A.L.1
  • 5
    • 33845260328 scopus 로고    scopus 로고
    • A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs
    • Bukchin, Y., and I. Rabinowitch. 2006. A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs. European Journal of Operational Research 174 (1 ):492-508.
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 492-508
    • Bukchin, Y.1    Rabinowitch, I.2
  • 6
    • 0013054874 scopus 로고
    • A dynamic programming approach to stochastic assembly line balancing
    • Carraway, R. L. 1989. A dynamic programming approach to stochastic assembly line balancing. Management Science 35 (4):459-471.
    • (1989) Management Science , vol.35 , Issue.4 , pp. 459-471
    • Carraway, R.L.1
  • 7
    • 0141976792 scopus 로고    scopus 로고
    • Computers & Operations Research3\
    • l:39-59
    • Celano, G., A. Costa, S. Fichera, and G. Perrone. 2004. Human factor policy testing in the sequencing of manual mixed model assembly lines. Computers & Operations Research3\ (l):39-59.
    • (2004)
    • Celano, G.1    Costa, A.2    Fichera, S.3    Perrone, G.4
  • 8
    • 0002395681 scopus 로고
    • Chance-constrained programming
    • Charnes, A., and W. W. Cooper. 1959. Chance-constrained programming. Management Science 6 (l):73-79.
    • (1959) Management Science , vol.6 , Issue.L , pp. 73-79
    • Charnes, A.1    Cooper, W.W.2
  • 10
    • 0030422390 scopus 로고    scopus 로고
    • Fuzzy assembly line balancing using genetic algorithms
    • Gen, M., Y. Tsujimura, and Y. Li. 1996. Fuzzy assembly line balancing using genetic algorithms. Computers & Industrial Engineering 31 (3-4):631-634.
    • (1996) Computers & Industrial Engineering , vol.31 , Issue.3-4 , pp. 631-634
    • Gen, M.1    Tsujimura, Y.2    Li, Y.3
  • 12
    • 60749099598 scopus 로고    scopus 로고
    • Hashimoto, Y., 1. Nishikawa, and H. Tokumaru. 1993. Line balancing using a hopfield network. In Proceeding of the Korea Automatic Control Conference, 391-394. Seoul, Korea.
    • Hashimoto, Y., 1. Nishikawa, and H. Tokumaru. 1993. Line balancing using a hopfield network. In Proceeding of the Korea Automatic Control Conference, 391-394. Seoul, Korea.
  • 14
    • 0001108060 scopus 로고
    • Assembly line balancing using the ranked positional weight technique
    • Helgeson, W. B., and D. P. Birnie. 1961. Assembly line balancing using the ranked positional weight technique. Journal of Industrial Engineering 12 (6): 394-398.
    • (1961) Journal of Industrial Engineering , vol.12 , Issue.6 , pp. 394-398
    • Helgeson, W.B.1    Birnie, D.P.2
  • 15
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assemblyline balancing problems
    • Henig, M. I. 1986. Extensions of the dynamic programming method in the deterministic and stochastic assemblyline balancing problems. Computers & Operations Research 13 (4):443-449.
    • (1986) Computers & Operations Research , vol.13 , Issue.4 , pp. 443-449
    • Henig, M.I.1
  • 16
    • 25144504530 scopus 로고    scopus 로고
    • A heuristic solution for fuzzy mixed-model line balancing problem
    • Hop, N. V. 2006. A heuristic solution for fuzzy mixed-model line balancing problem. European Journal of Operational Research 168 (3):798-810.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 798-810
    • Hop, N.V.1
  • 17
    • 0000804223 scopus 로고
    • A computing procedure for a line balancing problem
    • Jackson, J. R. 1956. A computing procedure for a line balancing problem. Management Science 2 (3):261-271.
    • (1956) Management Science , vol.2 , Issue.3 , pp. 261-271
    • Jackson, J.R.1
  • 18
    • 84990609518 scopus 로고
    • Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria
    • Leu, Y. Y., L. A. Matheson, and L. P. Rees. 1994. Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria. Decision Sciences 25 (4):581-606.
    • (1994) Decision Sciences , vol.25 , Issue.4 , pp. 581-606
    • Leu, Y.Y.1    Matheson, L.A.2    Rees, L.P.3
  • 19
    • 0032290201 scopus 로고    scopus 로고
    • Minimax chance constrained programming models for fuzzy decision systems
    • Liu, B. 1998. Minimax chance constrained programming models for fuzzy decision systems. Information Sciences 112(1-4):25-38.
    • (1998) Information Sciences , vol.112 , Issue.1-4 , pp. 25-38
    • Liu, B.1
  • 22
    • 60749105958 scopus 로고    scopus 로고
    • 2nd ed. Berlin: Springer-Verlag
    • Liu, B. 2007. Uncertain theory. 2nd ed. Berlin: Springer-Verlag.
    • (2007) Uncertain theory
    • Liu, B.1
  • 23
    • 0000804474 scopus 로고    scopus 로고
    • Chance constrained programming with fuzzy parameters
    • Liu, B., and K. Iwamura. 1998a. Chance constrained programming with fuzzy parameters. Fuzzy Sets and Systems 94 (2):227-237.
    • (1998) Fuzzy Sets and Systems , vol.94 , Issue.2 , pp. 227-237
    • Liu, B.1    Iwamura, K.2
  • 24
    • 0000058741 scopus 로고    scopus 로고
    • Liu, B., and K. Iwamura. 1998b. A note on chance constrained programming with fuzzy coefficients. Fuzzy Sets and Systems 100 (l-3):229-233.
    • Liu, B., and K. Iwamura. 1998b. A note on chance constrained programming with fuzzy coefficients. Fuzzy Sets and Systems 100 (l-3):229-233.
  • 25
    • 0035130068 scopus 로고    scopus 로고
    • Balancing mixedmodel assembly lines to reduce work overload
    • Matanachat, S., and C. A. Yano. 2001. Balancing mixedmodel assembly lines to reduce work overload. IIE Transactions 33 (l):29-42.
    • (2001) IIE Transactions , vol.33 , Issue.L , pp. 29-42
    • Matanachat, S.1    Yano, C.A.2
  • 26
    • 0031232825 scopus 로고    scopus 로고
    • A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    • McMullen, P. R., and G. V. Frazier. 1997. A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations. International Journal of Production Economics 51 (3):177-190.
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 177-190
    • McMullen, P.R.1    Frazier, G.V.2
  • 27
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • McMullen, P. R., and G. V. Frazier. 1998. Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations. International Journal of Production Research 36 (10):2717-2741.
    • (1998) International Journal of Production Research , vol.36 , Issue.10 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 28
    • 26444432230 scopus 로고    scopus 로고
    • Combining heuristic procedures and simulation models for balancing a pc camera assembly line
    • Mendes, A. R., A. L. Ramos, A. S. Simaria, and P. M. Vilarinho. 2005. Combining heuristic procedures and simulation models for balancing a pc camera assembly line. Computers & Industrial Engineering 49 (3):413-431.
    • (2005) Computers & Industrial Engineering , vol.49 , Issue.3 , pp. 413-431
    • Mendes, A.R.1    Ramos, A.L.2    Simaria, A.S.3    Vilarinho, P.M.4
  • 30
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie, C. L., and H. H. Young. 1965. A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering 16 (4): 23-28.
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.4 , pp. 23-28
    • Moodie, C.L.1    Young, H.H.2
  • 31
    • 34748923503 scopus 로고    scopus 로고
    • Balancing large assembly lines by a new heuristic based on differential evolution method
    • Nearchou, A. 2007. Balancing large assembly lines by a new heuristic based on differential evolution method. The International Journal of Advanced Manufacturing Technology 34 (9): 1016-1029.
    • (2007) The International Journal of Advanced Manufacturing Technology , vol.34 , Issue.9 , pp. 1016-1029
    • Nearchou, A.1
  • 32
    • 0015660893 scopus 로고
    • Balancing stochastic assembly lines
    • Reeve, N. R., and W. H. Thomas. 1973. Balancing stochastic assembly lines. HE Transactions 5 (3):223-229.
    • (1973) HE Transactions , vol.5 , Issue.3 , pp. 223-229
    • Reeve, N.R.1    Thomas, W.H.2
  • 34
    • 0000423498 scopus 로고
    • Stochastic assembly line balancing using simulated annealing
    • Suresh, G., and S. Sahu. 1994. Stochastic assembly line balancing using simulated annealing. International Journal of Production Research 32 (8): 1801-1810.
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1801-1810
    • Suresh, G.1    Sahu, S.2
  • 35
    • 0021202885 scopus 로고
    • An integer programming algorithm with network cuts for solving the assembly line balancing problem
    • Talbot, F. B., and J. H. Patterson. 1984. An integer programming algorithm with network cuts for solving the assembly line balancing problem. Management Science 30(l):85-99.
    • (1984) Management Science , vol.30 , Issue.L , pp. 85-99
    • Talbot, F.B.1    Patterson, J.H.2
  • 36
    • 0029276137 scopus 로고
    • Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage
    • Tsai, L.-H. 1995. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage. Management Science 41 (3):485-495.
    • (1995) Management Science , vol.41 , Issue.3 , pp. 485-495
    • Tsai, L.-H.1
  • 37
    • 0029368231 scopus 로고
    • Solving fuzzy assembly-line balancing problem with genetic algorithms
    • Tsujimura, Y., M. Gen, and E. Kubota. 1995. Solving fuzzy assembly-line balancing problem with genetic algorithms. Computers & Industrial Engineering 29 (1-4):543-547.
    • (1995) Computers & Industrial Engineering , vol.29 , Issue.1-4 , pp. 543-547
    • Tsujimura, Y.1    Gen, M.2    Kubota, E.3
  • 38
    • 34548567778 scopus 로고    scopus 로고
    • Modeling and analysis of a mixed-model assembly line with stochastic operation times
    • Zhao, X., J. Liu, K. Ohn, and S. Kotani. 2007. Modeling and analysis of a mixed-model assembly line with stochastic operation times. Naval Research Logistics 54 (6):681-691.
    • (2007) Naval Research Logistics , vol.54 , Issue.6 , pp. 681-691
    • Zhao, X.1    Liu, J.2    Ohn, K.3    Kotani, S.4
  • 39
    • 0033728251 scopus 로고    scopus 로고
    • Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
    • Zhao, X., and K. Ohno. 2000. Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages. European Journal of Operational Research 124 (3):560-570.
    • (2000) European Journal of Operational Research , vol.124 , Issue.3 , pp. 560-570
    • Zhao, X.1    Ohno, K.2
  • 40
    • 1842454666 scopus 로고    scopus 로고
    • A balancing problem for mixed model assembly lines with a paced moving conveyor
    • Zhao, X., K. Ohno, and H.-S. Lau. 2004. A balancing problem for mixed model assembly lines with a paced moving conveyor. Nαvαl Research Logistics 51 (3):446-464.
    • (2004) Nαvαl Research Logistics , vol.51 , Issue.3 , pp. 446-464
    • Zhao, X.1    Ohno, K.2    Lau, H.-S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.