메뉴 건너뛰기




Volumn 29, Issue , 2012, Pages 663-667

Analysis of random disturbances on shop floor in modern steel production dynamic environment

Author keywords

Disturbances; Dynamic environment; Hot rolling; Steelmaking and continuous casting

Indexed keywords

DISTURBANCES; DYNAMIC ENVIRONMENT; DYNAMIC ENVIRONMENTS; GENERAL REPAIR; MACHINE FAILURE; RANDOM DISTURBANCES; REPAIR STRATEGY; SHOP FLOOR; STEEL PRODUCTION; STEELMAKING AND CONTINUOUS CASTING;

EID: 84863359995     PISSN: 18777058     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1016/j.proeng.2012.01.020     Document Type: Conference Paper
Times cited : (20)

References (11)
  • 1
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang L, Rong A, Yang Z. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research2001;133:1-20.
    • European Journal of Operational Research2001 , vol.133 , pp. 1-20
    • Tang, L.1    Rong, A.2    Yang, Z.3
  • 2
    • 2442695353 scopus 로고    scopus 로고
    • Dynamic scheduling of steel casting and milling using multi-agents
    • Cowling P, Ouelhadj D, Petrovic S. Dynamic scheduling of steel casting and milling using multi-agents. Production Planning & Control,2004;15: 178-188.
    • (2004) Production Planning & Control , vol.15 , pp. 178-188
    • Cowling, P.1    Ouelhadj, D.2    Petrovic, S.3
  • 4
    • 77956075035 scopus 로고    scopus 로고
    • Research and development of steelmaking and continuous casting dynamic intelligence scheduling system
    • Pang XF, Yu SP, Liu W, Zheng BL.Research and Development of Steelmaking and Continuous Casting Dynamic Intelligence Scheduling System. Control Engineering of China2005;6: 553-556.
    • Control Engineering of China2005 , vol.6 , pp. 553-556
    • Pang, X.F.1    Yu, S.P.2    Liu, W.3    Zheng, B.L.4
  • 7
    • 84879026101 scopus 로고    scopus 로고
    • Production Rescheduling based on Stability under Uncertainty for Continuous Slab Casting
    • January 22-23, Bangkok, Thailand2009
    • Worapradya K, Buranathiti T. Production Rescheduling based on Stability under Uncertainty for Continuous Slab Casting. Proceedings of ASIMMOD 2009, January 22-23, Bangkok, Thailand2009: 170-176.
    • Proceedings of ASIMMOD 2009 , pp. 170-176
    • Worapradya, K.1    Buranathiti, T.2
  • 9
    • 74249102529 scopus 로고    scopus 로고
    • A dynamic scheduling algorithm based on just-in-tim e principle for steelmaking-continuous casting process
    • NING S, WANG W, PAN X. A Dynamic Scheduling Algorithm Based on Just-In-Tim e Principle for Steelmaking-Continuous Casting Process. Information and Control2007;36: 56-62.
    • Information and Control2007 , vol.36 , pp. 56-62
    • Ning, S.1    Wang, W.2    Pan, X.3
  • 10
    • 0032000378 scopus 로고    scopus 로고
    • Evaluation of ordering strategies for constraint satisfaction reactive scheduling
    • Suh MS, Lee A, Lee YJ, Ko Y K. Evaluation of ordering strategies for constraint satisfaction reactive scheduling.Decision Support Systems1998;22:187-197.
    • Decision Support Systems1998 , vol.22 , pp. 187-197
    • Suh, M.S.1    Lee, A.2    Lee, Y.J.3    Ko, Y.K.4
  • 11
    • 37149016932 scopus 로고    scopus 로고
    • A predictive reactive scheduling method for color-coating production in steel industry
    • Tang L, Wang X. A predictive reactive scheduling method for color-coating production in steel industry. The International Journal of Advanced Manufacturing2008;35: 633-645.
    • The International Journal of Advanced Manufacturing2008 , vol.35 , pp. 633-645
    • Tang, L.1    Wang, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.