-
2
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
Aytug, H., M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy. 2005. Executing Production Schedules in the Face of Uncertainties: A Review and Some Future Directions. European Journal of Operational Research 161 (1), 86-110
-
(2005)
European Journal of Operational Research
, vol.161
, Issue.1
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
3
-
-
0033093715
-
Production scheduling and rescheduling with genetic algorithms
-
Bierwirth, C., and D. C. Mattfeld. 1999. Production Scheduling and Rescheduling With Genetic Algorithms. Evolutionary Computation 7 (1), 1-17
-
(1999)
Evolutionary Computation
, vol.7
, Issue.1
, pp. 1-17
-
-
Bierwirth, C.1
Mattfeld, D.C.2
-
4
-
-
0013278675
-
Decision making on the factory floor: An integrated approach to process planning and scheduling
-
3/4315-319
-
Chryssolouris, G., S. Chan, and W. Cobb. 1984. Decision Making on the Factory Floor: An Integrated Approach to Process Planning and Scheduling. Robotics and Computer Integrated Manufacturing 1 (3/4), 315-319
-
(1984)
Robotics and Computer Integrated Manufacturing
, vol.1
-
-
Chryssolouris, G.1
Chan, S.2
Cobb, W.3
-
5
-
-
0346077605
-
A decision making approach to the operation of flexible manufacturing systems
-
Chryssolouris, G., J. E. Pierce, and K. Dicke. 1992. A Decision Making Approach to the Operation of Flexible Manufacturing Systems. International Journal of Flexible Manufacturing System 3 (4), 309-330
-
(1992)
International Journal of Flexible Manufacturing System
, vol.3
, Issue.4
, pp. 309-330
-
-
Chryssolouris, G.1
Pierce, J.E.2
Dicke, K.3
-
6
-
-
41549093615
-
A model for integrating process planning and production planning and control in machining processes
-
Ciurana, J., M. L. Garcia-Romeua, I. Ferrerb, and M. Casadesús. 2008. A Model for Integrating Process Planning and Production Planning and Control in Machining Processes. Robotics and Computer-Integrated Manufacturing 24 (4), 532-544
-
(2008)
Robotics and Computer-Integrated Manufacturing
, vol.24
, Issue.4
, pp. 532-544
-
-
Ciurana, J.1
Garcia-Romeua, M.L.2
Ferrerb, I.3
Casadesús, M.4
-
7
-
-
0032630439
-
Manufacturing responsiveness through integrated process planning and scheduling
-
Gindy, N. N., S. M. Saad, and Y. Yue. 1999. Manufacturing Responsiveness Through Integrated Process Planning and Scheduling. International Journal of Production Research 37 (11), 2399-2418
-
(1999)
International Journal of Production Research
, vol.37
, Issue.11
, pp. 2399-2418
-
-
Gindy, N.N.1
Saad, S.M.2
Yue, Y.3
-
9
-
-
64149102872
-
Applications of particle swarm and optimization in integrated process planning and scheduling
-
Guo, Y. W., W. D. Li, A. R. Milehama, and G. W. Owen. 2009a. Applications of Particle Swarm and Optimization in Integrated Process Planning and Scheduling. Robotics and Computer Integrated Manufacturing 25 (2), 280-288
-
(2009)
Robotics and Computer Integrated Manufacturing
, vol.25
, Issue.2
, pp. 280-288
-
-
Guo, Y.W.1
Li, W.D.2
Milehama, A.R.3
Owen, G.W.4
-
10
-
-
70449632611
-
Optimization of integrated process planning and scheduling using a particle swarm optimization approach
-
Guo, Y. W., W. D. Li, A. R. Milehama, and G. W. Owen. 2009b. Optimization of Integrated Process Planning and Scheduling Using a Particle Swarm Optimization Approach. International Journal of Production Research 47 (14), 3775-3796
-
(2009)
International Journal of Production Research
, vol.47
, Issue.14
, pp. 3775-3796
-
-
Guo, Y.W.1
Li, W.D.2
Milehama, A.R.3
Owen, G.W.4
-
11
-
-
0030270466
-
Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities
-
Ho Y. C., and C. L. Moodie. 1996. Solving Cell Formation Problems in a Manufacturing Environment With Flexible Processing and Routing Capabilities. International Journal of Production Research 34 (10), 2901-2923
-
(1996)
International Journal of Production Research
, vol.34
, Issue.10
, pp. 2901-2923
-
-
Ho, Y.C.1
Moodie, C.L.2
-
12
-
-
33750028809
-
An integrated scheme for process planning and scheduling in fms
-
Jain, A., P. K. Jain, and I. P. Singh. 2006. An Integrated Scheme for Process Planning and Scheduling in FMS. International Journal of Advanced Manufacturing Technology 30 (11-12), 1111-1118
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.11-12
, pp. 1111-1118
-
-
Jain, A.1
Jain, P.K.2
Singh, I.P.3
-
14
-
-
33746031638
-
Integration of process planning and scheduling functions
-
Khoshnevis, B., and Q. M. Chen. 1990. Integration of Process Planning and Scheduling Functions. Journal of Intelligent Manufacturing 2 (3), 165-176
-
(1990)
Journal of Intelligent Manufacturing
, vol.2
, Issue.3
, pp. 165-176
-
-
Khoshnevis, B.1
Chen, Q.M.2
-
16
-
-
0037410965
-
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
-
Kim, Y. K., K. Park, and J. Ko. 2003. A Symbiotic Evolutionary Algorithm for the Integration of Process Planning and Job Shop Scheduling. Computers and Operation Research 30 (8), 1151-1171
-
(2003)
Computers and Operation Research
, vol.30
, Issue.8
, pp. 1151-1171
-
-
Kim, Y.K.1
Park, K.2
Ko, J.3
-
17
-
-
0005667861
-
Methods for integration of process planning and production planning
-
Larsen, N. E. 1993. Methods for Integration of Process Planning and Production Planning. International Journal of Computer Integrated Manufacturing 6 (1-2), 152-162
-
(1993)
International Journal of Computer Integrated Manufacturing
, vol.6
, Issue.1-2
, pp. 152-162
-
-
Larsen, N.E.1
-
18
-
-
0035175069
-
Integration of process planning and scheduling using simulation based genetic algorithms
-
Lee, H., and S. S. Kim. 2001. Integration of Process Planning and Scheduling Using Simulation Based Genetic Algorithms. International Journal of Advanced Manufacturing Technology 18 (8), 586-590
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.18
, Issue.8
, pp. 586-590
-
-
Lee, H.1
Kim, S.S.2
-
19
-
-
77955268719
-
Integrated process planning and scheduling by an agent- based ant colony optimization
-
Leung, C. W., T. N. Wong, K. L. Mak, and R. Y. K. Fung. 2010. Integrated Process Planning and Scheduling by an Agent- Based Ant Colony Optimization. Computers and Industrial Engineering 59 (1), 166-180
-
(2010)
Computers and Industrial Engineering
, vol.59
, Issue.1
, pp. 166-180
-
-
Leung, C.W.1
Wong, T.N.2
Mak, K.L.3
Fung, R.Y.K.4
-
20
-
-
84864834759
-
Integrated process planning and scheduling using an imperialist competitive algorithm
-
Lian, K. L., C. Y. Zhang, L. Gao, and X. Y. Li. 2012. Integrated Process Planning and Scheduling Using an Imperialist Competitive Algorithm. International Journal of Production Research 50 (15), 4326-433
-
(2012)
International Journal of Production Research
, vol.50
, Issue.15
, pp. 4326-4433
-
-
Lian, K.L.1
Zhang, C.Y.2
Gao, L.3
Li, X.Y.4
-
21
-
-
33751504128
-
A simulated annealing- based optimization approach for integrated process planning and scheduling
-
Li, W. D., and C. A. McMahon. 2007. A Simulated Annealing- Based Optimization Approach for Integrated Process Planning and Scheduling. International Journal of Computer Integrated Manufacturing 20 (1), 80-95
-
(2007)
International Journal of Computer Integrated Manufacturing
, vol.20
, Issue.1
, pp. 80-95
-
-
Li, W.D.1
McMahon, C.A.2
-
22
-
-
81855178211
-
Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling
-
Li, X. Y., L. Gao, and W. D. Li. 2012. Application of Game Theory Based Hybrid Algorithm for Multi-Objective Integrated Process Planning and Scheduling. Expert Systems with Applications 39 (1), 288-297
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.1
, pp. 288-297
-
-
Li, X.Y.1
Gao, L.2
Li, W.D.3
-
23
-
-
84862805879
-
An active learning genetic algorithm for integrated process planning and scheduling
-
Li, X. Y., L. Gao, and X. Y. Shao. 2012. An Active Learning Genetic Algorithm for Integrated Process Planning and Scheduling. Expert Systems with Applications 39 (8), 6683-6691
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.8
, pp. 6683-6691
-
-
Li, X.Y.1
Gao, L.2
Shao, X.Y.3
-
24
-
-
70350568684
-
Mathematical modeling and evolutionary algorithm- based approach for integrated process planning and scheduling
-
Li, X. Y., L. Gao, X. Y. Shao, C. Y. Zhang, and C. Y. Wang. 2010. Mathematical Modeling and Evolutionary Algorithm- Based Approach for Integrated Process Planning and Scheduling. Computers and Operation Research 37 (4), 656-667
-
(2010)
Computers and Operation Research
, vol.37
, Issue.4
, pp. 656-667
-
-
Li, X.Y.1
Gao, L.2
Shao, X.Y.3
Zhang, C.Y.4
Wang, C.Y.5
-
25
-
-
77953685044
-
An effective hybrid algorithm for integrated process planning and scheduling
-
Li, X. Y., X. Y. Shao, L. Gao, and W. R. Qian. 2010. An Effective Hybrid Algorithm for Integrated Process Planning and Scheduling. International Journal Production Economics 126 (2), 289-298
-
(2010)
International Journal Production Economics
, vol.126
, Issue.2
, pp. 289-298
-
-
Li, X.Y.1
Shao, X.Y.2
Gao, L.3
Qian, W.R.4
-
26
-
-
71749109550
-
An agent-based approach for integrated process planning and scheduling
-
Li, X. Y., C. Y. Zhang, L. Gao, W. D. Li, and X. Shao. Y. 2010. An Agent-Based Approach for Integrated Process Planning and Scheduling. Expert Systems with Applications 37 (2), 1256-1264
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.2
, pp. 1256-1264
-
-
Li, X.Y.1
Zhang, C.Y.2
Gao, L.3
Li, W.D.4
Shao. Y, X.5
-
27
-
-
79957641056
-
A web based tool for dynamic job rotation scheduling using multiple criteria
-
Michalos, G., S. Makris, and D. Mourtzis. 2011. A Web Based Tool for Dynamic Job Rotation Scheduling Using Multiple Criteria. CIRP Annals-Manufacturing Technology 1 (60), 453-456
-
(2011)
CIRP Annals-Manufacturing Technology
, vol.1
, Issue.60
, pp. 453-456
-
-
Michalos, G.1
Makris, S.2
Mourtzis, D.3
-
28
-
-
84856872713
-
An intelligent search algorithm-based method to derive assembly line design alternatives
-
Michalos, G., S. Makris, and D. Mourtzis. 2012. An Intelligent Search Algorithm-Based Method to Derive Assembly Line Design Alternatives. International Journal of Computer Integrated Manufacturing 3 (25), 211-229
-
(2012)
International Journal of Computer Integrated Manufacturing
, vol.3
, Issue.25
, pp. 211-229
-
-
Michalos, G.1
Makris, S.2
Mourtzis, D.3
-
29
-
-
77953651240
-
Dynamic job rotation for workload balancing in human based assembly systems
-
Michalos, G., S. Makris, L. Rentzos, and G. Chryssolouris. 2010. Dynamic Job Rotation for Workload Balancing in Human Based Assembly Systems. CIRP Journal of Manufacturing Science and Technology 3 (2), 153-160
-
(2010)
CIRP Journal of Manufacturing Science and Technology
, vol.3
, Issue.2
, pp. 153-160
-
-
Michalos, G.1
Makris, S.2
Rentzos, L.3
Chryssolouris, G.4
-
30
-
-
0036642688
-
Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
-
Moon, C., J. Kim, and S. Hur. 2002. Integrated Process Planning and Scheduling with Minimizing Total Tardiness in Multi-Plants Supply Chain. Computers and Industrial Engineering 43 (1-2), 331-349
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.1-2
, pp. 331-349
-
-
Moon, C.1
Kim, J.2
Hur, S.3
-
31
-
-
41449093762
-
Integrated process planning and scheduling in a supply chain
-
Moon, C., Y. H. Lee, C. S. Jeong, and Y. S. Yun. 2008. Integrated Process Planning and Scheduling in a Supply Chain. Computers and Industrial Engineering 54, 1048-1061
-
(2008)
Computers and Industrial Engineering
, vol.54
, pp. 1048-1061
-
-
Moon, C.1
Lee, Y.H.2
Jeong, C.S.3
Yun, Y.S.4
-
34
-
-
84856002518
-
An improved genetic algorithm for integrated process planning and scheduling
-
Qiao, L. H., and S. P. Lv. 2012. An Improved Genetic Algorithm for Integrated Process Planning and Scheduling. International Journal of Advanced Manufacturing Technology 58 (5-8), 727-740
-
(2012)
International Journal of Advanced Manufacturing Technology
, vol.58
, Issue.5-8
, pp. 727-740
-
-
Qiao, L.H.1
Lv, S.P.2
-
35
-
-
0032648655
-
Integrating flexible process plans with scheduling in flexible manufacturing systems
-
Saygin, C., and S. E. Killic. 1999. Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems. International Journal of Advanced Manufacturing Technology 15 (4), 268-280
-
(1999)
International Journal of Advanced Manufacturing Technology
, vol.15
, Issue.4
, pp. 268-280
-
-
Saygin, C.1
Killic, S.E.2
-
36
-
-
56549112491
-
Integration of process planning and scheduling - A modified genetic algorithm-based approach
-
Shao, X. Y., X. Y. Li, L. Gao, and C. Y. Zhang. 2009. Integration of Process Planning and Scheduling - A Modified Genetic Algorithm-Based Approach. Computers and Operation Research 36 (6), 2082-2096
-
(2009)
Computers and Operation Research
, vol.36
, Issue.6
, pp. 2082-2096
-
-
Shao, X.Y.1
Li, X.Y.2
Gao, L.3
Zhang, C.Y.4
-
37
-
-
0242703954
-
Rescheduling manufacturing systems: A framework or strategies, policies, and methods
-
Viera, G. E., J. W. Herrmann, and E. Lin. 2003. Rescheduling Manufacturing Systems: A Framework or Strategies, Policies, and Methods. Journal of scheduling 6 (1), 39-62
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 39-62
-
-
Viera, G.E.1
Herrmann, J.W.2
Lin, E.3
-
38
-
-
34248206715
-
A novel function block based integration approach to process planning and scheduling with execution control
-
Wang, L. H., Y. J. Song, and W. M. Shen. 2007. A Novel Function Block Based Integration Approach To Process Planning and Scheduling With Execution Control. International Journal Manufacturing Technology Management 11 (2), 228-250
-
(2007)
International Journal Manufacturing Technology Management
, vol.11
, Issue.2
, pp. 228-250
-
-
Wang, L.H.1
Song, Y.J.2
Shen, W.M.3
-
39
-
-
32644476109
-
An agent-based negotiation approach to integrate process planning and scheduling
-
Wong, T. N., C. W. Leung, K. L. Maka, and R. Y. K. Fung. 2006a. An Agent-Based Negotiation Approach to Integrate Process Planning and Scheduling. International Journal of Production Research 44 (7), 1331-1351
-
(2006)
International Journal of Production Research
, vol.44
, Issue.7
, pp. 1331-1351
-
-
Wong, T.N.1
Leung, C.W.2
Maka, K.L.3
Fung, R.Y.K.4
-
40
-
-
33744827670
-
Dynamic shop floor scheduling in multi-agent manufacturing system
-
Wong, T. N., C. W. Leung, K. L. Maka, and R. Y. K. Fung. 2006b. Dynamic Shop Floor Scheduling in Multi-Agent Manufacturing System. Expert Systems with Applications 31 (3), 486-494
-
(2006)
Expert Systems with Applications
, vol.31
, Issue.3
, pp. 486-494
-
-
Wong, T.N.1
Leung, C.W.2
Maka, K.L.3
Fung, R.Y.K.4
-
41
-
-
33746794581
-
Integrated Process Planning and Scheduling/ rescheduling - An agent-based approach
-
Wong, T. N., C. W. Leung, K. L. Maka, and R. Y. K. Fung. 2006c. Integrated Process Planning and Scheduling/Rescheduling - An Agent-Based Approach. International Journal of Production Research 44 (18-19), 3627-3655
-
(2006)
International Journal of Production Research
, vol.44
, Issue.18-19
, pp. 3627-3655
-
-
Wong, T.N.1
Leung, C.W.2
Maka, K.L.3
Fung, R.Y.K.4
-
42
-
-
0035247355
-
A prototype of a feature-based multiple-alternative process planning system with scheduling verification
-
Yan, Y. N., H. R. Parasaei, and H. R. Leep. 2001. A Prototype of a Feature-Based Multiple-Alternative Process Planning System with Scheduling Verification. Computers and Industrial Engineering 39 (1-2), 109-124
-
(2001)
Computers and Industrial Engineering
, vol.39
, Issue.1-2
, pp. 109-124
-
-
Yan, Y.N.1
Parasaei, H.R.2
Leep, H.R.3
-
43
-
-
4544225193
-
Process planning and scheduling for mass customized shoe manufacturing
-
Zangiacomi, A., L. Zhijian, M. Sacco, and C. R. Boër. 2004.Process Planning and Scheduling for Mass Customized Shoe Manufacturing. International Journal of Computer Integrated Manufacturing 17 (7), 613-62
-
(2004)
International Journal of Computer Integrated Manufacturing
, vol.17
, Issue.7
, pp. 613-662
-
-
Zangiacomi, A.1
Zhijian, L.2
Sacco, M.3
Boër, C.R.4
-
44
-
-
0038787545
-
A holonic architecture of the concurrent integrated process planning system
-
Zhang, J., L. Gao, and F. Chan. 2003. A Holonic Architecture of the Concurrent Integrated Process Planning System. Journal of Materials Processing Technology 139 (1-3), 267-472
-
(2003)
Journal of Materials Processing Technology
, vol.139
, Issue.1-3
, pp. 267-472
-
-
Zhang, J.1
Gao, L.2
Chan, F.3
|