-
1
-
-
84896805668
-
On Madigan's approach to the deterministic multi-product production and inventory problem
-
K.R. Baker On Madigan's approach to the deterministic multi-product production and inventory problem Manage. Sci. 16 9 1970 636 638
-
(1970)
Manage. Sci.
, vol.16
, Issue.9
, pp. 636-638
-
-
Baker, K.R.1
-
2
-
-
0027927229
-
Production-inventory systems with unreliable machines
-
M. Berg, M.J.M. Posner, and H. Zhao Production-inventory systems with unreliable machines Oper. Res. 42 1 1994 111 118
-
(1994)
Oper. Res.
, vol.42
, Issue.1
, pp. 111-118
-
-
Berg, M.1
Posner, M.J.M.2
Zhao, H.3
-
3
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
T. Bielecki, and P.R. Kumar Optimality of zero-inventory policies for unreliable manufacturing systems Oper. Res. 36 4 1988 532 541
-
(1988)
Oper. Res.
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
4
-
-
0000326705
-
A dynamic programming approach to a lot size scheduling problem
-
E.E. Bomberger A dynamic programming approach to a lot size scheduling problem Manage. Sci. 12 11 1966 778 784
-
(1966)
Manage. Sci.
, vol.12
, Issue.11
, pp. 778-784
-
-
Bomberger, E.E.1
-
5
-
-
69749123862
-
Observation on: Economic production quantity model for items with imperfect quality
-
(201-201)
-
L.E. Cárdenas-Barrón Observation on: "Economic production quantity model for items with imperfect quality" [Int. J. Production Economics 64 (2000) 59-64] Int. J. Prod. Eco. 67 2 2000 (201-201)
-
(2000)
Int. J. Prod. Eco.
, vol.67
, Issue.2
-
-
Cárdenas-Barrón, L.E.1
-
6
-
-
34447260758
-
On optimal manufacturing batch size with rework process at single-stage production system
-
L.E. Cárdenas-Barrón On optimal manufacturing batch size with rework process at single-stage production system Comput. Ind. Eng. J. 53 1 2007 196 198
-
(2007)
Comput. Ind. Eng. J.
, vol.53
, Issue.1
, pp. 196-198
-
-
Cárdenas-Barrón, L.E.1
-
7
-
-
55649099841
-
Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation
-
L.E. Cárdenas-Barrón Optimal manufacturing batch size with rework in a single-stage production system - a simple derivation Comput. Ind. Eng. J. 55 4 2008 758 765
-
(2008)
Comput. Ind. Eng. J.
, vol.55
, Issue.4
, pp. 758-765
-
-
Cárdenas-Barrón, L.E.1
-
8
-
-
69649103599
-
Economic production quantity with rework process at a single-stage manufacturing system with planned backorders
-
L.E. Cárdenas-Barrón Economic production quantity with rework process at a single-stage manufacturing system with planned backorders Comput. Ind. Eng. J. 57 3 2009 1105 1113
-
(2009)
Comput. Ind. Eng. J.
, vol.57
, Issue.3
, pp. 1105-1113
-
-
Cárdenas-Barrón, L.E.1
-
9
-
-
58849151362
-
On optimal batch sizing in a multi-stage production system with rework consideration
-
L.E. Cárdenas-Barrón On optimal batch sizing in a multi-stage production system with rework consideration Eur. J. Oper. Res. 196 3 2009 1238 1244
-
(2009)
Eur. J. Oper. Res.
, vol.196
, Issue.3
, pp. 1238-1244
-
-
Cárdenas-Barrón, L.E.1
-
10
-
-
84865207817
-
An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework
-
L.E. Cárdenas-Barrón, A.A. Taleizadeh, and G. Treviño-Garza An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework Expert Syst. Appl. 39 18 2012 13540 13546
-
(2012)
Expert Syst. Appl.
, vol.39
, Issue.18
, pp. 13540-13546
-
-
Cárdenas-Barrón, L.E.1
Taleizadeh, A.A.2
Treviño-Garza, G.3
-
11
-
-
84876226120
-
Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework
-
L.E. Cárdenas-Barrón, B. Sarkar, and G. Treviño-Garza Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework Math. Comput. Appl. 18 2 2013 132 138
-
(2013)
Math. Comput. Appl.
, vol.18
, Issue.2
, pp. 132-138
-
-
Cárdenas-Barrón, L.E.1
Sarkar, B.2
Treviño-Garza, G.3
-
12
-
-
84872599165
-
An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments
-
L.E. Cárdenas-Barrón, B. Sarkar, and G. Treviño-Garza An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments Appl. Math. Modelling 37 1 2013 5549 5554
-
(2013)
Appl. Math. Modelling
, vol.37
, Issue.1
, pp. 5549-5554
-
-
Cárdenas-Barrón, L.E.1
Sarkar, B.2
Treviño-Garza, G.3
-
13
-
-
3242721026
-
EBQ for a multi stage production system considering rework
-
S. Chakrabarty, and N.V. Rao EBQ for a multi stage production system considering rework Opsearch 25 2 1988 75 88
-
(1988)
Opsearch
, vol.25
, Issue.2
, pp. 75-88
-
-
Chakrabarty, S.1
Rao, N.V.2
-
14
-
-
0345872325
-
A new EPQ model: Integrating lower pricing, rework and reject situations
-
W.M. Chan, R.N. Ibrahim, and P.B. Lochert A new EPQ model: integrating lower pricing, rework and reject situations Prod. Plann. Control 14 7 2003 588 595
-
(2003)
Prod. Plann. Control
, vol.14
, Issue.7
, pp. 588-595
-
-
Chan, W.M.1
Ibrahim, R.N.2
Lochert, P.B.3
-
15
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T.C.E. Cheng An economic order quantity model with demand-dependent unit production cost and imperfect production processes IIE Trans. 23 1 1991 23 28
-
(1991)
IIE Trans.
, vol.23
, Issue.1
, pp. 23-28
-
-
Cheng, T.C.E.1
-
16
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
S.W. Chiu, and Y.S.P. Chiu Mathematical modeling for production system with backlogging and failure in repair J. Sci. Ind. Res. 65 6 2006 499 506
-
(2006)
J. Sci. Ind. Res.
, vol.65
, Issue.6
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.S.P.2
-
17
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
S.W. Chiu, S.L. Wang, and Y.S.P. Chiu Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns Eur. J. Oper. Res. 180 2 2007 664 676
-
(2007)
Eur. J. Oper. Res.
, vol.180
, Issue.2
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.L.2
Chiu, Y.S.P.3
-
18
-
-
72949118882
-
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
-
Y.S.P. Chiu, K.K. Chen, F.T. Cheng, and M.F. Wu Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown Comput. Math. Appl. 59 2 2010 919 932
-
(2010)
Comput. Math. Appl.
, vol.59
, Issue.2
, pp. 919-932
-
-
Chiu, Y.S.P.1
Chen, K.K.2
Cheng, F.T.3
Wu, M.F.4
-
19
-
-
79952618361
-
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown
-
Y.S.P. Chiu, H.D. Lin, and H.H. Chang Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown Comput. Ind. Eng. 60 4 2011 576 584
-
(2011)
Comput. Ind. Eng.
, vol.60
, Issue.4
, pp. 576-584
-
-
Chiu, Y.S.P.1
Lin, H.D.2
Chang, H.H.3
-
20
-
-
80255139984
-
Combining an alternative multi-delivery policy into economic production lot size problem with partial rework
-
S.W. Chiu, Y.S.P. Chiu, and J.C. Yang Combining an alternative multi-delivery policy into economic production lot size problem with partial rework Expert Syst. Appl. 39 3 2012 2578 2583
-
(2012)
Expert Syst. Appl.
, vol.39
, Issue.3
, pp. 2578-2583
-
-
Chiu, S.W.1
Chiu, Y.S.P.2
Yang, J.C.3
-
21
-
-
0030835106
-
Bounds for production lot sizing with machine breakdowns
-
K.J. Chung Bounds for production lot sizing with machine breakdowns Comput. Ind. Eng. 32 1 1997 139 144
-
(1997)
Comput. Ind. Eng.
, vol.32
, Issue.1
, pp. 139-144
-
-
Chung, K.J.1
-
22
-
-
0037954442
-
Approximations to production lot sizing with machine breakdowns
-
K.J. Chung Approximations to production lot sizing with machine breakdowns Comput. Oper. Res. 30 10 2003 1499 1507
-
(2003)
Comput. Oper. Res.
, vol.30
, Issue.10
, pp. 1499-1507
-
-
Chung, K.J.1
-
23
-
-
59049103474
-
A two-warehouse inventory model with imperfect quality production processes
-
K.J. Chung, C.C. Her, and S.D. Lin A two-warehouse inventory model with imperfect quality production processes Comput. Ind. Eng. 53 1 2009 193 197
-
(2009)
Comput. Ind. Eng.
, vol.53
, Issue.1
, pp. 193-197
-
-
Chung, K.J.1
Her, C.C.2
Lin, S.D.3
-
24
-
-
0009403432
-
Scheduling for batch production
-
(549-570 and 582)
-
S. Eilon Scheduling for batch production Prod. Eng. J. 36 1957 (549-570 and 582)
-
(1957)
Prod. Eng. J.
, vol.36
-
-
Eilon, S.1
-
25
-
-
0036568439
-
Note on: Economic production quantity model for items with imperfect quality-A practical approach
-
S.K. Goyal, and L.E. Cárdenas-Barrón Note on: economic production quantity model for items with imperfect quality-a practical approach Int. J. Prod. Eco. 77 1 2002 85 87
-
(2002)
Int. J. Prod. Eco.
, vol.77
, Issue.1
, pp. 85-87
-
-
Goyal, S.K.1
Cárdenas-Barrón, L.E.2
-
26
-
-
0021387520
-
Looping in a multistage production system
-
T. Gupta, and S. Chakraborty Looping in a multistage production system Int. J. Prod. Res. 22 2 1984 299 311
-
(1984)
Int. J. Prod. Res.
, vol.22
, Issue.2
, pp. 299-311
-
-
Gupta, T.1
Chakraborty, S.2
-
27
-
-
70449505070
-
Scheduling accumulated rework in a normal cycle: Optimal batch production with minimum rework cycles
-
B. Haji, A. Haji, and A. Rahmati Tavakol Scheduling accumulated rework in a normal cycle: optimal batch production with minimum rework cycles J. Ind. Syst. Eng. 2 2 2008 236 249
-
(2008)
J. Ind. Syst. Eng.
, vol.2
, Issue.2
, pp. 236-249
-
-
Haji, B.1
Haji, A.2
Rahmati Tavakol, A.3
-
28
-
-
70449471743
-
Optimal batch production with minimum rework cycles and constraint on accumulated defective units, Service Operations, Logistics and Informatics, SOLI '09
-
Haji B., Haji A., Haji R., 2009. Optimal batch production with minimum rework cycles and constraint on accumulated defective units, Service Operations, Logistics and Informatics, SOLI '09. In: IEEE/INFORMS International Conference, pp. 633-638.
-
(2009)
IEEE/INFORMS International Conference
, pp. 633-638
-
-
Haji, B.1
Haji, A.2
Haji, R.3
-
29
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P.A. Hayek, and M.K. Salameh Production lot sizing with the reworking of imperfect quality items produced Prod. Plann. Control 12 6 2001 584 590
-
(2001)
Prod. Plann. Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
30
-
-
3142609617
-
Addendum to Stankard and Gupta's note on lot size scheduling
-
T.J. Hodgson Addendum to Stankard and Gupta's note on lot size scheduling Manage. Sci. 16 7 1970 514 517
-
(1970)
Manage. Sci.
, vol.16
, Issue.7
, pp. 514-517
-
-
Hodgson, T.J.1
-
31
-
-
33749665095
-
An EPQ model with setup cost and process quality as functions of capital expenditure
-
K.L. Hou An EPQ model with setup cost and process quality as functions of capital expenditure Appl. Math. Modelling 31 1 2007 10 17
-
(2007)
Appl. Math. Modelling
, vol.31
, Issue.1
, pp. 10-17
-
-
Hou, K.L.1
-
32
-
-
77955269308
-
Optimal production run length with imperfect production processes and backorder in fuzzy random environment
-
J.S. Hu, H. Zheng, C.Y. Guo, and Y.P. Ji Optimal production run length with imperfect production processes and backorder in fuzzy random environment Comput. Ind. Eng. 59 1 2010 9 15
-
(2010)
Comput. Ind. Eng.
, vol.59
, Issue.1
, pp. 9-15
-
-
Hu, J.S.1
Zheng, H.2
Guo, C.Y.3
Ji, Y.P.4
-
33
-
-
33646359183
-
A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: A fuzzy geometric programming approach
-
S. Islam, and T.K. Roy A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: a fuzzy geometric programming approach Appl. Math. Comput. 176 2 2006 531 544
-
(2006)
Appl. Math. Comput.
, vol.176
, Issue.2
, pp. 531-544
-
-
Islam, S.1
Roy, T.K.2
-
34
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
A.M.M. Jamal, B.R. Sarker, and S. Mondal Optimal manufacturing batch size with rework process at a single-stage production system Comput. Ind. Eng. 47 1 2004 77 89
-
(2004)
Comput. Ind. Eng.
, vol.47
, Issue.1
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
35
-
-
79955475463
-
A review of the extensions of a modified EOQ model for imperfect quality items
-
M. Khan, M.Y. Jaber, A.L. Guiffrida, and S. Zolfaghari A review of the extensions of a modified EOQ model for imperfect quality items Int. J. Prod. Eco. 132 1 2011 1 12
-
(2011)
Int. J. Prod. Eco.
, vol.132
, Issue.1
, pp. 1-12
-
-
Khan, M.1
Jaber, M.Y.2
Guiffrida, A.L.3
Zolfaghari, S.4
-
36
-
-
0031237390
-
Optimal batch size and investment in multistage production systems with scrap
-
H.L. Lee, M.J. Chandra, and V.J. Deleveaux Optimal batch size and investment in multistage production systems with scrap Prod. Plann. Control 8 6 1997 586 596
-
(1997)
Prod. Plann. Control
, vol.8
, Issue.6
, pp. 586-596
-
-
Lee, H.L.1
Chandra, M.J.2
Deleveaux, V.J.3
-
37
-
-
56249098653
-
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
-
G.L. Liao, Y.H. Chen, and S.H. Sheu Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance Eur. J. Oper. Res. 195 2 2009 348 357
-
(2009)
Eur. J. Oper. Res.
, vol.195
, Issue.2
, pp. 348-357
-
-
Liao, G.L.1
Chen, Y.H.2
Sheu, S.H.3
-
38
-
-
60549085550
-
An optimal operating policy for the production system with rework
-
N. Liu, Y. Kim, and H. Hwang An optimal operating policy for the production system with rework Comput. Ind. Eng. 56 3 2009 874 887
-
(2009)
Comput. Ind. Eng.
, vol.56
, Issue.3
, pp. 874-887
-
-
Liu, N.1
Kim, Y.2
Hwang, H.3
-
39
-
-
0001428478
-
Scheduling a Multi-product single machine system for an infinite planning period
-
J.T. Madigan Scheduling a Multi-product single machine system for an infinite planning period Manage. Sci. 14 11 1968 713 719
-
(1968)
Manage. Sci.
, vol.14
, Issue.11
, pp. 713-719
-
-
Madigan, J.T.1
-
40
-
-
0001753360
-
A computational approach to the economic lot scheduling problem
-
J. Rogers A computational approach to the economic lot scheduling problem Manage. Sci. 4 3 1958 264 291
-
(1958)
Manage. Sci.
, vol.4
, Issue.3
, pp. 264-291
-
-
Rogers, J.1
-
41
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Trans. 18 1 1986 48 55
-
(1986)
IIE Trans.
, vol.18
, Issue.1
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
42
-
-
59349105235
-
A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment
-
A. Roy, K. Maity, S. Kar, and M. Maiti A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment Comput. Ind. Eng. 56 1 2009 87 96
-
(2009)
Comput. Ind. Eng.
, vol.56
, Issue.1
, pp. 87-96
-
-
Roy, A.1
Maity, K.2
Kar, S.3
Maiti, M.4
-
43
-
-
82755161830
-
Optimal pricing, lot-sizing and marketing planning in a capacitated imperfect production system
-
S.J. Sadjadi, S.A. Yazdian, and K. Shahanaghi Optimal pricing, lot-sizing and marketing planning in a capacitated imperfect production system Comput. Ind. Eng. 62 1 2012 349 358
-
(2012)
Comput. Ind. Eng.
, vol.62
, Issue.1
, pp. 349-358
-
-
Sadjadi, S.J.1
Yazdian, S.A.2
Shahanaghi, K.3
-
44
-
-
0033874992
-
Economic production quantity model for items with imperfect quality
-
M.K. Salameh, and M.Y. Jaber Economic production quantity model for items with imperfect quality Int. J. Prod. Eco. 64 1 2000 59 64
-
(2000)
Int. J. Prod. Eco.
, vol.64
, Issue.1
, pp. 59-64
-
-
Salameh, M.K.1
Jaber, M.Y.2
-
45
-
-
34548565651
-
Optimal batch sizing in a process at multi-stage production system with network consideration
-
B.R. Sarker, A.M.M. Jamal, and S. Mondal Optimal batch sizing in a process at multi-stage production system with network consideration Eur. J. Oper. Res. 184 3 2008 915 929
-
(2008)
Eur. J. Oper. Res.
, vol.184
, Issue.3
, pp. 915-929
-
-
Sarker, B.R.1
Jamal, A.M.M.2
Mondal, S.3
-
46
-
-
0010839946
-
A note on Bomberger's approach to lot size scheduling: Heuristic proposed
-
M.F. Stankard, and S.K. Gupta A note on Bomberger's approach to lot size scheduling: Heuristic proposed Mange. Sci. 15 7 1969 449 452
-
(1969)
Mange. Sci.
, vol.15
, Issue.7
, pp. 449-452
-
-
Stankard, M.F.1
Gupta, S.K.2
-
47
-
-
79951600389
-
Economic production quantity model with scraped items and limited production capacity
-
A.A. Taleizadeh, A.A. Najafi, and S.T.A. Niaki Economic production quantity model with scraped items and limited production capacity Sci. Iran. 17 1 2010 58 69
-
(2010)
Sci. Iran.
, vol.17
, Issue.1
, pp. 58-69
-
-
Taleizadeh, A.A.1
Najafi, A.A.2
Niaki, S.T.A.3
-
48
-
-
70450240953
-
Multi-product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
-
A.A. Taleizadeh, S.T.A. Niaki, and A.A. Najafi Multi-product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint J. Comput. Appl. Math. 233 8 2010 1834 1849
-
(2010)
J. Comput. Appl. Math.
, vol.233
, Issue.8
, pp. 1834-1849
-
-
Taleizadeh, A.A.1
Niaki, S.T.A.2
Najafi, A.A.3
-
49
-
-
77955278534
-
Multi-product production quantity model with repair failure and partial backordering
-
A.A. Taleizadeh, H.M. Wee, and S.J. Sadjadi Multi-product production quantity model with repair failure and partial backordering Comput. Ind. Eng. 59 1 2010 45 54
-
(2010)
Comput. Ind. Eng.
, vol.59
, Issue.1
, pp. 45-54
-
-
Taleizadeh, A.A.1
Wee, H.M.2
Sadjadi, S.J.3
-
50
-
-
84864406470
-
Multi products single machine EPQ model with immediate rework process
-
A.A. Taleizadeh, L.E. Cárdenas-Barrón, J. Biabani, and R. Nikousokhan Multi products single machine EPQ model with immediate rework process Int. J. Ind. Eng. Comput. 3 2 2012 93 102
-
(2012)
Int. J. Ind. Eng. Comput.
, vol.3
, Issue.2
, pp. 93-102
-
-
Taleizadeh, A.A.1
Cárdenas-Barrón, L.E.2
Biabani, J.3
Nikousokhan, R.4
-
51
-
-
84872495906
-
Economic production quantity model with repair failure and limited capacity
-
A.A. Taleizadeh, H.M. Wee, and S.G. Jalali-Naini Economic production quantity model with repair failure and limited capacity Appl. Math. Modeling 37 5 2013 2765 2774
-
(2013)
Appl. Math. Modeling
, vol.37
, Issue.5
, pp. 2765-2774
-
-
Taleizadeh, A.A.1
Wee, H.M.2
Jalali-Naini, S.G.3
-
52
-
-
0037740269
-
The most economical production lot
-
E.W. Taft The most economical production lot Iron Age 101 1918 1410 1412
-
(1918)
Iron Age
, vol.101
, pp. 1410-1412
-
-
Taft, E.W.1
-
53
-
-
67349141707
-
Optimal production run length in deteriorating production processes with fuzzy elapsed time
-
X. Wang, and W. Tang Optimal production run length in deteriorating production processes with fuzzy elapsed time Comput. Ind. Eng. 56 4 2009 1627 1632
-
(2009)
Comput. Ind. Eng.
, vol.56
, Issue.4
, pp. 1627-1632
-
-
Wang, X.1
Tang, W.2
-
54
-
-
84893682210
-
An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders
-
H.M. Wee, W.T. Wang, and L.E. Cárdenas-Barrón An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders Comput. Ind. Eng. J. 64 2 2013 748 755
-
(2013)
Comput. Ind. Eng. J.
, vol.64
, Issue.2
, pp. 748-755
-
-
Wee, H.M.1
Wang, W.T.2
Cárdenas-Barrón, L.E.3
-
55
-
-
0043050544
-
Do not forget the breakdowns and the maintenance operations in FMS design problems
-
M. Widmer, and P. Solot Do not forget the breakdowns and the maintenance operations in FMS design problems Int. J. Prod. Res. 28 2 1990 421 430
-
(1990)
Int. J. Prod. Res.
, vol.28
, Issue.2
, pp. 421-430
-
-
Widmer, M.1
Solot, P.2
|