메뉴 건너뛰기




Volumn , Issue , 2009, Pages 633-638

Optimal batch production with minimum rework cycles and constraint on accumulated defective units

Author keywords

[No Author keywords available]

Indexed keywords

BATCH PRODUCTION; CHANGEOVER COST; DEFECTIVE ITEMS; ECONOMIC BATCH QUANTITY; PRODUCTION RATES; RESOURCE PLANNING; REWORK PROCESS; SET-UP TIME; SINGLE MACHINES; TOTAL COSTS; WHOLE PROCESS; ZERO DEFECTS;

EID: 70449471743     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SOLI.2009.5204011     Document Type: Conference Paper
Times cited : (7)

References (20)
  • 1
    • 3242721026 scopus 로고
    • EBQ for a multi stage production system considering rework
    • Chakrabarty S., Rao N.V. , "EBQ for a multi stage production system considering rework;" Opsearch, vol. 25, no. 2, pp. 75-88, 1988.
    • (1988) Opsearch , vol.25 , Issue.2 , pp. 75-88
    • Chakrabarty, S.1    Rao, N.V.2
  • 2
    • 0026116409 scopus 로고
    • An economic order quantity model with production processes
    • Cheng T.C.E., "An economic order quantity model with production processes," IIE Transactions, vol. 23, no. 1, pp. 23-28, 1991.
    • (1991) IIE Transactions , vol.23 , Issue.1 , pp. 23-28
    • Cheng, T.C.E.1
  • 6
    • 70449505070 scopus 로고    scopus 로고
    • Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles
    • Haji B., Haji A., Rahmati Tavakol A., "Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles," Journal of Industrial and Systems Engineering, vol. 2, no. 3, pp. 236-249, 2008.
    • (2008) Journal of Industrial and Systems Engineering , vol.2 , Issue.3 , pp. 236-249
    • Haji, B.1    Haji, A.2    Rahmati Tavakol, A.3
  • 7
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality item produced
    • Hayek P.A., Salameh M.K., "Production lot sizing with the reworking of imperfect quality item produced," Production Planning and Control, vol. 12, no. 6, pp. 584-590, 2001.
    • (2001) Production Planning and Control , vol.12 , Issue.6 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 8
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with network process at a single-stage production system
    • Jamal A.M.M., Sarker B.R., Mondal S., "Optimal manufacturing batch size with network process at a single-stage production system," Computers & Industrial Engineering, vol. 47, pp. 77-89, 2004.
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 10
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H. L., Rosenblatt M. J., "Simultaneous determination of production cycle and inspection schedules in a production system," Management science, vol. 33, no. 9, pp. 1125-1136, 1987.
    • (1987) Management science , vol.33 , Issue.9 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 11
    • 0001012373 scopus 로고
    • Lot sizing to reduce capacity utilization in production process with defective item, process corrections and rework
    • Lee H. L., "Lot sizing to reduce capacity utilization in production process with defective item, process corrections and rework," Management Science, vol. 38, no. 9, pp, 1314-1328, 1992.
    • (1992) Management Science , vol.38 , Issue.9 , pp. 1314-1328
    • Lee, H.L.1
  • 12
    • 0031237390 scopus 로고    scopus 로고
    • Optimal batch size and investment in multistage production systems with scrap
    • Lee H. L., Chandra MJ., Deleveaux V.J., "Optimal batch size and investment in multistage production systems with scrap," Production Planning and Control, vol. 8, no. 6, pp. 586-596, 1997.
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 586-596
    • Lee, H.L.1    Chandra, M.J.2    Deleveaux, V.J.3
  • 15
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus E.L., "Optimal lot sizing, process quality improvement and setup cost reduction," Operations Research, vol. 34, no. 1, pp. 137-144, 1986.
    • (1986) Operations Research , vol.34 , Issue.1 , pp. 137-144
    • Porteus, E.L.1
  • 16
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Resenblatt M. J., Lee H.L., "Economic production cycles with imperfect production processes," IIE Transactions, vol. 18, no. 1, pp. 48-55, 1986.
    • (1986) IIE Transactions , vol.18 , Issue.1 , pp. 48-55
    • Resenblatt, M.J.1    Lee, H.L.2
  • 17
    • 34548565651 scopus 로고    scopus 로고
    • Sarker B.R.J, amal A.M.M., Mondal S., Optimal batch sizing in a process at multi-stage production system with network consideration, European Journal of Operational research, 184, no. 3, pp. 915-929, 2008.
    • Sarker B.R.J, amal A.M.M., Mondal S., "Optimal batch sizing in a process at multi-stage production system with network consideration," European Journal of Operational research, vol. 184, no. 3, pp. 915-929, 2008.
  • 18
  • 20
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • Zhang X., Gerchak Y., "Joint lot sizing and inspection policy in an EOQ model with random yield," IIE Transactions, vol. 22, no. 1, pp. 41-47, 1990.
    • (1990) IIE Transactions , vol.22 , Issue.1 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.