-
1
-
-
37349077845
-
A genetic algorithm approach to optimize a multi-product EPQ model with discrete delivery orders and constrained space
-
Passandideh S.H.R., Niaki S.T.A. A genetic algorithm approach to optimize a multi-product EPQ model with discrete delivery orders and constrained space. Appl. Math. Comput. 2008, 195(2008):506-514.
-
(2008)
Appl. Math. Comput.
, vol.195
, Issue.2008
, pp. 506-514
-
-
Passandideh, S.H.R.1
Niaki, S.T.A.2
-
2
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
Cheng T.C.E. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Trans. 1991, 23:23-28.
-
(1991)
IIE Trans.
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
3
-
-
33645167020
-
An economic production quantity model with the steady production rate of scrap items
-
Chiu S.W., Chiu Y.P., Wu B.P. An economic production quantity model with the steady production rate of scrap items. J. Chaoyang Univ. Technol. 2003, 8:225-235.
-
(2003)
J. Chaoyang Univ. Technol.
, vol.8
, pp. 225-235
-
-
Chiu, S.W.1
Chiu, Y.P.2
Wu, B.P.3
-
4
-
-
0030835106
-
Bounds for production lot sizing with machine breakdown
-
Chung K.J. Bounds for production lot sizing with machine breakdown. Comput. Ind. Eng. 1997, 32:139-144.
-
(1997)
Comput. Ind. Eng.
, vol.32
, pp. 139-144
-
-
Chung, K.J.1
-
5
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee H.L., Rosenblatt M. Simultaneous determination of production cycle and inspection schedules in a production system. Manage. Sci. 1987, 33:1125-1136.
-
(1987)
Manage. Sci.
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.2
-
6
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt M.J., Lee H.L. Economic production cycles with imperfect production processes. IIE Trans. 1986, 18:48-55.
-
(1986)
IIE Trans.
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
7
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
Hayek P.A., Salameh M.K. Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 2001, 12:584-590.
-
(2001)
Prod. Plan. Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
8
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Chiu Y.P. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optim. 2003, 35:427-437.
-
(2003)
Eng. Optim.
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
9
-
-
34247872840
-
Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
-
Chiu S.W. Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Appl. Stochast. Models Business Indust. 2007, 23:165-178.
-
(2007)
Appl. Stochast. Models Business Indust.
, vol.23
, pp. 165-178
-
-
Chiu, S.W.1
-
10
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
Chiu S.W., Wang S.L., Chiu Y.S.P. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. Eur. J. Oper. Res. 2007, 180:664-676.
-
(2007)
Eur. J. Oper. Res.
, vol.180
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.L.2
Chiu, Y.S.P.3
-
11
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
Jamal A.M.M., Sarker B.R., Mondal S. Optimal manufacturing batch size with rework process at a single-stage production system. Comput. Ind. Eng. 2004, 47:77-89.
-
(2004)
Comput. Ind. Eng.
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
12
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
Ben-Daya M. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. Int. J. Prod. Econ. 2002, 76:257-264.
-
(2002)
Int. J. Prod. Econ.
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
13
-
-
0345872325
-
A new EPQ model: integrating lower pricing, rework and reject situations
-
Chan W.M., Ibrahim R.N., Lochert P.B. A new EPQ model: integrating lower pricing, rework and reject situations. Prod. Plan. Control 2003, 14:588-595.
-
(2003)
Prod. Plan. Control
, vol.14
, pp. 588-595
-
-
Chan, W.M.1
Ibrahim, R.N.2
Lochert, P.B.3
-
14
-
-
79957474689
-
Optimal ordering decisions with returns and excess inventory
-
Teng H.M., Hsu P.H., Chiu Y.F., Wee H.M. Optimal ordering decisions with returns and excess inventory. Appl. Math. Comput. 2011, 217:9009-9018.
-
(2011)
Appl. Math. Comput.
, vol.217
, pp. 9009-9018
-
-
Teng, H.M.1
Hsu, P.H.2
Chiu, Y.F.3
Wee, H.M.4
-
15
-
-
33646359183
-
A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: a fuzzy geometric programming approach
-
Islam S., Roy T.K. A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: a fuzzy geometric programming approach. Appl. Math. Comput. 2006, 176:531-544.
-
(2006)
Appl. Math. Comput.
, vol.176
, pp. 531-544
-
-
Islam, S.1
Roy, T.K.2
-
16
-
-
33751334391
-
A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs
-
Bayindir Z.P., Birbil S.I., Frenk J.B.G. A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs. Eur. J. Oper. Res. 2007, 179:114-123.
-
(2007)
Eur. J. Oper. Res.
, vol.179
, pp. 114-123
-
-
Bayindir, Z.P.1
Birbil, S.I.2
Frenk, J.B.G.3
-
17
-
-
33749665095
-
An EPQ model with setup cost and process quality as functions of capital expenditure
-
Hou K.L. An EPQ model with setup cost and process quality as functions of capital expenditure. Appl. Math. Model. 2007, 31:10-17.
-
(2007)
Appl. Math. Model.
, vol.31
, pp. 10-17
-
-
Hou, K.L.1
-
18
-
-
38349058125
-
Production lot size problem with failure in repair and backlogging derived without derivatives
-
Chiu S.W. Production lot size problem with failure in repair and backlogging derived without derivatives. Eur. J. Oper. Res. 2008, 188:610-615.
-
(2008)
Eur. J. Oper. Res.
, vol.188
, pp. 610-615
-
-
Chiu, S.W.1
-
19
-
-
38649111701
-
Analysis of postponement strategy by EPQ-based models with planned backorders
-
Li J., Wang S., Cheng T.C.E. Analysis of postponement strategy by EPQ-based models with planned backorders. Omega 2008, 36:777-788.
-
(2008)
Omega
, vol.36
, pp. 777-788
-
-
Li, J.1
Wang, S.2
Cheng, T.C.E.3
-
20
-
-
50349095709
-
The deterministic EPQ with partial back ordering: a new approach
-
Pentico W.D., Drake M.J., Toews C. The deterministic EPQ with partial back ordering: a new approach. Omega 2009, 37:624-636.
-
(2009)
Omega
, vol.37
, pp. 624-636
-
-
Pentico, W.D.1
Drake, M.J.2
Toews, C.3
-
21
-
-
56249101399
-
Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy
-
Teng J.T., Chang C.T. Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy. Eur. J. Oper. Res. 2009, 195:358-363.
-
(2009)
Eur. J. Oper. Res.
, vol.195
, pp. 358-363
-
-
Teng, J.T.1
Chang, C.T.2
-
22
-
-
8744223416
-
Effects of random defective rate and imperfect rework process on economic production quantity model
-
Chiu S.W., Gong D.C., Wee H.M. Effects of random defective rate and imperfect rework process on economic production quantity model. Jpn. J. Ind. Appl. Math. 2004, 21:375-389.
-
(2004)
Jpn. J. Ind. Appl. Math.
, vol.21
, pp. 375-389
-
-
Chiu, S.W.1
Gong, D.C.2
Wee, H.M.3
-
23
-
-
33748163005
-
Optimal inventory model for items with imperfect quality and shortage backordering
-
Wee H.M., Yu Jonas, Chen M.C. Optimal inventory model for items with imperfect quality and shortage backordering. Omega 2007, 35:7-11.
-
(2007)
Omega
, vol.35
, pp. 7-11
-
-
Wee, H.M.1
Yu, J.2
Chen, M.C.3
-
24
-
-
79951600389
-
Economic production quantity model with scrapped items and limited production capacity
-
Taleizadeh A.A., Najafi A.A., Niaki S.T.A. Economic production quantity model with scrapped items and limited production capacity. Scientia Iranica, Trans. E: Indust. Eng. 2010, 17:58-69.
-
(2010)
Scientia Iranica, Trans. E: Indust. Eng.
, vol.17
, pp. 58-69
-
-
Taleizadeh, A.A.1
Najafi, A.A.2
Niaki, S.T.A.3
-
25
-
-
70450240953
-
Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
-
Taleizadeh A.A., Niaki S.T.A., Najafi A.A. Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. J. Comput. Appl. Math. 2010, 233:1834-1849.
-
(2010)
J. Comput. Appl. Math.
, vol.233
, pp. 1834-1849
-
-
Taleizadeh, A.A.1
Niaki, S.T.A.2
Najafi, A.A.3
-
26
-
-
70449505070
-
Scheduling accumulated rework in a normal cycle: optimal batch production with minimum rework cycles
-
Haji B., Haji A., Rahmati Tavakol A. Scheduling accumulated rework in a normal cycle: optimal batch production with minimum rework cycles. J. Indust. Syst. Eng. 2008, 2:236-249.
-
(2008)
J. Indust. Syst. Eng.
, vol.2
, pp. 236-249
-
-
Haji, B.1
Haji, A.2
Rahmati, T.A.3
-
27
-
-
79953172529
-
Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time
-
Widyadana G.A., Wee H.M. Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time. Appl. Math. Model. 2011, 35:3495-3508.
-
(2011)
Appl. Math. Model.
, vol.35
, pp. 3495-3508
-
-
Widyadana, G.A.1
Wee, H.M.2
-
28
-
-
84862649934
-
Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time
-
doi:10.1080/00207543.2011.578159
-
Wee H.M., Widyadana G.A. Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. Int. J. Prod. Res. 2011, doi:10.1080/00207543.2011.578159.
-
(2011)
Int. J. Prod. Res.
-
-
Wee, H.M.1
Widyadana, G.A.2
-
29
-
-
45849091113
-
Lot sizing with non-zero setup times for rework
-
Haji R., Haji A., Sajadifar M., Zolfaghari S. Lot sizing with non-zero setup times for rework. J. Syst. Sci. Syst. Eng. 2008, 17:230-240.
-
(2008)
J. Syst. Sci. Syst. Eng.
, vol.17
, pp. 230-240
-
-
Haji, R.1
Haji, A.2
Sajadifar, M.3
Zolfaghari, S.4
-
30
-
-
78649323401
-
Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system
-
Chung Chun-Jen, Wee Hui Ming Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system. Int. J. Prod. Econ. 2011, 129:195-203.
-
(2011)
Int. J. Prod. Econ.
, vol.129
, pp. 195-203
-
-
Chung, C.-J.1
Wee, H.M.2
-
31
-
-
84872502234
-
Revisiting revenue management for remanufactured products
-
1-6, iFirst, doi:10.1080/00207721.2012.685199.
-
Jonas C.P. Yu, H.M. Wee, G.B. Su, 2012, Revisiting revenue management for remanufactured products, International Journal of Systems Science, 2012, 1-6, iFirst, pp. 1-6. doi:10.1080/00207721.2012.685199.
-
(2012)
International Journal of Systems Science, 2012
, pp. 1-6
-
-
Jonas, C.P.1
Yu, H.M.2
Wee, G.B.S.3
-
32
-
-
79956129507
-
Optimal batch production for a single machine system with accumulated defectives and random rate of rework
-
Haji A., Haji B. Optimal batch production for a single machine system with accumulated defectives and random rate of rework. J. Indust. Syst. Eng. 2010, 3:243-256.
-
(2010)
J. Indust. Syst. Eng.
, vol.3
, pp. 243-256
-
-
Haji, A.1
Haji, B.2
-
33
-
-
84859892101
-
An economic production quantity model for deteriorating items with multiple production setups and rework
-
Widyadana Gede Agus, Wee Hui Ming An economic production quantity model for deteriorating items with multiple production setups and rework. Int. J. Prod. Econ. 2012, 138:62-67.
-
(2012)
Int. J. Prod. Econ.
, vol.138
, pp. 62-67
-
-
Widyadana, G.A.1
Wee, H.M.2
-
34
-
-
79956140753
-
Effects of imperfect products on lot sizing with work in process inventory
-
Barzoki M.R., Jahanbazi M., Bijari M. Effects of imperfect products on lot sizing with work in process inventory. Appl. Math. Comput. 2011, 217:8328-8336.
-
(2011)
Appl. Math. Comput.
, vol.217
, pp. 8328-8336
-
-
Barzoki, M.R.1
Jahanbazi, M.2
Bijari, M.3
|