메뉴 건너뛰기




Volumn 37, Issue 5, 2013, Pages 2765-2774

Economic production quantity model with repair failure and limited capacity

Author keywords

Back ordering; Economic production quantity; Failure in repair; Inventory control; Limited production capacity; Scrapped items

Indexed keywords

BACK ORDERING; CYCLE LENGTH; DEFECTIVE ITEMS; ECONOMIC PRODUCTION QUANTITY; ECONOMIC PRODUCTION QUANTITY MODELS; EXPECTED COSTS; LIMITED CAPACITY; NUMERICAL EXAMPLE; OBJECTIVE FUNCTIONS; ONE-MACHINE; OPTIMAL PRODUCTION QUANTITY; PRODUCTION CAPACITY; REPAIR COSTS; SCRAPPED ITEMS;

EID: 84872495906     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2012.06.006     Document Type: Article
Times cited : (59)

References (34)
  • 1
    • 37349077845 scopus 로고    scopus 로고
    • A genetic algorithm approach to optimize a multi-product EPQ model with discrete delivery orders and constrained space
    • Passandideh S.H.R., Niaki S.T.A. A genetic algorithm approach to optimize a multi-product EPQ model with discrete delivery orders and constrained space. Appl. Math. Comput. 2008, 195(2008):506-514.
    • (2008) Appl. Math. Comput. , vol.195 , Issue.2008 , pp. 506-514
    • Passandideh, S.H.R.1    Niaki, S.T.A.2
  • 2
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • Cheng T.C.E. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Trans. 1991, 23:23-28.
    • (1991) IIE Trans. , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 3
    • 33645167020 scopus 로고    scopus 로고
    • An economic production quantity model with the steady production rate of scrap items
    • Chiu S.W., Chiu Y.P., Wu B.P. An economic production quantity model with the steady production rate of scrap items. J. Chaoyang Univ. Technol. 2003, 8:225-235.
    • (2003) J. Chaoyang Univ. Technol. , vol.8 , pp. 225-235
    • Chiu, S.W.1    Chiu, Y.P.2    Wu, B.P.3
  • 4
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdown
    • Chung K.J. Bounds for production lot sizing with machine breakdown. Comput. Ind. Eng. 1997, 32:139-144.
    • (1997) Comput. Ind. Eng. , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 5
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H.L., Rosenblatt M. Simultaneous determination of production cycle and inspection schedules in a production system. Manage. Sci. 1987, 33:1125-1136.
    • (1987) Manage. Sci. , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.2
  • 6
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt M.J., Lee H.L. Economic production cycles with imperfect production processes. IIE Trans. 1986, 18:48-55.
    • (1986) IIE Trans. , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 7
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek P.A., Salameh M.K. Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 2001, 12:584-590.
    • (2001) Prod. Plan. Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 8
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Chiu Y.P. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optim. 2003, 35:427-437.
    • (2003) Eng. Optim. , vol.35 , pp. 427-437
    • Chiu, Y.P.1
  • 9
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • Chiu S.W. Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Appl. Stochast. Models Business Indust. 2007, 23:165-178.
    • (2007) Appl. Stochast. Models Business Indust. , vol.23 , pp. 165-178
    • Chiu, S.W.1
  • 10
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • Chiu S.W., Wang S.L., Chiu Y.S.P. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. Eur. J. Oper. Res. 2007, 180:664-676.
    • (2007) Eur. J. Oper. Res. , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.S.P.3
  • 11
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • Jamal A.M.M., Sarker B.R., Mondal S. Optimal manufacturing batch size with rework process at a single-stage production system. Comput. Ind. Eng. 2004, 47:77-89.
    • (2004) Comput. Ind. Eng. , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 12
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • Ben-Daya M. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. Int. J. Prod. Econ. 2002, 76:257-264.
    • (2002) Int. J. Prod. Econ. , vol.76 , pp. 257-264
    • Ben-Daya, M.1
  • 13
    • 0345872325 scopus 로고    scopus 로고
    • A new EPQ model: integrating lower pricing, rework and reject situations
    • Chan W.M., Ibrahim R.N., Lochert P.B. A new EPQ model: integrating lower pricing, rework and reject situations. Prod. Plan. Control 2003, 14:588-595.
    • (2003) Prod. Plan. Control , vol.14 , pp. 588-595
    • Chan, W.M.1    Ibrahim, R.N.2    Lochert, P.B.3
  • 14
    • 79957474689 scopus 로고    scopus 로고
    • Optimal ordering decisions with returns and excess inventory
    • Teng H.M., Hsu P.H., Chiu Y.F., Wee H.M. Optimal ordering decisions with returns and excess inventory. Appl. Math. Comput. 2011, 217:9009-9018.
    • (2011) Appl. Math. Comput. , vol.217 , pp. 9009-9018
    • Teng, H.M.1    Hsu, P.H.2    Chiu, Y.F.3    Wee, H.M.4
  • 15
    • 33646359183 scopus 로고    scopus 로고
    • A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: a fuzzy geometric programming approach
    • Islam S., Roy T.K. A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: a fuzzy geometric programming approach. Appl. Math. Comput. 2006, 176:531-544.
    • (2006) Appl. Math. Comput. , vol.176 , pp. 531-544
    • Islam, S.1    Roy, T.K.2
  • 16
    • 33751334391 scopus 로고    scopus 로고
    • A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs
    • Bayindir Z.P., Birbil S.I., Frenk J.B.G. A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs. Eur. J. Oper. Res. 2007, 179:114-123.
    • (2007) Eur. J. Oper. Res. , vol.179 , pp. 114-123
    • Bayindir, Z.P.1    Birbil, S.I.2    Frenk, J.B.G.3
  • 17
    • 33749665095 scopus 로고    scopus 로고
    • An EPQ model with setup cost and process quality as functions of capital expenditure
    • Hou K.L. An EPQ model with setup cost and process quality as functions of capital expenditure. Appl. Math. Model. 2007, 31:10-17.
    • (2007) Appl. Math. Model. , vol.31 , pp. 10-17
    • Hou, K.L.1
  • 18
    • 38349058125 scopus 로고    scopus 로고
    • Production lot size problem with failure in repair and backlogging derived without derivatives
    • Chiu S.W. Production lot size problem with failure in repair and backlogging derived without derivatives. Eur. J. Oper. Res. 2008, 188:610-615.
    • (2008) Eur. J. Oper. Res. , vol.188 , pp. 610-615
    • Chiu, S.W.1
  • 19
    • 38649111701 scopus 로고    scopus 로고
    • Analysis of postponement strategy by EPQ-based models with planned backorders
    • Li J., Wang S., Cheng T.C.E. Analysis of postponement strategy by EPQ-based models with planned backorders. Omega 2008, 36:777-788.
    • (2008) Omega , vol.36 , pp. 777-788
    • Li, J.1    Wang, S.2    Cheng, T.C.E.3
  • 20
    • 50349095709 scopus 로고    scopus 로고
    • The deterministic EPQ with partial back ordering: a new approach
    • Pentico W.D., Drake M.J., Toews C. The deterministic EPQ with partial back ordering: a new approach. Omega 2009, 37:624-636.
    • (2009) Omega , vol.37 , pp. 624-636
    • Pentico, W.D.1    Drake, M.J.2    Toews, C.3
  • 21
    • 56249101399 scopus 로고    scopus 로고
    • Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy
    • Teng J.T., Chang C.T. Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy. Eur. J. Oper. Res. 2009, 195:358-363.
    • (2009) Eur. J. Oper. Res. , vol.195 , pp. 358-363
    • Teng, J.T.1    Chang, C.T.2
  • 22
    • 8744223416 scopus 로고    scopus 로고
    • Effects of random defective rate and imperfect rework process on economic production quantity model
    • Chiu S.W., Gong D.C., Wee H.M. Effects of random defective rate and imperfect rework process on economic production quantity model. Jpn. J. Ind. Appl. Math. 2004, 21:375-389.
    • (2004) Jpn. J. Ind. Appl. Math. , vol.21 , pp. 375-389
    • Chiu, S.W.1    Gong, D.C.2    Wee, H.M.3
  • 23
    • 33748163005 scopus 로고    scopus 로고
    • Optimal inventory model for items with imperfect quality and shortage backordering
    • Wee H.M., Yu Jonas, Chen M.C. Optimal inventory model for items with imperfect quality and shortage backordering. Omega 2007, 35:7-11.
    • (2007) Omega , vol.35 , pp. 7-11
    • Wee, H.M.1    Yu, J.2    Chen, M.C.3
  • 25
    • 70450240953 scopus 로고    scopus 로고
    • Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
    • Taleizadeh A.A., Niaki S.T.A., Najafi A.A. Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. J. Comput. Appl. Math. 2010, 233:1834-1849.
    • (2010) J. Comput. Appl. Math. , vol.233 , pp. 1834-1849
    • Taleizadeh, A.A.1    Niaki, S.T.A.2    Najafi, A.A.3
  • 26
    • 70449505070 scopus 로고    scopus 로고
    • Scheduling accumulated rework in a normal cycle: optimal batch production with minimum rework cycles
    • Haji B., Haji A., Rahmati Tavakol A. Scheduling accumulated rework in a normal cycle: optimal batch production with minimum rework cycles. J. Indust. Syst. Eng. 2008, 2:236-249.
    • (2008) J. Indust. Syst. Eng. , vol.2 , pp. 236-249
    • Haji, B.1    Haji, A.2    Rahmati, T.A.3
  • 27
    • 79953172529 scopus 로고    scopus 로고
    • Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time
    • Widyadana G.A., Wee H.M. Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time. Appl. Math. Model. 2011, 35:3495-3508.
    • (2011) Appl. Math. Model. , vol.35 , pp. 3495-3508
    • Widyadana, G.A.1    Wee, H.M.2
  • 28
    • 84862649934 scopus 로고    scopus 로고
    • Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time
    • doi:10.1080/00207543.2011.578159
    • Wee H.M., Widyadana G.A. Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. Int. J. Prod. Res. 2011, doi:10.1080/00207543.2011.578159.
    • (2011) Int. J. Prod. Res.
    • Wee, H.M.1    Widyadana, G.A.2
  • 30
    • 78649323401 scopus 로고    scopus 로고
    • Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system
    • Chung Chun-Jen, Wee Hui Ming Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system. Int. J. Prod. Econ. 2011, 129:195-203.
    • (2011) Int. J. Prod. Econ. , vol.129 , pp. 195-203
    • Chung, C.-J.1    Wee, H.M.2
  • 31
    • 84872502234 scopus 로고    scopus 로고
    • Revisiting revenue management for remanufactured products
    • 1-6, iFirst, doi:10.1080/00207721.2012.685199.
    • Jonas C.P. Yu, H.M. Wee, G.B. Su, 2012, Revisiting revenue management for remanufactured products, International Journal of Systems Science, 2012, 1-6, iFirst, pp. 1-6. doi:10.1080/00207721.2012.685199.
    • (2012) International Journal of Systems Science, 2012 , pp. 1-6
    • Jonas, C.P.1    Yu, H.M.2    Wee, G.B.S.3
  • 32
    • 79956129507 scopus 로고    scopus 로고
    • Optimal batch production for a single machine system with accumulated defectives and random rate of rework
    • Haji A., Haji B. Optimal batch production for a single machine system with accumulated defectives and random rate of rework. J. Indust. Syst. Eng. 2010, 3:243-256.
    • (2010) J. Indust. Syst. Eng. , vol.3 , pp. 243-256
    • Haji, A.1    Haji, B.2
  • 33
    • 84859892101 scopus 로고    scopus 로고
    • An economic production quantity model for deteriorating items with multiple production setups and rework
    • Widyadana Gede Agus, Wee Hui Ming An economic production quantity model for deteriorating items with multiple production setups and rework. Int. J. Prod. Econ. 2012, 138:62-67.
    • (2012) Int. J. Prod. Econ. , vol.138 , pp. 62-67
    • Widyadana, G.A.1    Wee, H.M.2
  • 34
    • 79956140753 scopus 로고    scopus 로고
    • Effects of imperfect products on lot sizing with work in process inventory
    • Barzoki M.R., Jahanbazi M., Bijari M. Effects of imperfect products on lot sizing with work in process inventory. Appl. Math. Comput. 2011, 217:8328-8336.
    • (2011) Appl. Math. Comput. , vol.217 , pp. 8328-8336
    • Barzoki, M.R.1    Jahanbazi, M.2    Bijari, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.