-
1
-
-
79952946306
-
Joint determination of the production lot size and number of shipments for epq model with rework
-
S.W. Chiu, D.-C. Gong, C.-L. Chiu, and C.-L. Chung, Joint determination of the production lot size and number of shipments for EPQ model with rework, Mathematical and Computational Applications 16, (2), 317-328, 2011.
-
(2011)
Mathematical and Computational Applications
, vol.16
, Issue.2
, pp. 317-328
-
-
Chiu, S.W.1
Gong, D.-C.2
Chiu, C.-L.3
Chung, C.-L.4
-
2
-
-
79953318395
-
Replenishment lot size and number of shipments for epq model derived without derivatives
-
K.-K. Chen and S.W. Chiu, Replenishment lot size and number of shipments for EPQ model derived without derivatives, Mathematical and Computational Applications, Vol. 16, (3), 753-760, 2011.
-
(2011)
Mathematical and Computational Applications
, vol.16
, Issue.3
, pp. 753-760
-
-
Chen, K.-K.1
Chiu, S.W.2
-
4
-
-
0037740269
-
The most economical production lot
-
E.W. Taft, The most economical production lot, Iron Age, 101, 1410-1412, 1918.
-
(1918)
Iron Age
, vol.101
, pp. 1410-1412
-
-
Taft, E.W.1
-
5
-
-
79952909315
-
Optimal lot sizing with scrap and random breakdown occurring in backorder replenishment period
-
C.-K. Ting, Y.-S.P. Chiu, and C.-C.-H. Chan, Optimal lot sizing with scrap and random breakdown occurring in backorder replenishment period, Mathematical and Computational Applications 16 (2), 329-339, 2011.
-
(2011)
Mathematical and Computational Applications
, vol.16
, Issue.2
, pp. 329-339
-
-
Ting, C.-K.1
Chiu, Y.-S.P.2
Chan, C.-C.-H.3
-
6
-
-
78149258620
-
An algebraic approach for determining the optimal lot size for epq model with rework process
-
S.W. Chiu, C.-B. Cheng, M.-F. Wu, and J.-C. Yang, An algebraic approach for determining the optimal lot size for EPQ model with rework process, Mathematical and Computational Applications 15 (3), 364-370, 2010.
-
(2010)
Mathematical and Computational Applications
, vol.15
, Issue.3
, pp. 364-370
-
-
Chiu, S.W.1
Cheng, C.-B.2
Wu, M.-F.3
Yang, J.-C.4
-
7
-
-
78149260411
-
Effects of joint replenishment policy on company cost under permissible delay in payments
-
Y.-C. Tsao, M.-Y. Wang, and P.-L. Lee, Effects of joint replenishment policy on company cost under permissible delay in payments, Mathematical and Computational Applications 15 (2), 248-258, 2010.
-
(2010)
Mathematical and Computational Applications
, vol.15
, Issue.2
, pp. 248-258
-
-
Tsao, Y.-C.1
Wang, M.-Y.2
Lee, P.-L.3
-
8
-
-
62149131037
-
Profit maximization multi-item inventory models considering trade credit and sales learning curve
-
Y.-C. Tsao, Profit maximization multi-item inventory models considering trade credit and sales learning curve, Mathematical and Computational Applications 14 (1), 45-53, 2009.
-
(2009)
Mathematical and Computational Applications
, vol.14
, Issue.1
, pp. 45-53
-
-
Tsao, Y.-C.1
-
9
-
-
62349085901
-
Mathematical method for expediting scrap or rework decision making in epq model with failure in repair
-
S.W. Chiu, K.-K. Chen and H.-H. Chang, Mathematical method for expediting scrap or rework decision making in EPQ model with failure in repair, Mathematical and Computational Applications 13 (3), 137-145, 2008.
-
(2008)
Mathematical and Computational Applications
, vol.13
, Issue.3
, pp. 137-145
-
-
Chiu, S.W.1
Chen, K.-K.2
Chang, H.-H.3
-
10
-
-
33847731807
-
Optimal retailer's inventory policy under supplier credits linked to retailer payment time
-
Y.-F. Huang and K.-H. Hsu, Optimal retailer's inventory policy under supplier credits linked to retailer payment time, Mathematical and Computational Applications 12 (2), 77-86, 2007.
-
(2007)
Mathematical and Computational Applications
, vol.12
, Issue.2
, pp. 77-86
-
-
Huang, Y.-F.1
Hsu, K.-H.2
-
11
-
-
39549101746
-
On the inventory model with two delay barriers
-
I. Unver, On the inventory model with two delay barriers, Mathematical and Computational Applications 12 (3), 125-134, 2007.
-
(2007)
Mathematical and Computational Applications
, vol.12
, Issue.3
, pp. 125-134
-
-
Unver, I.1
-
12
-
-
31344465116
-
Solving an epq model with rework and service level constraint
-
Y.-S.P. Chiu, S.W. Chiu, and H.-D. Lin, Solving an EPQ model with rework and service level constraint, Mathematical and Computational Applications 11 (1), 75-84, 2006.
-
(2006)
Mathematical and Computational Applications
, vol.11
, Issue.1
, pp. 75-84
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Lin, H.-D.3
-
13
-
-
79952002258
-
An epq model with inflation in an imperfect production system
-
B. Sarkar and I. Moon, An EPQ model with inflation in an imperfect production system, Applied Mathematics and Computation 217 (13), 6159-6167, 2011.
-
(2011)
Applied Mathematics and Computation
, vol.217
, Issue.13
, pp. 6159-6167
-
-
Sarkar, B.1
Moon, I.2
-
14
-
-
79959940448
-
An imperfect production process for time varying demand with inflation and time value of money-An emq model
-
B. Sarkar, S.S. Sana and K. Chaudhuri, An imperfect production process for time varying demand with inflation and time value of money-An EMQ model, Expert Systems with Applications 38 (11), 13543-13548, 2011.
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.11
, pp. 13543-13548
-
-
Sarkar, B.1
Sana, S.S.2
Chaudhuri, K.3
-
15
-
-
69249219084
-
A production-inventory model in an imperfect production process
-
S.S. Sana, A production-inventory model in an imperfect production process, European Journal of Operational Research 200 (2), 451-464, 2010.
-
(2010)
European Journal of Operational Research
, vol.200
, Issue.2
, pp. 451-464
-
-
Sana, S.S.1
-
16
-
-
84864396438
-
A collaborating inventory model in a supply chain
-
S.S. Sana, A collaborating inventory model in a supply chain, Economic Modelling 29 (5), 2016-2023, 2012.
-
(2012)
Economic Modelling
, vol.29
, Issue.5
, pp. 2016-2023
-
-
Sana, S.S.1
-
17
-
-
78650179722
-
A production-inventory model of imperfect quality products in a three-layer supply chain
-
S.S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain, Decision Support Systems 50 (2), 539-547, 2011.
-
(2011)
Decision Support Systems
, vol.50
, Issue.2
, pp. 539-547
-
-
Sana, S.S.1
-
18
-
-
70249126214
-
An economic production lot size model in an imperfect production system
-
S.S. Sana, An economic production lot size model in an imperfect production system, European Journal of Operational Research 201 (1), 158-170, 2010.
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.1
, pp. 158-170
-
-
Sana, S.S.1
-
19
-
-
37849188280
-
An imperfect production process in a volume flexible inventory model
-
S.S. Sana and K. Chaudhuri, An imperfect production process in a volume flexible inventory model, International Journal of Production Economics 105 (2), 548-559, 2007.
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 548-559
-
-
Sana, S.S.1
Chaudhuri, K.2
-
20
-
-
0035906315
-
The economic production quantity (epq) with shortage derived algebraically
-
L.E. Cárdenas-Barrón, The economic production quantity (EPQ) with shortage derived algebraically, International Journal of Production Economics 70 (3), 289-292, 2001.
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.3
, pp. 289-292
-
-
Cárdenas-Barrón, L.E.1
-
22
-
-
55649099841
-
Optimal manufacturing batch size with rework in a single-stage production system-A simple derivation
-
L.E. Cárdenas-Barrón, Optimal manufacturing batch size with rework in a single-stage production system-A simple derivation, Computers and Industrial Engineering 55(4), 758-765, 2008.
-
(2008)
Computers and Industrial Engineering
, vol.55
, Issue.4
, pp. 758-765
-
-
Cárdenas-Barrón, L.E.1
-
23
-
-
78751619592
-
The derivation of eoq/epq inventory models with two backorders costs using analytic geometry and algebra
-
L.E. Cárdenas-Barrón, The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra, Applied Mathematical Modelling 35(5), 2394-2407, 2011.
-
(2011)
Applied Mathematical Modelling
, vol.35
, Issue.5
, pp. 2394-2407
-
-
Cárdenas-Barrón, L.E.1
-
24
-
-
77950846623
-
The integrality of the lot size in the basic eoq and epq models: Applications to other production-inventory models
-
J. García-Laguna, L.A. San-José, L.E. Cárdenas- Barrón, J. Sicilia, The integrality of the lot size in the basic EOQ and EPQ models: Applications to other production-inventory models, Applied Mathematics and Computation 216 (5), 1660-1672, 2010.
-
(2010)
Applied Mathematics and Computation
, vol.216
, Issue.5
, pp. 1660-1672
-
-
García-Laguna, J.1
San-José, L.A.2
Cárdenas- Barrón, L.E.3
Sicilia, J.4
-
25
-
-
84864968928
-
A complement to a comprehensive note on: An economic order quantity with imperfect quality and quantity discounts
-
doi:10.1016/j.apm.2012.02.021
-
L.E. Cárdenas-Barrón, A complement to "A comprehensive note on: An economic order quantity with imperfect quality and quantity discounts", Applied Mathematical Modelling, doi:10.1016/j.apm.2012.02.021, 2012.
-
(2012)
Applied Mathematical Modelling
-
-
Cárdenas-Barrón, L.E.1
-
26
-
-
79957712611
-
A comprehensive note on: An economic order quantity with imperfect quality and quantity discounts
-
H.-C. Chang, A comprehensive note on: an economic order quantity with imperfect quality and quantity discounts, Applied Mathematical Modelling 35(10), 5208-5216, 2011.
-
(2011)
Applied Mathematical Modelling
, vol.35
, Issue.10
, pp. 5208-5216
-
-
Chang, H.-C.1
-
27
-
-
77952888162
-
An economic order quantity with imperfect quality and quantity discounts
-
T.Y. Lin, An economic order quantity with imperfect quality and quantity discounts, Applied Mathematical Modelling 34(10), 3158-3165, 2010.
-
(2010)
Applied Mathematical Modelling
, vol.34
, Issue.10
, pp. 3158-3165
-
-
Lin, T.Y.1
-
28
-
-
84865207817
-
An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework
-
L.E. Cárdenas-Barrón, A.A. Taleizadeh, and Treviño-Garza, G., An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework, Expert Systems with Applications, http://dx.doi.org/10.1016/j.eswa.2012.07.012.
-
Expert Systems with Applications
-
-
Cárdenas-Barrón, L.E.1
Taleizadeh, A.A.2
Treviño-Garza, G.3
|